Public tenders for construction in Helsinki Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Fingrid Oyj | Published November 4, 2017
Winner
Markkinaoikeus
cpvs
45000000

The construction of 400 + 110 kV transmission line Hikiä — Orimattila along with necessary modifications to the existing network.

Architectural, construction, engineering and inspection services

Baltic Connector Oy | Published August 2, 2016  -  Deadline August 15, 2016
cpvs

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Baltic Connector Oy | Published August 6, 2016  -  Deadline August 25, 2016
cpvs

Architectural, construction, engineering and inspection services

Construction work for gas pipelines

Baltic Connector Oy | Published May 18, 2017  -  Deadline May 29, 2017
cpvs
45231220, 45231110, 45231200, 45231100, 45244100, 71630000, 45120000

Baltic Connector Oy and Elering AS are planning to construct the Balticconnector pipeline, a bi-directional natural gas pipeline to connect Finland and Estonia.

The scope of the contract includes management, engineering, construction of seabed intervention and offshore pipeline construction works and pre-commissioning:

This is a joint procurement of Baltic Connector Oy and Elering AS. Baltic Connector Oy is the contracting authority responsible for carrying out the procurement procedure. Baltic Connector Oy and Elering AS have signed a co-operation agreement on joint procurement of the works covered by this procurement procedure. According to the agreement Baltic Connector Oy will be responsible for scheduling, design and overall management of the procurement procedure. However, the works shall be provided to both Baltic Connector Oy and Elering AS.

Construction work for gas pipelines

Baltic Connector Oy | Published May 3, 2017  -  Deadline May 29, 2017
cpvs
45231220, 45231110, 45231200, 45231100, 45244100, 71630000, 45120000

Baltic Connector Oy and Elering As are planning to construct the Balticconnector pipeline, a bi-directional natural gas pipeline to connect Finland and Estonia.

The scope of the contract includes management, engineering, construction of seabed intervention and offshore pipeline construction works and pre-commissioning:

This is a joint procurement of Baltic Connector Oy and Elering AS. Baltic Connector Oy is the contracting authority responsible for carrying out the procurement procedure. Baltic Connector Oy and Elering AS have signed a co-operation agreement on joint procurement of the works covered by this procurement procedure. According to the agreement Baltic Connector Oy will be responsible for scheduling, design and overall management of the procurement procedure. However, the works shall be provided to both Baltic Connector Oy and Elering AS.

The scope of the works includes management, engineering, construction of seabed intervention and offshore pipeline construction works and pre-commissioning:

The services to be executed under the contract awarded after this procurement procedure will consist of the following scopes of work:

— Pre-lay seabed intervention comprising: rock installation, subsea excavation and rock blasting and removal,

— Landfall construction/shore crossings,

— Pipelay including shore pulls and above water tie-in operation,

— Cable and pipeline (Nord Stream pipelines) crossings,

— Post-lay seabed intervention works comprising rock installation and trench backfilling,

— Pipeline pre-commissioning.

Pipe material (line pipe) will be purchased separately by the Contracting Authorities but installation contractor will be responsible for reception of pipe material on selected harbour (possibly Paldiski in Estonia or Inkoo or Hanko in Finland), bringing to the storage, storing and guarding. During the installation the contractor will bring the pipes from the storage to the installation area. Contractor will also be responsible for quality control of line pipe during manufacturing.

Seabed Intervention.

The Seabed intervention scope of works for the pre-lay and post-lay intervention work scopes include:

— Project management and engineering required to support the pre and post pipeline installation intervention work scopes;

— Provision of vessels, equipment and personnel required for the various seabed intervention campaigns;

— Installation of rock carpets and pipeline supports preferable by fall pipe vessel(s);

— Subsea excavation for lowering, trenching and levelling of the seabed;

— Subsea rock blasting and rock removal for removal of seabed peaks;

— Survey support for the seabed intervention campaigns, i.e. pre- and post-seabed intervention;

— As-built survey and reporting at the end of each phase of intervention;

— Other related services necessary for completing the scope of work.

The seabed intervention works may include seabed excavation, rock placement and boulder clearance, the extent of which will be confirmed during detailed design, will be carried out in two phases; pre and post pipeline installation.

Pipeline Installation and Pre-commissioning.

The package of work associated with the construction and testing of the offshore pipeline includes the following key activities:

— Project management and engineering required to support all aspects of the pipeline construction and pre-commissioning operations;

— Completing weld procedure qualification testing;

— Quality control of the line pipe at line pipe factory;

— Setting up of a logistics base for receipt and load-out of coated line pipe to the installation vessel;

— Taking receipt of the full quantity of coated line pipe and bare test pieces;

— Management of pipe transport logistics between the onshore logistics base and the pipeline installation vessel;

— Preparation of pipeline shore crossings at both Finnish and Estonian ends of the pipeline;

— Mobilisation of the pipeline installation vessels;

— Provision of all crew transfers;

— Provision of all fuel, lubes and consumables;

— Offshore pipelay including shore pull;

— Mid-line above water pipeline tie-in;

— Pipeline flooding, cleaning, gauging, hydro testing, de-watering and drying;

— As-built survey and reporting on completion of installation activities

— Other related services necessary for completing the scope of work.

The scopes of work will be described in more detail in the technical specifications, work requirements and commercial documents which will be provided to the candidates invited to the negotiations.

The Construction of 400 + 110 kV transmission line Lieto - Forssa and specified modifications to the existing network

Fingrid Oyj | Published August 26, 2015
cpvs
45231400

The Construction of 400 + 110 kV transmission line Lieto - Forssa and specified modifications to the existing Network.

Construction work for gas pipelines

Baltic Connector Oy | Published November 10, 2017  -  Deadline December 5, 2017
cpvs
45231220, 45231110, 45112000, 45231100, 45112100, 45231200, 71630000

The scope of the contract comprises of the civil and installation works in accordance with the procurement documents.

Gas pipeline materials (line pipes, valves, fittings, pig traps, insulation joints) will be provided by the Contracting Authority. Other materials will be provided by the contractor. Pipeline detail design will be provided by the Contracting Authority.

Civil and installation contractor will be assigned as the main contractor responsible for work planning and management on site, site arrangements, applying for all work-related permits and carrying out reviews with landowners.

The project is bilingual. The candidate must employ management personnel with proficiency in Finnish and English language. Especially the personnel administering the site management duties of the main contractor and relation toward landowners must have good command in Finnish language together with proper English skills for the project purposes.

Civil works

The planned scope of works and services to be executed will consist of the following works and services. The scope of works will be defined in detail in invitation to submit tender:

— Digging and back filling of the pipe trench, including rock blasting,

— Trench preparation and backfilling works including necessary materials according to alignment sheets and typical drawings,

— Tie-in related works to existing valve station (digging and back filling, foundations, fences etc.),

— Railway, river and road crossings (HDD, sleeves, boring, open cutting, etc.),

— Trench supporting, ground water lowering,

— Concrete weighting including weights,

— Final pipeline marking posts including installation,

— Access road construction and demolishing works,

Construction of permanent roads,

— Field drainage modifications,

— Civil works for anode fields,

— Pig trap and vent stack foundations,

— Transportation and unloading services (for transporting materials to and from site),

— As-built measurements,

— Other related works necessary to completing the scope of work.

The planned scope of installation works and services to be executed will consist of the following works and services. The final scope of works will be defined in detail in invitation to submit tender:

— Receiving, handling, transportation and storing of all piping materials,

— Installation and welding of the pipeline, field joint coating works and materials,

— Field cold bending works including bending equipment,

— Inspection and complete testing of pipeline: NTD, hydrotesting,

— Calibration and drying of the pipeline,

— Tie-in works to existing valve station and offshore pipeline,

— Pig trap and vent stack installation,

— Pin brazing for cathodic protection cables,

— Manufacturing book preparation,

— Other related works necessary to completing the scope of work.

Contractor must be prepared to perform the civil and installation works in Finnish weather conditions (ground frost, rain and snow are typical weather conditions during the winter. The temperature may go as low as -30°C.).

Construction work for gas pipelines

Baltic Connector Oy | Published October 19, 2017
cpvs
45231220, 45231110, 45112000, 45231100

This advertisement is to initiate market consultations with potential contractors. The purpose is to prepare the forthcoming procurement and inform suppliers of the plans and requirements for the procurement. Similarly, the consultation is to advertise market opportunities to potential contractors.

Information is requested on the following topics:

1) The works and services the company is able to provide;

2) Company's interest to be selected as the main contractor;

3) Company's interest to perform works for the main contractor, i.e. work as the subcontractor for the main contractor.

Baltic Connector may use the information provided by companies for the planning of the forthcoming procurement for the main contractor.

The main contractor will decide on subcontracting the works. Baltic Connector may provide a list of potential subcontractors compiled during the market consultations.

Local companies are also encouraged to participate and inform of their capabilities.

The scope of the contract will cover all construction and installation works and all materials excluding materials delivered by the contracting authority.

The list of specific works in the scope of the main contract include:

— Digging and back filling of the pipe trench, including rock blasting,

— Receiving, handling, transportation and storing of all piping materials,

— Installation and welding of the pipeline, field joint coating.

Inspection and complete testing of pipeline: NTD, hydrotesting:

— Calibration and drying of the pipeline,

— As-built measurements, manufacturing book preparation,

— Tie-in works to existing valve station.

Civil and installation contractor will be assigned as the main contractor responsible for work planning and management on site, site arrangements, applying for all work-related permits and carrying out reviews with landowners. The main contractor may assign part of the works to subcontractors.

Construction consultancy services

Baltic Connector Oy | Published October 6, 2016  -  Deadline October 18, 2016
cpvs
71530000, 71320000, 71000000, 71330000

Baltic Connector Oy is a company owned by the state of Finland. The company was set up in 2015 under the laws of Finland to implement the Finnish part for the Balticconnector pipeline project.

Construction consultancy services

Baltic Connector Oy | Published July 19, 2016
cpvs

The Balticconnector project is a gas infrastructure project aiming to interconnect the Finnish and Estonian gas networks in a joint project of Gasum and the Estonian gas transmission system operator Elering Gaas AS. The purpose of the procurement procedure is to award a framework agreement for the provision of engineering, project management and procurement services (hereinafter referred to as ‘EPM Services’).

Construction consultancy services

Baltic Connector Oy | Published July 19, 2016  -  Deadline August 8, 2016
cpvs

This is a joint procurement of Baltic Connector Oy and Elering AS (together referred to as ‘Contracting Authorities’). Baltic Connector Oy is the Contracting Authority responsible for carrying out this procurement procedure. Baltic Connector and Elering AS have signed a cooperation agreement on joint procurement of the services covered by this procurement procedure. According to the agreement Baltic Connector Oy shall be responsible for scheduling, design and overall management of the procurement procedure. However, the services are to be provided to both Baltic Connector Oy and Elering AS.

Stage construction works

Senaatti-kiinteistöt | Published May 18, 2017  -  Deadline June 9, 2017
cpvs
45237000, 45212300, 45212320, 45000000, 37820000

The purpose of the procurement procedure is to award a contract for the supply, installation and commissioning of the main stage ballet floor for the Finnish National Opera and Ballet.

The purpose of the procurement procedure is to award a contract for the supply, installation and commissioning of the main stage ballet floor for the Finnish National Opera and Ballet.

The Contracting Authority in this procurement procedure is Senate Properties. Senate Properties is a state enterprise operating under the Finnish state enterprises act and under the aegis of the Finnish Ministry of Finance and responsible for the maintenance of the National Opera House (Kansallisooppera) where the ballet floor will be installed.

The Contracting Authority and the awarded tenderer are expected to sign the contract on the supply of the ballet floor in June 2017. The first installation/assembly will take place during the summer shutdown of the Opera house in June — July 2018.

The scope of the procurement is described in more detail in the procurement documents.

Construction work for gas pipelines

Baltic Connector Oy | Published October 24, 2017
cpvs
45231220, 45231110, 45112000, 45231100

This advertisement is to initiate market consultations with potential contractors. The purpose is to prepare the forthcoming procurement and inform suppliers of the plans and requirements for the procurement. Similarly, the consultation is to advertise market opportunities to potential contractors.

Information is requested on the following topics:

1) The works and services the company is able to provide.

2) Company's interest to be selected as the main contractor.

3) Company's interest to perform works for the main contractor, i.e. work as the subcontractor for the main contractor.

Baltic Connector may use the information provided by companies for the planning of the forthcoming procurement for the main contractor.

The main contractor will decide on subcontracting the works. Baltic Connector may provide a list of potential subcontractors compiled during the market consultations.

Local companies are also encouraged to participate and inform of their capabilities.

The Construction of 400 + 110 kV Transmission Line Lieto — Forssa and Specified Modifications to the Existing Network.

Fingrid Oyj | Published August 29, 2015
cpvs
45231400

The Construction of 400 + 110 kV Transmission Line Lieto — Forssa and Specified Modifications to the Existing Network.

The Ring Rail Line, Construction Construction MRU3

Liikennevirasto | Published April 17, 2015
Winner
Graniittirakennus Kallio Oy
cpvs
45234100, 45221112, 45000000

Ring Rail Line avorataosuuden construction work in the western section of track Kivistö Lapland village in the area. The contract includes the construction works and the construction of the bridge, about 1.5 km long section of track contract area.

Construction management, construction, plumbing and electrical work supervision

Tampereen kaupunki | Published November 2, 2016
Winner
DUCO Rakennuttaja Oy,Insinööritoimisto Jorma Väänänen Oy,Sweco PM Oy,Rakennuttajatoimisto Valvontakonsultit Oy,Rakennuttajatoimisto HTJ Oy,Ramboll CM Oy,Planetcon Oy
cpvs
71000000

Construction management, construction, plumbing and electrical work supervision.

Construction work

A-Kruunu Oy | Published October 21, 2017  -  Deadline November 24, 2017
cpvs
45000000

A-Kruunu Construction of a residential construction project called the Fregatti Dygden Bute in Helsinki as a whole, including LVIAS works. The construction project includes the A-Kruunun owning 5-8-storey one-staircase construction of a residential building with its courtyard area as a fixed price total works. Apartments are interest-rate apartments.

Railways construction management procurement construction consultants

Liikennevirasto | Published November 8, 2016
cpvs
71000000

are the subject of construction management construction management of the following projects: - LIVI / 5670 / 02.01.07 / 2016 Hämeenlinna, Raahe, The estimated cost of 12.5 million. EUR (VAT 0), - LIVI / 5671 / 02.01.07 / 2016: Extension of the input Tampere railway yard tracks and the construction of a bypass track, the cost estimate. 8 million. EUR (VAT 0): - LIVI / 5672 / 02.01.07 / 2016: the Kuopio railway yard, the cost estimate of 5 million. EUR (VAT 0). containing the subject of the contract Construction, the following tasks: - track work, electrical work and the safety of buildings, - the control of track work, electrical and safety work. In addition, construction management should include: - operating a representative of the client, - track work carried out by the project supervisor coordinative, - the customer's tasks Security Coordinator *, - tasks of any project assistant, - any project engineer tasks - project addressed to the banking project to use its services. are the subject of construction management construction management of the following projects: - LIVI / 5670 / 02.01.07 / 2016 Hämeenlinna, Raahe, The estimated cost of 12.5 million. EUR (VAT 0), - LIVI / 5671 / 02.01.07 / 2016: Extension of the input Tampere railway yard tracks and the construction of a bypass track, the cost estimate. 8 million. EUR (VAT 0): - LIVI / 5672 / 02.01.07 / 2016: the Kuopio railway yard, the cost estimate of 5 million. EUR (VAT 0). containing the subject of the contract Construction, the following tasks: - track work, electrical work and the safety of buildings, - the control of track work, electrical and safety work. In addition, construction management should include: - operating a representative of the client, - track work carried out by the project supervisor coordinative, - the customer's tasks Security Coordinator *, - tasks of any project assistant, - any project engineer tasks - project addressed to the banking project to use its services.

Construction work

HUS-Kiinteistöt Oy | Published June 17, 2015
Winner
Rakennus-Arolin Oy
cpvs
45000000

The construction work comprises PET-CT for the container required for construction of the foundation and the passage to the Meilahti Hospital laboratory wing of the north end.

Construction work

Helsingin kaupunki, kiinteistövirasto, tilakeskus | Published July 8, 2016
cpvs

Construction work