"The engineering, supply and construction contract for the power station block of nr.8 Africa modification retort gas utilization" refurbishment over the supervision of the owner

Enefit Energiatootmine AS - Dina Kovriga | Published November 18, 2016  -  Deadline December 23, 2016
This task requires technical supervision by the owner of the service ordering work to be made at the "Engineering, procurement and construction contract for Modifications of the energy block no 8 at Eesti power plant for the utilization of retort gas" (hereinafter contract and build) standard. Construction-assembly works of the general contractor Amec Foster Wheeler Energia Oy. Construction and assembly works, the approximate time of exercise is 01.06.2017 - 31.12.2017. The service is paid for actual time worked. Construction and assembly works, a brief description, see the attached file "Scope of modification.docx" (Note 7). The owner of the construction supervision must be carried out in the following areas: - construction (construction according to the owner's building code). Mechanical work, welding, assembling equipment and structures; - Electricity and automation.

The "Narva district heating system in the main pipeline reconstruction" of the administration and advise the EIC financed with assistance from the Structural Funds

Enefit Energiatootmine AS - Dina Kovriga | Published November 10, 2016
EIC-demand service is designed to help support the project financed by the Structural Funds "Narva district heating system in the main pipeline reconstruction" of the administration and consulting. Financing of the project will be 50% of the Cohesion Fund, measure 6.2 "Effective thermal generation and transmission" activity "outdated and inefficient heat piping renovation" (6.2.2). Project Number: 2014-2020.6.02.16-0184.

Pulbitorustike No. 2, 3, 4, 6 and 7 spots Renovation of Eesti Power Plant

Enefit Energiatootmine AS - Natalja Beljajeva | Published November 22, 2016  -  Deadline December 12, 2016
The aim of this contract is pulbitorustike No. 2, 3, 4, 6, and 7 sections design, dismantling, procurement and construction-assembly works pulbitorustike replace the gantry 114 Support to the Estonian Power increases bagerpumpla second outlet of the building. The procurement shall be carried out in the tender documentation conditions and the following standards and normative documents in accordance with: EVS 811: 2012 907-2010 EVS, EVS 865-1: 2014 and EVS 865-2: 2014 and all the legislation in force in Estonia. This includes the procurement of all necessary design, demolition, erection and construction, materials, activities, work, labor, job switching, density tests, inspections, adjustments, inspections, approvals and documentation sets, which are necessary for the successful performance of the contract, and that " turnkey "-üleandmiseks. Procurement Technical description - see "Technical Specifications (Appendix 7) and drawings. Deadline for completion of the work - the latest 31.08.2017.a. from the moment of signing of the contract.