Engineering design services

DONG Energy Wind Power A/S | Published February 22, 2017  -  Deadline March 7, 2017
cpvs
71320000, 71322000, 71300000

The tendered contracts are framework agreements comprising engineering consultancy services to support DONG Energy Wind Powers offshore wind farm projects. The contracts are divided into the following lots:

Lot 1: Offshore substation design

Lot 2: Onshore substation design

Lot 3: Engineering services and design of buildings intended for Operation and Maintenance activities for offshore wind farms

Lot 4: Foundations structural design

As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 1 for an elaborated description of the services comprised by the four lots (in particular Appendix 1 to the contract draft, scope of services).

Lot 1 comprises design services regarding offshore substations intended to be utilised in the construction of future offshore wind farms and design services in connection with similar structures intended for offshore deployment. As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 1 for an elaborated description of the services comprised by lot 1.

Lot 2 comprises design services regarding onshore substations intended to be utilised in the construction of future offshore wind farms and design services in connection with similar structures intended for onshore deployment. As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 1 for an elaborated description of the services comprised by lot 2.

Lot 3 concerns engineering services, architecture and design of buildings, including offices and warehouses, mainly intended for operation and maintenance activities for offshore wind farms. As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 3 for an elaborated description of the services comprised by lot 3.

Lot 4 comprises engineering design of the primary steel in the monopiles, transition pieces and ‘jackets’ for offshore wind turbines as well as secondary structures such as landings, ladders, resting platforms, internal platforms, etc. As all procurement documents are available via the URL set out in I.3 above, please see contract appendix 1 for an elaborated description of the services comprised by lot 4.