Public tenders for construction in Ballerup Denmark

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for warehouses

Danish Defence Acquisition and Logistics Organization | Published September 29, 2017  -  Deadline October 15, 2017
cpvs
45213220, 39151100, 45213200

Storage equipment and service for DALO at DALOs Storage facilities.

DALO have different sizes of storage heated or cold containing Pallet Racks, Cantilever Racking, and Multi-Purpose Shelving, ranging in size from 50 square meters up to more than 10 000 m2, with height from 4 meters up to 10 meters.

DALO storages are spread across Denmark, in Jutland, Fynen, Bornholm and Zealand. Please see details for location of DALO storage facilities in Appendix A.1 to the Contract.

DALO requires Suppliers within 3 lots: Lot 1 Pallet racks, storage equipment and accessories, Lot 2 Automated Small parts Vertical Storage Solution and Lot 3 INSTA Services and Repairs.

Construction work for sewage pipes

Boligforeningen AAB, Afdeling 54 | Published May 11, 2016
cpvs
45232440, 45231300, 45232400, 45232410, 45232130, 45232454, 45233250, 45432112

Construction work for sewage pipes

Construction 2014 / S 219-386568

Almenbo a.m.b.a | Published November 13, 2014  -  Deadline December 3, 2014
cpvs
45210000

Construction

Construction work for multi-dwelling buildings and individual houses

Boligselskabet Baldersbo | Published December 19, 2015  -  Deadline January 13, 2016
cpvs
45211000

Construction work for houses and residential buildings

Construction work for sewage pipes

Boligforeningen AAB, Afdeling 54 | Published December 10, 2015  -  Deadline January 15, 2016
cpvs
45232440, 45231300, 45232400, 45232410, 45232130, 45232454, 45233250, 45432112

Section 54 located Hedeparken 117-235 and Magleparken 45-71 and 128-214, Ballerup, consists of 944 leases in 19 blocks covering an area of ​​approximately 215 000 m2. with coverings, paths, parking areas, green areas, communal laundries, public houses, etc. The building will be in operation during the entire construction period, there will therefore be a part occupant management during the construction period. Main contract for the execution of: - sewer renovation of sewers primarily by liner, including flushing and TV inspection before and after as well as possible. local excavations. - Sewer renovation of rainwater pipes, including any. partial excavation and replacement as needed. - Rainwater drainage and torrential action, possibly. decoupling and LAR (local rainwater). - Coating work, including replacement and establishment of new coatings and base layer for the main entry and paths and the establishment of new living and traffic areas. The performance will take place in two phases: 1) Renovation of wastewater sewers 2) Renovation of stormwater sewers, rainwater drainage, paving and green areas. Contracting authority expects to start of the contract will be 01/05/2016 with an anticipated construction period of approximately 2 years. General contractor should be ready to begin rehabilitation of the wastewater sewer immediately after the start of the contract.

Construction work for multi-dwelling buildings and individual houses

Boligselskabet Baldersbo | Published December 11, 2015  -  Deadline January 13, 2016
cpvs
45211000

For installation, and construction for the renovation of bathrooms and installations. Apartments will be occupied during the rebuilding period.

Construction work for houses and residential buildings 2015 / S 240-434883

Boligselskabet Baldersbo | Published December 19, 2015  -  Deadline January 13, 2016
cpvs
45211000

For installation, and construction for the renovation of bathrooms and installations. Apartments will be occupied during the rebuilding period.

Construction

Almenbo a.m.b.a | Published November 13, 2014  -  Deadline December 3, 2014
cpvs
45210000

Byggearbejde

Architectural, construction, engineering and inspection services

Boligselskabet Baldersbo Afd. 14 | Published October 27, 2015  -  Deadline November 30, 2015
cpvs
71000000

Architectural and engineering consultancy as a consultant under Danish Ark and FREE service descriptions; including planning, project management and construction management. Div. 14 consists of 422 properties totaling 32,253 m2. The project includes renovation of facades, windows and balcony door parties, re-insulation of facades, concrete renovation around basements and outputs as well as accessibility for the elevator operated housing.

Construction 2015 / S 030-049908

Boligselskabet Baldersbo, Afdeling 8 | Published February 12, 2015  -  Deadline April 9, 2015
cpvs
45210000

Construction Demolition of walls, floor slabs, bath, kitchen and installations Replacement of windows Façade plaster system Establishment of new foundations for new walls Establishment of new terrain tires in previous crawl space Creation of new light floor slabs New kitchens New bathrooms Establishment of new walls Establishing new ceilings and floors Renovation of staircases Establishing perimeter drain Establishing separing of regvandssystem Establishment of pumping wells with højvandslukker New drainage systems in building new domestic water installations and sanitation New heating installations Establishment of new extraction system with exhaust from the hood and valves in the shower / toliet New electrical installations Establishment ramps to buildings (accessibility) Drain Ning of grassland Establishing stay and play area in the terrain.

Architectural, construction, engineering and inspection services

Boligselskabet Baldersbo afd. 14 | Published July 14, 2016
Winner
Mangor & Nagel Arkitektfirma A/S
cpvs
71000000

Architectural and engineering advice as a consultant under Danish Ark and FREE service descriptions; including planning, project management and construction management.

Div. 14 consists of 422 homes totaling 32,253 m². The project includes renovation of facades, windows and balcony door parties, re-insulation of facades, concrete renovation around the cellars and outlets and the availability of the elevator operated housing.

Construction work

KPC København A/S | Published October 25, 2014
Winner
Oluf Jørgensen A/SKnudsvej 44cRoskilde 4400
cpvs
45000000

Ingeniørydelse som led i totalentreprise.

Construction work for sewage pipes 2015 / S 239-433434

Boligforeningen AAB, afdeling 54 | Published December 10, 2015  -  Deadline January 15, 2016
cpvs
45232440, 45231300, 45232130, 45232400, 45232410, 45232454, 45233250, 45432112

Section 54 located Hedeparken 117-235 and Magleparken 45-71 and 128-214, Ballerup, consists of 944 leases in 19 blocks covering an area of ​​approximately 215 000 m2. with coverings, paths, parking areas, green areas, communal laundries, public houses, etc. The building will be in operation during the entire construction period, there will therefore be a part occupant management during the construction period. Main contract for the execution of: - sewer renovation of sewers primarily by liner, including flushing and TV inspection before and after as well as possible. local excavations. - Sewer renovation of rainwater pipes, including any. partial excavation and replacement as needed. - Rainwater drainage and torrential action, possibly. decoupling and LAR (local rainwater). - Coating work, including replacement and establishment of new coatings and base layer for the main entry and paths and the establishment of new living and traffic areas. The performance will take place in two phases: 1) Renovation of wastewater sewers 2) Renovation of stormwater sewers, rainwater drainage, paving and green areas. Contracting authority expects to start of the contract will be 01/05/2016 with an anticipated construction period of approximately 2 years. General contractor should be ready to begin rehabilitation of the wastewater sewer immediately after the start of the contract.

Construction work

Ballerup Kommune | Published April 13, 2017  -  Deadline May 15, 2017
cpvs
45000000, 45200000, 45211360, 45213311, 45213320, 45213350, 45232130, 45232411

The project is located in Ballerup Municipality and comprises a reconstruction of the existing terminal by Ballerup station to the new Town Square, new bus terminal and new busdepot.

Press http://permalink.mercell.com/67075365.aspx

The Contracting Authority will hold briefing on the pre-qualification phase of Ballerup Library d. 04.24.2017 at. 13-15. Interested firms join the communication module in Mercell.

After the meeting the contracting gives a brief summary of the meeting to answer any. questions from the meeting.

The project is located in Ballerup Municipality and comprises a reconstruction of the existing terminal by Ballerup station to the new Town Square, new bus terminal and new busdepot.

The project deals with a conversion of the entire space with new coating for asphalt, concrete tiles and insitustøbte concrete slabs and planting beds and tree plantings. In addition, a number of fitting elements as busskurer, benches, billboards, signs, bicycle racks, signaling mm.

While Ballerup Municipality performs new space station performs drain Ballerup a number of utility relocations during this project.

Alongside the Municipality of Ballerup perform the new railway station area performs Ballerup Property Company / CAM an angle building in four levels on Town Square. The project is a turnkey contract by another contractor.

Works for complete or part construction and civil engineering work

Ballerup Kommune | Published May 19, 2017
Winner
CG Jensen A/S
cpvs
45200000, 45230000

The project is located in the municipality of Ballerup and includes a rebuilding of Linde Allé at the current railway station.

The project is located in the municipality of Ballerup and includes a rebuilding of Linde Allé at the current railway station. New road and cycle paths, new wastewater and rainwater pipelines, new bus platforms and new signaling facilities at Linde Allé / Bydammen and lighting fixtures must be established.

The purpose of the project is to transform Linde Allé into temporary bus terminal, approx. 1½ years, so existing railway stations can be rebuilt and new construction can be built.

Total Consultancy on. new construction of day care for about 210 children between 0 and 5 years.

Ballerup Kommune | Published February 24, 2016
Winner
RUBOW arkitekter a/s
cpvs
71200000

Total consulting concerns new construction of a children's house. It includes: architects, engineers or

landscape architect services and skills within educational principles and trends. Emphasis

inter alia, sustainability, flexibility and indoor air quality. Applicants are asked an outline proposals. the winning

company (or team) is to include perform various design and construction procurement phases up to commissioning incl.

construction management and technical supervision.

Urban development construction work

Ballerup Kommune | Published October 14, 2017
Winner
Per Aarsleff A/S
cpvs
45211360, 45213311, 45213320, 45213350, 45232130, 45232411

The project is located in the municipality of Ballerup and includes a rebuilding of the existing bus terminal at Ballerup station, new city square, new bus terminal and new bus depot.

An information and inquiry meeting will be held at. 13:00 d. 7.9.2017 at Ballerup Library, Banegårdspladsen nr. 1, 2750 Ballerup. At the meeting, the contracting entity will inform about the task and there will be an opportunity to ask questions about the tender documents. Questions are asked as much as possible by e-mail before the meeting, and questions asked at the meeting are then sent by fax. email.

Please send in the information and inquiry with the number of participants no later than 4.9.2017 in Mercell.

After the meeting, the contracting entity submits a brief summary of the meeting with answers to questions from the Mercell meeting.

The project is located in the municipality of Ballerup and includes a rebuilding of the existing bus terminal at Ballerup station, new city square, new bus terminal and new bus depot.

The project deals with a rebuilding of the entire site with new coatings in asphalt, concrete tiles and insulated concrete slabs, as well as plantations and tree plants. In addition, there are a number of accommodation elements such as bus shelters, benches, signs, boards, bicycle racks, signal systems, etc.

At the same time as the municipality of Ballerup performs new railway station, Novafos performs a number of management transformations under this project.

At the same time as the municipality of Ballerup performs the new railway station, house construction is carried out in the town square. The project is carried out by another contractor.

Road bridge construction work

Ballerup Kommune | Published December 23, 2016
cpvs
45221111

Establishment of temporary bus station with underlying rørbassiner retention of rainwater.

Ballerup Municipality and Drainage Ballerup intends to publish an EU tender shortly.

Building construction work

Boligselskabet Baldersbo, Afdeling 8 | Published February 12, 2015  -  Deadline April 9, 2015
cpvs
45210000

Demolition of walls, floor slabs, bath, kitchen and installations Replacement of windows Façade plaster system Establishment of new foundations for new walls Establishment of new terrain tires in previous crawl space Creation of new light floor slabs New kitchens New bathrooms Establishment of new walls Establishment of new ceilings and floors Renovation of staircases Establishing perimeter drain Establishing separing of regvandssystem Establishment of pumping wells with højvandslukker New drainage systems in building new domestic water installations and sanitation New heating installations Establishment of new extraction system with exhaust from the hood and valves in the shower / toliet New electrical installations Establishing ramps for buildings (accessibility) Drain Ning of grassland Establishing stay and play area in the terrain.

Architectural, construction, engineering and inspection services

Boligselskabet Baldersbo Afd. 14 | Published November 4, 2015  -  Deadline November 30, 2015
cpvs
71000000

Arkitekt-, konstruktions-, ingeniør- og inspektionsvirksomhed