Construction work

Københavns Kommune, Teknik- og Miljøforvaltningen | Published April 6, 2017  -  Deadline May 5, 2017
cpvs
45000000, 45233120, 45233162

The project's main objective is to support Amagerbro Gades function as strokes street by traffic calming it and improve conditions for pedestrians and cyclists.

70 new trees.

At a portion side streets will be established with through-crossings sidewalks.

The project's main objective is to support Amagerbro Gades function as strokes street by traffic calming it and improve conditions for pedestrians and cyclists.

70 new trees.

At a portion side streets will be established with through-crossings sidewalks.

Amagerbrogade has a rich commercial life, and to be associated with the construction work takes account of the stores can operate both in terms of visibility, customer access and product delivery.

The project on Amagerbrogade include the result of a large public involvement process, the locals will therefore feel some ownership and expectations for the project that can be expected a lot of interest from the locals.

During construction it will be possible to standardize vehicle traffic to the north, except for the stretch between Amager Boulevard and Holmbladsgade where throughout the construction phase to be maintained option for bi-directional traffic.

The contract shall initially scheduled performance in four main stages.

- Stage A is made up of Amagerbro Gade east side between Christmas Møllers seats Holmbladsgade.

- Stage B consists of Amagerbro Gades west side between Christmas Møller space to the junction Halland Street.

- Stage C is constituted by Amagerbro Gade between the east side and Holmbladsgade Shetlandsgade.

- Stage D is constituted by Amagerbro Gade west side between Halland Street Shetlandsgade.

Before starting work on a stage can be started, the work of the previous stage to be completed.

Outside the main stages lies a construction area at Vejlands All.

18 800 and 19 800th

15-18 southbound.

This work will be performed by the municipal lighting contractor Citelum ApS.

Currently we work with projects respectively. corner Amager Boulevard / Amagerbrogade and sidewalk explored Our Savior Church Cemetery.

Construction work for art and cultural buildings

Slots- og Kulturstyrelsen | Published April 7, 2017  -  Deadline May 3, 2017
cpvs
45212300

Construction work for art and cultural buildings

Environmental impact assessment for construction

Udviklingsselskabet By & Havn I/S og Copenhagen Malmö Port | Published April 21, 2017  -  Deadline May 26, 2017
cpvs
71313400

The assignment for technical advice and assistance on planning and preparation of an EIA report in connection with the planned construction of a container terminal in the northeastern part of the Outer Nordhavn and the establishment of a cruise terminal along the southeast quay at Outer Harbor. For a more detailed description of the task, refer to the mission statement.

For a description of the conditions of the tender refer at all to the document 'Terms and conditions - Offer'.

Construction work for art and cultural buildings

Slots- og Kulturstyrelsen | Published April 6, 2017  -  Deadline May 3, 2017
cpvs
45212300

The contract relates to works offered in a main contract offer.

The reason for the project is that the Danish Agricultural Museum, Auning in 2017 merged with Hunting and Forestry Museum, Hoersholm to the Green Museum, which provides knowledge and history of hunting, forestry, agriculture and the food here in Denmark. The merger of the two museums is an element of the political decision on the relocation of public sector jobs.

The merger of the museums causes a number of structural changes and updates that are all designed to support the future museum activities and work and raise the standard of the physical environment, as well as to expand the museum's capacity for storage of exhibits.

The total project includes an expansion of the museum stores on Aarhusvej 9 Auning (this contract, track 2) and a number of initiatives at the museum itself. These measures are implemented in a separate parallel tenders. (Track 1)

This supply comprises in outline:

- Demolition of example. Weighbridge - approximately 40 m².

- Construction of a new storehouse in sandwich concrete panels, about 1 230 m² gross + mezzanine floors to engineering. Magazine bath contains 3 clips, which are all provided with interior climate control, ventilation and dehumidification. Facilities include conservator workshops, also with ventilation and humidity control.

- Covering between eg. Building and construction, steel construction

- shelving, built stålmezzaniner and compact shelves

- Smaller reconstruction of existing workshops, grinding chamber, magazines and toilet incl. new ventilation and extraction.

- Conversion of deploying weapon magazine

To be awarded the contract agreement before the summer with start in early August 2017.

Construction work for buildings relating to leisure, sports, culture, lodging and restaurants

Slots- og Kulturstyrelsen | Published April 7, 2017  -  Deadline May 3, 2017
cpvs
45212000

Construction work for buildings relating to leisure, sports, culture, lodging and restaurants

District-heating plant construction work

Hofor A/S — Hovedstadsområdets Forsyningsselskab | Published April 7, 2017  -  Deadline April 24, 2017
cpvs
45251250, 45112000, 45262211, 45331200, 45300000

Tunnel pumping and exchanger station TPW near Amager Power Station (AMV) was established in 2007 to 2009 as part of a larger project for district heating from AMV and Amager Resource Center (ARC) to HOFORS district heating system in central Copenhagen. Since it has been decided that the steam-based district heating system must be converted to water-based in 2121, there has been an increased need for water-based district heating, which will primarily be supplied from the new biomass-fired CHP plants (AMV04). As a consequence of this, the capacity of TPW extended to 324 MJ / s.

In this context, building an extension to the existing Tunnel, Pump and exchanger building (TPW-building).

Building contract includes the following main operations:

- Haulage of land depot

- Pile foundations

- creation of load-bearing concrete floor

- Building Construction

- Establishment of ventilation.

Cogeneration plant construction work

Hofor Energiproduktion A/S | Published April 13, 2017  -  Deadline May 15, 2017
cpvs
45251220, 45223210, 45443000, 45421130

HOFOR, Headstand area Forsyningsselskab, building a new biofyret power plant at the existing Amagerværket. The project is called BIO4. Power plant block is about 50 m in width, 205 m in length and 70 m in height, at its highest point.

The store 2 is about 200 m long, 40 m wide and 40 m in height.

There are various transport systems from the south port leading to the store and to the block. Along this route of the conveyor belt, there are secondary structures which crush the harp-house, building chipper, and various elbygninger and reversing stations mm.

The project is located at the following cadastral numbers, 544,553, 554 and 566 Amager Bros Neighborhood, Copenhagen. The address of BIO 4 is Kraftværksvej 37, 2300 Copenhagen S.

The supply includes the manufacture and installation of steel structures for secondary buildings and structures as well as the facade, roof and completion work for secondary buildings and tunnel west of stocks.

The supply includes steel structures, front, roof, and completion work for the secondary buildings and structures, the port and along the conveyor system. This includes manufacturing, delivery and assembly of:

- Steel structures for chipper building

- Steel structures for harp-knusehus

- Steel structures for cable-

- Steel structures for tunnel west of stocks

- Steel structures for elbygninger

- Steel structures for servise and mounting apertures

- Façade, roof, and completion work for chipper building

- Façade, roof, and completion works for harp-knusehus

- Façade, roof, and completion works for the tunnel west of stocks

- Façade, roof, and completion work for elbygninger.

Cogeneration plant construction work

Hofor Energiproduktion A/S | Published April 19, 2017  -  Deadline May 18, 2017
cpvs
45251220, 45310000, 45331000, 45332000

Hofor, Headstand area Forsyningsselskab, building a new biofyret power plant at the existing Amagerværket. The project is called BIO4. Power plant block is about 50 m in width, 205 m in length and 70 m in height, at its highest point.

The store 2 is about 200 m long, 40 m wide and 40 m in height.

There are various transport systems from the south port leading to the store and to the block. Linjeføringaf along this conveyor belt is that secondary structures which crush the harp-house, building chipper, and return stations and forskelligeelbygninger mm.

The project is located at the following cadastral numbers, 544,553, 554 and 566 Amager Bros Neighborhood, København.Adressen of BIO 4 is Kraftværksvej 37, 2300 Copenhagen S.

The supply includes the manufacture and assembly of installations for block building, warehouses and secondary buildings.

The agreement covers delivery, installation and commissioning of:

- Delivery, installation and commissioning of HVAC installations in the process of building and external buildings;

- Delivery, installation, commissioning and commissioning of the ventilation building in the process of building and external buildings;

- Delivery, installation and commissioning of the building's electrical systems in the process of building and external buildings.

Cogeneration plant construction work

Hofor Energiproduktion A/S | Published April 20, 2017  -  Deadline May 21, 2017
cpvs
45251220, 45443000, 45261000, 45421100

Short description:

HOFOR, Headstand area Forsyningsselskab, building a new biofyret power plant at the existing Amagerværket. The project is called BIO4. Power plant block is about 50 m in width, 205 m in length and 70 m in height, at its highest point.

The store 2 is about 200 m long, 40 m wide and 40 m in height.

There are various transport systems from the south port leading to the store and to the block. Linjeføringaf along this conveyor belt is that secondary structures which crush the harp-house, building chipper, and return stations and forskelligeelbygninger mm.

The project is located at the following cadastral numbers 544, 553, 554 and 566 Amager Bros Neighborhood, København.Adressen of BIO 4 is Kraftværksvej 37, 2300 Copenhagen S.

Offering comprises closing the building block.

The design for manufacture, supply and installation.

- Closing the facades block building with SSP elements;

- closing of the roof building block trapezoidal plate insulation and roofing felt;

- Window of windows and bay windows;

- Doors and gates.

District-heating plant construction work

Hofor A/S — Hovedstadsområdets Forsyningsselskab | Published April 20, 2017  -  Deadline May 1, 2017
cpvs
45251250, 45112000, 45262211, 45331200, 45300000

Tunnel pumping and exchanger station TPW near Amager Power Station (AMV) was established in 2007 to 2009 as part of a larger project for district heating from AMV and Amager Resource Center (ARC) to HOFORS district heating system in central Copenhagen. Since it has been decided that the steam-based district heating system must be converted to water-based in 2121, there has been an increased need for water-based district heating, which will primarily be supplied from the new biomass-fired CHP plants (AMV04). As a consequence of this, the capacity of TPW extended to 324 MJ / s.

In this context, building an extension to the existing Tunnel, Pump and exchanger building (TPW-building).

Architectural, construction, engineering and inspection services

Københavns Kommune, Økonomiforvaltningen, Byggeri København | Published April 11, 2017  -  Deadline May 9, 2017
cpvs
71000000, 71200000, 71300000, 71400000

The City of Copenhagen will print a design contest followed by a negotiated procedure for the lead consultancy agreement listed. TVergG § 82 building will include a house to martial arts, associations and urban activities on the 'Skoda site' on the border between Nørrebro and north-west of Copenhagen. The project will be designed with a particular focus on the urban context and should open up in community relations and the life that is in the area.

Based on the project's location and qualities desired that a project that supports the special values ​​and activities in martial arts associations, the house can accommodate other types of activity when martial arts associations do not use the house and the Match sport house reaches out into the urban space in a way that supports a living urban environment. The total project comprises approximately 3,000 gross sq. kampsportshus, with club rooms and public functions. Moreover sports facilities in the outdoor areas, landscape machining and parking structure.

Construction work for buildings relating to leisure, sports, culture, lodging and restaurants

Slots- og Kulturstyrelsen | Published April 6, 2017  -  Deadline May 3, 2017
cpvs
45212000

The contract relates to works offered in the main contract.

The reason for the project is that the Danish Agricultural Museum, Auning in 2017 merged with Hunting and Forestry Museum, Hoersholm to the Green Museum, which provides knowledge and history of hunting, forestry, agriculture and the food here in Denmark. The merger of the two museums is an element of the political decision on the relocation of public sector jobs.

The combination results in a number of building updates and changes, all designed to support the future museum activities and work and raise the standard of the physical environment.

The total project includes actions in the museum itself (this contract, track 1) and an expansion of the museum stores on Aarhusvej 9, Auning. These expansions carried out in a separate parallel supply. (Lane 2)

This supply comprises in outline:

- Replacement of three large skylights / lanterns with new pultlys in existing flat roof

- Renovation of public toilets with new walls, new plumbing, lighting, etc.

- Building of approximately 200 m² sit stair / floor building in existing lobby / central hall

- Creation of approximately 400 m² mezzanine decks / balconies in glulam in existing halls

- Replacement of two skylights in eg. Buildings

- Update / new electricity and lighting in several construction areas (approximately 2,000 m²)

- Establishment of humidification in existing exhibition magazines (around 2000 m²)

- Establishment of dehumidifiers in two protected storage buildings, totaling approximately 2,500 m².

- Establishment of external drainage and conversion of deposits along the facades of listed buildings, drainage to the moat

- Minor alterations, a new ventilation and new fixture in a classrooms

- New exterior sheds / covers, approximately 140 m²

- Solar Energy, approximately 220 m², mounted on eg. The roof surface

- New digital camera surveillance.

To be awarded the contract agreement before the summer with start in early August 2017.

Works for complete or part construction and civil engineering work

Københavns Kommune | Published March 4, 2017  -  Deadline February 16, 2021
cpvs
45200000, 44230000, 45000000, 45210000, 45232410, 45232440, 45260000, 45261900, 45261910, 45261920, 45262000, 45262100, 45262300, 45262500, 45262690, 45310000, 45330000, 45422000, 45440000, 50000000

Copenhagen Municipality (hereinafter: "The Contracting Authority") wishes with this contract to establish a dynamic purchasing system. It is intended that the dynamic purchasing system in the next 4 years, will be used to buy the Contracting Authority's main contract work on major renovations and maintenance works or collections of renovations and maintenance of over 3 million DKK. The expected consumption on purchases through the dynamic purchasing system is about on 280 000 000 DKK per year, distributed in the following areas: 1) Roofing: 60,000,000 DKK, 2) Window and facade work: 100 000 000 DKK, 3) Earth, concrete and drainage work: 40 million DKK, 4) Electrical work 10 million DKK, 5) HVAC and plumbing 60 million DKK and 6) Painting 10 million DKK. The Contracting Authority does not undertake a certain minimum.

Press http://permalink.mercell.com/63674262.aspx

Granite

Folketinget | Published April 11, 2017  -  Deadline May 10, 2017
cpvs
44912100

Parliament and Palaces and Culture Agency wishes in connection with construction work concerning. conversion of Christiansborg Castle Square to buy ingots of granite for further processing. The granite to be processed into a variety of granite elements in the form of spheres, wall elements, base entering the card reader uprights as well as large granite tiles which are incorporated into the finished installation. The processing / production of granite elements will be done in installations contract for the reorganization of Palace Square.

Flatwork for recreation installations

I/S Amager Ressourcecenter | Published April 11, 2017  -  Deadline May 9, 2017
cpvs
45236200

Amager Bakke is a newly established waste-based energy plants. Amager Bakke is designed as a hill where the roof surface is made available to the public as a recreational green area where city residents and visitors can go skiing, climbing, running, walking, etc.

This call is for main contractor on site tagparken, including the establishment / construction of:

- Site

- Green roof with its green areas, trees and shrubs

- Paths and fixtures.

In addition the installation of skimåtte.

Tagparken constitutes about 15,000 m² and slopes from ground level up to ca. 80 m in height.

Various surface works

Folketinget, Byggesekretariatet | Published March 24, 2017  -  Deadline May 1, 2017
cpvs
45233200, 45232410, 45233330, 45221110

Construction of a perimeter security around Christiansborg Castle Square consisting of bollards, which are mounted 110 cm granite balls.

Further comprising the contract:

- Conversion of the entire space in front of Christiansborg

- Adjusting the bike path along the Christiansborg Castle Square

- Adjusting existing curbs along Slotsholmsgade

- Adjusting existing refuges in Slotsholmsgade

- Planting of trees along the canal north of Christiansborg Castle Square

- Machining of granite blocks (client delivery) to the granite balls

- Establishment of signaling and lighting

- Establishment of moisture membrane of Ruin Museum tires

- Sewage Works

- Establishment of raise / lower bollards

- Establishment of readers.