Public tenders for construction in Vejle Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Region Syddanmark | Published June 30, 2016
cpvs

Construction work

Construction work

Boligselskabet ØsterBO, De Vanføres boligselskab, afd. 1 | Published May 18, 2016  -  Deadline June 14, 2016
cpvs

Construction work

Construction work

Boligselskabet ØsterBO, De Vanføres boligselskab, afd. 1 | Published June 1, 2016  -  Deadline June 14, 2016
cpvs

Construction work

Construction work

Region Syddanmark | Published December 16, 2015  -  Deadline January 12, 2016
cpvs
45000000, 45215100, 45443000

Construction work

Construction work

UCL, University College Lillebælt | Published March 11, 2015  -  Deadline April 8, 2015
cpvs
45000000, 45111200, 45111240, 45112000, 45112200, 45112210, 45112310, 45112441, 45112500, 45113000

University College Little Belt ("UCL") hereby offers by readvertisement construction contracts in connection with an upcoming renovation, conversions and extensions of the current Engineering University (Faculty of Engineering) located at the Niels Bohr Allé 1, DK-5230 Odense M. The property must subsequently houses a total campus of UCL's programs and other activities located in Odense area. The existing building was built in up to 3 levels in the period 1959-1965 with less additions in 1992 and 1998. The Battle Resumes in brief works Renovation, renovation / refurbishment of approximately 33,250 m² of teaching, administration and canteen facilities. Conversion and reconditioning of approximately 12,800 m² basement areas. Construction of three new attics totaling approximately 3 250 m² on three of five teaching wings. Construction of new 1 level building of about 600 m² of Radiography. Construction and gardener working in the construction of new parking spaces and refurbishment of the courtyard. The described work is divided into three (3) delentrepriser as follows: Lot C: Gulventreprise 9-11 000 000 DKK Entreprise D: Painter Entreprise, 8-10 000 000 DKK Lot G: Construction Construction 10-12 000 000 DKK Each subcontract handled procurement law separately, so that there is prequalification, allocation and contracting separately. The applicant should therefore clearly specify which / what subcontract (s) applied for prequalification on.

Construction work

UCL, University College Lillebælt | Published November 12, 2015
cpvs
45000000

University College, Campus Odense deals degradation and environmental sanitation works, repair and maintenance, installation works and construction works with a total building stock of around 50,000 m2.

Construction-related services

Haderslev Kommune og Region Syddanmark | Published September 18, 2015
Winner
KPF Arkitekter A/S
cpvs
71500000, 71530000, 71200000, 71300000

Total Consultancy in connection with the construction of the Health Horley as new construction. The health center will house the following municipal and regional activities: Within psychiatry and abuse, the following municipal services included: - pårørendeundervisning - teaching own illness - offer of physical activity for people with mental health challenges - Counselling Centre (treatment and counseling for alcohol abuse) - Social psychiatric bostøttekorps - café and be nowhere activities. In the health center, the following regional local psychiatric services included: - general outpatient treatment - individually and in groups - outreach teams - base for regional specialized teams (oligofreni, Forensic Psychiatry, etc.) When they are in town - pårørendeundervisning - teaching own illness - awareness and open advice about mental illness (PsykInfo). The following municipal health services included: - general lifestyle offers (smoking cessation, exercise opportunities and others) - offers for chronically ill - nursing clinic (integrated in the Counselling Centre) - incontinence clinic - health care - projecting visitation and immediately dispensing devices - offering cancer rehabilitation - services for socially disadvantaged and mentally ill - other health and lifestyle offers - for citizens with late brain - functional test to describe and clarify the person's working - activation for example in the form of physical training and guidance about KRAM factors for upgrading citizen to employment. Health Offers - regional activities following regional health services included: - Midwives Consultation - Doctor on Call - Mammografibus - Blodbus. Similarly desired option for bringing health garden. The vision is to establish a health center are perceived as visible, accessible and attractive, and at the same time with the discretion that is necessary for the target groups. The contract includes consulting services in the form of total consultancy - architectural and engineering services - in connection with the construction of around 4,500 m2 new building and an option on the opportunity to expand the construction of up to about 2500 m2 as decided in the proposal phase. The total financial framework for the project, excluding options on enlargement and health garden is expected to be around good 71 million DKK by index 131.0. Total Counseling Service: Construction management and supervision offered but only as options.

Architectural, construction, engineering and inspection services

Vejle Spildevand A/S | Published April 7, 2017  -  Deadline May 8, 2017
cpvs
71000000, 71200000, 71300000, 71400000

Vejle Wastewater provider hereby consultant performance in relation to a climate protection project for part of Vejle Østby.

The project will contribute to making the district resilient / robust to meet future heavy rain and large quantities of water.

The aim is to create a supplement to existing drainage systems from Nørremarken and Østbyen by establishing controlled drainage possibility of terrain for rainwater crowd by torrential rain events.

Total consultant performance in the design and construction process includes architects, landskabsarkitekt- and engineering advice in the preparation of conceptual design, preliminary project and main project and supply of all construction works with stage-part design and commissioning as well as derivative work thereof.

The Contracting Authority expects that the construction works are offered as two lots in the invited tender which respectively. pump construction incl. machine delivery and construction of civil works.

Total consultant must also perform all services related to the developer's obligations concerning health and safety at the construction site Work Coordinator in both the design phase (P) and the construction phase (B). Work coordination during the construction phase carried out in cooperation with the contractor.

Total Advisor provides in addition to project monitoring and supervision up to and including plant delivery.

Total consultant The benefit also covers all services provided in connection with the construction management.

The task is described in more detail in the document 'General conditions', 'Technical background note', 'ATR for subprojects' and in other documents.

Construction work for buildings relating to health

Region Syddanmark, Psykiatrien | Published November 20, 2015
Winner
Hans Jørgensen & Søn Entreprenører A/S
cpvs
45215100, 70122210

The contractor will supply a turnkey construction including building land. With turnkey believed all construction / building related, ie including grounds, parking, access roads - anything but resolved fixtures. It is not a requirement that there is a new / newly constructed buildings. Thus, there will also be offered a renovation project, a previously built project or equivalent. The building will either could be a single, self-contained building or a condominium in a larger building complex. The building will accommodate around 5,000 m2. Psychiatry in Southern Denmark would however also that the bidders disclose the possible extension of the construction of up to about 2000 m2, which must be well integrated with the offered construction. Psychiatry in Southern Denmark want the greatest possible influence on building design and quality, and the project be pursued as a turnkey contract, but expected by partnering similar principles for the development phase. There must including expected a high degree of user involvement in the development phase.

Construction work for multi-dwelling buildings and individual houses

AAB Vejle | Published August 12, 2016
Winner
MT Højgaard A/S
cpvs

Construction work for houses and residential buildings

Construction work

Region Syddanmark | Published November 17, 2016  -  Deadline December 16, 2016
cpvs
45000000, 45215100, 45443000

The list of project concerns facade replacement of parts of the ward building C1 in Ribe County Hospital, Esbjerg Hospital, Finsensgade 35, 6700 Esbjerg.

Finally, we expect the latter part of the replacement of the facades of bed building, stage 5, completed in 2018.

The contract value of the offered main contract, extensive stage 4 shall not exceed in itself threshold for EU tenders.

The list of project concerns facade replacement of parts of the ward building C1 in Ribe County Hospital, Esbjerg Hospital, Finsensgade 35, 6700 Esbjerg.

Finally, we expect the latter part of the replacement of the facades of bed building, stage 5, completed in 2018.

It offered the main construction contract has a contract value which is significantly less than the EU threshold for public works.

Therefore, there is hedged with interimsvægge o. The like.

Demolition Works contains debugging.

Windows in the new facade must contain blinds in glazing for climatic foreclosure mm

There are prepared facade concept that underlies the tender documents.

Facade replacement covers about almost 1 600 m².

Contract Basis is a detailed functional tender, where the main contractor is required to recognize minimum requirements under the detailed design of glass facades, screen tile and assembly systems.

Provisional timetable for the main subcontract construction (including design) is expected to be mid-February 2017 31.12.2017.

Construction consultancy services

Region Syddanmark, Sygehus Sønderjylland | Published October 12, 2017
Winner
Nordic Office of Architecture
cpvs
71530000, 71300000, 71200000

Region of Southern Denmark, Syria, Jutland, has signed a contract for total counseling concerning Sønderborg Phase 2 'Ambulatory Court'.

The building project comprises overall renovation and conversion of floor 0 (ground plan) incl. Lobby. The following specialties are expected to have main functions in the Ambulatory Square:

- Lung medicine

- Nephrology

Endocrinology

- Orthopedic surgery - elective

- The eye area

- Ear / nose / throat area.

In addition, a number of other specialties will have local offers in the Ambulatory Square.

The construction project comprises approx. 5 250 m², of which approx. one fourth is easy renovation, while the rest is heavy renovation (about 1,800 m²) and renovation of the usual character.

The total construction budget of the project is 70 205 000 DKK excl. VAT.

The project is expected to be offered by the EU in specialist journals on the basis of main projects and divided into 3 stages.

Expected use of the final stage in the first half of 2020.

Region of Southern Denmark, Syria, Jutland, has wanted a comprehensive advisory team with both engineering and architectural skills, as it can be stated that it is estimated that the main focus of the offered overall advisory task lies in engineering disciplines.

An advisory team was requested, which, in addition to being able to provide a strong project management and general discipline with the emphasis on engineering disciplines, can also provide specialist competence in rebuilding (health) buildings in operation.

The overall advisory contract includes overall initial advice in the form of construction programs as well as advice in connection with project management, design, construction management, professional supervision, project follow-up and 1 year inspection.

The total consultancy contract was offered in restricted tender in accordance with sections 58-60 of the Public Procurement Act. Only prequalified bidders could offer an offer.

Construction work

Haderslev Kommune og Region Syddanmark | Published December 22, 2015  -  Deadline February 2, 2016
cpvs
45000000, 45215100, 45200000

Haderslev Municipality and Region of Southern Denmark invites companies interested in writing to submit an application for pre-qualification for participation in the restricted tender for subcontracts for the construction of the Health Haderslev. To the south supermarket, car park and city. 4500 m2. The building contains facilities for local mental health services, midwife center, abuse center, Children and Family, projecting visitation private medical practices, health clinic, health and prevention and emergency service system, as well as a number of common features of these. Also, a teaching kitchen. On both sides of the building constructed parking areas and the south being prepared for landscaping. To the south is established two large steel balconies overlooking the city. Floors performed predominantly by rail goods and in public areas with wooden floors in locker rooms and restrooms performed floor tiles. Plumbing works include common plumbing installations, the building is supplied by district heating. Ventilation works include mechanical ventilation spread across multiple systems by function / division. The work offered in trade contracts with the following allocation of contracts: Råhusentreprisen incl. bygggeplads, land - and sewer work Bricklayer Carpenter smith Painter Inventory plumbing Ventilation Floor El Landscape / coatings. For the construction project provides an overall economic framework excl. VAT at 58.9 million DKK including the following: - Basic Expenses - Landscaping - Mechanics Expenses - Weather-related measures - Contingencies.

Construction management 2015 / S 231-420075

Haderslev Kommune og Region Syddanmark | Published November 28, 2015  -  Deadline January 8, 2016
cpvs
71247000, 71000000, 71200000, 71240000, 71300000

Haderslev Municipality and Region of Southern Denmark invites interested consultants to writing to submit an application for pre-qualification for participation in the limited supply of construction management in the construction of the Health Haderslev. The contract covers the provision of project management, including project review of the project proposal and control of the main project in the performance of health Haderslev. For the task is associated with the following advisers responsible for the contracting, technical supervisor and co-ordination of the work environment: Total Counselor KPF A / S During Advisor Drias A / S During Advisor Esbensen Consulting Engineers A / S. The two builders want a construction management, independent / impartial in relation to these other consultants on building project. Total Consultancy Agreement with KPF A / S concluded on the basis of EU procurement. Together with the contract value of total consultancy contract is construction management contract EU tender liable, even if the contract value of construction management job is not in itself exceed the thresholds for EU tenders. The project is planned offered in trade contracts. The construction is carried out in Clausensvej 3 and 5 of Haderslev with a total size of the acc. BBR of 12 492 m 2 and is made up of two adjacent land registers - Clausensvej 3, matr. No. 1031 to 6400 m2 and - Clausensvej 5, matr. No. 4740 of 6492 m2. There is new construction and the building is scheduled for approximately 5,000 gross square meters. For the task provides an overall economic framework excl. VAT at 58.9 million DKK excl. VAT (index 131.0, September 2013), including the following: - Basic Expenses - Landscaping - Mechanics Expenses - Weather-related measures - Contingencies. Construction management contract is likely to have an execution period of about . 16 months completed in early 2018. In addition, project review of project proposals and control of the main project specifically focusing on control of schedules.

Construction consultancy services

Region Syddanmark, Sygehus Sønderjylland | Published February 9, 2017  -  Deadline March 10, 2017
cpvs
71530000, 71300000, 71200000

South Denmark, South Jutland Hospital, providing comprehensive advice regarding Sønderborg Phase 2 »Ambulatorietorvet '.

The following specialties is expected to have the main features of Ambulatorietorvet:

- Respiratory Medicine

- Nephrology

- Endocrinology

- Orthopedic surgery - elective

- Eye area

- Ear / nose / throat area.

Furthermore a number of other specialties have local deals in Ambulatorietorvet.

5250 m², of which about a quarter is easy renovation, while the rest are respectively heavy renovation (around 1,800 m²) and renovation of a standard nature.

The project's total construction budget is 70,205,000 DKK excl. VAT.

The execution of the project is expected EU offered to trade contracts on the basis of the main project and divided into 3 stages.

Expected commissioning of the final stage in the first half of 2020.

South Denmark, South Jutland Hospital wants a total consultant team with both engineering and architectural skills, while this can be stated that it is estimated that the emphasis of the total offered counseling job is on the engineering disciplines.

Please provide a team of consultants, in addition to field a strong project management and general disciplines with emphasis on the engineering disciplines, also can put up with specialist competence in conversion of (health) buildings in operation.

The offered consultancy agreement for overall initial advice in the form of the construction program as well as advice for project management, design, construction management, site supervision, project monitoring and defense of the 1-year inspection.

Only pre-qualified bidders will be able to bid for the job. If you wish to be pre-qualified, you must submit an application.

The tender notice and the prequalification conditions of the tender documents containing information on the conditions for submission and evaluation of prequalification applications.

Second

Prequalification for the main construction contract for conversion of Syrenparken, Børkop

Region Syddanmark | Published December 18, 2015  -  Deadline January 29, 2016
cpvs
45200000

The building includes conversion of approximately 3,657 m² gross area distributed on one level. Merging the current 2 homes / rooms for larger residential units, where each unit will have its own entrance from the outside. Common hallways converted into cozy seating niches and kitchen function for training purposes. The interior works within degradation, performance of new walls, replacing all ceilings, new linoleum, exports of furniture, as well as covering the atrium Existing installations Electricity and plumbing adapted to new layout and function. Performed new separate ventilation systems for each home and the expansion of existing vent system to the common areas and kitchen. Expected construction period is the beginning of April 2016 to the end of November 2017. The construction work is transferred deliverables in several stages. Syrenparken is with full occupancy of clients throughout the construction period, and will between delafleveringerne be breaks in the construction phase to provide peace for moving the relocation of residents. The total craftsman expense for the entire construction project is estimated at 32 million. kr. excl. VAT.

Construction consultancy services

Boligforeningen ØsterBo | Published November 23, 2016  -  Deadline December 19, 2016
cpvs
71530000

Div. 18 Moldeparken is a public housing estate built in the late 60s and early 70s, consisting of 350 family homes spread over 7 blocks and a total gross floor area of ​​approximately 30 000 m². The department will be rebuilt and renovated through the National Building Fund support to achieve higher standard of comfort and convenience, and better accessibility inside and out, including restyled exterior spaces. The renovation / refurbishment carried out in three fairly distributed levels respectively availability rebuilding the elevator (accessibility properties), renovation / update with elevator (comfort housing) and renovation / updating without elevator (renovation of housing). This lead consultant offering includes design and tender and contracting in large lots, while the construction management and fagtilsynsopgaven offered separately and later. We search for a consultant team with both the engineering, architectural and landscape competencies targeted renovation and reconstruction technique. Håndv.udgift incl. VAT is about 283 000 000 DKK.

Total Consulting assignment includes preparation of a comprehensive building program on the basis of a policy master plan and construction barge paradigm attached offer and then drawing up a coherent outline, and the project, authority project and main project. The assignment also includes supply / contracting in storentreprisern

Advisory services and skills relate to the conversion and renovation technology and especially management of price and quality based on the client's budget. The services will to a lesser extent include form and design, except the outdoor area to be refurbished and rethought.

Services related to construction 2014 / S 234-412210

Haderslev Kommune og Region Syddanmark | Published December 4, 2014  -  Deadline January 9, 2015
cpvs
71500000, 71200000, 71300000, 71530000

Services related to construction Haderslev Municipality together with the Region of Southern Denmark invites interested consultants to writing to apply for the limited supply of complete consulting services for the construction of the Health Haderslev as new construction. The health center will house the following municipal and regional activities (enumeration to give potential applicants a basis for assessing the nature of the task and is therefore intended to be final and / or exhaustive): Within psychiatry and abuse, the following municipal services included: - pårørendeundervisning - teaching own illness - offers of physical activity for people with mental health challenges - Advisory Centre (treatment and counseling on alcohol and misuse) - Social psychiatric bostøttekorps - café and be nowhere activities. At the health center, the following regional local psychiatric services included: - general outpatient treatment - individually and in groups - outreach teams - base for regional specialized teams (oligofreni, Forensic Psychiatry etc.) When they are in town - pårørendeundervisning - teaching own illness - awareness and open advice about mental illness (PsykInfo) The following municipal health services included: - general lifestyle offers (smoking cessation, exercise opportunities and others) - offers for chronically ill - nursing clinic (integrated in Counselling Centre) - incontinence clinic - health care - advanced visitation and immediately dispensing aids - Deals on cancer rehabilitation - offer to socially disadvantaged and mentally ill - other health and lifestyle offers - offers to citizens with late brain injury - function test for describing and clarifying the person's working - activation for example in the form of physical training and guidance on KRAM factors for upgrading citizen to employment . Health Offers - regional activities following regional health services included: - midwife consultation - medical service - mammografibus - blodbus. Similarly desired option for bringing health garden. The vision is to establish a health center are perceived as visible, accessible and attractive, and at the same time with the discretion that is necessary for the target groups. It is therefore expected that the advisors challenge conventional thinking in their solutions. The contract includes consulting services in the form of comprehensive advice - architectural and engineering services - in connection with the construction of around 4,500 m² new construction and optionally the possibility to extend the construction of up to about 2 500 m² as decided in the proposal phase. The overall economic framework for the project, excluding options on enlargement and health garden is expected to be around good 71 million DKK by index 131.0. Total Consulting Performance: Construction management and supervision offered, however, only as options.

Construction work for multi-dwelling buildings and individual houses

AAB Vejle | Published July 15, 2015  -  Deadline September 11, 2015
cpvs
45211000

Building renovation of the 40-floor buildings with 3 floors partially exploited roof and basement covers a total of 607 homes, stairwells and communal house. Residential blocks are built in the period 1950 to 1958. It is different, what type of renovation homes must undergo. The main contract includes the following work: Soil and plant construction site, degradation, environmental sanitation, concrete, masonry, steel, carpentry, façade, plumber, plumbing, ventilation, electricity, lift, painter and kitchen / bath fixtures. Residents must during the renovation re-homed. The resettlement takes place in AAB's own housing and temporary removable housing. Floor Residential blocks renovated consecutively.

Construction work for buildings relating to health

Region Syddanmark | Published October 14, 2017
Winner
5E Byg A/S
cpvs
45215100, 71000000

The development of the hospital in Aabenraa, which is a project under the quality fund, is carried out in 2 phases. Phase 1 contains FAM, cardiology, reception kitchen and a family house with pediatrics incl. neonatal, obstetrics and gynecology and was taken into use in autumn 2014.

This offer focused on the phase 2 of the project, which primarily deals with the establishment of beds and laboratories, intensive care units, laboratories, wards, chapels, porter and cleaning sections, bed linings, ambulance centers, warehouses, office areas, clothing, heliport and access and parking facilities.

Several of the tasks were offered as a function offering, where the chosen main contractor was to design the final solution as part of the contract.

Main features include phase 2 as the offer relates to the following construction work:

- Sewerage and utilities in terrain, including refurbishments

- Less asphalt, coating and gardener work, including P-areas

- Seniors

- Therapy

- Special ampulations

- Intensive and awakening

- Laboratory center

- Office, meeting and teaching facilities - Clinical areas

- Inventory

- Security rooms.

Systems, equipment and fixtures:

- Loose fixtures and medical devices.

Several of the tasks have been offered as a function offering, where the chosen main contractor as part of the contract will design the final solution.

The offer has included a main contract with new construction and minor related renovation work in a major part, and a number of selected renovation work in an option part.