Call +44 800 9755 164

Public tenders for construction in Copenhagen Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Boligforeningen AAB | Published December 24, 2016  -  Deadline January 25, 2017

The project consists of the construction of 58 social housing incl. udearealer in Ishoej. The homes built as townhouses in a plane with 3 different housing sizes. It included 32 townhouses along Ishøj Boulevard, spread over 3 construction fields. It included 26 townhouses along Ishoej Søvej over 3 construction fields.

The terraced houses to be after the completion be a part of the existing department 55th

See the Specifications, and the other tender documents. Access to the material obtained by contacting the contact person mentioned in section. I.3).

http://projektweb.mangor-nagel.dk

Construction consultancy services

Boligforeningen AAB | Published January 4, 2017  -  Deadline February 2, 2017

Offered 5 parallel framework agreements on comprehensive advice for new construction, major renovations and comprehensive plans of property (public housing) related departments falling within Boligforeningen AAB.

When major alterations / master plans mean more coherent conversion / renovation efforts for the department.

The advice includes architectural, engineering and landscaping services under the Danish Ark and FRI's performance descriptions for Building and Planning and Construction and Planning.

Parallel framework agreements and the specific agreements reached by mini-tenders will be based on ABR 89th

The scope of the advice will appear in the tender documents and be further specified in connection with mini-tender.

This is because the housing association AAB's construction with independent branches, which alone is responsible for its own economy.

It is Boligforeningen AAB's expectation that the labor costs for the majority will amount to at least 70 million DKK incl. VAT.

The Contracting Authority commit themselves not to conclude additional framework agreements for total consulting for the offered framework agreements region within the contract period for this parallel framework agreements.

Urban development construction work

Udviklingsselskabet By og Havn I/S | Published December 21, 2016  -  Deadline January 23, 2017
Cadastre is heavily contaminated with petroleum products and is listed at knowledge level 2 (V2) with mapping number 101-00104. 

II.2.4) in the notice for a more detailed description of the offered job as well as the tender documents.

PFA will be the client for the subsequent construction, which thus is not part of the offered task.

In addition, the main contractor remove existing coatings, foundations and cables.

The excavated soil must then be replaced partially with sand filling.

There must also be established construction pit and spoon sand replenishment.

The Contracting Authority emphasizes, however, that merely the estimated amounts of why the main contractor is required to dispose of all contaminated land in connection with the contract without providing financial or time requirements for the Contracting Authority.

For a detailed description of the offered job and claims, the Contracting Authority for the total tender documents listed in the Tender Document 0th

Architectural, construction, engineering and inspection services

Banedanmark | Published January 11, 2017

The qualification system include Banedanmark range of resource persons in the form of project manager, project manager, site supervision, construction manager, project support staff employee, SR-working management and regulatory, SR and CAD coordinator within the qualification system disciplines.

Architectural, construction, engineering and inspection services

Københavns Kommune, Økonomiforvaltningen, Byggeri København | Published December 23, 2016  -  Deadline January 23, 2017

Offered one framework agreements with two suppliers in a cascade model. The framework agreement covers construction consultancy in connection with the completion of construction projects in the originator's strategic partnerships.

The winner will be awarded the framework agreement as the primary framework agreement holds and no. 2 are assigned the Framework Agreement as secondary framework agreement holder. Please refer to tender documents.

It is estimated that the drag on the framework agreement may vary between 20 million and 60 million over 4 years. The Contracting Authority is not bound or obligated by this estimate.

Please refer to the tender documents, as available in the TN-137,604th

Construction work for school buildings

Københavns Kommune, Økonomiforvaltningen, Byggeri København | Published December 20, 2016  -  Deadline January 27, 2017

Christianshavn School is located at 2 separate land registers on Princess Street 45 and 54, 1422 Copenhagen K. Closed case involves capacity expansion and overall renovation of the existing school.

The capacity expansion includes an extension of the school from 3 to 4 track by rebuilding and extension of the existing gym building on Princess Street 45 (called Annex + Tower, 2 400 m²) as well as by construction of a building on Princess Street 54 (called Science LAB, 1,070 m²) .

GENERAL The renovation includes a partial update of existing buildings, including the Main School (5700 m²) on Princess Street 45 and the buildings branch (1224 m²) and Philip De Langes villa (530 m²) on Princess Street 54. The overall renovation includes int. And ext. Restoration, modernization , energy renovation and climate adaptation.

Outdoor areas of the two land registers (2,300 + 4,810 m²) must undergo an extensive upgrade of new coatings, playground, outdoor learning space, smaller buildings in the terrain, etc.

The work offered in the main contract.

Closed case is offered in one single main contract.

Urban development construction work

Udviklingsselskabet By og Havn I/S | Published January 11, 2017  -  Deadline February 10, 2017

Ørestad is a mixed town divided into 4 districts, which Ørestad Syd represents 1. The project is an is a main contractor to carry out a series of infrastructure works in 5 sections in Ørestad Syd. Infrastructure works are described in other documents and below section. II.2.4).

The 5 sections where the works are to be carried out are also described in other documents - generally these are infrastructure works on:

The promenade - the boundary between Ørestad Syd and Kalvebod Common

Forest belt / Alfelt Road (North)

Park band / Richard Mortensen Road (North)

Channel tape with cross conversions on Robert Jacobsensvej

Cross street Ejler Billes Alle (West).

The project is an is a main contractor to carry out a series of infrastructure works in 5 sections in Ørestad Syd. The main contractor to perform work which, inter alia comprising:

- Excavations

- Retaining wall / bung on a part of the promenade

- Structures (water channels, construction works, etc.)

- Coatings (asphalt, concrete slabs cast on site concrete pavements, pavements, etc.)

- Supplies (water, roof drainage, vejafvanding, sewage, district heating and gas)

- Planting

- Road and footpath lighting and various fixtures.

Bridge construction work

Københavns Kommune, Teknik- og Miljøforvaltningen, Byens Fysik | Published January 19, 2017  -  Deadline February 16, 2017

Offering includes a new road bridge, which will link the two new districts in the South Harbour, Teglholmen and Enghave Brygge.

The bridge form of a solid bridge in the concrete with a length of about 90 m, a width of about 17 m. Divided into 2 lanes a 3.5 m and sidewalks of 2.5 m and cycle path of 2.5 m in both sides of the bridge.

For the sake of the environment, the bridge retaining walls for remuneration, supports, ramps etc. is established so that noise and vibration as possible. Establish approximately 150 m retaining walls traditionelspunsjern with anchor plates and secantvægge. A portion of the reinforcement is carried out with glass fiber, but may optionally be deleted. The bridge's railing performed either in stainless or galvanized steel with integrated lighting in the railings handrail. Moreover conducted a bench in several levels approximately 60-70 mi rustfrit- / galvanized and wood about performed. Bench and railing are options.

Conclusion of the contract requires the project to be approved by the Transport Authority and the Technical and Environmental Committee approves the result of the expropriation.

Refer to the section. II.1.4) above and the tender documents.

Works for complete or part construction and civil engineering work

Københavns Kommune | Published January 4, 2017  -  Deadline February 14, 2017
The Contracting Authority does not undertake a certain minimum. 

Press http://permalink.mercell.com/63674262.aspx

Similarly, all communication with the Contracting Authority made digitally through communication module in Mercell.

Translation services

Femern A/S | Published January 10, 2017  -  Deadline February 9, 2017

Framework agreement for translation services and additional language assistance during the construction of the fixed link under the Fehmarn Belt, particularly in connection with work related to the fulfillment of the German regulatory approval.

The construction of the fixed link under the Fehmarn Belt is one of the largest construction projects in northern Europe. The project for the adoption of Law no. 575 of 05.04.2015 on the construction and operation of a fixed link across the Fehmarn Belt with associated land facilities in Denmark gained approval in Denmark. The project has yet a German approval.

Framework agreement for translation services cover any language assistance, appears during the term of the agreement. It is expected that the benefits particularly for use in connection with the work of the German approval process, but specifies that the supplier is also expected to provide language services for use for other purposes. The services will be closely linked to the construction project and will therefore be of engineering professional, legal and / or environmental academic nature.

The framework agreement is expected to include the following services:

- Translations

- Rewrites

- Proofreading

- Quality Check of texts and translations

- Further development of Fehmarn A / S 'translation memories and words and terminology list, and

- Development and maintenance of a customer portal, which among other things to be used in connection with the orders.

Engineering services

Hofor A/S | Published January 17, 2017  -  Deadline February 15, 2017

Offering includes advice in cross- functional architectural work, surveying works and engineering works for Hofors activities within water, wastewater, district heating, city gas, district cooling, wind and energy production.

The tender is divided into 6 areas of competence (water, sewage, heating / gas / cooling, wind, CHP, all supplies), consisting of a total of 15 lots.

Hofors diverse production and water distribution activities.

Typical tasks will be projecting, regulatory processing, procurement and construction management, including:

- Preparation of analysis, network modeling, EIA, environmental studies, hydraulic studies, project development and project sketches etc.

Tasks can range from ad hoc tasks to overall client advice through all stages

- Construction management including supervision of both small and large 'own' projects

- Project planning, including preparation of preliminary and detailed design

- Body Treatment

- Production of hydraulic and static calculations for utility relocations, construction works, waterworks, well fields and building structures made of concrete and / or steel, envelope etc.

- Risk mapping compared to DDS documented drinking water safety

- Provision of services, purchases and contracts requiring technical knowledge of water supply including electrical work, well fields, water utilities etc.

- Preparation of procurement strategy, contract documents and client perspectives, including advice on procedure, contract form and award criteria, evaluation of prequalification applications and offers, participation in negotiation meetings etc.

- Quality of work, private as well as other advisors

- Assistance in the contracting

- Periodically lending by consultants as 'in-house' consultant tasks in construction management / supervision, project management, project planning etc. at københavns belysningsvæsen.

- Execution of groundwater chemical assessments (both natural and environment-enhancing drugs).

- Construction of water drilling, geotechnical drilling and dewatering.

- Execution of borehole logging incl. data processing and interpretation.

Hofors diverse wastewater activities.

Typical tasks will be projecting, regulatory processing, procurement and construction management, including:

- Preparation of analysis, network modeling, EIA, environmental studies, hydraulic studies, project development and project sketches etc.

Tasks can range from ad hoc tasks to overall client advice through all stages

- Construction management including supervision of both small and large 'own' projects

- Project planning, including preparation of preliminary and detailed design

- Body Treatment

- Production of hydraulic and static calculations for utility relocations, construction works, concrete basins, minor and major pumping stations and building structures made of concrete and / or steel, envelope etc.

- Project of financing climate projects, including the handling of many stakeholders

- Provision of services, purchases and contracts requiring technical knowledge in waste water supply including electrical works, pumping stations etc.

- Preparation of procurement strategy, contract documents and client perspectives, including advice on procedure, contract form and award criteria, evaluation of prequalification applications and offers, participation in negotiation meetings etc.

- Quality of work, private as well as other advisors

- Assistance in the contracting

- Periodically lending by consultants as 'in-house' consultant tasks in construction management / supervision, project management, project planning etc. at københavns belysningsvæsen.

Hofors diverse wastewater activities.

Typical tasks will be analysis and modeling, including:

- Production of hydraulic calculations and model work for sewage and water main roads.

- Adjustment of models and scenario-in models.

Hofors multiform heat, gas and district cooling activities.

Typical tasks will be projecting, regulatory processing, procurement and construction management, including:

- Preparation of analysis, network modeling, water hammer analyzes, EIA, environmental studies, project development and project sketches etc.

- Support for the Business Case calculations and cost estimates in the analysis projects

- Proposals (production and new network connections) for regulatory processing

- Project development and project sketches

Tasks can range from ad hoc tasks to overall client advice through all stages

- Construction management including supervision of both small and large 'own' projects

- Project planning, including preparation of preliminary and detailed design

- Body Treatment

- Production of hydraulic and static calculations for new power lines, utility relocations, construction works, pumping stations and city

IT services: consulting, software development, Internet and support

Kombit A/S | Published January 12, 2017  -  Deadline March 22, 2017
Further talks economic considerations for a total contract because there is expected to be savings in the procurement process and in the subsequent contract. 

Furthermore, other authorities for the Construction and Environment subject area via Kombit to finance acquisitions and further development of the solution, as recently happened with the Environmental expansion.

All the country's municipalities are currently connected Closed section and Environmental expansion, while 90 municipalities are connected to environmental part.

Further development, operation and maintenance etc. of Building and Environment happens with Kombit, as it is Kombit responsible for dialogue with suppliers and contract holder for municipalities.

Build and Environment has been in production since April 2014 and is an efficient solution in the form it has today.

However, there will be no significant changes to the solution during the re-tender.

It is crucial that local users experience significant genes by re-tender, including a lack of system availability and support.

Re-tender includes operation, maintenance, development and support in relation to the solution.

4, which means that the processing of certain data must be in Denmark.

Railway-track maintenance services

Sund og Bælt Holding A/S | Published January 17, 2017  -  Deadline February 16, 2017

The Contracting Authority hereby offers track alignment on the Great Belt rail and Sound track.

Under point II.2.4) gives a detailed description as well as the tender documentation also contains a more detailed description of the task.

The contract involves performing track alignment on the Great Belt rail and Sound track.

Entre prize amounts shown in TBL offer list.

A / S Storebælt and A / S Øresund has transferred operation and maintenance of the Great Belt The road section and railway component to Sund and Bælt Holding A / S, including authorized this company to enter into and manage all advisory, supply and construction contracts.

The 1.3.2006 was responsible for Great Belt railway's operation and maintenance and reinvestments taken over and 01.09.2013 were responsible for the Sound railroad operation and maintenance and reinvestments transferred.

Great Belt Fixed Link consists of the following elements:

- East Bridge, 6.8 km 4-lane highway

- West Bridge, 6.6 km 4-lane highway and two-track railway

- East Tunnel, 8 km two-track railway tunnel

- Landanlæg halsskov, Sprogø and Knudshoved

- Stations in Korsor and Nyborg incl. Security Technology station on Sprogø

- Payment System, Administration Center (AC) and Materielgård by halsskov.

The plant covers a total of 25.6 km railway installations on railway line 14 from km 106.84 at Svenstrup in Korsor to 132,396 km by Frisengårdsvej in Nyborg. Storebæltsforbindelsen also includes individual plant components outside these ownership limits.

Øresund line consists of the following elements:

Øresund motorway 8.6 km four lane highway of Amager to the artificial peninsula at the Amager coastline, where it is connected to the tunnel under the Sound.

Railway facility includes a total of 17.5 km double-track line on railway line 50 from Copenhagen Kastrup (from km 0.523 to km 12.854) and freight line from Vigerslev to Kalvebod (from km 0.583 to km 4.074).

  • 1