Public tenders for elevator in Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

elevator-platforms trucks

Międzygminne Przedsiębiortswo Gospodarki Odpadami i Energetyki Odnawialnej Master Sp. z o.o. | Published November 23, 2012  -  Deadline December 4, 2012
cpvs
34142100

elevator-platforms trucks

Modernization of the hospital elevator in the building D.

 | Published March 12, 2014  -  Deadline March 27, 2014
cpvs
50531400, 45313100

Modernization of the hospital elevator in the building D.

Design and construction of the elevator at SDS.

 | Published October 18, 2013  -  Deadline November 5, 2013
cpvs
45313100, 71220000, 71320000, 45310000, 45223000

Design and generalization of one of the elevator shaft made in the technology of masonry and the supply and installation of a passenger lift connects the three floors of the building ..

Modernization of the staircase and freight elevator.

 | Published January 24, 2014  -  Deadline February 11, 2014
cpvs
45000000, 45453000, 42416100, 45313100, 45111300, 45110000, 45410000, 45442100, 45431000, 45421100, 45400000, 45262100, 45111220, 45432100, 45421000, 45311000, 45310000, 45330000, 45331210

Repair of the stairwell in the building laboratory and workshop (3) Institute of Physical Chemistry including: construction, electrical and sanitary. Replacing an old freight elevator with a new personal-goods elevator, meeting the requirements of EU directives and national security, along with the adjustment of the shaft and the engine, in the laboratory and workshop building (No. 3) Institute of Physical Chemistry of the Polish Academy of Sciences.

The incorporation of an elevator shaft along with the installation of elevators in the Secondary School No. 3 in Suwalki.

 | Published May 23, 2014  -  Deadline June 10, 2014
cpvs
42416100, 45313100, 45210000, 45315100, 33196200

1 The contract is to build an elevator shaft along with the installation of an elevator in the Secondary School No. 3 in Suwalki. 2 The contract includes the execution of construction works involving the incorporation of an elevator shaft, and execution of electrical installation and installation of a passenger lift in the building of the School No. 3 in Suwalki. 3 A detailed description of the contract include: design documentation, technical specifications and bills of quantities ..

Cultivation elevator at Primary School No. 3 in Myślenice.

 | Published October 2, 2013  -  Deadline October 16, 2013
cpvs
45233222, 45000000, 45400000, 45450000, 45410000, 45223800, 45223500, 42416100, 45313100, 45300000, 45100000

This contract is construction work, including work Mon.: Cultivation elevator at Primary School No. 3 in Myślenice The scope of the contract referred to in paragraph 1 includes construction works, including in particular:-work on foundations, reinforced concrete-lift-elevator shaft, finishing work ,-external plaster with warming-terrain, walkways, elevators-assembly in accordance with the supplier's instructions and the conditions of the Office of Technical Inspection. A detailed description of the contract includes Volume III of this Terms of Reference - Technical Specifications Performance and Acceptance of Public Works and of quantities ...

Cultivation elevator at Primary School No. 3 in Myślenice.

 | Published September 16, 2013  -  Deadline September 30, 2013
cpvs
45233222, 45000000, 45400000, 45450000, 45410000, 45223800, 45223500, 42416100, 45313100, 45300000, 45100000

This contract is construction work, including work Mon.: Cultivation elevator at Primary School No. 3 in Myślenice The scope of the contract referred to in paragraph 1 includes construction works, including in particular:-work on foundations, reinforced concrete-lift-elevator shaft, finishing work ,-external plaster with warming-terrain, walkways, elevators-assembly in accordance with the supplier's instructions and the conditions of the Office of Technical Inspection. A detailed description of the contract includes Volume III of this Terms of Reference - Technical Specifications Performance and Acceptance of Public Works and of quantities ..

Delivery / Exchange crane hospital with dismantling the old lift and execution of technical documentation for replacement of the elevator with the work of adjustment to the new shaft elevator.

 | Published September 5, 2014  -  Deadline September 23, 2014
cpvs
42416100, 45313100, 45400000, 45310000

Delivery / replacement crane hospital with dismantling the old elevator and execution of the technical documentation for the exchange of lift along with the work of adaptation to the new elevator shaft with an estimated value of the contract less than the amount specified in regulations issued pursuant to Art. 11 paragraph. 8.

Elevator-platforms trucks

Międzygminne Przedsiębiortswo Gospodarki Odpadami i Energetyki Odnawialnej Master Sp. z o.o. (SAM/Ś/10/2012) | Published January 23, 2013
Winner
TANDEM TRUCKS Sp. z o.o. UL. TARTACZNA 6 40-749 KATOWICE POLAND
cpvs
34142100

Przedmiot zamówienia: Dostawa dwóch fabrycznie nowych samochód specjalistycznych typu: Śmieciarka I. Podwozie: 1) Samochód ciężarowy, 6 x 2 – ilość 2 szt. 2) Samochód DMC. min. 26 ton 3) Rok produkcji: fabrycznie nowy rok produkcji 2012 4) Silnik o mocy min. 300 KM spełniający wymagania norm Euro 5, 5) Silnik wysokoprężny, 6. cylindrowy, rzędowy - 4 zawory na cylinder, 6) Poziom hałasu zgodnie z normą UE 80 dB(A). 7) Układ dolotowy i wydechowy - wlot powietrza wyprowadzony do góry, wydech pionowy za kabiną 8) Dodatkowy filtr paliwa podgrzewany wyposażony w separator wody, 9) Elektroniczny ogranicznik prędkości do 90 km/h. 10) Blokada mechanizmu różnicowego kół, możliwość włączania przy niskiej prędkości ( sterowanie przez EBS) 11) System zapobiegający blokowaniu kół (ABS). 12) Wspomaganie hamowania awaryjnego (EBA). 13) Układ przeciwpoślizgowy (ASR). 14) Przekładnia kierownicza ze wspomaganiem 15) Zawieszenie przednie paraboliczne resory wzmocnione. 16) Skrętna, stała, tylna 3 oś z ogumieniem pojedynczym. 17) Oś tylna nie unoszona. 18) Sterowanie 3 osi odciążeniem z kabiny, ze zwłoką czasową (maks.30 km/h). 19) Pozycja osi tylnej: za mostem napędowym. 20) Nośność osi przedniej: 8t - Mostu tylnego: 11,5t - Osi tylnej: 7,5t. 21) Przystawka odbioru mocy od silnika, 22) Klimatyzacja, 23) Skrzynia biegów manualna, 9 biegów do przodu 1 wsteczny 24) Zbiornik paliwa zamykany na kluczyk, o minimalnej pojemności 200 litrów, 25) Kabina krótka w kolorze białym, 26) Fotel kierowcy regulowany z zawieszeniem pneumatycznym, 27) Miejsce dla dwóch pasażerów, 28) Pokrowce na fotele, 29) Światło ostrzegawcze w kształcie cienkiej belki z napisem MASTER zamontowane na kabinie pojazdu – napisy należy uzgodnić z Zamawiającym. 30) Dźwiękowy sygnał ostrzegawczy biegu wstecznego, 31) Radio i minimum 2 głośniki 32) Lusterka wsteczne lewe i prawe podgrzewane, 33) Lusterko przednie dojazdowe, przed szybą przednią 34) Przednia szyba przyciemniana lub wyposażona w osłonę przeciwsłoneczną, 35) Legalizowany tachograf, cyfrowy 1 dniowy zgodny z EC 36) Opony o podwyższonej wytrzymałości dla wszystkich osi o wymiarze 315/80R22.5 R, 37) Immobilizer 38) Komputer pokładowy, komunikaty wyświetlane w języku polskim, 39) Dodatkowe miejsce na zamontowanie CB z wyprowadzoną instalacją elektryczną 12V, i anteną CB 40) Dywaniki gumowe dla kierowcy i pasażera. 41) Rozstaw osi od 3450mm do 3550 mm

Elevator-platforms trucks

Port Lotniczy Łódź im. Władysława Reymonta sp. z o.o. | Published February 1, 2013
cpvs
34142100

:Przedmiotem zamówienia jest dostawa nowego urządzenia do odladzania i zabezpieczenia przed oblodzeniem statków powietrznych dla Portu Lotniczego Łódź im. Władysława Reymonta sp. z o.o. Pojazd składa się z podwozia ciężarowego produkowanego seryjnie oraz zabudowy spełniającej wymagania funkcjonalne w zakresie odladzania i zabezpieczenia przed oblodzeniem statków powietrznych, wyprodukowany i dedykowany do użytkowania w systemie metrycznym. Urządzenie musi spełniać co najmniej wymagania IATA AHM 975 (“Functional Specifications for Self-Propelled Aircraft De-Icing/Anti-Icing Unit”).

Repair and maintenance services of X-ray equipment

Wojewódzki Szpital Specjalistyczy im. M. Kopernika w Łodzi | Published November 24, 2015
Winner
Medikol Systems Sp. z o.o.
cpvs
50421200

1. The subject of a public contract maintenance service without parts Aquilion CT scanner for SN: A3512039, X-ray machine Ulitimax on the Supreme Court: 99D0542434, X-ray machine Combi Elevator on the Supreme Court: 5356 and the execution of 16 technical surveys CT scanner Aquilion RXL on the Supreme Court: UCB12Z2055 accordance with the recommendations producer for WSS them. Copernicus in Lodz. 2. On the subject of contract consists of two packages: Package No. 1 - service without parts: a) the Aquilion CT scanner for SN: A3512039; b) X-ray machine Ulitimax on the Supreme Court: 99D0542434; c) the X-ray machine Combi Elevator on the Supreme Court: 5356. Package No. 2 - the execution of 16 technical inspections CT scanner Aquilion RXL on the Supreme Court: UCB12Z2055 in accordance with the manufacturer's instructions. 3. The contract includes 2 packages. Offer for its validity in the package must be submitted on all items. Purchaser does not allow tenders for individual items in the package.

Repair and maintenance services of X-ray equipment

Wojewódzki Szpital Specjalistyczy im. M. Kopernika w Łodzi | Published August 4, 2015  -  Deadline September 9, 2015
cpvs
50421200

1. The subject of a public contract maintenance service without parts Aquilion CT scanner for SN: A3512039, X-ray machine Ulitimax on the Supreme Court: 99D0542434, X-ray machine Combi Elevator on the Supreme Court: 5356 and the execution of 16 technical surveys CT scanner Aquilion RXL on the Supreme Court: UCB12Z2055 accordance with the recommendations producer for WSS them. Copernicus in Lodz. 2. On the subject of the contract in consists of two packages: Package No. 1 - service without parts: a) the Aquilion CT scanner for SN: A3512039 b) X-ray machine Ulitimax on the Supreme Court: 99D0542434, c) X-ray machine Combi Elevator on the Supreme Court: 5356 Package No. 2 - making 16 technical inspections CT scanner Aquilion RXL on the Supreme Court: UCB12Z2055 according to the manufacturer 3. The contract includes 2 packages. Offer for its validity in the package must be submitted on all items. Purchaser does not allow tenders for the individual items in the package.

Subject of the tender is to build a personal elevator in the building B18 University of Technology.

 | Published August 9, 2013  -  Deadline August 26, 2013
cpvs
45262500, 45410000, 45421000, 45431000, 45432110, 45320000, 45311200, 45000000, 45330000

Subject of the tender is to build a personal elevator in the building B18 University of Technology ..

Cultivation lift shaft, the purchase and installation of an elevator in the building Specialist Clinic in Nisku.

 | Published October 8, 2013  -  Deadline October 23, 2013
cpvs
45313000, 45310000, 45262000, 45400000

Extension of the lift shaft, the purchase and installation of an elevator in the building Specialist Clinic in Nisku.

Elimination of architectural barriers by building an elevator shaft along with the installation of elevators in Psychological-Pedagogical Szczecinku.

 | Published July 15, 2013  -  Deadline July 30, 2013
cpvs
45223500, 45261000, 45311200, 33196200

Object of the contract includes: supply and installation of elevators, expansion of extension works to the gable wall of the north-eastern elevation of the building of a passenger lift shaft connecting all floors of the existing building, construction of a new walkway to the main entrance of the building, which will communicate to the elevator with focused on small concrete blocks, making handles for people with disabilities to lift a passenger without a threshold for entry in / on the sidewalk to the building, making the internal power system with lighting elevator lift.

Czarnocin: Extension of the Health Center consisting in dobudowie elevator with the reconstruction of the building

Gmina Czarnocin | Published July 15, 2016  -  Deadline July 12, 2016
Winner
Zakład Usług Technicznych ELEKTRA-GW s.c. Kazimierz Wochniak, Czesław Gąsieniec, ul. Wysoka 34/36, 97-200 Tomasów Mazowiecki, kraj/woj. łódzkie.
cpvs
45262800, 45313100, 45310000, 45332000

The contract is the extension of the health center of the area. 344,22m2 building, located on a plot of Reg. No. 1738 in m. Czarnocin, which consists of dobudowie elevator with the reconstruction of the building. The scope of substantive contract must perform: the demolition of the existing external stairs, building extension of the angular-through elevator outside for disabled people from the north and external stairs, curing area of ​​concrete blocks around the stairs and elevator exterior renovation of the stairs on the south side of the building, insulation vertically on the entire length of the basement walls, reconstruction of rooms in the building in order to allow the installation of elevators and adapt them to the needs of dental rehabilitation, electrical installation (lighting rooms and the elevator shaft, power lift), reconstruction of plumbing - sewage. The detailed scope of works to be carried out was specified in the project documentation, technical execution and acceptance of works and works przedmiarach.

Replacing the elevator in the hotel assistants' No. 2 at ul. Gagarina 45 in Torun.

 | Published April 18, 2014  -  Deadline May 6, 2014
cpvs
45313100

1 The agreement is the exchange of the elevator in the hotel assistant's No. 2 Street. Gagarin 45 in Torun. 2 A detailed description of the contract scope of work and requirements for the implementation of the work is commissioned technical documentation in the form of Annex 9 to the ToR.

Construction of the elevator inside the building of the Municipal Office in Ożarow

 | Published September 10, 2014  -  Deadline September 25, 2014
cpvs
45400000, 42416100, 45323100

The contract is for the execution of works related to the construction of an elevator shaft with the assembly of the lifting device in the building of the Municipal Office in Ożarow in order to adapt the existing building for use by persons with disabilities, in particular, moving a wheelchair. The Employer has described in detail the subject of the contract and specify requirements in this regard in the bill of quantities, technical performance and acceptance of the works and the building project. Created as part of the contract is obliged to carry out all preparatory work, cleaning, construction site management, maintenance facilities construction, any arrangement of the UDT and related charges, the preparation of the registration dossier lift in accordance with the requirements of the UDT and as-built documentation, and any other actions necessary to performance of the contract. Robots in the facility may also be held between the hours of 15.00 to 23.00. Each time, at the request of the Employer, the Contractor with which the agreement will be signed, will be required to submit documents certifying conformity of construction products used to applicable standards. A condition for acceptance of the works will be supplied by the contractor on receipt of the following documents: a) Approval of technical (compliance statements) b) Certificates CE safety mark for products c) Statement of compliance The construction manager of the works with the provisions and applicable European Union standards or equivalent country States of the European Economic Area. d) Kwart guarantee the warranty, e) Statements contractor for bringing to a satisfactory condition and order the building of the f) document indicating the contact person / entity who should be called in the event of lift failure and the need for immediate evacuation of trapped passengers g) The technical documentation lift h ) UDT decision authorizing the elevator for use Employer requires that the Contractor has provided guarantees for work performed for a period of five years from the date of final acceptance of the works. When damaged or stops the elevator, preventing its exit by passengers contractor must promptly, but no later than within 30 minutes from the moment of notification of a failure to provide an opportunity to leave the elevator lift by its passengers.

Delivery elevator.

 | Published April 8, 2014  -  Deadline April 16, 2014
cpvs
42416100, 45313000

Delivery external lift shaft and with the assembly.

Cultivation external elevator shaft of the building IV High School.

 | Published March 10, 2014  -  Deadline March 25, 2014
cpvs
42416100, 45110000, 45210000, 45311000

The contract is: Cultivation external elevator shaft of the building IV High School Main Subject: CPV: 42416100-6 naming by CPV: Windy additional items: CPV: 45110000-1 naming by CPV: Demolition and wrecking of buildings. Earthworks. CPV: 45210000-2 Construction work for buildings. CPV: 45.31.10.00-0 naming by CPV works wiring and electrical installations. Detailed scope of work to complete sets: A. Documentation Project I. Bill of Quantities: 1) Bills of quantities Name: generalization outside the elevator shaft of the building IV High School in Elblag - Bill of quantities - construction - Bill of quantities - electrical, Object: Building IV High School in Elblag, Industry: Elevators, General Building, Electrical, Address Object, 82-300 Elblag, ul. Sienkiewicz 4 Employer informs that the bill of quantities referred to in section I. is APPENDIX 5 hereto. II. CONSTRUCTION DESIGN: A Course development - Project construction executive: architecture + design - construction project executive: electric. Object: side entrance to the building IV High School in Elblag B. Technical performance and acceptance of works 1 Specifications performance and acceptance of Cultivation external elevator shaft of the building IV High School 1 Technical Specifications Electrical Installations Mountable external elevator shaft of the building IV High School Employer informs the design documentation referred to in point A. II. and technical specification and execution of construction works listed in paragraph B. are APPENDIX 6 hereto. 1 The contract scope includes: - Demolition of reinforced concrete platform and stairs located at the location of the elevator shaft. - Earthworks associated with the implementation of the excavation for the foundation of the elevator. - Implementation of the foundation for the elevator shaft. - Reconstitution of a reinforced concrete platform. - Removal of windows and doors in the well site. - Shoeing walls under windows on the first and second floor and the reduction of window openings to - Bring them to the dimensions of the elevator door. - Installation of steel lintels. - Installation of steel elevator shaft with a platform to transport persons with disabilities, - Installation of new front door on the ground floor. - Painting and decorating - plastering, painting. - Organize the construction area - Execution of a complete power lifts for the disabled. 2 The Employer recommends that the Contractor has made local vision to become familiar with the scope of work and the terms of their execution. 3 In the case of a security for the due performance of the contract in the form of guarantees, the Contractor shall be required to submit them in the form in accordance with the standards forming APPENDIX 4 to the ToR. 4 The Contractor will be required if the bid, and if the execution of works involving subcontractors to enter into contracts with subcontractors, in accordance with the provisions of Art. 647 stamped 1 - Civil Code. 5 The Contractor will be required if the bid, and if the execution of works involving subcontractors to enter into agreements on transfer of liabilities to subcontractors owed them for work performed. Copies of the above. The contractor agreements must provide to the Employer within 10 days of signing the contract with the subcontractor. 6 In the event of winning the tender, the Contractor shall be obliged to construction insurance from damage that may occur, sudden mishap and liability for the period from inception to the completion of the works, comprising: a) insurance works, equipment and construction equipment up to 100% of contractual salary b) insurance against third parties. 7 Employer requires the award of 36 months warranty from the date of final acceptance of the works. 8 In the event of winning the tender Contractor shall prepare material schedule - financial performance of work covered by the contract and submit for approval within 5 working days from the date of signing the contract. 9 The Purchaser requires that waste resulting from the execution of works were transported and stored at the place of disposal. Contractor shall submit to the Employer the relevant documents. 10 The Employer does not reserve in the TOR that part or all of the order can not be entrusted to subcontractors. Employer requires identification by the Contractor in the tender part of the contract it intends to subcontract. 11 Employer informs that does not provide for the award of supplementary contracts. 12 Employer informs that does not provide for the granting of advances to perform the contract. 13 Employer informs that the works will be carried out in the facility active, in which the activity will be conducted. Robots must be conducted with the safety regulations and were not able
Categories
  Poland - Show all countries
Wrocław (24)Warszawa (20)Łódź (15)Poznań (13)Szczecin (13)Kraków (12)Warsaw (11)Gdynia (8)Białystok (7)Gdańsk (7)Kalisz (7)Bielsko-biała (6)Katowice (6)Kętrzyn (6)Chorzów (5)Kołobrzeg (5)Łomża (5)Dzierżoniów (4)Góra kalwaria (4)Konin (4)Puck (4)Tarnów (4)Bydgoszcz (3)Hrubieszów (3)Koszalin (3)Leszno (3)Lublin (3)Opole (3)Oświęcim (3)Radom (3)Zamość (3)Świdwin (3)Świecie (3)Bolesławiec (2)Bytom (2)Cieszyn (2)Czarny bór (2)Częstochowa (2)Dąbrowa tarnowska (2)Gdansk (2)Gdansk (2)Giżycko (2)Gostyń (2)Gryfice (2)Gubin (2)Inowrocław (2)Józefów (2)Krosno odrzańskie (2)Legnica (2)Malbork (2)Nowy dwór mazowiecki (2)Ostróda (2)Ostrów wielkopolski (2)Poddębice (2)Przeworsk (2)Płock (2)Rybnik (2)Rzeszów (2)Stalowa wola (2)Suwałki (2)Szamotuły (2)Szastarka (2)Szczecinek (2)Słupca (2)Tychy (2)Tychy (2)Włocławek (2)Zabrze (2)Zgierz (2)Zielona góra (2)Łomianki (2)Świętoszów (2)00198 roma, włochy (1)Aleksandrów kujawski (1)Biłgoraj (1)Buk (1)Bukowno (1)Charsznica (1)Chełm (1)Choszczno (1)Czarnocin (1)Czastary (1)Czerwionka-leszczyny (1)Działoszyn (1)Elbląg (1)Ełk (1)Gniezno (1)Golub-dobrzyń (1)Gorzów wielkopolski (1)Grand saconnex, szwajcaria (1)Grudziądz (1)Iwonicz (1)Jastrzębie-zdrój (1)Jaworze (1)Jelcz-laskowice (1)Jelenia góra (1)Kamień pomorski (1)Kańczuga (1)Kielce (1)