Call +44 800 9755 164

Public tenders for construction in Helsinki Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Helsingin kaupungin asuntotuotantotoimisto | Published December 7, 2016  -  Deadline March 10, 2017

scheme for apartment buildings and terraced houses, the City of Helsinki taken Kuninkaantammi neighborhood block 33381 and 33 388 as well as the construction of an underground car park as a fixed price turn-key contract including design.

The block will be built 33 388 rental apartments in the Helsinki city breaks Oy at Heka Kuninkaantammi Kuninkaantammi Circulation 14, the service garage and yard areas.

The block will be built 33 381 tenant-owner apartments in Helsinki Asumisoikeus Oy at Turquoise Alley 4, the service garage and yard areas.

Contract tendered as a whole in order to achieve the schedule management and low-cost.

Planning started a preliminary agreement (around April 2017) and is valid until the contractual obligations have been met to the satisfaction of the client.

Estimated Time of construction works is June 2018, and construction work will begin no later than October 2018.

The scope:

Quarter of 33381 is building a total of 5 200 sq m and k-quarter 33 388 45 00 D-m².

Yard areas are formed partially on top of underground car parks.

In addition, to be implemented for recreational and meeting space.

A group in the provision of:

The group must undertake to ensure that designated in the tender members of the group are available for the implementation of the contract, if a group is selected.

Construction work

A-Kruunu Oy | Published January 13, 2017  -  Deadline February 15, 2017

Invitations to tender for the implementation of the applicable interest-subsidized housing for residential building projects (new construction) in the Helsinki region (project acquisition).

The participant may be implemented to provide a number of separate independent projects.

The project of land acquisition, planning and implementation are the responsibility of the contractor.

Invitations to tender for the implementation of the applicable interest-subsidized housing for residential building projects (new construction) in the Helsinki region (project acquisition).

The participant may be implemented to provide a number of separate independent projects.

The project of land acquisition, planning and implementation are the responsibility of the contractor.

Level of quality of the projects agreed jointly on the basis of the requirements of the A-Crown.

the suitability of the projects A-crown explains in joint negotiations.

Minimum requirements for projects:

- The project must be located in the Helsinki region, (Any relevant municipalities of Helsinki, Espoo, Vantaa, Hyvinkää, Nurmijärvi, Järvenpää, Kirkkonummi, Tuusula, Kerava, Vihti, Mäntsälä Sipoo and surroundings).

- Plots are located regionally in key locations of reasonable transport links.

- Plot can be your own or rented, but not from the municipality.

- Land and the subject will be the price level of interest subsidy to production (ara-prices) applicable. start-up projects is conditional on approval of the plans and cost ara C.

- The project must have a minimum size of 1 500 asm².

In principle, the main focus is on small residences.

- Building Type will be blocks of flats or terraced. (Primarily condominium).

- The construction projects will be initiated during the years 2017-2018.

- The area must be sufficient demand for interest-subsidized housing.

The participant will in his application provides sufficient information on the proposed negotiations as a basis for selecting projects.

The participation request can also be sent by e-mail.

Stage construction works

Senaatti-kiinteistöt | Published January 3, 2017  -  Deadline January 25, 2017

Delivery is subject to the Finnish National Opera and Ballet päänäyttömän ballet floor design, construction and installation of their works to include any other codec. Floor area approx. 260 m². The acquisition is described in more detail in the procurement documents.

The installation site address is the Opera House, Helsinki 58, FI-00260 Helsinki, Finland.

Architectural, construction, engineering and inspection services

Helsingin kaupunki, rakennusvirasto | Published January 4, 2017  -  Deadline February 16, 2017

related to construction project management services for infrastructure projects (street, park and other green areas) east of Helsinki in the area. The project management service includes infrastructure construction, project management, cost and quality management, specialist and ancillary tasks related to construction.

The City of Helsinki Public Works Department to request a quotation, the period 1.3.2017-31.5.2018 are scheduled infrastructure projects (street, park and other green areas) related to construction management, project management services. The project management service includes infrastructure construction, project management, cost and quality management, to make statements and related construction management expertise and operational support.

Industrial and construction of storage building

Helsingin kaupunki | Published December 13, 2016  -  Deadline January 16, 2017
Built one-storey upholstered profiled steel sheet hall building on the Helsinki border island, at the border of the island berm 12. Construction works workshop and warehouse Liikuntavirastaon marine services. Built one-storey upholstered profiled steel sheet hall building on the Helsinki border island, at the border of the island berm 12. Construction works workshop and warehouse Liikuntavirastaon marine services.

SUSPENSION ROPE - Construction Partner 4 (URKU4)

Liikennevirasto | Published December 22, 2016
ROPE - Construction Partner 4 (URKU4) framework agreement - contract partner ROPE 4 (URKU4) framework agreement, the duration until 31.12.2018 ROPE - Construction Partner 4 (URKU4) framework agreement

Paloheinä outdoor tent maintenance hall for new construction

Helsingin kaupunki | Published January 10, 2017  -  Deadline January 30, 2017
Maintenance Hall for new construction HVAC their works fully completed in accordance with the tender documents Maintenance Hall for new construction HVAC their works fully completed in accordance with the tender documents

Ämmässuo the construction of the expansion area of ​​the waste water line

Helsingin seudun ympäristöpalvelut -kuntayhtymä | Published January 10, 2017  -  Deadline January 26, 2017
Ämmässuo contract includes the construction of waste treatment center expansion area of ​​approx. 350 meters on a journey activities sewer line, which involves the construction of conventional municipal engineering and civil engineering works. Ämmässuo contract includes the construction of waste treatment center expansion area of ​​approx. 350 meters on a journey activities sewer line, which involves the construction of conventional municipal engineering and civil engineering works.

Construction of Family Municipal Road between Hakuninmaa park - Pallet Circulation

Helsingin kaupungin rakennusvirasto | Published January 11, 2017  -  Deadline February 9, 2017
The contract includes Family Municipal Road construction of a new public transport across the street. The contract includes Family Municipal Road construction of a new public transport across the street.

Works for complete or part construction and civil engineering work

Vt8 Tievalaistus välillä Mynämäki-Unaja,ST | Published December 30, 2016  -  Deadline February 14, 2017

Illuminated sections of road lighting design and construction.

Road lighting design and implementation of 34 km trip.

Works for complete or part construction and civil engineering work

Helsingin kaupungin rakennusvirasto | Published December 20, 2016  -  Deadline February 6, 2017

The contract includes the construction of infrastructure Naulakallio area of ​​contract documents to the extent indicated.

esirakentamista rod Vainio In the area of ​​contract documents extent.

The total contract. The phasing of the work and duties of the project supervisor of the tender documents by.

Works for complete or part construction and civil engineering work

Liikennevirasto | Published January 6, 2017  -  Deadline March 15, 2017

The contract is made mainly planned by and carry out (ST) basis.

Construction site is located in the south-east Uuraisten center promoted by the side of the road 627, 6304 and 16777 interface and its surrounding area. The contract area is mainly zoned area.

The contract will involve work to the extent that they have been defined with all road arrangements in the attached invitation to tender documents, accessories and equipment.

The contract is a form of quality assurance is the quality of responsibility for the construction or LVR.

The contract is located Uurainen.

the content of the contract is defined in more detail in the tender documentation.

The contract includes road 627 (Jyväskyläntie / Hakintie), 6304 (Saarijärventie) and 16777 (Kuukantie) Changing the current four-way interface roundabout. Kiertosaarekkeen traffic circle has a diameter of 20 meters. Keskisaarekkeet and channeling islets implemented elevated. The project will also include pedestrian and cycle route along highway 627, and carried out street lighting contract area.

The contract also includes quality control, information, reporting, and warranty term work and the role of project supervisor within the

yhteensovittamisvelvoitteita accordance with the tender documents.

The contract is the total price based plan-implement-a chore.

The contract is a form of quality assurance is the quality of responsibility for the construction or LVR.

The contract is located Uurainen.

the content of the contract is defined in more detail in the tender documentation.

Naulakallio streets and water supply and construction of esirakentaminen, turnkey rail Vainio area

Helsingin kaupungin rakennusvirasto | Published December 18, 2016  -  Deadline February 6, 2017
The requirements in the contract documents in accordance with the specified overall contract. The phasing of the work and duties of the project supervisor of the tender documents by. The contract includes the construction of infrastructure Naulakallio area of ​​contract documents to the extent indicated. esirakentamista rod Vainio In the area of ​​contract documents extent. The requirements in the contract documents in accordance with the specified

Ex-post: Riihimäki, Tampere, replacement of security equipment, construction consulting services

Liikennevirasto | Published December 20, 2016
Riihimäki, Tampere renewal -rataosuuden security equipment, construction consultant services, with which the Finnish Transport Agency acquires, builds and monitors the measures which the project objectives are achieved. In addition, the acquisition includes the tasks of the security co-ordinator and the role of project supervisor. Line segment's safety will be renewed during the years 2016-2018. Finnish Transport Agency's aim is to replace the current system of a completely new, as well as ensuring the technical security and high availability of advanced main line. As the project progresses looking at the possibility of extending the mandate of the client option to include renewal of the Tampere-Seinäjoki railway line safety devices. Summary of the project: Riihimäki, Tampere renewal of the safety devices is part of a project to reduce government debt allocated for repair, the project will be implemented during 2016-2018. As the project progresses looking at the possibility of extending the mandate of the client option to include renewal of the Tampere-Seinäjoki railway line safety devices. Riihimäki, Tampere renewal -rataosuuden security equipment, construction consultant services, with which the Finnish Transport Agency acquires, builds and monitors the measures which the project objectives are achieved. In addition, the acquisition includes the tasks of the security co-ordinator and the role of project supervisor. Line segment's safety will be renewed during the years 2016-2018. Finnish Transport Agency's aim is to replace the current system of a completely new, as well as ensuring the technical security and high availability of advanced main line. As the project progresses looking at the possibility of extending the mandate of the client option to include renewal of the Tampere-Seinäjoki railway line safety devices.

ASTANA EXPO 2017 KAZAKSTAN: CONSTRUCTION OF FINNISH PAVILION

Finpro Oy | Published December 23, 2016  -  Deadline January 18, 2017
Finpro is seeking for the constructor for EXPO 2017 ASTANA world exhibition Finnish pavilion. The World Exhibition will be held from 10.6.2017 to 10.9.2017 in the World Expo area, Astana, Kazakhstan. The Finnish pavilion will be constructed based of design and plans by Ateljé Sotamaa and Finpro Oy. Number of Finnish companies and organization will be participating in the country pavilion. Also Team Finland actors are taking part in the world exhibition. Finpro is seeking for the constructor for EXPO 2017 ASTANA world exhibition Finnish pavilion. The World Exhibition will be held from 10.6.2017 to 10.9.2017 in the World Expo area, Astana, Kazakhstan. The Finnish pavilion will be constructed based of design and plans by Ateljé Sotamaa and Finpro Oy. Number of Finnish companies and organization will be participating in the country pavilion. Also Team Finland actors are taking part in the world exhibition.

Saimaa Canal railway bridge construction design

Liikennevirasto | Published December 19, 2016  -  Deadline January 31, 2017
The requirements in the contract documents in accordance with the specified

oil separation Ämmässuo Sortti position and horizontal areas of the construction

Helsingin seudun ympäristöpalvelut -kuntayhtymä | Published January 12, 2017  -  Deadline February 6, 2017
The contract is implemented waste treatment center Sortti- oil separation system and the horizontal areas. The work includes the acquisition and installation of the oil separator additionally mm. excavation and earth works, as well as sewage and cable protection pipes installation. The contract is implemented waste treatment center Sortti- oil separation system and the horizontal areas. The work includes the acquisition and installation of the oil separator additionally mm. excavation and earth works, as well as sewage and cable protection pipes installation.

Acting paragraph 4 of Oulu and Zatelliitin interchange construction management and quality control

Liikennevirasto | Published December 23, 2016  -  Deadline February 14, 2017
The requirements in the contract documents in accordance with the specified

The City of Helsinki eastern area of ​​project management services for infrastructure projects

Helsingin kaupunki, rakennusvirasto | Published January 3, 2017  -  Deadline February 16, 2017
The requirements in the contract documents, as defined in Helsinki City Public Works Department to request a quotation, the period 1.3.2017-31.5.2018 are scheduled infrastructure projects (street, park and other green areas) related to construction management, project management services. The project management service includes infrastructure construction, project management, cost and quality management, to make statements and related construction management expertise and operational support. related to construction project management services for infrastructure projects (street, park and other green areas) east of Helsinki in the area. The project management service includes infrastructure construction, project management, cost and quality management, specialist and ancillary tasks related to construction. The requirements in the contract documents in accordance with the specified

Management of stone alley 1 and 2 yards for improvement

Helsingin kaupungin asunnot Oy | Published December 19, 2016  -  Deadline January 18, 2017
The construction works and place: Helsinki City Housing Ltd. / Heka-Pihlajisto Management Ltd stone alley 1 and 2. The construction works and place: Helsinki City Housing Ltd. / Heka-Pihlajisto Management Ltd stone alley 1 and 2