Construction work for kindergarten buildings

Tartu Linnavalitsus | Published April 15, 2017  -  Deadline May 24, 2017
cpvs
45214100

This volume includes the procurement of Tartu Raatuse reconstruction of the school. For complete reconstruction of the entire school building and the school territory.

Technical description of the contract or construction project is located in Tartu LV FTP server at: ftp://ftp.raad.tartu.ee/pub/LVO_ET/Tartu_Raatuse_Kooli_EHITUSPROJEKT/

Estonia Biokeskuse clean room design and construction

Eesti Biokeskus - Ain Laving | Published April 5, 2017  -  Deadline April 28, 2017
cpvs
45214600

Delivered Estonia Biokeskuse clean room design and construction.

Student hostel at Viljandi, facades 6 Small renovation design and construction

Tartu Ülikool - TUULI ILULA | Published April 13, 2017  -  Deadline April 27, 2017
cpvs
45443000, 71221000

Student at the University of Tartu, Viljandi, renovation of facades 6 Small vastyavalt design and construction tender documents. The desired volume of work and the embodiment is described in the general part of the description of the work and the job description included in other documents, and the volume of the table. Since it is a design and construction procurement, procurement volume also includes all the additional works required for the main project for the construction of Viljandi City Government notification.

'Tartu Health Care College dormitory third and fourth floors of dwellings and repair works and refuse disposal chutes 1.- sixth floor of the reconstruction work in conjunction with the design "

Tartu Tervishoiu Kõrgkool - Ermo Kruuse | Published April 12, 2017  -  Deadline May 5, 2017
cpvs
45200000, 71320000

Procurement components are as follows: Osa_I: 3. The floor of housing construction and repair work Osa_II: 4-deck wing of the housing B in the partial volume of repair works and the first-sixth prügišahti floor space with auxiliary rooms alterations wire installation

Building at Tartu, 19 Baths vivarium reconstruction auditoriums

Tartu Ülikool - TUULI ILULA | Published April 12, 2017  -  Deadline May 5, 2017
cpvs
45210000

The main objective is to carry out construction work on time and at optimal cost with the water supply, heating, sanitation, ventilation, cooling, and electrical and weak current works at the University of Tartu Ravila 19, Tartu. The result achieved must comply with the established requirements, must maintain an durable and long lasting. The construction quality and rationality operating costs must be secured in the best way. The tender must include all works and operations in accordance with the contract documents, incl. Add 10 Award of the tender documents and the tender conditions of the volume and cost must be taken into account in the work and activities which are not explicitly described in the contract documents but which are necessary for the work described in the contract documents the proper conduct of the contracting authority and the final goal. Contracting ultimate goal is to get targeted drawdown completely finished, incl. of authorized academic part of the building with all the documents and guarantees.

Building at Tartu, 19 Baths vivarium reconstruction auditoriums

Tartu Ülikool - TUULI ILULA | Published April 24, 2017  -  Deadline May 8, 2017
cpvs
45210000

The main objective is to carry out construction work on time and at optimal cost with the water supply, heating, sanitation, ventilation, cooling, and electrical and weak current works at the University of Tartu Ravila 19, Tartu. The result achieved must comply with the established requirements, must maintain an durable and long lasting. The construction quality and rationality operating costs must be secured in the best way. The tender must include all works and operations in accordance with the contract documents, incl. Add 10 Award of the tender documents and the tender conditions of the volume and cost must be taken into account in the work and activities which are not explicitly described in the contract documents but which are necessary for the work described in the contract documents the proper conduct of the contracting authority and the final goal. Contracting ultimate goal is to get targeted drawdown completely finished, incl. of authorized academic part of the building with all the documents and guarantees.

University of Tartu Viljandi Culture Academy academic building at the Viljandi Market 7, partial reconstruction

Tartu Ülikool - TUULI ILULA | Published March 28, 2017
cpvs
45210000

Commissioned main goal is to be carried out on time and at optimal cost Tartu University Viljandi Culture Academy school building in the partial reconstruction. The result achieved must comply with the requirements to be user-friendly, sustenance durable and long lasting. The quality of building construction and operating costs of rationality must be guaranteed the best possible way. That the work must comply with applicable building standards, regulations, official requirements and regulations and consistent with good engineering practice. Open to interpretation solutions / wording / work, if they have not been submitted during the procurement clarifying questions will be considered at the time of execution of the contract priority vendor of interpretation.

Tartu tn Soinaste section Raja - near water, rain water and sewer construction

aktsiaselts Tartu Veevärk - Antri Oja | Published April 6, 2017
cpvs
45231300

Tartu city Soinaste street track section - near water, rain water and sewage plumbing works execution reduced scale according to the Environmental Project OÜ prepared by the project.

Soinaste Tartu Aardla tn section - Raja water, rain water and sewer construction

aktsiaselts Tartu Veevärk - Antri Oja | Published April 21, 2017
cpvs
45231300

Soinaste in Tartu Aardla street section - Raja water, rain water and sewage plumbing works execution reduced scale according to the Environmental Project OÜ prepared by the project.