Public tenders for construction in Horsens Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Andelsboligforeningen Odinsgaard, afd. 60 | Published May 18, 2016
cpvs

Construction work

Construction work

Andelsboligforeningen Beringsgaard | Published June 17, 2016  -  Deadline August 4, 2016
cpvs

Construction work

Construction work

Andelsboligforeningen Odinsgaard, afd. 60 | Published June 22, 2016
cpvs

Construction work

Construction work

Dansk Boligbyg A/S | Published March 28, 2017  -  Deadline March 29, 2017
cpvs
45000000

The project includes the construction of 28 social housing around 2677 m² and 32 private residences around 3 048 m² as one project. The project offered in 22 trades.

Construction work

Dansk Boligbyg A/S | Published February 25, 2017  -  Deadline March 27, 2017
cpvs
45000000

The project includes the construction of 28 social housing around 2677 m² and 32 private residences around 3 048 m² as one project. The project offered in 22 trades.

This project is carried out using the delegated client model whereby Danish Boligbyg A / S acts as delegated client on behalf of Domea Horsens dept. 60/11. This means that Danish Boligbyg A / S is committed to - on Domea Horsens dept. 60/11 behalf - to ensure compliance with the framework and support conditions for general construction and purchase of real estate, including the obligation.

The offering is a limited supply acc. Contract Law.

There prequalified 5 companies per. Lot invited to tender.

Construction consultancy services

Horsens HF og VUC | Published October 22, 2015  -  Deadline November 19, 2015
cpvs
71530000

CASA currently has sent architect performance for campus construction in the contract with an option for Horsens HF and VUC to use the consultancy agreement entered into in connection therewith. The idea is also that the institutions on campus reason to be shared, for example. canteen, sports hall and facility management etc. to achieve synergy gains. Overall, produced over 700 årskursister. The schedule for Horsens HF and VUC's move to campus ground (slaughterhouse area) is not yet determined, but currently envision Horsens HF and VUC of an occupation in August 2019 or 2020. The offered building consultancy assignment includes construction consultancy in the drafting of the basis for the movement of Horsens HF and adult education centers to campus ground (slaughterhouse area) and possible sale of Horsens HF and VUC's existing buildings and construction consultancy in connection with the conclusion of the purchase agreement with CASA, including building consultancy in the programming and execution of construction and commissioning of the construction.

Architectural, construction, engineering and inspection services

CASA A/S | Published May 31, 2016
cpvs

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Fjernvarme Horsens A/S | Published December 9, 2015  -  Deadline January 5, 2016
cpvs
71000000

Architectural, construction, engineering and inspection services

District-heating mains construction work

Fjernvarme Horsens A/S | Published October 4, 2016
cpvs
45232140

Provision of framework agreement on the construction and metalwork to District Horsens.

Consultancy in construction 2015 / S 205-372405

Horsens HF og VUC | Published October 31, 2015  -  Deadline November 19, 2015
cpvs
71530000

In order to develop the old slaughterhouse because the middle of Horsens railway station for an upcoming campus for education has Horsens Municipality transferred the property to CASA A / S. CASA A / S must be in charge of development of the property and the construction of buildings for the institutions that wish to move to the campus ground (slaughterhouse reason). The buildings used for educational assumed listed as a bespoke construction and so that educational institutions included purchase agreement with CASA for the purchase of the buildings. CASA currently has sent architect performance for campus construction in the contract with an option for Horsens HF and VUC to use the consultancy agreement entered into in connection therewith.

Architectural, construction, engineering and inspection services

Region Midtjylland, Hospitalsenheden Horsens | Published January 26, 2017  -  Deadline February 24, 2017
cpvs
71000000

Region Midtjylland hereby offers total consultant premium for the refurbishment and renovation of bldg. 5 bed building at the Regional Hospital Horsens, also called the tower block.

Total Counselor performance in the design and construction process includes architectural and engineering advice in the design, supply of all construction works, stage shared execution and commissioning as well as derivative work thereof.

Total Counselor allowance covers all services related to the safeguarding of client's obligations concerning health and safety, Work Coordinator at the design stage (P). Client's obligations concerning health and safety at the building site, Working environment coordinator (B) shall be provided by the developer.

Total Advisor provides in addition to project monitoring and site supervision up to and including the construction commissioning and overall consultant ensure that deficiencies identified by AB92 followed to full completion.

Total Counselor handles construction management.

Please see section II.1.4).

Works for complete or part construction and civil engineering work

Fjernvarme Horsens A/S | Published July 15, 2016  -  Deadline August 15, 2016
cpvs

Main for complete or part construction and civil engineering

Architectural, construction, engineering and inspection services 2015 / S 078-138244

Horsens Andelsboligforening af 1954 | Published April 22, 2015  -  Deadline May 18, 2015
cpvs
71000000

Architectural, construction, engineering and inspection services Provision of a framework agreement with a client and with more comprehensive advisors. Housing Association expects total capital investment of approximately 100 000 000 DKK including VAT, expected in 2 projects. Horsens Andelsboligforening 1954 wants to conclude a framework agreement on technical total consultancy in the planning and construction phases respectively for new construction, further preliminary comprehensive advice and assistance, such as through the implementation of programming and initial of explanations with principals and authorities as well as other relevant decisions.

Architectural, construction, engineering and inspection services

Fjernvarme Horsens A/S | Published December 3, 2015  -  Deadline January 5, 2016
cpvs
71000000

The contract covers a total of advice by the construction of a biomass-fired district heating plant. Counseling services include in brief initial advice, project management, project planning, project tracking, build management and technical supervision in relation to machinery, building construction, electrical and control systems, etc. Heating Horsens A / S has received approval Heating project proposal, "District Heating of the rest of the Horsens City area." Refer to Horsens Municipality's agenda of city council on 06.10.2015: http://www.horsens.dk/sitecore/content/Home/Politik/DagsordnerOgBeslutningsreferater/50.aspx proposal entails the construction of a heating plant burning biomass on Endelavevej Horsens Harbour next to the existing CHP plant, so the plant's total heat output increased to over 100 MW. The extension of the work on Endelavevej happens in two stages so that only builds 30 MW, the expected commissioning in late 2017, as well as storage capacity to 8 000 m3 of biomass, and to build an additional 30 MW to the expected commissioning at the end of 2020. Building Construction expected to be built to a height of about 27 meters and will house the boiler plant, indoor biomass storage and systems for flue gas, etc. Available under a chimney to a height of about 88 meters, equivalent to the height of the existing chimney at Horsens CHP, as well as an outdoor biomass storage. The proposal provides that there shall be prepared a new local plan and a new municipal plan for an area of ​​Endelavevej. In addition, the Environmental Protection Agency concurrent treatment of the case, which involves an environmental assessment and a full EIA study for the new plant at Endelavevej. The Contracting Authority has initiated these activities along with another counselor. The Contracting Authority has also assigned an architect with overall responsibility for building design, architecture, facades etc. The selected lead consultant, being a part of the design management expect that would coordinate and harmonize all advisers services.

Architectural, construction, engineering and inspection services 2015 / S 078-138255

Andelsboligforeningen Beringsgaard | Published April 22, 2015  -  Deadline May 18, 2015
cpvs
71000000

Architectural, construction, engineering and inspection services Provision of a framework agreement with a client and with more comprehensive advisors. Housing Association expects total capital investment of approximately 575 000 000 DKK including VAT, expected spread of 5-6 projects. Andelsboligforeningen Bering Gaard wants to conclude a framework agreement on technical total consultancy in the planning and construction phases respectively for new construction and renovation / rebuilding, also initial comprehensive advice and assistance, such as through the implementation of a physical master plan, programming and initial of explanations with entities and authorities and otherwise relevant decisions.

Works for complete or part construction and civil engineering work

Fjernvarme Horsens A/S | Published September 16, 2016  -  Deadline October 18, 2016
cpvs
45200000, 45251000, 45251250, 45262300, 45223210, 45261000, 45262311, 45262500, 45440000, 45443000, 45400000

Heating Horsens is building a new wood-fueled district heating boiler plants totaling 30 MW thermal power. As part of the plant construction plan Heating Horsens to expand district heating production by up to 60 MW, distributed on a project divided into two phases.

Construction of Multi-dwelling buildings 2015 / S 064-111853

Andelsboligforeningen Odinsgaard | Published April 1, 2015  -  Deadline April 29, 2015
cpvs
45211340

Construction of Multi-dwelling searched prequalify 3-6 firms to tender the main contract. Projects include 42 homes divided into approximately 4500 m2, so roads and parking areas, outdoor areas mm.

Works for complete or part construction and civil engineering work

Fjernvarme Horsens A/S | Published December 15, 2016
Winner
Per Aarsleff A/S
cpvs
45200000, 45251250, 45251000, 45262300, 45262680, 45262211, 45100000, 45110000, 45231100, 45231110, 45233222, 44160000, 44212410

Heating Horsens is building a new wood-fueled district heating boiler plants totaling 30 MW thermal power. As part of the plant construction plan Heating Horsens to expand district heating production by up to 60 MW, distributed on a project divided into two phases.

This offering includes the works, Heating Horsens should do business only in the context of plant construction and regards the project phase 1, which includes property development, civil engineering, sheet piling and pile driving and coating work for a 30 MW district heating systems.

Heating Horsens is building a new wood-fueled district heating boiler plants totaling 30 MW thermal power. As part of the plant construction plan Heating Horsens to expand district heating production by up to 60 MW, distributed on a project divided into two phases.

This offering includes the works, Heating Horsens should do business only in the context of plant construction and regards the project phase 1, which includes property development, civil engineering, sheet piling and pile driving and coating work for a 30 MW district heating systems.

The tender covers the following works:

- Earthworks

- Wire Work

- Grounding drains and drainage

- Concrete work

- Road Surveys

- pile driving

- sheet piling

- Coatings on vejkasser.

Duration of the contract is 24 months from the date of conclusion of the contract with option to extend for one time in 12 months (optional).

Architectural, construction, engineering and inspection services 2015 / S 234-425485

Fjernvarme Horsens A/S | Published December 9, 2015  -  Deadline January 5, 2016
cpvs
71000000

The contract covers a total of advice by the construction of a biomass-fired district heating plant. Counseling services include in brief initial advice, project management, project planning, project tracking, build management and technical supervision in relation to machinery, building construction, electrical and control systems, etc. Heating Horsens A / S has received approval Heating project proposal, "District Heating of the rest of the Horsens City area." Refer to Horsens Municipality's agenda of city council on 06.10.2015: http://www.horsens.dk/sitecore/content/Home/Politik/DagsordnerOgBeslutningsreferater/50.aspx proposal entails the construction of a heating plant burning biomass on Endelavevej Horsens Harbour next to the existing CHP plant, so the plant's total heat output increased to over 100 MW. The extension of the work on Endelavevej happens in two stages so that only builds 30 MW, the expected commissioning in late 2017, as well as storage capacity to 8 000 m3 of biomass, and to build an additional 30 MW to the expected commissioning at the end of 2020. Building Construction expected to be built to a height of about 27 meters and will house the boiler plant, indoor biomass storage and systems for flue gas, etc. Available under a chimney to a height of about 88 meters, equivalent to the height of the existing chimney at Horsens CHP, as well as an outdoor biomass storage. The proposal provides that there shall be prepared a new local plan and a new municipal plan for an area of ​​Endelavevej. In addition, the Environmental Protection Agency concurrent treatment of the case, which involves an environmental assessment and a full EIA study for the new plant at Endelavevej. The Contracting Authority has initiated these activities along with another counselor. The Contracting Authority has also assigned an architect with overall responsibility for building design, architecture, facades etc. The selected lead consultant, being a part of the design management expect that would coordinate and harmonize all advisers services.

District-heating plant construction work

Fjernvarme Horsens A/S | Published March 25, 2017
Winner
Dansk Energi Service A/S
cpvs
45251250, 42515000, 42161000, 42164000, 42511100, 45300000, 71320000

Heating Horsens is building a new wood-fueled district heating boiler plants totaling 30 MW thermal power. The delivery includes everything from wood chips boiler funnel chimney inlet, ie hot water boiler, environmental plants and electrical and SCADA (a full bio and district heating systems).

The tendered delivery includes the task of installation engineering of plant layout and construction of the facility, the supply of components to the plant, installation and commissioning of the complete district heating systems, and the approval of pressure equipment parts and verification of the guaranteed fixed payments.

Duration of the contract is 24 months from the date of conclusion of the contract with option to extend for one time in 12 months (optional).

Heating Horsens is building a new wood-fueled district heating boiler plants totaling 30 MW thermal power. System configuration is expected to be in a configuration with two boilers each of 15 MW indfyrret effect, as is desired variation operation from about 5 MW to 30 MW said.

The wood-fired bio-plant will produce district heating and water for Horsens District Heating networks. The flow temperature is about 105 C and the return temperature about 45 C.

The delivery includes everything from wood chips boiler funnel chimney inlet, ie hot water boiler, environmental plants and electrical and SCADA (a full bio and district heating systems).

Delivery main components will besides hot water boiler include gas cleaning (particle filter and wash / condenser), blowers, muffler and possible reheating of the flue gas before the gas is deleted to the chimney. In addition, the shipment include the supply of district heat exchanger to the plant.

For other information, please refer to the contract notice.