Public tenders for construction in Hadsund Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Sewage pumping stations construction work

Mariagerfjord Vand a|s | Published August 26, 2016
Winner
VAM A/S
cpvs

Construction contract for the establishment of three pumping stations to transport wastewater, respectively. Mariager, Dania and Vive.

Sewage pumping stations construction work

Mariagerfjord Vand a|s | Published December 26, 2015  -  Deadline January 14, 2016
cpvs
45232423, 45232431

Construction contract for the establishment of three pumping stations to transport wastewater, respectively. Mariager, Dania and Vive.

Foul-water piping construction work

Mariagerfjord Vand a/s | Published December 8, 2015  -  Deadline January 12, 2016
cpvs
45232411

The project includes the design and construction of waste water pipes in trenches around 2600 m. From Dania in the south to Vive north, including crossing Mariagerfjord. At approximately 2200 m. Of the section, there are two parallel wires (2 x ø315 mm.) And 400 m. Single wire (1 x ø400 mm.). The total cable length totaled about 4800 m. The route that crosses Mariagerfjord represents about 1300 m. And the stretch of land 1 300 m .. It should be noted that the geotechnical conditions, involves the wires under the fjord not be established by "directional drilling" (HDD).

Architectural, construction, engineering and inspection services

Mariagerfjord Vand A/S | Published January 9, 2016
cpvs
71000000, 71310000, 71320000, 71322200, 71323200, 71600000, 45230000

Advisory contract

Sewage work

Mariagerfjord Vand A/S | Published May 21, 2016
cpvs
45232420

Country Leads in connection with the cutting of Mariager and Assens Wastewater Treatment Plant, Lot # 1: Cable Construction Assens - Fladbjerg

Sewage work

Mariagerfjord Vand A/S | Published December 23, 2015  -  Deadline January 25, 2016
cpvs
45232420

In connection with Mariagerfjord Water A / S dismantles Assens purification Mariager WWTP must be established cutoff drains from Assens Mariager forward to a new main pumping station at Dania. Total must be established about 9.6 km cutoff line. There must also be made conversion of the existing pool of Assens WWTP and establish a rørbassin at Dania. The contract offered in two lots: Lot 1: Cable Construction Assens - Fladbjerg Lot 2: Wire Enterprise Mariager - Fladbjerg.
  • 1