Construction work

DONG Energy Thermal Power A/S | Published December 31, 2016

This notice contains only a notice of extension of the previously announced qualification system from DONG Energy: Construction and Civil Engineering qualification system verses. 2015, 2015 / S 249-455988 subsequent additional information.

The qualification system allows for continuous intake of suppliers.

In continuation of this announcement on the extension done tenderers who have already been admitted to the qualification system, pay attention to the information from the latest annual or updating the certificates or references to be sent to DONG Energy Thermal Power via link to Scanmarket contained in this notice. Information must appear in the completed ESPD from the applicant, and the information must be sent to DONG Energy Thermal Power within 6 months.

See also Additional Information below.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk (‘ENDK’) | Published January 18, 2017  -  Deadline February 17, 2017

NGVL and ENDK (the ‘Employers’) are jointly developing an HVDC interconnector between the United Kingdom and Denmark (the ‘Interconnector’). This notice concerns the award of one or more contracts for the detailed design, engineering, procurement, manufacture, installation, construction, testing, commissioning, spares provision, operational handover and maintenance of an interconnector between the UK and Denmark.

The procurement is structured in 7 lots consisting of:

1. lot 1 — HVDC MIND Cables underground UK.

2. lot 2 — HVDC MIND Cables submarine UK.

3. lot 3 — HVDC MIND Cables submarine NL & DE.

4. lot 4 — HVDC MIND Cables submarine DK.

5. lot 5 — HVDC MIND Cables underground DK.

6. lot 6 — HVDC XLPE Cables underground and submarine UK, NL, DE, DK.

7. lot 7 — HVDC VSC Converters UK & DK.

Two HVDC cable poles over a total route length of approximately 55km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils works, as more fully described in the Tender Documents.

Tenderers' submissions must include Transition Joints (as defined in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for both Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 230km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end as more fully described in the Tender Documents. All installation is included in Lot 2.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for both Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 195km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, as more fully described in the Tender Documents. All installation is included in Lot 3.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit compliant tenders for Lots 1 and 5. Any Tenderer who submits individual compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 210km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, as more fully described in the Tender Documents. All installation is included in Lot 4.

Tenderers submissions must include Transition Joints (as more fully described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution. Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commisioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525 kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tender for Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 76km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils work, as more fully described in the Tender Documents.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end to end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 768km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils works but including all submarine installation works, as more fully described in the Tender Documents.

Tenderers submissions must include Transition Joints (as defined in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV XLPE and Tenderers must note that the cable system (cables + accessories, including factory joints and Transition Joints) proposed in their design must have been PQ tested in accordance with Cigre TB 496 and type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 6 must also submit a compliant tender for Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

— Design, delivery, installation and commissioning of all electrical equipment for the 1400MW @ +/- 525kV Bipol VSC converter stations in DK and UK — from connection to AC substation to the DC cable termination

— Civil design and works (etc. all required buildings and foundations) in DK and UK.

— Commissioning and testing of the Interconnector

— HVAC cable in the UK

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The Employers reserve the right to award a single contract in respect of Lot 7 or not to award any contract.