Building construction work

Søllerød almene Boligselskab | Published October 25, 2017  -  Deadline December 1, 2017
cpvs
45210000

Renovation of a total of 182 homes in department 08, Egevang Nord, Egehegnet 18-168E 2850 Nærum.

Egevang Nord was built in 1973 and consists of 30-storey two-storey houses plus ceilings, two-storey, 2-storey basement and 102-storey two-storey houses with 50 retirement homes.

The main rate includes the following:

- Environmental treatment of asbestos, heavy metals, PCBs

- Decomposition lightweight walls, decomposition wall tiles, scraper concrete floors, dismantling / decomposition sanitation and water installations and drainage installations

- Lining of fall trunks and drainage pipes under construction / in soil

- New water and drainage installations, new sanitation and bathing equipment

- Mechanical extraction bath and kitchen

- Electrical installations incl. lighting

- New tile floors, wall tiles and painting works

- Customize existing kitchen furniture.

Construction work for sewage pipes

Forsyningen Allerød Rudersdal A/S | Published May 26, 2017  -  Deadline June 26, 2017
cpvs
45232440, 45232151

The Client wishes to complete a tender pursuant to the Procurement Act of the Framework Agreement for Strengthening and Stirring of Drains for the 4th Quarter of 2017 through the 3rd Quarter of 2019 with option for extension for additional 2 periods of one year at a time.

The first sub-agreement is planned between the developer and the contractor with start-up in Q4 2017. It is expected to be able to be renovated for approx. 23 million. Danish kr. From 4th quarter 2017 to 3rd quarter 2019. It is estimated and expected that in total over a 4 year period (2017-2021) will be renovated approx. 30 km main line at No-Dig methods stocking and tight lining, overall, must be renovated approx. 3 km stitching in the No-Dig methods, tight and tight lining and it is also expected that approx. 360 wells must be refurbished.

Construction work

Rudersdal Kommune | Published May 26, 2017  -  Deadline June 19, 2017
cpvs
45000000

Construction of approx. 28 general care homes with associated facilities and service areas.

The building assignment is offered in a total contract on the basis of a construction program in accordance with prior prequalification.

The tender is conducted as a negotiated procedure in accordance with the provisions of the Procurement Act.

The main task of the building assignment is:

Design and construction of new care homes including common living areas with associated service areas.

Design and construction of access roads, parking spaces and outdoor living areas.

Partial demolition and disposal of existing building, if this is part of the winning bidder's proposal.

Construction work

Rudersdal Kommune | Published April 6, 2017  -  Deadline May 5, 2017
cpvs
45000000

Construction of about 28 social care homes and related facilities and service areas.

Closed The task is offered as a turnkey under construction program after prequalification.

The offering is negotiated procedures in accordance with Contract Law.

Construction The task includes the following main:

Design and construction of new assisted living facilities including common living areas with group

service areas.

Design and construction of access road, parking areas and outdoor living areas.

Partial demolition and disposal of existing building, if included as part of the

winning bidder's proposal.

Works for complete or part construction and civil engineering work

Boligselskabet Birkebo afd: 723-07 | Published March 7, 2017  -  Deadline April 3, 2017
cpvs
45200000

The project includes renovation of the dept. 723-07 - Byager Vænge in a main contract.

As part of the future security of dept. 723-07 has prepared a master plan for the department, which has been approved by Schedule A of Landsbyggefonden and municipal.

Section 723-07 is a department with 126 homes, located on Byager alley in Birkerød.

The master plan includes general renovation of the building envelope and stabilization construction of a new roof construction and energy optimization, construction is carried out in eight stages.

The assignment includes main contract, ie all work services and materials necessary for the delivery of housing and outdoor areas in complete finished condition, as well as all services and ancillary services as specified in the contractual basis.

The performance includes the performance of construction from start on site to handover 1- and 5-year inspection and all in the specifications described service and ancillary service.

Construction work

Søllerød almene Boligselskab | Published December 21, 2016  -  Deadline January 25, 2017
cpvs
45000000

Design and construction of 50 new homes in turnkey fixed target price. Offered as a turnkey contract, with prior pre-qualification.

Construction work

Søllerød almene Boligselskab | Published December 9, 2016  -  Deadline January 25, 2017
cpvs
45000000, 71500000

The project includes the construction of 50 new social housing in Vedbæk.

Refer to project material d. 12.21.2016, for planning and project description.

Link to project material:

https://www.byggeweb.dk/controller?cmd=tender.public.view&tn=TN167253

Construction work for sewage pipes

Forsyningen Allerød Rudersdal A/S | Published November 25, 2016  -  Deadline December 21, 2016
cpvs
45232440, 45232151

Client want to implement procurement under the Contract Law of the framework agreement for hosiery and stramforing of sewers for the period 2017 and 2018 with the option to renew for a further 2 periods of 1 year at a time.

The first lot is planned between client and contractor to start in Q2 2017. There is expected to be renovated for about 25 million DKK in 2017 and 2018. It is estimated and expected that overall there will be renovated about 30 km main line at No-Dig methods hosiery and tight lining over a 4-year period (2017-2020). It is estimated that overall there will be renovated about 3 km spur line at No-Dig methods hosiery and tight lining over a 4-year period (2017-2020). Also expected renovated 360 wells over a 4-year period (2017-2020).

Solar installation

Lillerød Rensningsanlæg, Forsyningen Allerød Rudersdal | Published November 25, 2016  -  Deadline November 24, 2016
cpvs
09332000, 09331200, 09331000, 31712347

Eu-supply includes delivery, installation and complete installation of 1 piece. solar installations in the terrain.

The tender dossier includes claims specifications for photovoltaic plants with a desired annual output of about 235 000 kWh. Static conditions and wind load mm.

The offer must include all the necessary services for the photovoltaic plants full completion (materials, components, assembly, construction site safety, installation work, web / production monitoring, as built drawings and complete documentation for all authorities, etc.)

Required performance guarantees and product guarantees.

Notification of award of contract is sent by. mail to the bidders d. 12 September.

The standstill period was 10 calendar days.

The contract is d. 10.08.2016 assigned ViaSol A / S.

Construction consultancy services

Boligselskabet Birkebo Afdeling 01 Kajerød Vænge, Birkerød v/ Boligkontoret Danmark | Published May 18, 2016  -  Deadline June 20, 2016
cpvs

Services related to construction

Technical consulting services in connection with the expansion of Plejecenter Sjælsø

Rudersdal Kommune | Published December 22, 2015  -  Deadline February 4, 2016
cpvs
71311000

The assignment includes construction consultancy in connection with the preparation of idea-presentations and byggepro-gram, offering turnkey and consultancy in progress as detailed in the tender documents. Plejecenter Sjælsø is located Sold Raget 35-43 in Birkerød and consists of a nursing home built in 1975 with later additions and six point blocks built in the period 2003-2009. The center is to be extended by approximately 28 new homes with accompanying Public and service areas divided into two detached buildings. The construction is financed in part with the support for social housing law.

Services related to construction works 2015 / S 209-379731

Rudersdal Kommune | Published October 28, 2015  -  Deadline November 30, 2015
cpvs
71311000

Counselor assignment includes advice under Danish Ark and FRI's description of services »Building and Planning 2012 'in connection with the demolition and disposal of existing buildings has been the setting for the former Kajerødskole. The buildings will undergo an extensive debugging in connection with the demolition. Land register must also be cleared, so that after the execution of the contract is ready for new construction project. Project assumed drafted with the involvement of Rudersdal Municipality's department for Technology and Environment and other local stakeholders.

Civil engineering consultancy services

Rudersdal Kommune | Published October 28, 2015  -  Deadline November 30, 2015
cpvs
71311000

Counselor assignment includes advice under Danish Ark and FRI's description of services »Building and Planning 2012 'in connection with the demolition and disposal of existing buildings has been the setting for the former Kajerødskole. The buildings will undergo an extensive debugging in connection with the demolition. Land register must also be cleared, so that after the execution of the contract is ready for new construction project. Project assumed drafted with the involvement of Rudersdal Municipality's department for Technology and Environment and other local stakeholders.

Construction of residential homes in 2015 / S 172-311789

Ella Mariehjemmet, c/o Fonden Mariehjemmene | Published September 5, 2015  -  Deadline October 19, 2015
cpvs
45215213, 70120000, 71000000, 71400000

Ella Marie House wishes by this contract to acquire a suitable land to build 50 new assisted living facilities incl. service area in Nørresundby. It is understood that the tenderer (because the supplier) and also undertakes the construction of care homes.

Nursing home construction work

Ella Mariehjemmet, c/o Fonden Mariehjemmene | Published September 5, 2015  -  Deadline October 19, 2015
cpvs
45215213, 70120000, 71000000, 71400000

Ella Marie House wishes by this contract to acquire a suitable land to build 50 new assisted living facilities incl. service area in Nørresundby. It is understood that the tenderer (because the supplier) and also undertakes the construction of care homes. Thus, there is an offer of a total delivery which the offeror (the supplier) both to provide a suitable plot and build new care homes in turnkey. Care homes must reflect the requirements for future-oriented care homes - also in relation to mental influences such as light, color scheme, spatial, experiences, outdoor activities and social relationships; but also in terms of providing staff with good and inspiring working. Requirements for building overall design and other requirements, including for the reason stated in the tender documents that can be obtained per. e-mail lb@lilholmogpartnere.dk.

Engineering services

Søllerød almene Boligselskab v/Boligkontoret Danmark | Published September 9, 2015  -  Deadline October 6, 2015
cpvs
71300000, 71400000, 71500000, 71200000

Supply of total advising on. renovation of Nærum Vænge. 2 Sollerod General Housing Association, consisting of 340 homes respectively in multi-storey buildings and terraced houses, located in Nærum. In the headlines these are the following works: - Sewer rehabilitation (Addresses Nærum alley and Forty Road) - Replacement of heating and hot water pipes in soil (Forty road and ml. Apartment blocks and townhouses on the road Nærum alley). - Replacement of tile coating (worthy of preservation), asphalt and retaining walls - Replacement of the ventilation system for balanced ventilation - Replacement of water installations in housing - Insulation terraced houses and apartment blocks. The chief consultant contributes material here. 110 000 000 DKK, but this may differ significantly when the extent with lead consultant, further clarified. General information about the performance: Søllerød General Boligselskab want to contract with one counselor to assume the role as a consultant during the planning, design and execution phases of the project, and according to published reports. The assignment includes total advice under ABR89 and performance description Building and Planning 2012 / Delivery specifications for plants and Planning 2013 DANISH ARK and FRI, 2013 and includes the following services: - Building Program, conceptual design, project, scheme design, detailed design, procurement, project monitoring, technical inspection, construction management, work coordination and ICT management. - Process management / process advice in connection with involvement of user groups, discussions with management, authorities, etc.

Construction of sheltered housing 2014 / S 230-405208

Rudersdal Kommune | Published November 28, 2014  -  Deadline December 23, 2014
cpvs
45211200, 45000000, 45200000, 45210000, 71000000, 71500000, 71530000, 71541000

Development of supported housing

Architectural, construction, engineering and inspection services 2014 / S 224-396190

Rudersdal Kommune | Published November 20, 2014  -  Deadline December 19, 2014
cpvs
71000000, 71200000, 71300000, 71600000

Architectural, construction, engineering and inspection services task includes technical total advice for renovation and partial refurbishment of the property Pipe Roedhus. Refer to the prequalification documents published on http://www.rudersdal.dk/udbud

Construction work

Søllerød almene Boligselskab | Published December 14, 2016
cpvs
45000000, 71500000

Construction work

Construction work for sewage pipes

Forsyningen Allerød Rudersdal A/S | Published March 28, 2017
cpvs
45232440, 45232151

Client want to implement procurement under the Contract Law of the framework agreement for stocking and tight lining of sewers for the period 2017 and 2018 with the option to renew for a further 2 periods of 1 year at a time.

The first lot is planned between client and contractor to start in Q2 2017. There is expected to be renovated for about 25 million DKK in 2017 and 2018. It is estimated and expected that overall there will be renovated about 30 km main line at No-Dig methods hosiery and tight lining over a 4-year period (2017-2020). It is estimated that overall there will be renovated about 3 km spur line at No-Dig methods hosiery and tight lining over a 4-year period (2017-2020). Also expected renovated 360 wells over a 4-year period (2017-2020).