Construction work

A-Kruunu Oy | Published November 17, 2016  -  Deadline December 2, 2016

A Crown Kirkkonummi Tarutie the construction of a residential building project called turnkey basis (including civil works, HVAC and plumbing and electrical work, as well as the design in accordance with the tender documents completely ready to be placed).

Construction work

Helsingin kaupungin asuntotuotantotoimisto | Published November 9, 2016  -  Deadline December 8, 2016
Helsinki City Pukinmäki district Quarter 37186 ​​Construction of residential carried out on plots 5 and 6 multi-storey flat-rate package contract including HVAC and plumbing

Construction work

Helsingin kaupungin asuntotuotantotoimisto | Published December 7, 2016  -  Deadline March 10, 2017

scheme for apartment buildings and terraced houses, the City of Helsinki taken Kuninkaantammi neighborhood block 33381 and 33 388 as well as the construction of an underground car park as a fixed price turn-key contract including design.

The block will be built 33 388 rental apartments in the Helsinki city breaks Oy at Heka Kuninkaantammi Kuninkaantammi Circulation 14, the service garage and yard areas.

The block will be built 33 381 tenant-owner apartments in Helsinki Asumisoikeus Oy at Turquoise Alley 4, the service garage and yard areas.

Contract tendered as a whole in order to achieve the schedule management and low-cost.

Planning started a preliminary agreement (around April 2017) and is valid until the contractual obligations have been met to the satisfaction of the client.

Estimated Time of construction works is June 2018, and construction work will begin no later than October 2018.

The scope:

Quarter of 33381 is building a total of 5 200 sq m and k-quarter 33 388 45 00 D-m².

Yard areas are formed partially on top of underground car parks.

In addition, to be implemented for recreational and meeting space.

A group in the provision of:

The group must undertake to ensure that designated in the tender members of the group are available for the implementation of the contract, if a group is selected.

Railways construction management procurement construction consultants

Liikennevirasto | Published November 8, 2016
are the subject of construction management construction management of the following projects: - LIVI / 5670 / 02.01.07 / 2016 Hämeenlinna, Raahe, The estimated cost of 12.5 million. EUR (VAT 0), - LIVI / 5671 / 02.01.07 / 2016: Extension of the input Tampere railway yard tracks and the construction of a bypass track, the cost estimate. 8 million. EUR (VAT 0): - LIVI / 5672 / 02.01.07 / 2016: the Kuopio railway yard, the cost estimate of 5 million. EUR (VAT 0). containing the subject of the contract Construction, the following tasks: - track work, electrical work and the safety of buildings, - the control of track work, electrical and safety work. In addition, construction management should include: - operating a representative of the client, - track work carried out by the project supervisor coordinative, - the customer's tasks Security Coordinator *, - tasks of any project assistant, - any project engineer tasks - project addressed to the banking project to use its services. are the subject of construction management construction management of the following projects: - LIVI / 5670 / 02.01.07 / 2016 Hämeenlinna, Raahe, The estimated cost of 12.5 million. EUR (VAT 0), - LIVI / 5671 / 02.01.07 / 2016: Extension of the input Tampere railway yard tracks and the construction of a bypass track, the cost estimate. 8 million. EUR (VAT 0): - LIVI / 5672 / 02.01.07 / 2016: the Kuopio railway yard, the cost estimate of 5 million. EUR (VAT 0). containing the subject of the contract Construction, the following tasks: - track work, electrical work and the safety of buildings, - the control of track work, electrical and safety work. In addition, construction management should include: - operating a representative of the client, - track work carried out by the project supervisor coordinative, - the customer's tasks Security Coordinator *, - tasks of any project assistant, - any project engineer tasks - project addressed to the banking project to use its services.

Construction consultancy services

Liikennevirasto | Published November 9, 2016  -  Deadline December 19, 2016
The assignment comprises the Kirkkonummi-Turku repair work, construction management korjausvelka- and 364 in respect of the financial package.

Construction work for water projects

Helsingin kaupungin liikennelaitos -liikelaitos | Published November 17, 2016  -  Deadline December 30, 2016

The contract includes strengthening the Kulosaari metro bridge structures.

The reinforcement is planned to cover both sides with vertical steel beams, which cover the bottom of the original is supported on cross beams with a center to center distance of about 4-5 meters. The beams are supported by the originators against subsidies or their connection to be built in new aid as well.

The construction work includes "Metro Bridge - Brando - The reinforcement of the bridge" in accordance with the construction works can tender specifications with all their works, traffic, accessories and equipment, as well as their other procurements fully completed. The contract will involve the integration of new structures and seamlessly finishing the built environment.

School Hill yhtenäiskoulu development and construction and construction project

Äänekosken kaupunki | Published November 27, 2016  -  Deadline January 9, 2017
To provide the company and the offer of the designated project team must meet the tender material, as well as this notice in sections 3.1.1, 3.1.2 and 3.1.3 of the required conditions and qualifications. Elected will be the operator / project by the hourly-based pricing of the total price is the cheapest. The customer defines the classes used in the assessment of the project call for tenders based on the job description. Competitive bidding on the project rakennuttamisen- and construction of the project team, which includes the following experts 4kpl: 1.Rakennuttajakonsultti / Project Manager 2.Hankinta- / Competitive bidding Expert 3.LVIA Specialist / Administrator 4.Sähkö Specialist / conditions of participation, the suitability of the terms and conditions of the administrator offer companies and individuals named professional qualifications are listed in this notice, 3.1.1, 3.1.2 and 3.1.3, as well as the tender material. School Hill yhtenäiskoulu formed Äänekoski Central School, School Hill School and the so-called. Teken school by combining the comprehensive model. This will require Hill School new construction, the extent of which will be n.6000 m2 / 24000m3. The budgeted total cost of the project is 12 000 000EUR. The new building will be built enrgiatehokkaaksi and long-life cycle as having edification. The project is implemented projektinjohtorakennuttamis- and construction project management model. Construction of the project will be distributed n.25-30 separate supply contract and the client. Site Manager / project supervisor functions are defined and tendered later. List of selection criteria and their short-list of selection criteria and their company and the offer of the designated project team will provide a brief complies with the tender material, as well as this notice in sections 3.1.1, 3.1.2 and 3.1.3 of the required conditions and qualifications. Elected will be the operator / project by the hourly-based pricing of the total price is the cheapest. The customer defines the classes used in the assessment of the project call for tenders based on the job description.

Construction of Kangasvuori nursery-school

Jyväskylän kaupunki/Jyväskylän Tilapalvelu | Published November 8, 2016
The requirements in the contract documents in accordance with the specified acquisition includes Kangasvuori nursery-school for new construction as well as the site of the old building landing. New Development of the project is approximately 5040 BM2. Hankintatoteutetaan divided by the build contract includes construction, demolition, plumbing, ventilation and electrical works. Automation and safety works are carried out puitesopimushankintoina. Registrations will not be asked on the basis of this notice, but registrations are received, pursuant to separate ilmoittautumispyyntöjen. This advance notification concerns the construction of Kangasvuori nursery school, the contents of which will be presented later published in the tender dossier. The requirements in the contract documents in accordance with the specified

Kyrön underpass (AKS) construction, KU

Liikennevirasto | Published November 8, 2016
Rail level crossing removal and construction of a new underpass the highway Kyrö 2250, in the municipality of Pöytyä. Includes track superstructure, road construction and ground water trough municipal Pöytyä street work. Rail level crossing removal and construction of a new underpass the highway Kyrö 2250, in the municipality of Pöytyä. Includes track superstructure, road construction and ground water trough municipal Pöytyä street work.

Architectural, construction, engineering and inspection services

Liikennevirasto | Published October 25, 2016  -  Deadline December 5, 2016
Planning Task The aim is to establish a channel for the project geotechnical plans and waterway construction plan in respect of the opening trough of the channel Kimolan project also including the waterway lake contributions.

Architectural, construction, engineering and inspection services

Helsingin kaupungin asuntotuotantotoimisto | Published November 16, 2016  -  Deadline January 3, 2017

The preparation of the tender for renovation of rental housing in the construction plans and construction time for carrying out the oversight.

4-8).

The buildings are completed in 1962.

78 051 m³.

Contract tendered as a whole in order to achieve the schedule management and low-cost.

The agreement begins the signature of the contract and will be valid until the contract obligations have been met by accepting the client's way.

The whole renovation of the contract will be completed in 2022.

Description of the power held:

Execution of the project structural design tasks and construction-time control tasks extent stated in the tender documents.

The cost calculations makes the developer.

Project description:

The residential sector is on the ground floor and 3-4 residential floors of the buildings is also a basement.

Storefronts tiilimuuratut.

Renovation objectives:

- Construction and building equipment in accordance with the objectives of the project plans,

- ARA in accordance with the project plan /: fit within the limits set by the price of the cost,

- Good value for money,

- Facades, roof, yards and public spaces easy maintenance,

- Building parts and materials for facades and flats of standard products,

- The improvement of energy efficiency,

- Improving accessibility.

Preliminary schedule:

The project is implemented in two contract.

Preliminary schedule.

Heka Puotila Rusthollarintie step 10, 1: (148 apartments):

- Phase 1 includes ATT's 2018 production program,

- Ready for the contract calculation january 2018

- To start construction in autumn 2018,

- Construction completed in the autumn of 2020.

Heka Puotila Rusthollarintie step 10, 2: (175 apartments):

- Step 2 includes ATT's 2020 production program,

- Ready for the contract calculation in November 2019,

- Construction starting in the autumn of 2020.

The whole renovation job is completed in 2022.

Planning Schedule shall be drawn up under the leadership of chief designer in collaboration with other designers at an early stage of planning.

The acquisition is described in more detail in "Planning the execution of Contract structural design tasks" as well as project plans.

Designer selection:

Designer Selection will be based on the overall economic affordability.

Offer Price:

The design also includes a yard and parking facilities planning.

Quality Evaluation:

The quality assessment is carried out only in respect of the minimum requirements that meet the tender.

Works for complete or part construction and civil engineering work

Liikennevirasto | Published November 17, 2016  -  Deadline December 15, 2016

Rail level crossing removal and construction of a new underpass the highway FI-2250 Kyrö, in the municipality of Pöytyä. Includes track superstructure, road construction and ground water trough municipal Pöytyä street work.

Architectural, construction, engineering and inspection services

Helsingin Kaupungin Asuntotuotantotoimisto | Published November 22, 2016  -  Deadline December 30, 2016
Kokonaisuunnitteluun includes structural, HEVAC, shako- and sprinklerisuunnittelu. 

with each special designer signed a separate planning agreements.

Sprinklkerisuunnittelu included in the HVAC design contract.

sprinklerisuunnittelu can also be used by the consultant HVAC design office.

The design includes the company:

- 47031/12, Heka Kontula Hemgård 14b ER, ARA kustannusvalvoma five enhanced service group homes in the new building.

Chief designer also includes a yard design and functions of the BIM coordinator.

Other designers will each appoint a responsible to the designer, who is responsible for this specialized entity and the fact that the plan meets the requirements set for it.

Responsible project designer or osalllistuu site mallikatselmuksiin.

Geotechnical design by: Helsinki City Real Estate Department, Geotechnical Division.

3 330 htm².

The design mandate includes, in addition to the above-mentioned five enhanced service group of auxiliary facilities homes on plots include:

- Design changes caused by small-scale reorganization of the lowest floor of the building premises of an existing,

- Pelastustiejärjestelyt,

- HVAC systems,

- Other structures shown in the city plan and the plots belong to (such as substations, etc.),

- The project plan and the body of the text are in electronic form attached to this contract notice

- The extent of the sprinkler.

Parking spaces are placed on the plot, as well as the existing LPA area.

Preliminary schedule:

- Submission of the building permit pending: May 2017 (date recorded in an agreement KSE2013 design appropriate sakollisena intermediate goal),

- Contract calculation stored in the project plans for the bank työpiirustustasoisina and coordinated and ready to be sent in August 2017 (date recorded in an agreement KSE2013 design appropriate sakollisena intermediate goal),

- Planning time: ~ 8-9 months,

- The initial contract competition is August 2017

- The construction of the initial december february 2018

- Construction time estimate: + 24 months.

Vermo Road in the south part and its side streets, construction

Espoon kaupunki | Published November 3, 2016  -  Deadline December 16, 2016
the subject of the contract is Vermo Road in the south part of the side streets and the construction of the extent stated in the tender documents mentioned plans to stand up to the level.

A Crown Kirkkonummi Tarutie construction on a turnkey basis

A-Kruunu Oy | Published November 16, 2016
A Crown Kirkkonummi Tarutie the construction of a residential building project called turnkey basis (including civil works, HVAC and plumbing and electrical work, as well as the design in accordance with the tender documents completely ready to be placed). A Crown Kirkkonummi Tarutie the construction of a residential building project called turnkey basis (including civil works, HVAC and plumbing and electrical work, as well as the design in accordance with the tender documents completely ready to be placed).

Building Services Engineering works and construction management consultancy services

IS-Hankinta Oy | Published November 25, 2016  -  Deadline January 9, 2017
Construction management consulting services 02.01.2017 commencing the contract period. The purpose of the contract is to get as wide a network of actors to carry out the building services works and construction management services for monitoring. Competitive bidding to make the framework agreement, which is selected up to 7 minimum level and priced the cheapest supplier in both target groups. Construction management consulting services 02.01.2017 commencing the contract period. Construction management consulting services 02.01.2017 commencing the contract period. Construction management consulting services 02.01.2017 commencing the contract period. The purpose of the contract is to get as wide a network of actors to carry out the building services works and construction management services for monitoring. Competitive bidding to make the framework agreement, which is selected up to 7 minimum level and priced the cheapest supplier in both target groups. Variants will be accepted (alternative tenders): no Variants will be accepted (alternative tenders): no

Works for complete or part construction and civil engineering work

Liikennevirasto | Published November 16, 2016  -  Deadline January 12, 2017

The project is located in the municipality of Espoo and Kauniainen area, the road Highway 1 in connection with, the area of ​​Church Lake. The precise geographic position of Regions is apparent from building design documents.

The contract includes Vt 1 for the construction of the detour, the pole plate, noise protection and the construction of the bus, to the extent construction plan documents defined. The contract also includes the construction of a bridge Neighbor hill and the associated light traffic lane and Kasavuori bat and repair Kirkkojärvi bridge.

The contract is the total-based turnkey contract. Part of the contracted works is offered bound quantities the unit price.

The Finnish Transport Agency will implement the project the City of Espoo and the ELY Centre with, based on the implementation agreements between these parties.

Works for complete or part construction and civil engineering work

Liikennevirasto | Published November 19, 2016  -  Deadline December 29, 2016

The construction of two bridges (railway and light traffic bridge) and the construction of related arrangements street in Oulu city center. The contract includes the underpass bridge of additional rail track construction, as well as new gear in the immediate vicinity of the bridge.

The tender dossier download portal user name and password:

Username: yleinen@proxion.fi

Password: Proxi2016.

Renewal of Heikinkatu underpass bridges and related arrangements street -urakassa replaces an old cranky Heikinkatu new underpass bridge. The bridge is carried out additional track when the train service supply can be improved. Heikinkatu aks's below street underpass height increases the renewal of the bridge and the widening of the bridge will be below street lane quantities are grown. next to the underpass pedestrian and bicycle bridge also renewed.

Works for complete or part construction and civil engineering work

Liikennevirasto | Published November 5, 2016  -  Deadline December 15, 2016
The project will attribute is removed from the dangerous tasoristeus Mt in 2250 along Kyrön agglomeration, the municipality Pöytyä. Tasoriteys replaced by a reinforced concrete bridge, which will be built next to the track and moved into place. during the work built during working hours and a detour to the level crossing facility. below the bridge will be built less than 2250 MB of ground water trough. fork municipal street works construction site of the site is done in the same contract at. The track will be built under the pile tile and railway gear is renewed.

SOLICITATION road construction and MAINTENANCE MATERIALS FOR 2017-2019

KIRJAAMO / Kempeleen kunta | Published November 16, 2016  -  Deadline January 4, 2017
Set out in the letter of invitation. Kempele municipality to request a quotation road construction and maintenance materials delivery period 1.1.2017 (ao.) - buil-nuskaava areas and private roads 31.12.2019 municipality of Kempele. The sand filter M M 0-56 0-32 0-22 SRT M 0 - 16 sanding sand # 0 - 6 traction sand # 3 - 6 Salaojasora Kempele municipality to request a quotation road construction and maintenance materials delivery period 1.1.2017 (ao.) - 31.12.2019 Kempele municipal construction-nuskaava areas and private roads. The sand filter M M 0-56 0-32 0-22 SRT M 0 - 16 sanding sand # 0 - 6 traction sand # 3 - 6 Salaojasora List of selection criteria and their short-list of selection criteria and their short Presented letter of invitation.