Public tenders for construction in Kokkola Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Centria-ammattikorkeakoulu Oy | Published October 26, 2017  -  Deadline December 1, 2017
cpvs
45000000

The acquisition includes a construction work for a renovation of the Kokkola campus at Centria University of Applied Sciences. The construction contractor acts as the main contractor in the project and is subject to separate competitive tendering.

Construction work, main contract for a shared contract.

Construction work

Centria-ammattikorkeakoulu Oy | Published November 28, 2017  -  Deadline December 1, 2017
cpvs
45000000

The acquisition includes a construction work for a renovation of the Kokkola campus at Centria University of Applied Sciences.

The construction contractor acts as the main contractor in the project and is subject to separate competitive tendering.

Construction materials and associated items

Kokkolan kaupunki | Published April 28, 2016
cpvs

Construction materials and associated items

Construction work

Liikelaitos Kokkolan Vesi | Published February 6, 2015  -  Deadline February 20, 2015
cpvs
45000000

Lohtaja-Kälviä transmission lines of the project works element 2. Acquisition includes Lohtaja - Haavisto Fabric transmission drain and transfer the aqueduct construction procurements in more detail in the tender documents to the extent specified.

Construction machinery for the years 2018-2019

Kokkolan kaupunki | Published November 13, 2017  -  Deadline December 1, 2017
cpvs
45500000

The Technical Service Center of the City of Kokkola asks for the city's joint procurement of machinery needed for construction work during the period 1.1.2018-31.12.2019 The City Technical Service Center of Kokkola calls for joint offers for the machinery needed for the construction of the country during the construction period 1.1.2018-31.12.2019

Street lighting maintenance and construction work

Kokkolan kaupunki | Published December 7, 2017  -  Deadline December 19, 2017
cpvs
50232100, 50232110

The Technical Service Center of the City of Kokkola will apply for street lighting lighting maintenance and construction services during the period from January 1, 2018 to December 31, As well as a possible option for 2019-2020, the Technical Service Center of the City of Kokkola will ask for your street-lighting maintenance and construction services during January 1, 2018-31 December 2018. As well as a possible option for 2019-2020

Centria University of Applied Sciences, Renovation of the Campus - Construction Works

Centria-ammattikorkeakoulu Oy | Published November 22, 2017
cpvs
45000000

The acquisition includes a construction work for a renovation of the Kokkola campus at Centria University of Applied Sciences. The construction contractor acts as the main contractor in the project and is subject to separate competitive tendering. The acquisition includes a construction work for a renovation of the Kokkola campus at Centria University of Applied Sciences. The construction contractor acts as the main contractor in the project and is subject to separate competitive tendering.

Construction work for electricity power lines

Kenet Oy | Published April 27, 2017  -  Deadline May 29, 2017
cpvs
45231400

The acquisition includes the substations and the KMT The SCA teräsristikkopylväsrakenteisen the construction of a 110 kV transmission line.

Wire: 3x2-305-AL 1/39-ST1A "duck".

The lightning conductor: 2x 106-L2 / 25 ST1A "Sustrong" + OPGW.

The design of columns: 3x2-Duck + + 2xSustrong OPGW. Shipping Up the built and tested.

The acquisition includes the substations and the KMT The SCA teräsristikkopylväsrakenteisen the construction of a 110 kV transmission line.

Wire: 3x2-305-AL 1/39-ST1A "duck".

The lightning conductor: 2x 106-L2 / 25 ST1A "Sustrong" + OPGW.

The design of columns: 3x2-Duck + + 2xSustrong OPGW.

Shipping Up the built and tested.

Centria University of Applied Sciences, Renovation of the Campus - Construction Works

Centria-ammattikorkeakoulu Oy | Published October 25, 2017  -  Deadline December 1, 2017
cpvs
45000000

Requirements as stipulated in the procurement documents Construction work, the main contract for a shared contract The acquisition comprises a works contract for renovating the Kokkola campus of the Centria University of Applied Sciences. The construction contractor acts as the main contractor in the project and is subject to separate competitive tendering. Requirements as specified in the procurement documents

Construction work for school buildings

Kokkolan kaupunki | Published May 23, 2017  -  Deadline June 22, 2017
cpvs
45214200, 45000000, 71000000, 71500000

Acquisition is the issue of the implementation of Chydenius school turn-key contract. The acquisition includes the school's planning and implementation. Destination will be new.

Acquisition is the issue of the implementation of Chydenius school turn-key contract. The acquisition includes the school's planning and implementation. The project includes the demolishing of buildings.

Destination will be new city of Kokkola Chydenius current school on the site. The new building is approx. 4 700 brm². The building employs approx. 40 people. School pupils in pre-school and grades 1-6 has a total of approx. 320 pupils. The scope of the project as a whole (including square and employee amounts) preliminary estimate, which may change the acquisition progresses.

The aim is to place the following functions and services:

-. 50 pre-school student,

- the categories. 1 - 6 of the pupil 270,

- after-school facilities,

- catering kitchen and dining facilities,

- sports facilities, including a 450 m² gym divisible väliverholla.

- the technical work spaces including the Center for gas and textile categories also the adjacent middle school students.

Timetable The objective is that the choice of providers in the negotiation phase is done in June 2017. The negotiations take place in June - September 2017. The contract will be signed in January 2018. The estimated starting date of construction is May - June 2018. The school can be introduced no earlier than in August 2019. Schedule and presented in section II.2.7 estimate is agreement duration are preliminary.

The project language is Finnish.

-Value comparison criteria are rate (weight 40%) in addition to 1) the design solution for functionality, performance, and innovation (weight 35-40%), 2) the suitability of the design solution environment (weight of 5 to 10%), 3) the design of the solution life cycle point of view (score 5 to 10% ), and 4) the design and construction project plan (5 to 10%).

construction of Saostuslaboratorion

Centria-ammattikorkeakoulu Oy | Published November 22, 2016  -  Deadline December 5, 2016
cpvs
45310000, 45330000

Centria-ammattikorkeakoulu Oy on monialainen, dynaaminen ja kansainvälinen koulutus- ja TKI-toimija. Vahvan TKI-toiminnan tavoitteena on edistää alueen yritysten kehittymistä ja kilpailukykyä. Centria-ammattikorkeakoulu Oy toteuttaa yhdessä Oulun yliopiston ja Kokkolan yliopistokeskus Chydeniuksen kanssa Keski-Pohjanmaan liiton rahoittamaa hanketta SAOSTUS – kemiallinen saostus uusien metallikemikaalien valmistuksessa, liuospuhdistuksessa ja veden käsittelyssä. Hankkeen olennaisena osana on korkeakoulujen tutkimus- ja kehittämisympäristön vahvistaminen saostuslaboratoriolla. Saostuslaboratorion rakennusurakka käsittää kolme eri urakointialuetta, jotka ovat: - sähköosaston muutostyöt konelaboratorion tiloihin alueella 2, pinta-alaltaan n. 69m², - saostuslaboratorion muutostyöt sähkölaboratorion tiloihin alueella 1, pinta-alaltaan n. 93m², - vesikatolla olevan iv-kojehuoneen laajennus, laajennuksen p-a on n. 30 m². Hankkeen urakkamuotona käytetään kokonaisurakkaa. Rakennusprojekti aloitetaan tammi-helmikuussa 2017 ja se on valmis toukokuussa 2017. Rakennuspaikan osoite on Talonpojankatu 2, 67100 Kokkola. Centria-ammattikorkeakoulu Oy on monialainen, dynaaminen ja kansainvälinen koulutus- ja TKI-toimija. Vahvan TKI-toiminnan tavoitteena on edistää alueen yritysten kehittymistä ja kilpailukykyä. Centria-ammattikorkeakoulu Oy toteuttaa yhdessä Oulun yliopiston ja Kokkolan yliopistokeskus Chydeniuksen kanssa Keski-Pohjanmaan liiton rahoittamaa hanketta SAOSTUS – kemiallinen saostus uusien metallikemikaalien valmistuksessa, liuospuhdistuksessa ja veden käsittelyssä. Hankkeen olennaisena osana on korkeakoulujen tutkimus- ja kehittämisympäristön vahvistaminen saostuslaboratoriolla. Saostuslaboratorion rakennusurakka käsittää kolme eri urakointialuetta, jotka ovat: - sähköosaston muutostyöt konelaboratorion tiloihin alueella 2, pinta-alaltaan n. 69m², - saostuslaboratorion muutostyöt sähkölaboratorion tiloihin alueella 1, pinta-alaltaan n. 93m², - vesikatolla olevan iv-kojehuoneen laajennus, laajennuksen p-a on n. 30 m². Hankkeen urakkamuotona käytetään kokonaisurakkaa. Rakennusprojekti aloitetaan tammi-helmikuussa 2017 ja se on valmis toukokuussa 2017. Rakennuspaikan osoite on Talonpojankatu 2, 67100 Kokkola.

Construction work

Liikelaitos Kokkolan Vesi | Published January 15, 2016
cpvs
45000000

Lohtaja-Kälviä transmission lines UO2.

Professional Campus, Närvilänkatu 8, teaching kitchen renovation construction, plumbing, ventilation and electrical works

Keski-Pohjanmaan koulutusyhtymä | Published May 10, 2016  -  Deadline May 25, 2016
cpvs
45310000, 45331000, 45332000

Professional Campus, Närvilänkatu 8, teaching kitchen renovation construction, plumbing, ventilation and electrical works. The building was built in 1981 and it has undergone renovations and modifications in 2009 and 2013, and the renovation of the contract area is largely in original condition and the extent of approx. 300 m2. The main and performance of works include construction work, construction services contractor responsible for the duties and obligations of the main contractor, including construction management duties and obligations of the project supervisor in accordance with the tender documents. Plumbing, ventilation and electrical works include relevant work in accordance with the tender documents, the main contract of subordinate-page contract. This notice applies to the following contracts promotions: 1. Main and works (RU) 2. Putkiurakka (PU) 3. Ilmanvaihtourakka (IU), includes building automation contract 4. Sähköurakka (SU) The main contractor and those carrying works building contractor. The main contract is subjected to alistamissopimuksella em. Page-contracts. We ask that interested in space works for the contract calculation documents at petri.rintala@kpedu.fi. Invitation to tender documents submitted by the customer in electronic format only. We ask interested parties to submit works contract offer by the attachments indicated period. Tenders must be submitted by the deadline by e-mail or petri.rintala@kpedu.fi Central Ostrobothnia Training Consortium, Närvilänkatu 8, 67100 Kokkola. The client requires providers to target a visit in the renovation of the premises prior to the submission of the offer.

Construction of Operating Theatre

Keski-Pohjanmaan sosiaali- ja terveyspalvelukuntayhtymä | Published March 8, 2017  -  Deadline March 29, 2017
cpvs

Obtain four operating theater, modular structures. Obtain four operating theater, modular structures.

Construction materials and associated items

Kokkolan kaupunki | Published September 26, 2015  -  Deadline October 27, 2015
cpvs
44100000

Rakennustarvikkeet ja vastaavat tuotteet

Construction materials and associated items

Kokkolan kaupunki | Published September 22, 2015  -  Deadline October 27, 2015
cpvs
44100000

The city of Kokkola ask for a quotation hardware stores and building supply products. The acquisition are ordered by the Central Ostrobothnia specialized healthcare and basic Federation of Municipalities, Central Ostrobothnia Training Consortium and Kokkola seurakuntayhtymä. Competitive bidding establishment of a multi-supplier framework agreement. The scope of the framework agreement is selected as many contract suppliers that the city of Kokkola four regions (Stock Kokkola, Kälviä, Lohtaja and Ullava) the supply requirements of these products can be met. Note: Notice Additional information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification: https://tarjouspalvelu.fi/kokkola/?id=46191&tpk=c463d4c8-a29e-4135-aa36-f0876b890578

Professional Campus, Närvilänkatu 8, teaching kitchen renovation construction, plumbing, ventilation and electrical works

Keski-Pohjanmaan koulutusyhtymä | Published May 10, 2016  -  Deadline May 25, 2016
cpvs
45000000, 45310000, 45331000, 45332000

Professional Campus, Närvilänkatu 8, teaching kitchen renovation construction, plumbing, ventilation and electrical works.

The building was built in 1981 and it has undergone renovations and modifications in 2009 and 2013, and the renovation of the contract area is largely in original condition and the extent of approx. 300 m2.

The main and performance of works include construction work, construction services contractor responsible for the duties and obligations of the main contractor, including construction management duties and obligations of the project supervisor in accordance with the tender documents.

Plumbing, ventilation and electrical works include relevant work in accordance with the tender documents, the main contract of subordinate-page contract.

This notice applies to the following contracts promotions:

1. Main and works (RU)

2. Putkiurakka (PU)

3. Ilmanvaihtourakka (IU), includes building automation contract

4. Sähköurakka (SU)

The main contractor and those carrying works building contractor. The main contract is subjected to alistamissopimuksella em. Page-contracts.

We ask that interested in space works for the contract calculation documents at petri.rintala@kpedu.fi.

Invitation to tender documents submitted by the customer in electronic format only.

We ask interested parties to submit works contract offer by the attachments indicated period. Tenders must be submitted by the deadline by e-mail or petri.rintala@kpedu.fi Central Ostrobothnia Training Consortium, Närvilänkatu 8, 67100 Kokkola.

The client requires providers to target a visit in the renovation of the premises prior to the submission of the offer.

Kokkola City Hall, D-wing of the renovation - construction, LVV-, IV, AU and Electrical Works

Kokkolan kaupunki | Published May 30, 2016  -  Deadline June 16, 2016
cpvs
45332000, 45331000, 45300000, 45310000

renovation of the D-wing of the interior work. Repair includes office floors 1-3 and 4 technical rooms floor and ceiling of the apartment: - in the demolition work is mainly done - the inner walls of the compaction foreign and mainly made, - intravenous engine room has been emptied of machinery and equipment, - electrical and HEVAC systems is renewed almost entirely. Outside the building repair work is included in the D-wing of the renewal of all the roofing flashings and their other accessories construction contract covers civil works of the main work in accordance with the tender documents. Contractor construction engineering works project supervisor. Pipe contract covers heating, plumbing and sewage works tender documents, the main contract of subordinate page-contract. ventilation works ventilation The contract covers the tender documents, the main contract of subordinate page-contract. building automation work automation contract covers the tender documents, the main grooves subordinate page-build contract power The contract covers electrical engineering works tender documents, the main contract of subordinate page-contract. Construction works are Indoor Air Classification 2008: (RT 07-10946) P1 and air system cleanliness class P1 in accordance with the construction described in the purity requirements. The client has a right to a quality assurance tests (eg. Tensile tests, coating thickness measurement, tightness test marker to try), the place of the tracks which caused a contract.

Kokkola City Hall, D-wing of the renovation - construction, LVV-, IV, AU and Electrical Works

Kokkolan kaupunki | Published May 30, 2016  -  Deadline June 16, 2016
cpvs
45000000, 45332000, 45331000, 45300000, 45310000

renovation of the D-wing of the interior work. Repair includes office floors 1-3 and 4 technical rooms and a penthouse floor:

- In the demolition work is mostly done,

- The inner walls of the compaction foreign and mainly made,

- Intravenous engine room has been emptied of machinery and equipment,

- Electrical and HEVAC systems will be renewed almost completely.

Outside the building repair work is included in the D-wing of the renewal of all the roofing flashings and their other accessories

Construction contract covers civil works of the main work in accordance with the tender documents. Contractor construction engineering is the main implementer of the project.

The contract covers the tube heating, plumbing and sewage works tender documents, the main contract of subordinate-page contract.

ventilation works ventilation The contract covers the tender documents, the main contract of subordinate-page contract.

building automation Automation works contract covers the tender documents, the main grooves subordinate page-build contract

Electricity contract covers electrical works tender documents, the main contract of subordinate-page contract.

Construction work done in Indoor Air Classification 2008: (RT 07-10946) described

construction of cleanliness class P1 and ventilation system cleanliness class

in accordance with the requirements of P1.

The client has a right to a quality assurance tests (eg. Tensile tests,

coating thickness measurement, testing the tightness of the marker to try)

the place of the tracks which caused a contract.

Correction Notice! Construction of Operating Theatre

Keski-Pohjanmaan sosiaali- ja terveyspalvelukuntayhtymä | Published March 13, 2017
cpvs

Obtain four operating theater, modular structures. Obtain four operating theater, modular structures.