Construction work

Domea.dk s.m.b.a. | Published November 25, 2016  -  Deadline December 21, 2016

To ensure optimum handling of particularly new construction projects in terms of time, cost and quality, will Domea.dk conclude a framework agreement for the turnkey.

The framework agreement includes buildings with variation in the projects and the construction method depending on the specific project. There is thus no concept / modular buildings, but individual projects listed in the turnkey.

The tender form is restricted by Contract Act §§ 58-60.

The specifications shall include the formal conditions for the implementation of the procurement process. It is therefore important that the applicant for prequalification and later the successful bidders put themselves thoroughly in the document.

To achieve an appropriate competition will Domea.dk prequalify up to six applicants to bid on the framework agreement.

Based on the tenders received awards Domea.dk framework agreement for the four offers that have the best ratio of price and quality.

Construction work

DSB SOV | Published November 18, 2016

DSB faces major project where the East Gate station to be modernized so that it can handle the increased rejsetal due to Metro City Circle opening in mid 2019. The station's premises must be rebuilt and modernized at the same time, that there should be a partial return to the old constructions built in 1896-97. Finally, the building's floors, facades and roof undergo a careful renovation, so it will still appear well-maintained and beautiful for years to come.

Renovation, repair and renewal work consists primarily of the following work:

- Main Rehabilitation and reinforcement of the deck structure over the tracks

- Main Renovation of half-timbered facades

- Cleaning up the old technical installations and the establishment of routes for new installations for future lease

- Renovation and refurbishment of leases

- Replacement of two platform lifts

- Establishment of new waste disposal area.

The total renovation must be done with the station in full operation.

Via qualification system TransQ DSB will implement the negotiated procedure around the main construction contract to underpin modernization. The purpose of this prior information notice is to make the market aware of the possibility to be qualified in TransQ as DSB expects to complete a pre-qualification among the actors who recorded in TransQ the codes 9.1.99, 9.4.1 or 9.4.99 primo december 2016.

DSB expects the negotiated procedure and the corresponding allocation is completed in the spring of 2017 and the contract will be awarded in April 2017. Construction works are considered to begin in early Q2 2017 and completed by the end of Q2 2019. The main contract to be implemented under complex relationship - with regard to the full, continuous operation and extensive construction projects around the Baltic Port station also - and under a tight schedule, including as a result of considerations to include train services.

Construction work

Boligselskabet Domea Solrød, Afd. 10308 — Timianhaven | Published November 17, 2016  -  Deadline December 15, 2016

The tendered contract concerns the construction of 44 terraced houses, 35 of which were in 2 floors and 9 in 1 floor.

The terraced houses with 2 floors is divided into 6 blocks, while homes in one floor are grouped in two blocks.

125 m².

The roof covered with sheet pan, and the facade covered with brick chips.

The terraced houses with 2 floors is divided into 6 blocks, while homes in one floor are grouped in two blocks.

125 m².

The roof covered with sheet pan, and the facade covered with brick chips.

The building zone is subject to local planning 206.1 Havdrup West.

Because the site is within the noise impact area of ​​Tune Airport, the windows of the building in accordance with the existing local plan provided with noise glass, and the roofs, noise-insulated.

For reasons of traffic noise from this road, the housing development under the existing local plan comply with a distance of 35 m from the center of the road.

Total Contractor shall on the basis of preliminary project (tender documents) to conduct further detailed design of the building, including incorporated comments as authority treatment causes the submission of additional technical documentation, calculations, make all surveyor deposits, additional geotechnical studies, etc..

Project supervised by the developer's technical building consultant, which implements the project review of the overall master project before provision must be started.

The design must also be in accordance with building code requirements and at a level of detail that is customary for subsidized public housing.

  • 1