Public tenders for construction in Greve Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Greve Boligselskab | Published May 26, 2016  -  Deadline June 20, 2016
cpvs

Construction work

Building construction work

Greve Kommune, Center for Teknik og Miljø | Published October 10, 2015  -  Deadline November 18, 2015
cpvs
45210000

The main contract includes PCB redevelopment, thermal stripping, demolition, restoration and maintenance work on Hedelyskolen School in Greve. Work will be performed in stages while school is in operation. Hedelyskolen is a large school of about 14,300 m2, located on a large, green land of 69,337 m2. The school holds, in addition to classrooms, also after-school play areas, a music school and rooms for various leisure activities. The rest of the cadastre divided into two playgrounds, playing fields, parking lots and green areas. Hedelyskolen is constructed as respectively. 1-, 2- and 3-storey buildings with basement or crawl space beneath. Hedelyskolen is inaugurated in 1954, and several times over the years become detached and rebuilt - in 1972 got its present name while the great extension by the project was inaugurated. Exterior walls are built of reddish bricks, and roofs respectively. tile roofs with 20 degree slope and flat tar paper roofs. Windows and doors to be replaced are big parties performed as a carpenter elements. Highlights of the renovation are: - Replacement of windows and doors - Replacement of floor coverings - Partial Switching Coverages and re-insulation - Environmental clean-up and thermal stripping / bake-out - Replacement of ceilings - Replacement of electrical installations and lighting - Replacement of mechanical ventilation - Painting - Replacing interior doors - Exterior facade renovation - Moving Help. The non-affected part of the school will be in operation during the entire construction period, and the work must be coordinated from this. The work is performed is divided into five stages. The total affected part of the school comprises about 8000 m2 divided into ground floor and balconies / 1st floor plus basement and crawl space. Carried out a pilot project in 2015-2016, which will form the basis of the final offer expected to be issued in early 2016. Expected construction start on the first stage is summer 2016. The project is expected to be delivered in 2018.

Water-main refurbishment construction work

KLAR Forsyning A/S | Published February 23, 2017
Winner
Per Aarsleff
cpvs
45232151

Framework agreement on the lining of sewers and renovation of wells plates of the municipal partners READY Supply A / S.

Water-main refurbishment construction work

KLAR Forsyning A/S | Published September 16, 2016  -  Deadline October 18, 2016
cpvs
45232151

The contract includes the design, supply and installation of main and stikledningsforinger and renovation of the well bottoms.

Water-main refurbishment construction work

KLAR Forsyning A/S | Published November 3, 2016  -  Deadline December 2, 2016
cpvs
45232151

The contract includes the design, supply and installation of main and stikledningsforinger and renovation of the well bottoms.

Construction 2015 / S 197-355915

Greve Kommune, Center for Teknik og Miljø | Published October 10, 2015  -  Deadline November 18, 2015
cpvs
45210000

The main contract includes PCB redevelopment, thermal stripping, demolition, restoration and maintenance work on Hedelyskolen School in Greve. Work will be performed in stages while school is in operation.

Architectural, engineering and planning services 2015 / S 188-341691

Greve Gymnasium | Published September 29, 2015  -  Deadline October 27, 2015
cpvs
71240000

The Board of Greve Gymnasium will implement a design with the aim to find the proposals that could form the basis for design and construction of a sports hall with an expected gross area of ​​approximately 1700 m² on an area that is part of the school's extensive outdoor sports area immediately west of the existing high school complex.

Architectural and related services

Greve Kommune | Published November 12, 2016
cpvs
71200000, 71310000, 71320000, 71210000, 71220000, 71420000

The job includes counseling in comprehensive advice regarding. construction of sports buildings in Greve Municipality. The supply is one of three independent supply as part of a joint project by the municipalities Greve, Kalundborg and Slagelse has launched with the support of Culture and Sports Facilities Fund. The competition is organized as a negotiated procedure, acc. Law no. 1564 of 12/15/2015 § 61. The three municipalities and Culture and Sports Facilities Foundation performs together a common project for the future of sports buildings. There is therefore a common project, which is offered in three (3) separate contracts comprise the comprehensive advice.

The project is expected to be around 2 500 m 2 . The economic framework for the project is about 30-60000000 DKK including (minimum) 3-5000000 DKK processing building close-range areas. The economic framework incl. total consultant fees which represent 15% of the total construction meaning. enclosed contract.

The vision for Greve welfare and greenhouse for sports is that the house in form and function meet changes in the public exercise habits including an increasing number of self-organized activities, new forms of activity, new user groups and preferences to be active outdoors. The house must offer rich and flexible framework for partnerships between sports clubs and municipal institutions in such a way that all citizens can reap the joys of sport positive effects - also on other social policy areas than sport itself. Greve welfare and greenhouse for sports manifests as an innovative 'future heritage', which on the architectural and narrative point of view refers to the cultural heritage along Greves coastline.

Repair and maintenance services

Greve Kommune | Published December 16, 2016
cpvs
50000000, 44230000, 45231300, 45232100, 45232440, 45259300, 45261000, 45261200, 45261210, 45262500, 45262520, 45310000, 45321000, 45422000, 45432110, 45432130, 45440000, 45441000, 50116100, 50531200, 50711000, 50720000, 71314310

Greve Municipality wants to conclude a number of framework agreements for the supply of plumbing services during scheduled and daily building maintenance of municipal buildings.

The 14 lots are within the following craft services: Carpentry installation work, roofing, floor work, glass work, bricklaying, painting, electrical work, plumbing / GVS work and sewer work.

Interior works as doors / windows, walls, ceilings, floors (dock out joists and panels), fixtures, moldings, acoustics tasks, etc.

The work could include shipbuilding, construction, repair, replacement, repair, installation, setup, dismantling several for all properties in the areas referred to. 'Annex 4 Property Overview'.

The work could include new buildings, repairs, repair, assembly, demolition, sealing and others.

Specific requirements:

- The supplier performs the work in accordance with the rules on hot work, see. Section 7, point c.

The supplier must use craftsmen with roofer training for the tasks.

The work could include laying of new flooring, repair, repairing, cleaning and more.

Specific requirements:

- Application of 3.2 mm linoleum when performing linoleum floors.

This agreed with PropertyCentre in this case.

- Floor coverings in wet areas must comply with the current regulations and wet rooms to select good long-lasting products.

- When flooring in kitchens must applicable requirements for AT and food control are observed.

The supplier must use craftsmen with flooring contractor training for the tasks.

Including guard, replacing the windows (facade and roof), sealing windows, perform window film, perform removable windows, mirrors, fire, glass, etc.

The work could include new buildings, repair, repairing, assembling and others.

Specific requirements:

Mud and debris must be removed immediately, so it does not damage surfaces and materials in the environment.

- Execution must maintain consistency with the existing masonry.

The supplier must use craftsmen with mason training for the tasks.

The work could include new buildings, repair, repair, removal, configuration and more.

The work could include new buildings, construction, repair, repair, installation, adjustment and others.

Including conduits, wiring, installation, installations, fittings, boards, relays, electric motors, electrical certificates, visible and hidden wiring systems etc. for all properties in the area allocated see. 'Annex 4 Property Overview'.

The work could include new buildings, repairs, repairs, installations, regulation, management, replacement and others.

Specific requirements:

- Use pipes and technical insulation request (stainless steel, black, galvanized, copper, PEX, AluPEX).

- When purchasing new taps must be used 'institutional model', which is a ceramic seal.

In addition, the Supplier shall have the gasautorisation for residential boilers.

The supplier is on call for all municipal properties in the area allocated.

The work could include new buildings, repair, excavation, replacement, installation, demolition and more.

The work could include new buildings, repair, excavation, replacement, installation, demolition and more.

In addition, the partial agreement maintenance and service of grease traps.

  • 1