Public tenders for construction in Odense Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Gas-production plant construction work

Bionaturgas Månsson A/S | Published April 17, 2015
cpvs
45255800

Gas-production plant construction work

Construction work

Odense Havn | Published February 21, 2017  -  Deadline March 20, 2017
cpvs
45000000, 45210000, 45241000, 45241100, 45243600, 71320000, 71322000, 71323200, 71332000, 45112600, 45221111

The contract put out for tender is a turnkey contract for the expansion of the port of Odense comprising extending quays, dredging of the new harbour bassin, the fairways and and the new quay and dredging and removal of any soft deposits locally behind the new quay including disposal of dredged but non-reusable materials, reclamation behind the quay and in hinterlands and establishment of revetment at the northern boundary of the reclaimed area. Pavement work on quay aprons and hinterlands with bound pavements, designing future pavement on hinterlands and establishment of drainage systems for quay aprons and hinterlands with bound pavements. All planning, design and authorities processing is also included in the contract.

The tender is a negotiated procedure and the procedure is further described in the Generel Terms of the tender documents.

The contract put out for tender is a turnkey contract for the expansion of the port of Odense, comprising all planning, design, authorities processing and execution work for the project.

The scope of the work divided into professional disciplines is as follows:

Port structures: Establishing a 125 meter extension of Quay 76 with a water depth of 11.0 meters, prepared for a minimum water depth of 12.5 meters. Establishing 250 meter section-quay with a water depth of 11.0 meters, prepared for a minimum water depth of 12.5 meters. Establishing 660 meter main quay with a water depth of 11.0 meters, prepared for a minimum water depth of 12.5 meters. Establishing a wing wall at the northern end of the main quay of approximately 40 meters. All with associated quay equipment (bollards, quya ladders, fenders etc.).

Dredging and reclamation: Dredging of the new harbour bassin and the fairways including reclamation and re-use or disposal of dredged material and re-use of cohesive material. Dredging of new basin between the fairways and the new quay including disposal of dredged but non-reusable materials and re-use of cohesive material. Dredging and removal of any soft deposits locally behind the new quay including disposal of dredged but non-reusable materials. Reclamation behind the quay at a width corresponding to the quay aprons, using clean friction materials up to the underside of the bearing layer for surfacing. Reclamation in hinterland. Removal of existing revetment at the northern end of Quay 76. Establishment of revetment at the northern boundary of the reclaimed area.

Roads and pavements: Pavement work on the quay aprons and hinterlands with bound pavements. Design of future pavements on hinterlands. Work for the crane site.

Installations: Establishment of drainage systems for the quay aprons and hinterlands with bound pavements.

All candidates are invited to an information meeting which will be held in the prequalification period on 2 March 2017 at 10 am at The Port of Odense, Noatunvej 2, 5000 Odense.

The tenderes will not receive remuneration for submitting the tenders.

Construction work

Region Syddanmark, Projektorganisationen for Nyt OUH | Published July 8, 2016
Winner
Ajos A/S
cpvs

Construction work

Construction work

Region Syddanmark | Published July 19, 2016  -  Deadline August 25, 2016
cpvs

Construction work

Construction work

Region Syddanmark | Published April 23, 2016
cpvs

Construction work

Construction work

Civica, Afd. C55 — Lensvej. Årslev | Published May 6, 2016  -  Deadline June 5, 2016
cpvs

Construction work

Construction work

Region Syddanmark | Published March 5, 2016  -  Deadline March 30, 2016
cpvs

Construction work

Construction work

Region Syddanmark | Published March 2, 2016  -  Deadline March 30, 2016
cpvs

Construction work

Construction work

Sortekilde — Kerteminde — Fyns Almennyttige Boligselskab | Published March 21, 2017  -  Deadline April 19, 2017
cpvs
45000000

Main contract for the construction of 38 new homes and remodeling for 31 new (conversion) homes in existing buildings at the address Hyrdevej 11, 5300 Kerteminde, matr. no. 26 cm Kerteminde Markjorder and associated parking and road construction.

Offering concerns main contract for the construction of 38 new homes and remodeling for 31 new (conversion) homes in existing buildings at the address Hyrdevej 11, 5300 Kerteminde, matr. no. 26 cm Kerteminde Markjorder and associated parking and road construction.

The new buildings are constructed multi-family buildings in 2 floors, the upper floor is entered with trempelspær. Conversion takes place in three of the existing buildings, one building has been declared worthy of preservation. There is currently project was carried out by lead consultant C & W Architects A / S and the counselor OBH-Gruppen A / S. Construction management is handled by C & W Architects AS.

Local Plan no. 285 applies to the area.

Construction work

Region Syddanmark | Published May 17, 2017  -  Deadline June 12, 2017
cpvs
45000000, 45215100, 71000000

The Region of Southern Denmark started work in 2016 in connection with the construction of the new Odense University Hospital (New OUH) for the provision of building development in 2 separate sub-projects DP01 and DP02. With this offer, 2 full-time contracts for project optimization, design and construction / layout of large parts of the hospital building (New OUH) are now included in the form of subproject DP03 - Vidensaksen (Delaftale 1) and subproject DP04 - Treatment and bedsection (Delaftale 2).

Both subcontracts are offered in full contract on partner-like terms in accordance with the rules on competitive dialogue, with the published dialogue material being intended to ensure the widest possible flexibility in relation to the use of minimum requirements and the forward-looking dialogue process. The Region of Southern Denmark, however, reserves the right to convert any requirements for minimum requirements in connection with the delivery of the final tender documents at the end of the dialogue.

Houses construction work

Fyns almennyttige Boligselskab, Afd. Jernstøberi | Published November 4, 2015  -  Deadline November 30, 2015
cpvs
45211300

Construction of 46 social housing units in the main contract on Foundry site in rings incl. all winter, vejrligs and drying measures. The work is scheduled from approximately March / April 2016 and expected completion is set at 17 months. The building must meet local building codes and low energy building class in 2015 and consists of: construction of 46 social housing units with a total living area of ​​4517 m2. Distributed by: - ​​7 pcs. 2-room apartments - 14 pcs. 3-room apartments - 25 pcs. 4-room apartments - and detached depots and service shed. Homes will be built in four blocks of varying height from two to five storeys with flat roofs: individual take performed as roof terraces. Refer to acompanied sketch drawings on prequalification URL.

Construction work

Boligforeningen Lillebælt | Published May 4, 2017  -  Deadline June 6, 2017
cpvs
45000000

Housing Association Lillebælt Division 28 wishes to build 28 general family homes and 20 flexible homes, totaling 3,770 gross metric tons, divided into 4 blocks on 2 floors including depots and common access and parking areas. The building is offered with a financial framework and project contest based on local plans, ideas and building programs.

New construction of 3,770 gross floor space floor building on 2 floors with depot sheds and common access and parking areas on the ground floor.

Construction work

Syddansk Erhvervsskole | Published October 17, 2017  -  Deadline November 14, 2017
cpvs
45000000

The offer relates to:

The building is built on an area, partly existing parking space and partly built with pavilions, both of which are closed during the present contract.

The indicative drawings show how the task can be solved and designed, as well as how the developer loosely anticipates space distribution and proximity principles.

Coatings around the building are dimensioned for driving with forklifts and the like.

Restoration of the remaining building site area so it appears as immediately before the construction site was established.

The assignment is offered in total contract with a target price of 51,000,000 DKK excl. VAT.

Click here https://permalink.mercell.com/75051238.aspx

The offer relates to:

The building is built on an area, partly existing parking space and partly built with pavilions, both of which are closed during the present contract.

The total contractor is responsible for the completion of the project,

authority processing and execution until no delivery.

Coatings around the building are dimensioned for driving with forklifts and the like.

Restoration of the remaining building site area so it appears as immediately before the construction site was established.

The assignment is offered in total contract with a target price of 51,000,000 DKK excl. VAT.

Construction work

Syddansk Erhvervsskole | Published November 21, 2017  -  Deadline December 19, 2017
cpvs
45000000

The offer relates to:

The building is built on an area, partly existing parking space and partly built with pavilions, both of which are closed during the present contract.

The indicative drawings show how the task can be solved and designed, as well as how the developer loosely anticipates space distribution and proximity principles.

Coatings around the building are dimensioned for driving with forklifts and the like.

Restoration of the remaining building site area so it appears as immediately before the construction site was established.

The assignment is offered in total contract with a target price of 70,000,000 DKK excl. VAT.

Click here https://permalink.mercell.com/76373142.aspx

The offer relates to:

The building is built on an area, partly existing parking space and partly built with pavilions, both of which are closed during the present contract.

The total contractor is responsible for the completion of the project,

authority processing and execution until no delivery.

Coatings around the building are dimensioned for driving with forklifts and the like.

Restoration of the remaining building site area so it appears as immediately before the construction site was established.

The assignment is offered in total contract with a target price of 70,000,000 DKK excl. VAT.

Architectural, construction, engineering and inspection services

Civica | Published April 20, 2016  -  Deadline May 18, 2016
cpvs

Architectural, construction, engineering and inspection services

Urban development construction work

Odense Kommune | Published December 16, 2015  -  Deadline January 18, 2016
cpvs
45211360, 45200000, 45112420, 45113000, 45111100, 45213312, 45223822, 45262212, 45262300, 45262310, 45262311, 45262210

Storentreprise wide deployment of underground parking in two storeys, including earthworks, retaining walls as Secant pile walls with ground anchors / stretch etc. as well as in-situ concrete work and the design, supply and erection of precast concrete, in sub-regions 1 and 2, respectively. Southern underground parking and associated connecting tunnel to the north parking garage, which is currently under construction. Furthermore, the contract degradation of existing parts of the parking garages and refurbishments in this regard. The work takes place in an area of ​​difficult access, existing built-up congestion, and alongside many other construction activities in the area. A contractor who is awarded the contract will be invited to engage in dialogue with the developer and other developers for the construction to be carried out on top of the basement. The dialogue aims to optimize the construction industry as a whole compared. Finances and time as well as the general organization of work, in order to achieve any. financial and time savings for all parties if possible.

Houses construction work

Fyns almennyttige Boligselskab, Afd. Jernstøberi | Published September 15, 2015  -  Deadline October 11, 2015
cpvs
45211300

Construction of 46 public housing in trade contracts on Foundry site in rings incl. all winter, vejrligs and drying measures. The work is scheduled from approximately 01.02.2016 and expected completion is set at 17 months. The building must meet local building codes and low energy building class in 2015 and consists of: construction of 46 social housing units with a total living area of ​​4517 m2. Distributed by: 7 pcs. 2-room apartments, 14 pcs. 3-room units 25 pcs. 4-room apartments As well as detached depots and service shed. Homes will be built in four blocks of varying height from two to five storeys with flat roofs: individual take performed as roof terraces. Refer to acompanied sketch drawings on prequalification URL. The work offered in five separate contracts: TEK - El, elevator, plumbing and ventilation JOB - earth, concrete, sewage and decomposition BE - Concrete, fiber concrete balconies MU - Bricklayer TØ - Carpenter (carpentry, furniture, facades, steel protection, etc.).

Building construction work

Boligforeningen Kristiansdal, afd. 34 | Published September 27, 2017
Winner
NCC Danmark A/S
cpvs
45210000

The offer relates to the redevelopment of the building contract.

The offer relates to the building contract price:

- Demolition works:

Heavy facades, light facades with windows, balconies, tires and light walls, windows, doors and lots, interior walls and tires and for elevators, concrete wall and deck walls, interior walls and roofing floors of light construction, kitchens, environmental hazard fabrics, interim relief facades.

- Closing work:

New facades with windows, cavity insulation and new binders in gables, facade covers, new entrances, new balconies, new altanges, roof coverings incl. roof wells and shelters.

- Masonry and concrete works incl. sewer:

Sewerage and sinks, foundations, elevators and exterior stairs, elevator shafts, wall and deck elements, demolition walls and floors in bathrooms, new walls and floors in bathrooms, wall and floor tiles, closure of holes in walls and tires and construction site equipment.

Construction work

Region Syddanmark | Published May 11, 2017  -  Deadline June 12, 2017
cpvs
45000000, 45215100, 71000000

With this offer, 2 full-time contracts for project optimization, design and construction / layout of large parts of the hospital building (New OUH) are now included in the form of subproject DP03 - Vidensaksen (Delaftale 1) and subproject DP04 - Treatment and bedsection (Delaftale 2).

The Region of Southern Denmark, however, reserves the right to convert any requirements for minimum requirements in connection with the delivery of the final tender documents at the end of the dialogue.

The total contract includes project optimization, design and execution of the part-project concerning Vidensaksen, which is described in detail in the project description in the tender documents.

The competition does not constitute a usual total contract, since a tender project must not be handed in with a fixed installment fee.

Instead, Region Syddanmark will, on the basis of the offer, assess the ability of the tenderers to ensure, in the light of the offerers proposal for the optimization process, compliance with the binding financial framework and thus the ability to enter into close and partnership-like cooperation with the Region of Southern Denmark on realization of the project in the light of the present Procurement and contractual basis.

The bidder who wins the offer of DP03 - Vidensaksen will thus be involved in close cooperation with the Region of Southern Denmark on the preparation of the final project in the light of the current tender document, where requirements for construction are described at the building program level.

II.2.7).

In connection with a possible offer of both DP03 - Knowledge Axis (Part-deal 1) and DP04 - Treatment and Bedside (Part-2), the bidder will have the opportunity to offer discount rates and optimizations across the two sub-projects / sub-agreements.

The total contract includes project optimization, design and execution of the subprocess for treatment and bed sections, which is described in detail in the project description in the tender documents.

The competition does not constitute a usual total contract, since a tender project must not be handed in with a fixed installment fee.

Instead, Region Syddanmark will, on the basis of the offer, evaluate the ability of the tenderers to ensure, in the light of the offerers proposal for the optimization process, compliance with the binding financial framework and thus the ability to enter into close and partnership-like cooperation with the Region of Southern Denmark on realization of the project in the light of the present Procurement and contractual basis.

The bidder who wins the offer of DP04 - Treatment and bed section will thus be part of a close cooperation with the Region of Southern Denmark on the preparation of the final project based on the present tender material, where requirements for construction are described at the building program level.

II.2.7).

In connection with a possible offer of both DP03 - Knowledge Axis (Part-deal 1) and DP04 - Treatment and Bedside (Part-2), the bidder will have the opportunity to offer discount rates and optimizations across the two sub-projects / sub-agreements.

Gas-production plant construction work

NGF Nature Energy Korskro A/S | Published December 7, 2016  -  Deadline December 30, 2016
cpvs
45255800

The agreement includes the establishment of 3 pieces. for storage tanks in concrete for liquid degassed biomass in the construction of the biogas plant Nature Energy Korskro A / S. The agreement also includes the design of the tanks incl. base plates, etc.