Call +44 800 9755 164

Public tenders for construction in Kokkola Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

repair and painting Ullava church and bell tower

Kokkolan seurakuntayhtymä | Published February 16, 2017  -  Deadline March 28, 2017
cpvs

The work includes Ullava outside the church and bell tower repair and painting of the accompanying documents by. The total contract price in addition to all the work and operations set the unit price. The final amounts of the potential repair work will survive until construction stage. The contractor is to provide unit prices for all action list yksikköhinnoitelluille service cost. The unit prices used in construction stage and the settlement of additional work, the actual amounts of the measures are clear. The work includes Ullava outside the church and bell tower repair and painting of the accompanying documents by. The total contract price in addition to all the work and operations set the unit price. The final amounts of the potential repair work will survive until construction stage. The contractor is to provide unit prices for all action list yksikköhinnoitelluille service cost. The unit prices used in construction stage and the settlement of additional work, the actual amounts of the measures are clear.

Architectural, engineering and planning services

Centria-ammattikorkeakoulu Oy | Published February 15, 2017  -  Deadline March 16, 2017
cpvs
71240000, 71321000

Centria University of Applied Sciences Talonpojankatu 2's campus renovation of the overall design, including the main architectural, structural, HEVAC, electrical, AV and acoustic design.

Contract includes Centria University of Applied Sciences Talonpojankatu 2's campus renovation design kokonaissuunnitteluna including the main architectural, structural, HEVAC, electrical, AV and acoustic design.

The building was built in 1974-77 and it was renovated in 2005. The expansion was completed in 2006. The building has a total surface area of ​​9 519 square meters. The extent of the renovation is about 8 078 brm².

The project consists of the current school building renovation and change in such a way that the facilities to better respond to changing needs. The project will pay particular attention to real estate versatility, lightness, safety and accessibility. The aim is to achieve a risk-free structurally, functionally high-quality building and the environment, taking into account the technical construction and kustannuspuitteen defined limits.

Centria University of Applied Sciences, the campus renovation, the overall design

Centria-ammattikorkeakoulu Oy | Published February 14, 2017  -  Deadline March 16, 2017
cpvs
71240000

The requirements in the contract documents in accordance with the specified Contract comprises Centria University of Applied Sciences Talonpojankatu 2's campus renovation design kokonaissuunnitteluna including the main architectural, structural, HEVAC, electrical, AV and acoustic design. The building was built in 1974-77 and it was renovated in 2005. The expansion was completed in 2006. The building has a total surface area of ​​9 519 square meters. The extent of the renovation is about 8 078 gross m2. The project consists of the current school building renovation and change in such a way that the facilities to better respond to changing needs. The project will pay particular attention to real estate versatility, lightness, safety and accessibility. The aim is to achieve a risk-free structurally, functionally high-quality building and the environment, taking into account the technical construction and kustannuspuitteen defined limits. Centria University of Applied Sciences Talonpojankatu 2's campus renovation of the overall design, including the main architectural, structural, HEVAC, electrical, AV and acoustic design. The requirements in the contract documents in accordance with the specified
  • 1