Public tenders for construction in Middelfart Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction of a new urban center consisting of City Hall, houses and shops.

Middelfart Kommune | Published October 9, 2014
Winner
5E BYG A/SGrønvænget 3Odense 5260 info@5e-byg.dk +45 63404140 http://www.5ebyg.dk/+45 63404141
cpvs
45000000

The task includes the design and construction of City Hall, houses and shops. In addition, the task purchase of residential development rights for the construction of approximately 6000 m² of housing and obligation to construct approximately 6000 m² of housing and any basement areas. In addition to the above, the task obligation to buy Municipality of Middelfart town hall in Carnarvon from the time of Middelfart municipality commissioning of the new town hall. Turnkey Contract expected to be signed 03.11.2014 and construction is expected to be handed 04/01/2017.

Architectural, construction, engineering and inspection services

Middelfart Spildevand A/S | Published July 14, 2015
cpvs
71000000, 71400000

Byudvikling gennem klimatilpasning i kvarteret omkring Kongebrovej i Middelfart.

Works for complete or part construction and civil engineering work

Middelfart Spildevand A/S | Published March 28, 2017
Winner
Arkil A/S
cpvs
45200000, 45212140, 45233222, 45233250

The project Climate town in Middelfart - Skanderborg Climate Adaptation implemented as a partnership between Realdania, Middelfart Sewage A / S and Middelfart Municipality. The project includes overall establishment of a number of facilities for stormwater management in the city surfaces that complement the existing sewerage network with additional capacity, flexibility and robustness. Climate Adaptation Solutions must be designed in a way that as a whole fits into the city and at the same time contributing to the townscape and the urban quality and life. The project area is overall just over 450 000 m² and the area extending from the villa neighborhoods in Middelfart's western outskirts, through the central city and the old town at the harbor. The project area is divided into three strands, which are offered as separate main contracts, in addition a supply of 'Aktivitetssskoven' so that expectedly will be offered 4 separate main contracts. This Order awarding the order relates Subarea 2 -Allékvarteret.

This offering of Aspect 2 - adaptation of Alle neighborhood, made up of an area in the middle part of the city climate strategy for the area is to utilize the terrain's natural fall to divert rainwater from road surfaces, on to the belt. The aim is to decouple as much rainwater from the detached areas as possible from the common sewer. This aims mostly everyday rain in the area handled locally. In heavy rain and extreme rain is overflow to adjacent areas.

All roads in the area decoupled from the common sewer, so all rainwater that falls on the roads, handled on the surface, either along the curb, in the trenches or in the rain asking roadside. From single family areas, the water continued to rain pray and to a greater vandhåndterende stairways at the Western Cemetery, and pass over the cemetery in both surface solutions and a closed pipe system. Then the water passes through another aquifer staircase installation and piping the Little Belt.

Works for complete or part construction and civil engineering work

Middelfart Spildevand A/S | Published November 11, 2016  -  Deadline December 9, 2016
cpvs
45200000, 45212140, 45233222, 45233250

This call is for Sub 2 - Alle neighborhood.

In heavy rain and extreme rain is overflow to adjacent areas.

Then the water passes through another aquifer staircase installation and piping the Little Belt.

Works included in Aspect 2:

Estimated includes the supply of this main contract the following works:

830 m²

200 lm.

1 500 m²

570 m²

225 lm.

200 m²

300 m³

700 lm.

35 lm.

160 lm.

- Indløbsbygværk in concrete: 1.

40 pcs.

II.2.7) are estimated and may be deviated to a lesser extent.

Works for complete or part construction and civil engineering work

Middelfart Spildevand A/S | Published September 13, 2016
Winner
Per Aarsleff A/S
cpvs
45200000, 45212140, 45233250, 45233222

45 pcs.

Works for complete or part construction and civil engineering work

Middelfart Spildevand A/S | Published November 26, 2015  -  Deadline January 7, 2016
cpvs
45200000, 45212140, 45233250, 45233222

About Climate town of Middelfart: Climate Adaptation Solutions must be designed in such a way that the overall fit in the city and at the same time contributing to the townscape and the urban quality and life. The project area stands at more than 450 000 m2 and the area extending from the villa neighborhoods in Middelfart's western outskirts, through the central city and the old town by the harbor. Division into lots: The project area is divided into three strands, which are offered as separate main contracts, and then a range of 'Aktivitetssskoven' so that expectedly will be offered four separate main contracts: Sub 1 - Forest neighborhood: This offering of Aspect 1 - adaptation of Forest neighborhood , consists of an area in the southwestern part of the neighborhood by Kongebrovej which consists of residential and recreational areas. In heavy rain and extreme rain is overflow to adjacent areas. The grooves channel water to a forest lake where the water is treated before it via Langedam and Posten Rende discharged into the Little Belt. Works included in Sub-1: Estimated includes the supply of this main contract following work: 350 m2 110 lm. 230 lm. 800 m2 200 m2 300 lm. 2500 m2 2 000 m3 150 lm. 50 lm.

Works for complete or part construction and civil engineering work

Middelfart Kommune | Published May 7, 2015
Winner
Trap VVS ApS
cpvs
45200000, 45310000, 45440000, 45330000, 45320000, 45430000, 45260000, 45422000, 45262520, 45300000, 45232440, 45236000

However, in connection with the renovation of the municipality's public rental housing both occur inside and outside tasks. Middelfart Municipality intends to conclude framework agreements for operating and building maintenance within the following 8 lots. - Lot 1, EL-works, including low voltage and IT cabling - Lot 2, Glazing works - Lot 3, Flooring Works, including linoleum and vinyl flooring - Lot 4, Earthworks and concrete work, including sewer and paving - Lot 5, Painter Works, including sanding, refinishing wood floors - Lot 6, Murer- and steel works, including tile and tile work - Lot 7, Carpentry and joinery - Lot 8, plumbing and gasarbejder, including technical insulation and plumbing The total annual volume of the lots is estimated to 10 000 000 DKK excl. VAT. Middelfart Municipality reserves the right to extend the framework agreement for up to 2 x 12 months. It is noted that it is only possible to send one request for prequalification per lot per. company or consortium, but the same company or consortium is free to bid on several lots. Prequalified applicants will be awarded a framework agreement on: - Lot 1 (EL-works, including low-power and IT cables) - Lot 4 (Earthworks and concrete work, including sewer and paving) - Lot 8 (plumbing and gasarbejder, including technical insulation and plumbing) Middelfart Municipality may at any time ask for documentation. Middelfart Municipality may at any time ask for documentation. The following tasks are not covered by this offer: - building management and energy management systems - Service Contracts of alarm, ventilation, elevator inspection. It is further noted that the framework agreements do not exclude Middelfart Municipality use of other artisans in emergency cases such as, but not limited to, storm and water damage. Pre-qualification conditions can be downloaded from http://www.middelfart.dk/Udbud

Works for complete or part construction and civil engineering work

Middelfart Spildevand A/S | Published October 3, 2017  -  Deadline October 30, 2017
cpvs
45200000, 45233222, 45233250, 45231300, 45230000

This offer relates to Sub-area 3 Bykvarteret.

The roads are reprofiled into a trough form so they can handle everyday rain as well as clouds.

At Knorretorv (the transition from Skovgade til Knorregade), the square is recreated with a tree and space for stays.

Works included in Part 3:

Estimately, the supply of this main contract includes the following works:

30 m²

7 400 m²

4 800 m²

1 400 lbm.

500 m²

4 500 m³

20 lbm.

10 lbm.

45 lbm.

Vestergade

25 lbm.

- Establishment of drainage arrangement at the harbor at Havnegade - including 2 pieces. Ø600 mm collecting wells, 1 pc. Ø1500 mm Regulator well, 1 pc. Ø2000 mm Sandbox well (4.5 m3), 1 pc. Ø2500 mm Lamel oil separator well and connection to drain well to Lillebælt and installation of WaStop return valve

20 pcs.

100 pieces.

- Cancellation of road drainage plants in Skovgade, Knorregade and Søndergade: 5 pcs. Ø425 mm wells, 77 m Ø315 mm, 17 m Ø200 mm incl. plug and associated line drainage

50 trees and 330 m² perennials.

II.2.7).

Works for complete or part construction and civil engineering work

Middelfart Spildevand A/S | Published October 5, 2017  -  Deadline October 30, 2017
cpvs
45200000, 45233222, 45233250, 45231300, 45230000

The KlimaByen project in Middelfart - Denmark's most beautiful climate adaptation is implemented as a partnership between Realdania, Middelfart Spildevand A / S and Middelfart Municipality. In total, the project involves establishing a number of rainwater treatment facilities in the city's surfaces, which complement the existing sewage network with extra capacity, flexibility and robustness. Climate adaptation solutions must be designed in such a way that they fit into the city as a whole and at the same time contribute to the quality and life of city and city spaces. The total area of ​​the project is 450,000 m², and the area extends from the residential neighborhoods in the western outskirts of Middelfart, through the central city and to the old town by the harbor. The project area is divided into 3 subdivisions, which are offered as separate main entrants, as well as an offer of 'Activity Skov' so that 4 separate main entrants will be expected to be offered. This offer relates to Sub-area 3 Bykvarteret.

Works for complete or part construction and civil engineering work

Middelfart Spildevand A/S | Published November 14, 2017  -  Deadline December 12, 2017
cpvs
45200000, 45233222, 45233250, 45231300, 45230000

The KlimaByen project in Middelfart - Denmark's most beautiful climate adaptation is implemented as a partnership between Realdania, Middelfart Spildevand A / S and Middelfart Municipality.

This main contract includes the execution of:

Urban development and climate adaptation of subarea 4 (Activity Forest) in Klimabyen - Middelfart.

The lights are open programmed surfaces while the space has a forest character - and this is where the water runs.

The activity forest is developed in the idea of ​​a multifunctional area of ​​movement with a wide range of rooms and elements that invite for different uses. Open slopes in the forest can be used for high-speed and sound outgoing activities.

Between the lights runs the water and the self-grown nature that, with its planting, creates a different intimate,

The KlimaByen project in Middelfart - Denmark's most beautiful climate adaptation is implemented as a partnership between Realdania, Middelfart Spildevand A / S and Middelfart Municipality.

This main contract includes the execution of:

Urban development and climate adaptation of subarea 4 (Activity Forest) in Klimabyen - Middelfart.

The lights are open programmed surfaces while the space has a forest character - and this is where the water runs.

The activity forest is developed in the idea of ​​a multifunctional area of ​​movement with a wide range of rooms and elements that invite for different uses. Open slopes in the forest can be used for high-speed and sound outgoing activities.

Between the lights, the water and the self-grown nature, which with its planting, create different, intimate, spatial experiences for the various forest users of the forestry.

At the activity forest's arrival from Julievej, parking is maintained, but the coating is refurbished and recycled so that it can be reused for skating and roller skating and other activities through legendary raising, which invites for another use when no parked cars are on the area.

Here's inspiration in SDU's Athletics and Movement Stadium, where classic athletics disciplines are combined with new approaches to movement.

This develops as a builder delivery in cooperation with Kompan.

The site's northernmost lightning is designed as a multifunctional surface with a varied rack and several different types of goals.

The lighting is dimensioned as a fairytale football pitch at the request of Vestre Skole, so that the conventional ball game can always be exercised.

The bridge as multifunctional typology is made into a motion-motivating object that, with varying degrees of difficulty, challenges both boys and girls.

Prequalification Totalrådgivning renovation, conversion and extension of Carnarvon School Nørregade 88 5592 Ejby

Middelfart Kommune | Published October 26, 2015  -  Deadline November 16, 2015
cpvs
71240000

Middelfart Municipality wants complete advice in connection with the renovation, conversion and extension of Carnarvon School. Total Advisor Performance is based on an established educational catalog of ideas with records such as functional diagrams and schematic floor plans indicating the buildings principle the main layout. Construction work is offered in trade contracts. The total budget for artisan expenditure is expected to amount to kr. 22.2 million excl. VAT. Total Counselor performance is expected to start in early January 2016 - commissioning the second quarter of 2018.
  • 1