Public tenders for construction in Grenaa Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Unwanted chemistry and sustainable construction

Miljøstyrelsen | Published April 28, 2015  -  Deadline May 25, 2015
cpvs
90721000

The Environmental Protection Agency is now offering the task of transforming knowledge of unwanted chemicals in products for the construction industry for specific recommendations. The project will utilize the wealth of knowledge collected in the effort to map the substances on the list of undesirable substances and other relevant knowledge about unwanted chemicals in the building, so it will be easier to build sustainable. The recommendations should be directed to the construction actors wide, but it will also propose specific requirements for chemicals in a future voluntary sustainability class expected to be presented as part of the Building Regulations 2016.

Building construction work

B45, afd. 11 | Published March 9, 2017  -  Deadline April 5, 2017
cpvs
45210000

The building is located the Lichtenberg Road 31-83. The existing building was built in the 1960s, however, easier rebuilt in 1987 and is a classic stick building. The offered job consists primarily of interior renovation of 162 subsidized housing, which merged to approximately 135 social housing which establishes accessibility for about 80 of the homes. In addition, established balconies for all homes.

The design is expected to start 9/1/2017 and construction is expected to start 01.01.2018 and handed 29/03/2021.

See section II.1.4) and the uploaded tender on http://arkikon.dk/projektrum/ and then tab 'PQ-De Lichtenberg's Road'.

Architectural, construction, engineering and inspection services

Norddjurs Kommune | Published August 11, 2015
Winner
Arkitektfirmaet Kjaer & Richter A/S
cpvs
71000000

Norddjurs want to contract with one counselor to assume the role of consultant on all projects under planning, design and construction phases of the projects. The assignment includes total advice under ABR89 and performance specifications Building and Planning 2012 and Work Coordination November 2012 and includes the following services: - Building Program, conceptual design, preliminary project, project, detailed design, procurement, project monitoring, technical inspection, construction management and health and safety coordination. - Process management / process advice in connection with involvement of user groups, discussions with management, authorities, etc. In the total budget must be given all the costs associated with the construction, including resettlement, loose fixtures, disability equipment, restoration of outdoor areas, environmental sanitation in connection with the possible degradation. The projects covered by the invitation: Collection of Jutland school's current Fjellerup- and Stenvad departments on Voldby School: The contract includes comprehensive advice in rebuilding / renovation and degradation associated with collection of Jutland school departments in Fjellerup and Stenvad on Voldby School. 3100 m2 premises at Voldby School. There are a total budget of 14.5 million DKK. Project launched in May 2015 - official opening in June 2017. New construction and renovation of Jutland School Department 'Damgården' in Orum: The contract includes complete advice in the extension, modification and degradation of rooms at Damgården in Orum. 9,000,000 DKK. Project launched in May 2015 - official opening in June 2017. New construction and renovation of Jutland School main building Djursvej in Orum: 1 400 m2 and make a conversion of 1 750 m2. 30,250,000 DKK. Project launched in April 2016 - inauguration in August 2018. Construction on Orum School include replacing pavilions: The contract includes total advice for extension and conversion of Orum School. 9.5 million DKK.

Construction work

Grenaa Varmeværk A.m.b.A. | Published December 22, 2015  -  Deadline February 17, 2016
cpvs
45000000, 45223210, 45223500, 45251000, 45262300

Grenaa Varmeværk amba has decided to build a new biomass-fired heating plant in Bredstrupvej in Grenaa. Offering comprises execution of works in connection with this new heating plant. The new heating plant is expected to include wood chips silo (around 1200 m2), new boiler building for two boiler lines expected in concrete and steel (around 1300 m2), building expected in concrete (about 500 m2) and foundation of chimney foundation. In addition, it is expected to be carried out earthworks, site preparation and paving. In addition to this construction contract is expected to put up a total contract for mechanical, electrical and tube techniques as well as a contract for heat pumps. In the execution phase, the principal contractor expect to maskinmontage-, electricity and plumbing, etc. are ongoing in parallel with their own work.

Building construction work

B45 | Published December 24, 2016
cpvs
45210000

This notice concerning. annulment of an offering (see also section. II.1.1) and justification under Part VI).

See section II 1.4) and the uploaded tender on http://arkikon.dk/projektrum/ and then tab 'PQ-De Lichtenberg's Road'.

Building construction work

B45 | Published September 29, 2016  -  Deadline October 26, 2016
cpvs
45210000

See section II 1.4) and the uploaded tender on http://arkikon.dk/projektrum/ and then tab 'PQ-De Lichtenberg's Road'.

Architectural, construction, engineering and inspection services

Grenaa Varmeværk A.m.b.A. | Published July 10, 2015  -  Deadline August 21, 2015
cpvs
71000000

The new CHP plant should be ready for commissioning 31.12.2017. Offering comprises a total of advice in connection with the establishment of a biomass-fired boiler plant of 30 -36 MW consisting of 2 x 15 MW or 2 x 18 MW boiler plants and 2 MW absorp- tion heat pump and common wood chips silo and utilities (electricity, compressed air, ash handling), however, divided as operation of the plants are independent of each other. Based on the preliminary consideration of plant design, expected the district heating system that includes the following elements, the list is not exhaustive and is subject to changes in non-negligible extent in the further planning: Construction prepared for retrofitting SNCR system for NOX reduction . SRO, emission measuring equipment and UPS systems. Transmission Line. Service Building sections with wood laboratory, control, welfare facility with kitchen, meeting room and workshop / warehouse. The current supplier delivered in 2012 106.000 MWh where a normal corresponds to a delivery of 109,000 MWh heat to Grenaa Varmeværk, and fails the delivery must be provided an alternative heat supply. The work must support Grenaa Heating folk objective of flexibility, high security and low production costs.

Road construction works

Norddjurs Kommune | Published September 2, 2015  -  Deadline September 28, 2015
cpvs
45233120

Establishing Grenå bypass as a design-build project. The project is about 5.5 km long, two-lane road at the western end connected to the main road 16 in a channeled cross and at the eastern end finished in a roundabout. On the stage there are side road connections and a track crossing over.

Road construction works

Norddjurs Kommune | Published April 1, 2015  -  Deadline April 28, 2015
cpvs
45233120

Establishment of Grenå bypass as a design-build project. The project is about 5.5 km long, two-lane road at the western end connected to the main road 16 in a channeled cross and at the eastern end finished in a roundabout. On the stage there will be side road connections.

Road construction works

Norddjurs Kommune | Published August 29, 2015
cpvs
45233120

Anlæg af vej

Road construction works

Norddjurs Kommune | Published September 3, 2015  -  Deadline September 28, 2015
cpvs
45233120

Anlæg af vej

Road construction works

Norddjurs Kommune | Published April 16, 2015  -  Deadline April 28, 2015
cpvs
45233120

Anlæg af vej

Architectural, construction, engineering and inspection services

Norddjurs Kommune | Published March 24, 2017  -  Deadline April 21, 2017
cpvs
71000000

Grenada Sports Center has developed steadily and now need more space and roominess. This together with the need to replace the roof on the east side, is the basis for this contest.

Architectural, construction, engineering and inspection services

Grenaa Varmeværk A.m.b.A. | Published November 28, 2015
cpvs
71000000

Totalrådgivning ifm opførelse af nyt biomassefyret fjernvarmeværk i Grenaa.

Environmental indicators analysis other than for construction

Norddjurs Kommune | Published December 11, 2015  -  Deadline January 28, 2016
cpvs
90711300, 71900000

Delivery on the sampling and analysis of bathing water for Jysk Fællesindkøb.

Pre-qualification of construction services in the development of Grenaa Midtby

Norddjurs Kommune | Published April 4, 2017  -  Deadline April 24, 2017
cpvs
45211360

The work includes the traffic diversion and the establishment of new space formation at City Hall in Grenaa, with a total area of ​​ca. 2700 m 2. This task provides the clearing of existing shoes, furniture and vegetation, traffic management, earthworks including handling of contaminated soil, drainage works, asphalt work, paving, plantings, lighting, equipment, the establishment of fountain mm.

Analysis of environmental indicators other than construction work 2015 / S 240-435659

Norddjurs Kommune | Published December 11, 2015  -  Deadline January 28, 2016
cpvs
90711300, 71900000

Delivery on the sampling and analysis of bathing water for Jysk Fællesindkøb.

Landfills Stage III A - Phase first

RenoDjurs I/S | Published November 12, 2014  -  Deadline December 15, 2014
cpvs
45200000

The contract covers the construction of landfills, coating area, Valve and pumpebygværk and transport lines.

Furnace burners

Grenaa Varmeværk A.m.b.A | Published December 22, 2015  -  Deadline February 22, 2016
cpvs
42310000, 42390000, 42111000, 42960000, 44600000

Grenaa Varmeværk amba has decided to build a new chip-fired district heating plant in Bredstrupvej in Grenaa. The tender includes the supply and execution of machine installations, largely comprising two about 15 MW boiler plant, including overhead crane for wood transport, indfyringssystem, exchanger plants, flue gas cleaning, chimney, district heating pumps, weighbridge and electricity and SCADA systems. In addition to this mechanical construction is expected to put up a single contract for construction works and the construction of heat pumps. In the execution phase, the principal contractor expect that other contracts are performed in parallel with their own work.

Heat pumps 2015 / S 247-450359

Grenaa Varmeværk A.m.b.A | Published December 22, 2015  -  Deadline February 22, 2016
cpvs
42511110

Grenaa Varmeværk amba has decided to build a new chip-fired district heating plant in Bredstrupvej in Grenaa. The supply includes delivery and performance of absorption heat pumps with 4-8 MW cooling effect of cooling the combustion gases and any recovery of waste heat from industrial plants. In addition to this contract are expected to put up a single contract for construction works and the construction of the boiler. In the execution phase, the principal contractor expect that other contracts are performed in parallel with their own work.