Public tenders for construction in Tabasalu Estonia

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

School Tabasalu three warehouse building

Osaühing Strantum - MEELIS HÄRMS | Published June 7, 2017  -  Deadline June 8, 2017
cpvs
45213260

Contract annulment of Harku Parish School Tabasalus at three of the former boiler building expansion. When working on the outer wall of the existing building must be a two-storey warehouse plokistada kivikonstruktsioonis which is välisgabariidid 9,5m x 1.25 m and a height similar to the existing building parapets parapets + 7.8m height. Construction works of the contracting authority ordering drawn together, LLC R The flash of Architect No job. 1615, "Tabasalu, School Street 3 tsentraalkatlamaja extension", which has been issued a building permit. The project is part of a constructive solved Engineering Company Ltd. prepared by the basic principle in the project, no work. T_2017_03. Electrical installation has resolved City Energy Ltd. prepared by the work of the No. 02052017th The contractor must be drawn up and the monitoring of the owner engineer coordinate specifying technical solutions work project. The scope of works is more particularly described in the tender documents Part III: Job Description and Part IV: Töömahuloend.

Swan path (from Klooga highway to serve the dunes) and light traffic in the dunes of the promenade construction

Harku Vallavalitsus - Siiri Pelisaar | Published May 23, 2017
Winner
Altos Teed OÜ, 12967894, Lääne tee 4, Suurupi küla, Harku vald, Harjumaa, 76907 Eesti (EE) Tel.: +372 51961292
cpvs
45233140

Job No. 014049 "(Appendix 1, available electronically link the tender document) and the Bill of Quantities (Form 8). 2. The contracting authority notes that procurement volumes are not included in the draft Luige tee 9 parking building, a poolside landscaping of the promenade, the beach area playground for children, sports games area Easy Home mini modules of wood and wood-laudiskattega footpath laudiskattega istumisplatvorm. 3. The contracting authority concludes a successful bid by the tenderer of the contract for which the project is presented in Annex 2 to the tender documents, the deadline for entries (11/08/2017) must complete all the work, the Client täitedokumentatsioon parties and signed by the works of delivery and receipt. 5. The Supplier must take into account that the first construction phase of the contract will start the construction of the promenade, to allow access to visitors and local residents of the coastal area. Contractor Project fixes "Completed Works Act" actually made during the calendar month backlog and calculate the unit prices of the costs of the work. Customer shall pay to the Contractor within 30 calendar days after the contract executed under the "Completed Works Act" and the receipt of the invoice. 8. The client does not provide for the possibility of an advance payment.

Harkujärve reoveepumpla reconstruction

Osaühing Strantum - MEELIS HÄRMS | Published May 22, 2017
cpvs
45232423, 45232440

Contract Harku movable object is located in the village Harkujärve Harkujärve reoveepumpla reconstruction. Contract volume of work shall be drawn up for carrying out the necessary work project, which is coordinated with the customer and the owner's supervision. Carry out the necessary construction, demolition and reconstruction work. Procured all the necessary approvals and permits to complete the work complete.

Harkujärve reoveepumpla reconstruction

Osaühing Strantum - MEELIS HÄRMS | Published May 22, 2017  -  Deadline May 29, 2017
cpvs
45232423, 45232440

Contract Harku movable object is located in the village Harkujärve Harkujärve reoveepumpla reconstruction. Contract volume of work shall be drawn up for carrying out the necessary work project, which is coordinated with the customer and the owner's supervision. Carry out the necessary construction, demolition and reconstruction work. Procured all the necessary approvals and permits to complete the work complete.

Harkujärve village J. and J. Venter Venter tee 2 tee 6, and a short-range land units to the plan for water and sanitation facilities in building

Harku Vallavalitsus - Siiri Pelisaar | Published May 19, 2017  -  Deadline June 2, 2017
cpvs
45231300

1. The purpose of the procurement is Harku Parish Harku lake in the village, and J. Venter Venter tee 2 tee 6, and a short-range land units to the plan for water and sanitation facilities, according to the building construction projects (Appendix 1 and Appendix 2) and the Bill of Quantities (Form 7). Cost provider offers the Form 8 above processing (5 Venter tee pipe installation), which Customer can order lisatöödena, by concluding an additional agreement (plus financing). These costs do not take into account the contract price included! 8, in the form of work quotation is valid until 30 June 2017. 2. Work will be started as soon as possible after the award of the contract. The works, the deadline is August 1, 2017. 3. Request the project is given in the contract document as an annex to the third

Tabasalus the coastal road building Phase II

Harku Vallavalitsus - Siiri Pelisaar | Published May 17, 2017  -  Deadline June 9, 2017
cpvs
45233140

1. The purpose of the procurement is Harku parish, Tabasalu hamlet located in the beach road, as well as the Birch Street, roadway, sidewalk and parking lot construction, and street lighting, electricity and communication works, water supply and sewerage system reconstruction / construction, landscaping and other work according LLC TINTER-DRAFT prepared for the project "Residential area, coastal road reconstruction project. Work project. Job No. 38-15-TP "(link given in the contract documents) and töömahuloenditele (Forms 7-8, NB Both Bill consist of several parts!). 2. The contracting authority concludes a successful bid by the tenderer of the contract for which the project is given in the contract documents Annex 2. 3. The work was started immediately with a written order of the Client Representative (hereinafter Alustamiskorraldus) on the date specified, which are issued not later than 07.14.2017. 4. Work execution period is 100 days from the date indicated Alustamiskorralduses. The deadline for the works to be completed all the work, the Client täitedokumentatsioon including, the proper usage and the applications of the parties, signed by the works of delivery and receipt. 5. The Contractor is responsible for compliance with the terms of the Agreement, the safety and the quality of the warranty period of 60 months. The warranty period will begin after completion of the works contract by the signing of the act of delivery and receipt date.

Harkujärve reoveepumpla reconstruction

Osaühing Strantum - MEELIS HÄRMS | Published May 3, 2017  -  Deadline May 17, 2017
cpvs
45232423, 45232440

Contract Harku movable object is located in the village Harkujärve Harkujärve reoveepumpla reconstruction. Contract volume of work shall be drawn up for carrying out the necessary work project, which is coordinated with the customer and the owner's supervision. Carry out the necessary construction, demolition and reconstruction work. Procured all the necessary approvals and permits to complete the work complete.

Residential homes construction work

Harku Vallavalitsus | Published April 28, 2017
cpvs
45215214

Nursing homes construction work

Tabasalu nursing home construction works concession procedure

Harku Vallavalitsus - Siiri Pelisaar | Published April 26, 2017
cpvs
45215214

The contracting authority wishes to award a works concession procedure to set the building lease (superficies) Harku municipality-owned property at the Klooga mnt 13 (register No. 14591502, cadastral register number 19801: 001: 2372, Purpose: public buildings, the land of 100%, an area of ​​19,432 m2). Building lease conditions are as follows: 1. The building lease term is 50 years; 2. The owner (vendor) will ensure the building of infrastructure Klooga mnt 13 property (cadastral number 19801: 001: 2372), the limit at the latest 05/31/2018. Superficiaries nursing home is required to begin construction later than 10.01.2018; 3. superficiary undertakes to establish Klooga mnt 13 real estate (cadastral number 19801: 001: 2372), a nursing home in accordance with the public procurement "Tabasalu nursing home construction works concession procedure" document and application for the concession, to ensure the building (s) to use the necessary permits in place and nursing home services no later than 31.12. 2019th The nursing home provides a clock üldhooldusteenust the elderly, people with disabilities and people affected by dementia and day care for the elderly, people with disabilities and dementia. 4. The building lease fee is not paid. The concession document is added to the basic conditions for building leases (Note 1), a draft concession agreement (Annex 2), and service requirements (Annex 3).

Residential area in the Liivik road building Phase I

Harku Vallavalitsus - Siiri Pelisaar | Published April 20, 2017  -  Deadline April 27, 2017
cpvs
45233140

1. The purpose of the procurement is Harku parish, Tabasalu hamlet located Liivik road building Phase I of the project in accordance with the Road Laboratory Ltd. "I Uuetoa to me Carriageway construction technical work project, no work. 18/16 "with concordances (Appendix 1) and the Bill of Quantities (Form 7). 2. The contracting authority concludes a successful bid by the tenderer of the contract for which the project is given in the contract documents Annex 2. 3. The work was started immediately with a written order of the Client Representative (hereinafter Alustamiskorraldus) on the date specified, which are issued not later than 05.15.2017. 4. Work execution period is 45 days from the date indicated Alustamiskorralduses. The deadline for the works to be finished all the work submitted to the Contracting Authority and signed by both Parties täitedokumentatsioon works, delivery and receipt.

Residential area in the construction of Phase I of the road Liivik

Harku Vallavalitsus - Siiri Pelisaar | Published April 13, 2017  -  Deadline April 24, 2017
cpvs
45233140

1. The purpose of the procurement is Harku parish, Tabasalu hamlet located Liivik road building Phase I of the project in accordance with the Road Laboratory Ltd. "I Uuetoa to me Carriageway construction technical work project, no work. 18/16 "with concordances (Appendix 1) and the Bill of Quantities (Form 7). 2. The contracting authority concludes a successful bid by the tenderer of the contract for which the project is given in the contract documents Annex 2. 3. The work was started immediately with a written order of the Client Representative (hereinafter Alustamiskorraldus) on the date specified, which are issued not later than 05.15.2017. 4. Work execution period is 45 days from the date indicated Alustamiskorralduses. The deadline for the works to be finished all the work submitted to the Contracting Authority and signed by both Parties täitedokumentatsioon works, delivery and receipt.

Harku parish road surface dressing

Harku Vallavalitsus - Siiri Pelisaar | Published April 13, 2017
Winner
osaühing Üle, 10405442, Peterburi tee 46, Tallinn, 11415 Eesti (EE) Tel.: +372 5060760
cpvs
45233220

1. Public REFERENCE Harku parish road surface in accordance with the tender document attached diagram and Form 8 shows volumes. The contractor carries all of the award of the proper performance of the work necessary, seek all labor, materials, tools and equipment, if necessary, carries traffic and ensures the safety of the works. 2. Detailed description of the works, and the volumes of sections of concrete are given in Part 8 of the form shown in the table of costs and work volumes. 3. During the works period 15.05.2017-31.07.2017. 4. The contracting authority concludes a successful bid by contractor and procurement contract for which the project is given in the contract documents Annex 1. 5. The agreement is based on ühikhindadel contract. 6. Completed works are carried by the work actually carried out. Contractor's site manager fixes "Completed Works Act" actually made during the calendar month backlog and calculates the cost of work on the basis of unit prices. The contractor shall submit to the object manager "Completed Works Act" and the measuring log on covered works "Completed Works Act" included the works supervision of the owner representative for signature. The holder shall submit audited and signed the "Act of operation 'customer representative. 7. The Customer shall pay to the Contractor within 30 days after the contract in accordance with the form of "Completed Works Act" and the receipt of the invoice. 8. Construction work warranty period of three (3) years. The warranty period begins with the subject of the contract or part of the delivery and receipt of signing the report the day after.

Swan path (from Klooga highway to serve the dunes) and light traffic in the dunes of the promenade construction

Harku Vallavalitsus - Siiri Pelisaar | Published April 13, 2017  -  Deadline April 25, 2017
cpvs
45233140

Job No. 014049 "(Appendix 1, available electronically link the tender document) and the Bill of Quantities (Form 8). 2. The contracting authority notes that procurement volumes are not included in the draft Luige tee 9 parking building, a poolside landscaping of the promenade, the beach area playground for children, sports games area Easy Home mini modules of wood and wood-laudiskattega footpath laudiskattega istumisplatvorm. 3. The contracting authority concludes a successful bid by the tenderer of the contract for which the project is presented in Annex 2 to the tender documents, the deadline for entries (11/08/2017) must complete all the work, the Client täitedokumentatsioon parties and signed by the works of delivery and receipt. 5. The Supplier must take into account that the first construction phase of the contract will start the construction of the promenade, to allow access to visitors and local residents of the coastal area. Contractor Project fixes "Completed Works Act" actually made during the calendar month backlog and calculate the unit prices of the costs of the work. Customer shall pay to the Contractor within 30 calendar days after the contract executed under the "Completed Works Act" and the receipt of the invoice. 8. The client does not provide for the possibility of an advance payment.

Harku field, Muraste village, street bicycles and Troika the walkway construction, the first stage (D 0 + 00 - 60 + 6 SD)

Harku Vallavalitsus - Siiri Pelisaar | Published April 11, 2017
Winner
Verston Ehitus OÜ, 11947047, Pärnu 128, Paide, 72720 Eesti (EE) Tel.: +372 56509550
cpvs
45233120

1. The purpose of the procurement is Harku parish, Muraste a trio of street bicycle and footpath construction of phase I (PK 0 + 00 - PK 6 + 60) In accordance with the road project Laboratory Ltd 'Harjumaa, Harku parish Muraste village, street light traffic Troika technical work project. Job No. 35/16 "(Appendix 1) and the Bill of Quantities (Form 7). 2. Supplier is responsible for the construction site contractors. Construction work includes the completion of the work until all the work is transferred, the works associated documents (including the construction of technical documents, etc.) the preparation and delivery of vendors, as well as other tasks necessary for the performance of works and the potential risks. 3. Work was started immediately with a written order of the Client Representative (hereinafter Alustamiskorraldus) on the date specified, which are issued not later than 05.15.2017. 4. Work execution period of two months from the date indicated Alustamiskorralduses. The deadline for the works to be finished all the work submitted to the Contracting Authority and signed by both Parties täitedokumentatsioon works, delivery and receipt. 5. A product made the basis for payment under the contract is done "Completed Works Act" with the bill. Customer shall pay to the Contractor within 30 calendar days after the contract executed under the "Completed Works Act" and the receipt of the invoice. 6. Client does not provide for the possibility of an advance payment. 7. The contractor is responsible for compliance with the terms of the Agreement, the safety and the quality of the warranty period, which is five (5) years. The warranty period will begin after completion of the works contract by the signing of the act of delivery and receipt date.

Residential area in the construction of Phase I of the road Liivik

Harku Vallavalitsus - Siiri Pelisaar | Published April 6, 2017  -  Deadline April 18, 2017
cpvs
45233140

1. The purpose of the procurement is Harku parish, Tabasalu hamlet located Liivik road building Phase I of the project in accordance with the Road Laboratory Ltd. "I Uuetoa to me Carriageway construction technical work project, no work. 18/16 "with concordances (Appendix 1) and the Bill of Quantities (Form 7). 2. The contracting authority concludes a successful bid by the tenderer of the contract for which the project is given in the contract documents Annex 2. 3. The work was started immediately with a written order of the Client Representative (hereinafter Alustamiskorraldus) on the date specified, which are issued not later than 05.15.2017. 4. Work execution period is 45 days from the date indicated Alustamiskorralduses. The deadline for the works to be finished all the work submitted to the Contracting Authority and signed by both Parties täitedokumentatsioon works, delivery and receipt.

We bring the path of the carriageway, and the walkway (phase I and II), together with sand, and the street lighting and road bicycle footpath and road construction Tõnu Family

Harku Vallavalitsus - Siiri Pelisaar | Published April 4, 2017  -  Deadline April 27, 2017
cpvs
45233120

1. The purpose of the procurement is Harku parish, and Tiskre Harkujärve village in Toome road carriageway and footpath (phase I and II), with street lighting, and the sand road cycling and walkway Tõnu Family and road construction. 2. Work was started immediately with a written order of the Client Representative (hereinafter Alustamiskorraldus) on the date specified, which are issued not later than 05.31.2017. 3. Work as a deadline is 3 months from the date indicated Alustamiskorralduses. The deadline for the works to be finished all the work submitted to the Contracting Authority and signed by both Parties täitedokumentatsioon works, delivery and receipt. 4. Completed works are carried by the work actually carried out. Contractor Project fixes "Completed Works Act" actually made during the calendar month backlog and calculate the unit prices of the costs of the work. 5. All interested participates in co-financier, who will pay the Contractor for the construction of Phase II and Toome tee Tõnu Family road building cost. Cofinancier Contractor pays the bill for 30 (thirty) calendar days from the invoice. 6. A product made the basis for payment under the contract is done "Completed Works Act" with the bill. Customer shall pay to the Contractor within 30 calendar days after the contract executed under the "Completed Works Act" and the receipt of the invoice. 7. Client does not provide for the possibility of an advance payment. 8. The Contractor is responsible for compliance with the terms of the Agreement, the safety and the quality of the warranty period of 60 months. The warranty period will begin after completion of the works contract by the signing of the act of delivery and receipt date.

Home ÜVK Tabasalu streets and storm water piping for the establishment and reconstruction of design and construction

Osaühing Strantum - MEELIS HÄRMS | Published April 4, 2017
cpvs
45231300, 71250000

Procurement is an object of Harku Parish Home and Home Residential area adjacent the cross streets and estates in the water, wastewater and stormwater drains construction and reconstruction. Contract volume of work shall be drawn up for carrying out the necessary project documentation and obtained all necessary approvals and permits to complete the work complete.

Harkujärve school building reconstruction and extension

Harku Vallavalitsus - Siiri Pelisaar | Published March 29, 2017
Winner
RIITO Ehituse AS, 11903308, Koidu tn 27, Tallinn, 10136 Eesti (EE) Tel.: +372 53801509
cpvs
45214200

1. The purpose of the procurement is Harku parish, Harku lake village in Harkujärve school building reconstruction and expansion according to the project O2 OÜ drawn Job No. 16-09 "Harkujärve primary school reconstruction and extension of the main project" (Appendix 1, available electronically link given in the contract documents) and the Bill of Quantities (Form 8). 2. The contracting authority concludes a successful bid by the tenderer of the contract for which the project is given in the contract documents Annex 2. 3. Harkujärve existing school building reconstruction can start from the beginning of the summer school holidays (from 06/10/2017). Reconstruction of the existing building should be completed by 08.15.2017 to 1.09.2017 school to start learning activities. Expansion of the school building will start as soon as possible after the conclusion of the contract, taking into account the fact that the school learning takes place, and the execution of works deadline is 30/11/2017. This deadline must complete all the work, the Client täitedokumentatsioon, the parties signed the delivery and receipt of construction and use has been given. 4.Tellija does not provide for the possibility of an advance payment. 5. The Contractor is responsible for compliance with the terms of the Agreement, the safety and the quality of the warranty period, which is 36 months. The warranty period will begin after completion of the works contract by the signing of the act of delivery and receipt date.

Swan's path (from Klooga highway to serve the dunes) and light traffic in the dunes of the promenade construction

Harku Vallavalitsus - Siiri Pelisaar | Published March 27, 2017  -  Deadline April 19, 2017
cpvs
45233140

Job ID 014049 "(Appendix 1, available electronically link the tender document) and the Bill of Quantities (Form 8). 2. The contracting authority notes that the volume of procurement not included in the draft Luige tee 9 park construction, landscaping side of the promenade, the beach, playground area for children, sports games area Easy Home mini modules of wood and wood-laudiskattega footpath laudiskattega istumisplatvorm. 3. The contracting authority enters into with the successful tenderer submitted a tender award, which the project is given in the contract documents in Annex 2 to the final deadline for entries (08.11.2017) must be completed by all works submitted to the Contracting Authority and signed by both Parties täitedokumentatsioon works, delivery and receipt. 5. The Supplier must take into account that the first construction phase of the contract will start construction of the promenade, to enable visitors and local residents have access to the coastal zone. Contractor Project fixes "Completed Works Act" actually made during the calendar month backlog and calculates the unit prices of the costs of the work. Customer shall pay to the Contractor within 30 calendar days after the contract in accordance with the form of "Completed Works Act" and the receipt of the invoice. 8. The client does not provide for the possibility of an advance payment.

Home ÜVK Tabasalu streets and stormwater piping construction and reconstruction of the design and construction

Osaühing Strantum - MEELIS HÄRMS | Published March 14, 2017  -  Deadline March 30, 2017
cpvs
45231300, 71250000

Procurement is an object of Harku Parish Residential area in Home and Home transverse streets and estates adjacent to the water, wastewater and stormwater sewer pipelines construction and reconstruction. Contract volume of work shall be drawn up for carrying out the necessary project documentation and procured all the necessary approvals and permits to complete the work as a whole.