Engineering design services

DONG Energy Wind Power A/S | Published February 22, 2017  -  Deadline March 7, 2017
cpvs
71320000, 71322000, 71300000

The tendered contracts are framework agreements comprising engineering consultancy services to support DONG Energy Wind Powers offshore wind farm projects. The contracts are divided into the following lots:

Lot 1: Offshore substation design

Lot 2: Onshore substation design

Lot 3: Engineering services and design of buildings intended for Operation and Maintenance activities for offshore wind farms

Lot 4: Foundations structural design

As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 1 for an elaborated description of the services comprised by the four lots (in particular Appendix 1 to the contract draft, scope of services).

Lot 1 comprises design services regarding offshore substations intended to be utilised in the construction of future offshore wind farms and design services in connection with similar structures intended for offshore deployment. As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 1 for an elaborated description of the services comprised by lot 1.

Lot 2 comprises design services regarding onshore substations intended to be utilised in the construction of future offshore wind farms and design services in connection with similar structures intended for onshore deployment. As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 1 for an elaborated description of the services comprised by lot 2.

Lot 3 concerns engineering services, architecture and design of buildings, including offices and warehouses, mainly intended for operation and maintenance activities for offshore wind farms. As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 3 for an elaborated description of the services comprised by lot 3.

Lot 4 comprises engineering design of the primary steel in the monopiles, transition pieces and ‘jackets’ for offshore wind turbines as well as secondary structures such as landings, ladders, resting platforms, internal platforms, etc. As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 1 for an elaborated description of the services comprised by lot 4.

Construction work

DONG Energy Wind Power A/S | Published December 20, 2016
cpvs
45000000

Connexio.

Architectural, construction, engineering and inspection services

Energinet.dk | Published February 2, 2017
Winner
Prysmian Denmark
cpvs
71000000, 71310000, 71540000

Energinet.dk wants to purchase service for a complete AC HiPot and PD test for 400 kV, 220 kV and 132 kV cable systems. The tender for HiPot AC/PD test for cable systems 2016-2018 consist of several cable project with planned installation and commissioning in 2016-2018. The tender is divided into three (3) lots, 1 for each cable project.

Sections to be tested are Ejbygård (EBY) — Herstedgård (HST) — Vejleå (VEJ) Substations.

Sections to be tested are KFA +B offshore substations — Rødvig (landfall) — Bjæverskov (BJS) — Ishøj (ISH) — Hove (HVE) substations.

Sections to be tested are TEG-LAR 1+2 (Teglstrupgård — Laröd in Denmark and Sweden).

Construction work

DONG Energy Thermal Power A/S | Published December 31, 2016
cpvs
45000000

This notice contains only a notice of extension of the previously announced qualification system from DONG Energy: Construction and Civil Engineering qualification system verses. 2015, 2015 / S 249-455988 subsequent additional information.

The qualification system allows for continuous intake of suppliers.

In continuation of this announcement on the extension done tenderers who have already been admitted to the qualification system, pay attention to the information from the latest annual or updating the certificates or references to be sent to DONG Energy Thermal Power via link to Scanmarket contained in this notice. Information must appear in the completed ESPD from the applicant, and the information must be sent to DONG Energy Thermal Power within 6 months.

See also Additional Information below.

Works for complete or part construction and civil engineering work

Boli.nu | Published March 31, 2017  -  Deadline May 4, 2017
cpvs
45200000

Building works include outline a comprehensive renovation and reconstruction of all 341 apartments spread over 15 blocks in boli.nu Section 7 Skanseparken. There will after renovation / redevelopment be 330 apartments.

11 of the blocks renovated with new bathrooms and kitchens, as well as all plumbing, heating and drainage systems replaced, and new ventilation built.

4 of the blocks further converted to the radical enhanced availability of new apartment device. Establish elevator in all wells in these blocks.

For all the blocks is the current that carried new balconies, porch and roof covering.

The open areas between the blocks renewed by paving, planting and terrain fixtures.

The works offered in the main contract for prequalification.

The work includes construction works in the main contract for the implementation of the physical

overall plan for boli.nu, comp. 7, Skanseparken

Client reserves the right to offer the job in concurrent tender as regards renovation extent of

facades.

Construction work for water and sewage pipelines

Fredericia Spildevand og Energi A/S | Published April 7, 2017  -  Deadline May 8, 2017
cpvs
45231300

The offered agreement is a framework agreement for sewer rehabilitation offered with its partnering agreement, which among other things entails the obligation for the successful tenderer for the entire contract to cooperate with the contractor for optimizing working processes in order to perform sewer ancestry not in a technically better way and / or economically more advantageous way.

Press http://permalink.mercell.com/66529957.aspx

The sewer ancestors not include the following main benefits:

o Obtaining digging permits, signs and markings plans and the organization of pipeline owners

o Resident Orientation

o Excavation and replacement of existing sewers and wells

o Establishment of new independent rainwater pipes and wells

o Switching on of laterals

o renovation of existing conduits by CIPP

o Documentation of work

o Participation in partnering

80-90% of the contract value is estimated to relate to the sewer rehabilitation by means of excavation and 10-20% of the contract value is estimated to relate to the sewer rehabilitation by no-dig solution.

II.1.4) and to the information in the tender material.

I.3) publicly available on www.mercell.com

To participate in the offer, you must be searching supply via Mercell at the address www.mercell.com (click påErhverv - Public procurement - use the search term 'Provision of a framework agreement in partnering for sewer rehabilitation')

Then sign up for the task by pressing »meld your interest. '

If you are not already a licensee of Mercell Denmark A / S, please fill out a registration of your company.

This registration is required for further participation and is at no cost.

Then you will receive log-in codes for Mercell.

When you log in, press' My Mercell "to view or download all information.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk (‘ENDK’) | Published January 18, 2017  -  Deadline February 17, 2017
cpvs
31000000, 31200000, 31321300, 31321500, 45231400, 45314310

NGVL and ENDK (the ‘Employers’) are jointly developing an HVDC interconnector between the United Kingdom and Denmark (the ‘Interconnector’). This notice concerns the award of one or more contracts for the detailed design, engineering, procurement, manufacture, installation, construction, testing, commissioning, spares provision, operational handover and maintenance of an interconnector between the UK and Denmark.

The procurement is structured in 7 lots consisting of:

1. lot 1 — HVDC MIND Cables underground UK.

2. lot 2 — HVDC MIND Cables submarine UK.

3. lot 3 — HVDC MIND Cables submarine NL & DE.

4. lot 4 — HVDC MIND Cables submarine DK.

5. lot 5 — HVDC MIND Cables underground DK.

6. lot 6 — HVDC XLPE Cables underground and submarine UK, NL, DE, DK.

7. lot 7 — HVDC VSC Converters UK & DK.

Two HVDC cable poles over a total route length of approximately 55km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils works, as more fully described in the Tender Documents.

Tenderers' submissions must include Transition Joints (as defined in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for both Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 230km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end as more fully described in the Tender Documents. All installation is included in Lot 2.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for both Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 195km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, as more fully described in the Tender Documents. All installation is included in Lot 3.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit compliant tenders for Lots 1 and 5. Any Tenderer who submits individual compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 210km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, as more fully described in the Tender Documents. All installation is included in Lot 4.

Tenderers submissions must include Transition Joints (as more fully described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution. Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commisioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525 kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tender for Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 76km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils work, as more fully described in the Tender Documents.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end to end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 768km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils works but including all submarine installation works, as more fully described in the Tender Documents.

Tenderers submissions must include Transition Joints (as defined in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV XLPE and Tenderers must note that the cable system (cables + accessories, including factory joints and Transition Joints) proposed in their design must have been PQ tested in accordance with Cigre TB 496 and type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 6 must also submit a compliant tender for Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

— Design, delivery, installation and commissioning of all electrical equipment for the 1400MW @ +/- 525kV Bipol VSC converter stations in DK and UK — from connection to AC substation to the DC cable termination

— Civil design and works (etc. all required buildings and foundations) in DK and UK.

— Commissioning and testing of the Interconnector

— HVAC cable in the UK

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The Employers reserve the right to award a single contract in respect of Lot 7 or not to award any contract.

Construction work

Boligkontoret Fredericia Afd. 604 | Published January 25, 2017  -  Deadline February 24, 2017
cpvs
45000000, 71000000

Boligkontoret Fredericia provider construction of 4,280 sq.m. public housing on a 3426 m 2 large plot of land (building zone 7) by the new district Fredericia C. Furthermore entered 3531 sq.m. private residential / commercial building in a physical blended construction. The general part of the project amounted to approximately 55% of the overall project, while the private sector accounts for about 45%. In the general framework established 41 new homes and a common room. Furthermore, established full basement under the project. The offered turnkey contract relating to the design and execution of the entire general part of the project as well as underground parking, and is subject to the turnkey contractor enters into a conditional purchase agreement on the building right and obligation to construct the private part at their own risk and expense.

Turnkey Contract for the construction of public housing and underground parking in a physically blended construction, which also includes private residential / commercial building. The project offered on behalf of Boligkontoret Fredericia dept. 604. Construction on the general part is offering duty acc. The applicable law, including procurement law and applicable regulations for the construction of public construction. It is a condition of the turnkey contract, the turnkey contractor performs the private part at their own risk and expense.

The supply of the turnkey contract implemented as a negotiated procedure in accordance with § 61-66 in the procurement law. Only pre-qualified bidders are entitled to submit bids and enter into any negotiation. The Contracting Authority reserves the right to award the contract on the basis of the tenderer's first offer and thus not be admitted to negotiation. The process of negotiated procedures are described in the specifications.

Hire of vessels with crew

DONG Energy Wind Power A/S | Published March 8, 2017
Winner
Klagenævnet for Udbud
cpvs
60651000

The objective of the tender is to charter two Walk-to-Work vessels for DONG Energy's German windfarms. One Walk-to-Work vessel for Operations and Maintenance in BKR1 and GOW1+2, and one vessel for construction of the BKR2 windfarm.

The Walk-to-Work vessel will be an integral part of the operation and maintenance setup on the wind farms BKR01 and GOW01+02 located in Germany. Technicians and site management of the wind farm will be operating from the vessel, where minimum 40 technicians will be based on a bi-weekly rotational basis.

The W2W vessel is equipped with a motion compensated gangway system for transferring technicians from the W2W to the TP. Furthermore, the W2W must be equipped with a boat landing and a crane for handling cargo from W2W to a CTV when the CTV is positioned in the W2W's boat landing.

The Scope of Services specifies our requirements for capabilities and capacities of the Walk-to-Work Vessel, including operational requirements. The Walk-to-Work Vessel must have capacity for minimum 40 charterer personnel in single cabins, and be able to transfer personnel and tools/spare parts between the vessel and the wind turbine generators. The Walk-to-Work Vessel must include a crew to operate the vessel. The Walk-to-Work Vessel can both be new built or a conversion of an existing vessel.

Water distribution and related services

Energinet.dk | Published November 25, 2016
Winner
Klagenævnet for Udbud (Nævnenes Hus)
cpvs
65100000, 66510000

Public procurement of All-Risk Insurance (CAR/EAR) with extended maintenance and Marine Cargo for the construction project Krieger's Flak Combined Grid Solution. The purpose of the project is to construct an infrastructure for the transmission of electricity between Germany and Denmark, using inter alia both existing and future offshore facilities in the Baltic Sea.

Construction Erection All-Risk Insurance (CAR/EAR ) and Marine cargo.

The tenderer awarded contract must collaborate with Energinet.dk's insurance broker.

Third Party Liability (TPL).

The tenderer awarded contract must collaborate with Energinet.dk's insurance broker.

Architectural and related services

Energinet.dk | Published November 30, 2016
Winner
K.G Hansen & Sønner A/S
cpvs
71200000, 71500000

The main contract includes the construction of buildings and facilities on the Danish side in

Project Cobra Cable. Energinet.dk and the Dutch TSO TenneT has to

plans to establish a 700 MW HVDC connection between the two countries to

to exchange energy and thus improve security of supply and ensuring

attractive energy prices in Denmark and the Netherlands. To this end, a

cable connection with associated converter stations respectively Endrup by

Bramming in Denmark and in Eemshaven in the Dutch north coast. Energinet.dk

provider in the connection main contract for building - and construction activities on

Danish side in Endrup. The contract is offered on the basis of a specific tender.

The main contract includes the construction of buildings and facilities on the Danish side in

Project Cobra Cable. Energinet.dk and the Dutch TSO TenneT has to

plans to establish a 700 MW HVDC connection between the two countries to

to exchange energy and thus improve security of supply and ensuring

attractive energy prices in Denmark and the Netherlands. To this end, a

cable connection with associated converter stations respectively Endrup by

Bramming in Denmark and in Eemshaven in the Dutch north coast. Energinet.dk

provider in the connection main contract for building - and construction activities on

Danish side in Endrup. The contract is offered on the basis of a specific

tender documents.

Offshore-module fabrication work

Energinet.dk | Published November 30, 2016
Winner
Joint venture: Iemants & Jan De Nul
cpvs
45262424, 45000000, 76522000

Detailed Engineering, Procurement, Construction and offshore Installation based on Employers basic design and general specifications of 2 gravity based substructures (GBS). The substructures are to be used as foundations for the 3 AC offshore substation topsides (KFA, KFB and KFE) for 2 projects called Kriegers FlakAC and Kriegers Flak Combined Grid Solution (CGS).

Fabrication and Transportation of substructures to the offshore construction site, preparation of seabed, placement of the substructures, preparing of scour protection, all other relevant works for fabrication, transport and offshore installation.

The expected time for execution of the contract is Q4 2016 — Q1 2018, subject to change of time schedule. Related services.

Fabrication of two Gravity Based Substructures, preparation of seabed, transportation and installation of the foundations on the offshore site for the 2 projects called Kriegers Flak AC and Kriegers Flak CGS.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Energinet.dk | Published December 30, 2016
Winner
Per Aarsleff A/S
cpvs
45230000

The purchase includes the burial of 150 and 320 kV cables consisting of 3 pieces. 150

kV cables per. system and 2. 320 kV cables per. system. including

excavation and restoration of cable trenches and muffehuller feed cables

incl. ø40 pipes for fiber communications and possibly. Cu-conductors. The establishment of the handlebar

drilling and drainage repairs.

Burial of 150 kV cables in the cable project He District - Thy - Mors - Salling.

Burial of 150kV cables in the cable project COBRAcable, including the establishment of two national cable runs between Fano West and Method and Endrup cable project COBRA.

Consultative engineering and construction services

Dong Energy Wind Power A/S | Published August 17, 2016
cpvs

Lot 3 and Lot 6

Construction work

DONG Energy Thermal Power A/S | Published September 3, 2016
cpvs

Construction work

Architectural, construction, engineering and inspection services

Energinet.dk | Published September 14, 2016  -  Deadline September 26, 2016
cpvs
71000000, 71310000, 71540000

Sections to be tested are TEG-LAR 1+2 (Teglstrupgård — Laröd in Denmark and Sweeden).

Construction work for pipelines, communication and power lines

Energinet.dk | Published November 3, 2016  -  Deadline November 14, 2016
cpvs
45231000, 45232000

The Offering consists of digging and installation of approximately 3 km land cable in two parallel corridors of bundled cables from the station Laröd to the beach at Sofiero.

Insurance services

Energinet.dk | Published November 22, 2016
cpvs
66510000, 66513200, 66516000

On behalf of themselves and 50Hertz, Energinet.dk wishes to purchase the below mentioned insurance lines as a part of the construction project Krieger's Flak Combined Grid Solution. The purpose of the project is to construct an infrastructure for the transmission of electricity between Germany and Denmark, using inter alia both the existing and future offshore facilities in the Baltic Sea. Construction period is scheduled from April 2016 to December 2018, subject to change of time schedule.

The following insurance services are requested:

Construction/Erection All Risks Insurance (CAR/EAR)with extended maintenance and Marine Cargo

The tenderer awarded the contract must collaborate with Energinet.dk's insurance broker.

The following insurance services are requested:

— Third Party Liability (TPL)

The tenderer awarded the contract must collaborate with Energinet.dk's insurance broker.

Construction work for tunnels, shafts and subways

Energinet.dk | Published December 21, 2016
Winner
Klagenævnet for Udbud
cpvs
45221200

Delivery of 4 horizontal directional drillings for the Han Herred project (lot 1)

and 1 horizontal directional drilling for the COBRAcable project (lot 2). Drilling

lengths range between roughly 350 and 800 meters. The procurement

procedure will result in two contracts, one for each lot. The contracts will be

awarded individually.

Lot 1 consists of four long horizontal directional drillings, each having length of approximately 300-450 m in relation Han Herred Thy Mors Salling.

Lot 2 consists of a single HDD of 755m length which is placed on Fanø Island near Esbjerg in relation with CobraCable.

Valves defined by function

Dong Energy Thermal Power A/S | Published July 12, 2016
Winner
Pentair Valves & Controls Denmark A/S
cpvs

The scope for Lot 2 comprises valves and other components. The supply includes planning, design, construction, fabrication, factory testing, transport, delivery, supervision and documentation.