Water purification plant construction work

Glostrup Hospital | Published September 19, 2015  -  Deadline October 20, 2015
cpvs
45252210, 65120000, 42996000, 44163130, 45232420, 45232421, 45252000, 45252130, 45222100, 90500000, 90510000, 90511200, 90524200

Water purification plant construction work

Water purification plant construction work

Glostrup Hospital | Published July 10, 2015  -  Deadline September 15, 2015
cpvs
45252210, 65120000, 42996000, 44163130, 45232420, 45232421, 45252000, 45252130, 45222100, 90500000, 90510000, 90511200, 90524200

Water purification plant construction work

Construction consultancy services

BO-VEST | Published July 5, 2016  -  Deadline August 1, 2016
cpvs

Services related to construction

District-heating mains construction work

I/S Vestforbrænding | Published July 2, 2016
cpvs

Construction work: main pipes for district heating

Architectural, construction, engineering and inspection services

FA09 | Published July 19, 2016
Winner
Kuben Management A/S
cpvs

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Glostrup Spildevand A/S | Published June 14, 2016  -  Deadline July 12, 2016
cpvs

Architectural, construction, engineering and inspection services

Construction consultancy services

BO-VEST | Published February 2, 2017
Winner
Arkitektfirmaet Friis Andersen A/S
cpvs
71530000

Vridsløselille Andelsboligforening dept. 53 and BO-VEST offered the job as a consultant concerning. replacement of the department's water and drainage systems. In addition, the desired existing bathrooms modernized.

Total Advisor's services include registration, overall budget, feasibility studies, screenings, user involvement, planning, preparation of project proposals / regulatory project, detailed design, supply and site supervision / construction management as well as 1-year inspection. Total Adviser shall also undertake construction management and health and safety coordination (P) + (B).

The offering was conducted as a restricted tender with pre-qualification under the Contract Act.

District-heating mains construction work

I/S Vestforbrænding | Published December 16, 2016
Winner
Wicotec Kirkebjerg
cpvs
45232140

Conclusion of framework agreement on construction services related to the installation of flying connector by district heating. Contract concluded on the basis of a dynamic purchasing system 2016 / S 126-225688.

Construction work

Nordea Pension Danmark, Investeringslivsforsikringsselskab, c/o Nordea Ejendomme | Published August 15, 2015
Winner
Entreprenørfirmaet Einar Kornerup A/S
cpvs
45000000, 45100000, 45210000, 45300000, 71200000, 71300000

The project is a turnkey contract. There should be associated with the conversion into account the other tenants in the property. The renovation project includes the preparation of the main project, including the design of structures, ventilation, water and drainage, building management, electrical installations and ABA, and the choice of materials. In the main project, perform a mock-up of building workspaces and meeting rooms. The main project and mock-up must be approved by the tenant before construction work is started. Construction works in the project include construction, ventilation, building management, water / drainage, electrical installations, fire alarm installation, plaster walls, glass walls, acoustic regulation on walls and ceilings, walls, floors, painting. There are mid 1980s conducted a major renovation of the property, which include windows are replaced and the existing brick facade is applied building. The separate contracts to be coordinated with Total contractor's work and the turnkey contractor will build a common site. All other installations done as complete new facilities / installations. The second stage comprises 3,000 m2, office, toilets, kitchenettes and meeting rooms.

Works for complete or part construction and civil engineering work

I/S Vestforbrænding | Published January 7, 2017
Winner
Entreprenørfirmaet Strømberg & Sahl A/S
cpvs
45200000

There will be built a new teaching and showroom.

Execution of facade work and carpentry. In addition, construction of showroom.

Construction consultancy services

BO-VEST | Published February 28, 2017  -  Deadline March 30, 2017
cpvs
71530000, 71220000, 71210000, 71310000, 71320000, 71610000, 71621000

The tender starts on Monday. 27.02.2017 and implemented as a restricted tender with pre-qualification under the Contract Act.

It may be noted that the 5 advisors will be invited to tender.

Applications must be submitted via byggewebs procurement portal. Instructions and information which appears in the contract documents.

Tender documents can be found under TN646708 on building web.

To secure the buildings and achieve a more balanced composition of residents, assessed the organization board in 2008 that there was a greater coordinated effort to. It requires extensive renovation, conversion and social efforts to reduce the development's relatively high emigration rate.

Organisation Board initiated the necessary studies for the implementation of a physical master plan. Below technician registration of renovation needs in connection with any building damage work, analysis of environmental improvement measures and the identification of options for apartment aggregation Building.

Within a few years, other advisers conducted numerous technical studies, and they have prepared a draft building program with recommendations for refurbishment measures. In addition, there have been study tours and workshops with the department and a specially appointed Committee of Construction. The work has resulted in a draft master plan.

This master plan to be completed in Phase 1, and shall, if commitment and permission obtained, conducted in Phase 2nd

In addition a new community to be entered as new. Total Counselor conducts volume studies, workshops etc. as well as design, construction management, supervision, etc.. acc. tender documents.

Architectural, construction, engineering and inspection services

Vridsløselille Andelsboligforening afdeling 1 Toften ved BO-VEST | Published July 4, 2015  -  Deadline August 25, 2015
cpvs
71000000, 71500000

The assignment includes preparation of the master plan for approval by the National Building Fund, and the implementation of the master plan incl. project management, design, ICT management, work coordination during design and work coordination, construction management and project monitoring during execution and on submission. Project background: 1 Toften. The department consists of six apartment buildings of three storeys. The two national draft master plans estimate a total budget of artisan expenses of 50-110 000 000 DKK. The latest condition assessment of buildings (updated in April 2011), sets forth a condition that requires renovation - including the renovation of bathroom and kitchen, balconies, sewer, roof repla- cement, masonry work and new heating system. The possibility of establishing penthouses investigated and will if necessary. be included in the project. It is expected that construction work includes both subsidized and non-subsidized work in the master plan as well as private work carried out simultaneously with the master plan.

Architectural, construction, engineering and inspection services

Glostrup Spildevand A/S | Published October 7, 2016
Winner
Sweco Danmark A/S
cpvs
71000000, 71300000, 71420000

Glostrup Sewage A / S has a need for technical advice and assistance in connection with the supply adaptation of the drainage system in the supply, ie geographically in Glostrup. The purpose medprojektet is to solve supply service obligations. The elements of supply adaptation to climate change is expected to span broad and could include opdimensionering of existing common pipeline, construction of new retention basins, separate drainage of existing common systems, partly separate drainage of existing common systems, establishment of new detention ponds, local management of surface water catchments and subsurface solutions. The supply wishes to conclude framework agreements with 2 total advisors for the purpose of getting prepared conceptual design for the area north of the main road and as a possible task concretization plan for climate adaptation region 1, KTP 1 and division of the municipality in relevant KTP areas. ...

Construction work for buildings relating to health

Rigshospitalet, Glostrup | Published July 2, 2016
Winner
Hoffmann A/S
cpvs
45215100

The Regional Council has decided that the Danish Headache Centre will require new and contemporary sites to continue

to develop research and serve the rapidly increasing number of patients needed for evaluation and treatment.

It is against this background decided that should include a new two story building on 2200 m² for housing the

new Danish Headache Center on the east side of Glostrup Hospital at input 1. The new Danish Headache

Centre shall include, inter alia, outpatient clinics, research laboratories and offices and be placed partially on top of it

existing cellar under the now demolished building CA.

Construction is to be implemented in three large contracts broken down by

Råhus and Building site (lot 1), Outfitting (lot 2) and Technology (Lot 3), and there will thus be concluded

separate lot for each major contract.

Consultative engineering and construction services

I/S Vestforbrænding | Published February 3, 2017
Winner
Sweco A/S
cpvs
71310000

Selling On behalf of Vestforbrænding handle the legislative tasks below Order no. 117 of 05.02.2013 on the developer's obligations and Decree 110 of 05/02/2013 - safety coordinator B (construction phase), as well as those of client-defined tasks that are above the statutory level .

See also FRI's description of services, in August 2014, The National Coordination.

The assignment includes the following services:

- Ongoing review of PSS (initial PSS prepared by safety coordinator P and refreshed and updated by the contractor), the collection and analysis of APV and APB incl. preparation of report.

- Start-up meetings / introduction to PSS etc. for new contractors

- Inspection of jobs

- Review of tender documents

- Safety meetings every 14 days incl. summary

- Security Round Ring 1 time per week. incl. supervision memo

- Possibly. security review by customer installations

- Possibly. tasks relating to the safety coordinator in the design.

Architectural, construction, engineering and inspection services 2015 / S 127-232919

Vridsløselille Andelsboligforening afdeling 1 Toften ved BO-VEST | Published July 4, 2015  -  Deadline August 25, 2015
cpvs
71000000, 71500000

This offering includes comprehensive advisory services in connection with the preparation of a renovation and reconstruction project for Vridsløselille Andelsboligforening dept. 1 Toften v. BO-VEST. The assignment includes preparation of the master plan for approval by the National Building Fund, and the implementation of the master plan incl. project management, design, ICT management, work coordination during design and work coordination, construction management and project monitoring during execution and on submission.

Works for complete or part construction and civil engineering work

Albertslund Vest c/o BO-VEST, Boligsamarbejdet på Vestegnen | Published June 20, 2015  -  Deadline August 18, 2015
cpvs
45200000, 45260000, 45261210, 45261410, 45261900

General: In this context provider BO-VEST on behalf of Vridsløselille Andelsboligforening (VA) a thorough renovation of farm houses in department »VA West '- a total of 258 courtyard houses. The renovation includes demolition, new heavy slab, debugging, new electricity, water and heating systems, new light facing the courtyard, new toilet, the establishment of membrane and insulation work in the ceiling, new walls and floors, new kitchens and ground works. Alongside housing renovation, in collaboration with utilities performed new supply lines in terrain, including district heating pipes, water, electricity etc.. Renovation of farm houses and pipe works for Alberton Varmeværk offered under this contract notice. The renovation means that residents must re-homed while the renovations are ongoing. The maximum could be resettled residents from 60 homes simultaneously, which will mean restrictions in relation to performance logistics. Timetable for implementation is scheduled for two years with construction starting in early / mid 2016 and delivery in early / mid 2018. There is currently. obtained funding commitments (Form A) of the total 263 000 000 DKK incl. VAT and expenses. We receive also financing through housing company's own funds and residents' right of disposal. The developer expects that addition can be obtained additional funding, but the amount is not known at present. Housing Departments have signed a total consultancy agreement with Arkitema Architects who have Plan and Process and engineering firm Alectia as sub-consultants and connection. supply project COWI consultant for the utility. Procurement and tendering: The developer has decided to offer the renovation of farm buildings in the following trade contracts (lots): E.01 Supply Project (incl. The land and surfacing) E.02 E.03 Site Demolition & debugging E.04 Concrete and sewer E.05 Installations E.06 Carpentry - facade E.07 Carpentry - interior work E.08 E.09 Painter Gartner E.10 Roofing There will be opportunity to inspect the homes, test house and area connection. bidding. Selection and acquisitions: In tender documents is indicated in a 'catalog of resident choice and occupant acquisitions' and tender lists will contain items with estimated amounts thereof.

Architectural, construction, engineering and inspection services

Vestforbrænding | Published April 12, 2017  -  Deadline April 8, 2021
cpvs
71000000, 45220000, 71240000, 71300000, 71310000, 71318000, 71320000, 71321000, 71322000, 71323000, 71330000, 71332000

The Dynamic Purchasing Systems aims to establish a database of qualified companies that can provide technical advice and engineering service to Vestforbrænding.

Vestforbrænding total consumption of consulting services amounts to about 40 million DKK annually. The estimated consumption is based on historical figures and expectations, these assessments are at any time binding on Vestforbrænding.

Works for complete or part construction and civil engineering work

c/o BO-VEST, Boligsamarbejdet på Vestegnen | Published October 13, 2015  -  Deadline November 17, 2015
cpvs
45200000, 45212140

General: In this context provider BO-VEST on behalf of Vridsløselille Andelsboligforening (VA) a thorough renovation of farm houses in department »VA West '- a total of 258 courtyard houses. All contracts are subject to high repeatability and is thus dependent on high precision and professional approach from everyone involved. The developer's consultants plan a scenario where all contractors initially participating in the implementation of referencehus (s) for testing of the processes with all involved. BO-VEST, following on the midway and in this case offering equivalent 199 homes for Albertslund Housing Association (AB), ie the remaining portion of the total settlement »Alberton West '. For information manages BO-VEST also sister settlement Alberton South, where the first approximately 500 courtyard houses of the same nature will soon be ready for implementation, while a further approximately 500 courtyard houses to be offered in the coming years. The renovation includes demolition, new heavy slab, debugging, new electricity, water, heating and ventilation installations, new light facing the courtyard, new entrances with tekniskabe, new toilet, the establishment of membrane and insulation work in the ceiling, new walls and floors, new kitchens and ground works - there a separate site contracted to handle the logistics that characterize the renovation project. All trades are explained in more detail later under 'lots' and below. Prior to housing renovation, in collaboration with utilities performed new supply lines in terrain, including district heating pipes, water, power supply, etc. (supply project). Renovation of farm houses and pipe works for Albertslund Varmeværk offered under this contract notice. The renovation means that residents must re-homed while renovation is ongoing, however, performed supply contract before resettlement. The expected maximum that could be resettled residents from 60 homes simultaneously, which is part of the planning and limitations with respect to performance logistics. Timetable for implementation is scheduled for two years with construction to start in mid 2016 and delivery in mid / end of 2018. There are obtained pledge of support (Form A) of the National Building Fund and flowing to additionally finance through the housing association's own funds and residents' private right of disposal. Regarding supply project COWI consultant for the utility. There will thus be different builders for the supply contract and the other contracts, but there will have to co-operation of the individual contracts. Information Meeting / Open House: In addition, the project overview drawings etc. available at BO-Vest's website - see www.albertslundvest.dk 13-16 at the address Rügen Neighborhood 7F, 2620 Albertslund - registration must be made to pesb@arkitema.dk later than 10/23/2015. Procurement and tendering: The developer has decided to offer the renovation of farm buildings in the following trade contracts (lots, which are further described later in this notice): E.01 Supply Project (incl. The land and paving) E.02 Site E.03 Demolition & debugging E 0.04 Concrete & sewer installations E.05 E.06 E.07 Carpentry Roofing E.08 E.09 Painter Gartner. There will, in the upcoming bidding, be possible for the inspection of housing, test house and the area. Selection and acquisitions: In tender documents is indicated in a 'catalog of tenant choice and occupant acquisitions' and tender lists will contain items with estimated amounts thereof.

Key for complete or part construction works 2015 / S 047-080244

Albertslund Boligselskab (AB) Afdeling AB-Syd c/o Bo-Vest, Boligsamarbejdet på Vestegnen | Published March 7, 2015  -  Deadline April 7, 2015
cpvs
45200000, 45230000

Key for complete or part construction works In this context provider BO-VEST on behalf of the Orbiter Boligselskab (AB) a thorough renovation of farm houses in department 'AB south'. The renovation includes demolition, new heavy slab, debugging, new electricity, water and heating systems, new light facade facing the courtyard, the establishment of membrane ceiling, new walls, new kitchens and ground works. Parallel to housing renovation, in collaboration with utilities performed new supply lines terrain, including district heating pipes, water, electricity, etc. Renovation of farm houses for Alberton Boligselskab (AB south) and pipe works for Alberton Varmeværk happens as a single supply but contracting is done on two individual contracts . 80 houses simultaneously, which puts certain restrictions in relation to the performance logistics. The developer will perform additional packs and options to the extent that can be obtained additional funding / connection thereto. Procurement and tendering: in addition will include a number of additional renovation solutions for the bathroom, ventilation, roof, etc. In choosing between the 3-4 parallel supply will be crucial which option to obtain financing for. For each tender package is also attached separate 2D project drawings, descriptions, quantity offer made lists etc. 5, due clarification of financial matters. The renovation is based on seven test houses that demonstrate possible technical solutions which have formed the basis for the planning of full-scale renovation throughout Alberton South, which together include housing departments AB south, VA4 north and south VA4. Housing Departments have signed a total consultancy agreement with Wissenberg A / S, which has Vandkunsten as sub-consultant. It includes options for all 3-4 contiguous range, but options are only included where they are relevant to the individual procurement package. The tender documents are those options set out in a 'elective catalog'. As an option also offered conducting wires for district heating, water, electricity, etc., with Alberton Varmeværk as principal.