Harbour construction works

Port of Hanstholm | Published February 7, 2017  -  Deadline March 7, 2017
cpvs
45241000, 39370000, 45110000, 45112600, 45221111, 45241100, 45241600, 45243200, 45243600, 45244200, 45310000

Hanstholm Havn calls for tenders for the construction of works related to the expansion of the port of Hanstholm. Due to the high level of activity in and around the port of Hanstholm, a new development plan is in the works. The expansion of the port, including basins, hinterland, quay walls, water depth, entrance width and the reduction in wave disturbance, is a crucial element in this development. The design of the works regarding the above-mentioned expansion, including both the wave model and sedimentation models, will be carried out by the port of Hanstholm. The winning Tenderer shall build the expansion of the port on the basis of this design in accordance with the contract. The port of Hanstholm has allocated a budget of DKK 450-500 000 000 for the expansion.

This tender is a negotiated procedure.

It is expected that the negotiation stage of the procurement procedure will include the following stages:

— Submission of the first negotiation tender by the Tenderers

— First negotiation meeting

— Submission of a revised negotiation tender by the Tenderers

— Second negotiation meeting

— Submission of the BAFO

The contracting entity expects to eliminate Tenderers during the procedure, see section 8.3 in the Tender Conditions. This means that only a selected number of Tenderers will be invited to submit the BAFO. Please also refer to section IV.1.4.

However, after receiving tenders and before entering into a negotiation round, the contracting entity may choose either i) to complete evaluation of the compliant tenders with a view to identifying the most economically advantageous tender, cf. the Tender Conditions or ii) Invite all remaining Tenderers to a negotiation round.

The contracting entity reserves the right during the negotiation stage to ask the Tenderers to participate in additional negotiation meetings.

All costs and expenses of the Tenderers related to the preparation of their tenders and their participation in the negotiations must be borne by the Tenderers.

However, to compensate Tenderers regarding the preparation of the tenders, all Tenderers except the winning Tenderer will receive remuneration. The contracting entity will compensate the prequalified Tenderers according to the following plan of distribution:

— The winning Tenderer will not receive remuneration.

— The Tenderers who have submitted a BAFO will receive DKK 1 000 000 each.

— Prequalified Tenderers who are eliminated during the negotiated procedure and therefore will not submit a BAFO will receive DKK 500 000 each.

Procurement of insurance solutions - Construction All risk (CAR)/Third Party Liability (TPL)/Environmental Impairment Liability (EIL)

Sund & Bælt Holding | Published January 29, 2017  -  Deadline February 27, 2017
cpvs
66500000, 66000000

Procurement of insurance solutions (CAR/TPL + EIL) for A/S Femern Landanlæg.

A/S Femern Landanlaeg, part of Sund og Baelt Holding A/S, is to undertake extensive works along the alignment from Ringsted to Femern Banen. Estimated period: 2016 – 2021; a significant number of contracts have already been awarded or completed.

Scope of Works: The existing line from Ringsted to Nykoebing F. will be expanded to double track and upgraded to allow for 200km/h train systems and new track will be laid between Vordingborg and Holeby. Additional signaling/electrification works are expected to be undertaken at some stage in the future – to be completed by 2024.

The main project insurance programme comprising Contract Works, Third Party Liability, Professional Indemnity and Environmental Impairment Liability will be procured for the full duration of the project under the full EU tender process which will commence in early 2017 with an inception date for insurances of 1st January 2018.

A/S Femern Landanlaeg would like to procure Early Works policies to provide insurances in respect of the completed works to date and the anticipated works to be carried out during 2017. The Early Works policies have to cover the period until the Main Project Insurance Programme will be put in place (January 2018).

There are two alternatives;
o Construction All risk (CAR)/Third Party Liability (TPL)
o Environmental Impairment Liability (EIL)
It is possible to quote either one or both lines of insurance.

Marsh A/S is handling the tender on behalf of A/S Femern Landanlaeg.

Contact information:

• Regarding CAR/TPL, please contact:
Dominic McEwen
Assistant Vice President
Marsh A/S
DK – 2830 Virum, Denmark.
Phone: +45 4595 9506
Cellular: +45 2940 9109
mailto:dominic.mcewen@marsh.com

• Regarding EIL, please contact:
Suzanne Svendsen
Senior Vice President
Marsh A/S
Teknikerbyen 1
DK – 2830 Virum, Denmark
Phone: +45 4595 9532
Cellular: +45 22 15 18 15
mailto:suzanne.svendsen@marsh.com


A ‘mini’ public tender procedure will be followed since the contracts are estimated to have cross border interest.

Best & Final offer has to be submitted upfront, since there will be no negotiation round.
Quote deadline: 27th of February 2017, 23:55 CET

The required tender response including terms and conditions are set out in the submission material, which can be obtained on request from the contact persons above.
Questions can also be addressed to these contact persons in writing before the 17th of February 2017.

Marsh will gather all questions in a Q/A document which will be updated along the process, and which tenderers will receive.

Quotes have to be submitted by e-mail before deadline (please note that prolongation of deadline is NOT possible).

The quotes will be evaluated on the basis of the following combined criteria for award decision:
• Price
• Best possible terms and conditions

 In respect of CAR/TPL
o It will be evaluated positively, if the terms follow the Marsh wording (appendix E) in full.
o Deviations from the Marsh wording will be evaluated negatively.

 In respect of EIL
o It will be evaluated positively, if the coverage is broad, and if requirements regarding extensions are met in full (section 5 of the EIL submission).
o If all/part of the required extensions cannot be provided, it will be evaluated negatively.

There will be done an overall evaluation of the accumulated advantages/disadvantages of the received quotes in respect of pricing and terms/conditions.

Construction work

Boligkontoret Århus, Katrinebjerg afdeling 77 | Published February 2, 2017  -  Deadline March 2, 2017
cpvs
45000000, 71000000, 71200000, 71310000, 71400000

Total contract includes design and construction of Boligkontoret Aarhus' new Section 77 which includes ca.115 general youth housing, with accompanying Public and outdoor areas, located Paludan-Müller Road, Aarhus.

Buildings must DGNB certification.

Building and construction work is offered as a negotiated procedure with prior pre-qualification acc. Contract Act §§ 61-66.

The project is offered as a turnkey competition between selected turnkey teams, consisting of total construction and related advisors.

Construction work

Metroselskabet I/S | Published February 15, 2017  -  Deadline March 17, 2017
cpvs
45000000, 45100000, 45200000, 45112700, 45113000, 45210000, 45213300, 45220000, 45233000, 45233300

Construction contract for the establishment of the station and shaft seats Vibenshus Runddel (Vhr) Nørrebros Runddel (Nør), Nuuk Space (Nup) and Nørrebroparken (Nøp).

Metro company has since 2010 been engaged in building the new metro line Cityringen. Project for the City Circle Line will soon be entering its final phase, where the Metro construction sites again be transformed into urban space. Within Cityringen opening in July 2019 places around the stations and shafts reestablished.

Construction contract for the establishment of the station and shaft seats Vibenshus Runddel (Vhr) Nørrebros Runddel (Nør), Nuuk Space (Nup) and Nørrebroparken (Nøp) includes civil works, including primarily the landscaping work, planting work, surfacing, earthworks, clearance works and road construction, and installation of street furniture and wire works including drainage.

Construction work

Boligkontoret Fredericia Afd. 604 | Published January 25, 2017  -  Deadline February 24, 2017
cpvs
45000000, 71000000

Boligkontoret Fredericia provider construction of 4,280 sq.m. public housing on a 3426 m 2 large plot of land (building zone 7) by the new district Fredericia C. Furthermore entered 3531 sq.m. private residential / commercial building in a physical blended construction. The general part of the project amounted to approximately 55% of the overall project, while the private sector accounts for about 45%. In the general framework established 41 new homes and a common room. Furthermore, established full basement under the project. The offered turnkey contract relating to the design and execution of the entire general part of the project as well as underground parking, and is subject to the turnkey contractor enters into a conditional purchase agreement on the building right and obligation to construct the private part at their own risk and expense.

Turnkey Contract for the construction of public housing and underground parking in a physically blended construction, which also includes private residential / commercial building. The project offered on behalf of Boligkontoret Fredericia dept. 604. Construction on the general part is offering duty acc. The applicable law, including procurement law and applicable regulations for the construction of public construction. It is a condition of the turnkey contract, the turnkey contractor performs the private part at their own risk and expense.

The supply of the turnkey contract implemented as a negotiated procedure in accordance with § 61-66 in the procurement law. Only pre-qualified bidders are entitled to submit bids and enter into any negotiation. The Contracting Authority reserves the right to award the contract on the basis of the tenderer's first offer and thus not be admitted to negotiation. The process of negotiated procedures are described in the specifications.

Construction work

Boligselskabet Domea Hillerød afd. 5903 og v/Domea.dk | Published January 28, 2017  -  Deadline March 1, 2017
cpvs
45000000, 45110000, 45210000

The project is an concern the removal of most of the old nursing home located on Cherry Bakken 2 + 2a in Hillerød, cadastral number 437a, 437e, 437i, Hillerød Bygrunde. And the construction of a total of 56 social housing turnkey. The assignment includes all the necessary work to perform, including design, authority application, demolition and construction works.

Turnkey concerning. design, authority application, demolition and construction work concerning. Cherry Bakken 2 + 2a in Hillerød. Remove most of the old nursing home and build 56 social housing matr.nr. 437a, 437e, 437i, Hillerød Bygrunde.

Tender documents are available on www.ibinder.com. Id no. 444398, 5903 Cherry hill, turnkey prequalification. Applications for pre-qualification delivered via http://www.ibinder.com/External/EnquiryLink.aspx?id=gokqbfnbwq&lang=3 by selecting the offer and request access.

Construction work

Boligorganisationen Tårnbyhuse | Published February 14, 2017  -  Deadline March 23, 2017
cpvs
45000000, 45200000, 45110000, 45261000, 45313000, 45311000, 45331000, 45332000, 45421100, 45422000

The supply of contract conducted as a public offering, see. TVergG §§ 56-57.

The assignment includes the construction of housing on Randkløve Allé in Tårnby Municipality in the main contract. The construction size is about 3700 m², of which about 800 m² galleries and sheds. The new housing to be built on Randkløve Allé in Tårnby Municipality, and must be part of the 'Tårnby park'.

Construction has developed from a desire for cheap 1- and 2-bedroom rental housing. The design of the building adapts to the built environment in Tårnby park being built in blocks, in this case 2 blocks perpendicular to each other. The block along Randkløve Allé carried out in three floors, while the second block is performed in 4 and 5 floors with basement. In total, the blocks together 58 apartments.

The building constructed in betonbagmur and tires, the masonry in the facade with partial light facades and facades, as well as a roof as roof cassettes with high ceiling. The building will be constructed as Class 2015 see. Br15.

Building construction work

Næstved Kommune | Published February 3, 2017  -  Deadline May 1, 2017
cpvs
45210000, 45212100, 45212212, 45259000, 71000000, 90910000, 92610000

The project is an includes a PPP project, where there is a comprehensive offering of:

1. Design, planning, construction and construction in the construction phase.

2. Building Operation and maintenance in a subsequent operating phase of up to 25 years.

3. Financing of the project in both the construction phase as operating phase.

The contract is designed to provide integration of the respective construction and operation and to give incentive to optimize the project's long-term overall economy.

Offering comprises simultaneously available to purchase building rights for the construction of premises for rental or commercial activities within the sports and leisure or health.

Refer to the specifications and its annexes, including the function-based requirements (Annex 1 to the PPP contract) for a detailed description.

Refer to section II.1.4) and the description of the specifications and its annexes.

Construction work

Kolding Kommune | Published January 19, 2017  -  Deadline February 21, 2017
cpvs
45000000, 45215000, 45215100

It should be implemented under the current Låsbyhøj at the address Nørregade 1 in Kolding. 

The project also includes outdoor areas.

The skills and rebuilt Låsbyhøj must in future be able to accommodate functions for the promotion of mental health in Kolding.

The offered turnkey contract includes the design and execution of renovation and reconstruction task, which is offered on the construction program level.

The total financial framework for the conclusion of a turnkey contract amounts to 37.6 million DKK excl. VAT.

It should be implemented under the current Låsbyhøj at the address Nørregade 1 in Kolding.

The project also includes outdoor areas.

By commissioning the building must provide a framework for the Region of Southern local psychiatry, Kolding Municipality abuse center, børnefamiliehus young contact, home support and 'Revanche'.

As functional mental health means a building that only the supply of loose furniture can work in all the situations described and thus meet the standard construction program.

The competition therefore assumes that offer the best project within budget.

The bidder who gets the job assigned, receives not offer remuneration.

Provisional timetable for total subcontract construction (including design) is expected to be from mid-June 2017 and with delivery and commissioning in Q1 to 2019.

Construction work

Forsvarsministeriets Ejendomsstyrelse | Published February 16, 2017  -  Deadline March 17, 2017
cpvs
45000000, 45110000, 45100000, 45113000, 44230000, 45441000, 45330000, 45440000, 71550000, 45262520, 45262300, 45310000, 45331000

The works offered in 5 lots, of which 4 are offered by this notice. 

In addition, purchased tiles independently as client delivery.

Demolition and debugging large contract settled mainly before reconstruction and renovation can begin in individual houses and construction section.

The contract is responsible for construction site operation incl. conservatory measures, and nedrivning- and environmental sanitation works including down / picking up the slab, roof, plumbing and electrical systems, ventilation, stairs, tiles, floors, ceilings, walls, cabinet elements, etc.

E01 is working closely with other relevant contracts, including in debugging sessions where other contracts including dismantles the landmark building and / or the initial gentle cleaning work on the landmark building.

E01 comprises:

- Construction site incl. winter measures.

- Demolition and disposal of discarded materials and building components - incl. environmental measures and disposal of all hazardous waste generated from the construction project.

- Environmental clean-up including mold decontamination, asbestos removal, PCB decontamination, PAH redevelopment, blysanering and other heavy metals, including zinc.

II.2.7) is estimated.

Early in debugging sessions to be E02 in cooperation with E01 charge of cleaning or dismantling of the landmark building.

During the entire project cooperate E02 closely with the other contracts.

E02 comprises:

- EMPTY - carpentry / joinery

- GLA - Glass Construction Works

- BLK - Plumbing Supplies

- MAL - Painter Working

- SME - Forging Works.

II.2.7) is estimated.

During the entire project cooperate E03 closely with the other contracts.

E03 comprises:

- JOR - Excavations

- BE - Concrete Work

- MU - Bricklayers

- JFL - Excavation for wires

- AFL - Drain in soil.

II.2.7) is estimated.

During the entire project cooperate E04 closely with the other contracts.

E04 comprises:

- Plumbing - water, heating and sanitation works

- VENT - Ventilation Works

- EL - Electrical installation work

- AUT - Building automation

- BYPASS - Technical Insulation.

II.2.7) is estimated.

Construction work

SAB afd. Valby Idrætskollegie v/ KAB | Published February 14, 2017  -  Deadline March 16, 2017
cpvs
45000000, 71000000, 45211340

The project concerns the construction of Valby Sports College, a new building with 3 floors with student housing.

The work includes design from schematic design to the project including regulatory project and execution of turnkey.

The building must DGNB certification.

For further information refer to tender documents on IBinder.

The tender exercise is the construction of Valby Sports College, a new building with youth housing in Valby Sports Park. Ungdomsboligerne conceivably rented to students, athletes and municipal assigned.

The work is offered as a turnkey in a restricted procedure with prior pre-qualification under the Contract Act.

To be built around 139 youth homes with a total area of ​​approximately 5500 m². A number of homes fitted out as residences for the disabled.

There is made a sketch presentations in connection with the preparation of the regional plan. Copenhagen municipality wants the volume and the architectural expression of the proposal is preserved in the future project.

SAB has visions of building sustainable and project offered therefore calling for a DGNB certification for minimum silver. Upgrade to a gold certification is admitted as an option.

Total quantity stated in the tender documents.

Construction work

Banedanmark | Published February 1, 2017  -  Deadline March 6, 2017
cpvs
45000000, 45262210, 45200000, 45315300, 45232340, 44212263, 45232332, 44212230, 44212250, 45231000, 44212261

Net Denmark are faced with having to purchase and install masts for radio coverage for:

1) The line between Copenhagen and Ringsted,

2) Signal program

3) Fehmarn

4) Internet in trains.

In order to cover the current needs provider Net Denmark hereby a framework agreement including delivery and installation of a number of master.

Please refer to the Order section II.2.4).

The purpose of the framework agreement is that the contractor, after entering into a Delivery Agreement, will supply and install the master, in some cases bringing foundations and complete the necessary ground works, and thus build a number of mast sites.

The Contractor shall in this connection charge of production and supply of masts, including carrying out construction work, as well as establish the necessary access roads.

Finally, the Framework Agreement cleanup in the terrain, leading back to the original state, except for the access road and from the foundation position.

Access roads to be constructed so that they can withstand driving in connection with the construction and subsequent traffic for maintenance and operation of antennas / master.

Immediately after the award obliges contracting entity to enter into the Delivery Agreement including the supply and installation of a number of masts on the route between Copenhagen and Ringsted. In addition, the framework agreement is not exclusive, ie the Contracting Authority in concrete situations may choose to enter into other agreements relating to the services covered by the Framework.

Besides the Delivery Agreement including the supply and installation of a number of masts on the Copenhagen-Ringsted could Contracting Authority can not guarantee that a given turnover of the framework agreement is achieved.

Construction work

Lejerbo, Næstved | Published February 14, 2017  -  Deadline March 13, 2017
cpvs
45000000, 45210000, 45100000

Lejerbo, Næstved want to build for Lejerbo Div. 985 recently built, turnkey consisting of 40 energy-family homes listed as 1 and 2-storey cluster houses.

The buildings have a total gross floor area of ​​approximately 3 800 m². The buildings are intended carried out as easily industrialized construction with partial use of recycled materials.

Udmatrikuleringen is not yet complete, so currently no cadastral number can be specified.

Turnkey contract involving the design, authority application and works on Fasanvej 50 in Næstved.

Tender documents are available at https://www.rib-software.dk/ during the tender number TN674319.

The project is a very ambitious project that shows new paths for social housing communities, fitting in with the landscape and the recycling of materials.

We recommend interested people to attend the orientation meeting, where there will be the opportunity to hear more about this exciting project on 02/21/2017 at. 13: 30-16: 00 at Lejerbo in Næstved, Brogade 6, 4700 Næstved.

Building construction work

Esbjerg Havn | Published February 2, 2017  -  Deadline March 2, 2017
cpvs
45210000

Open procedure The turnkey of the new hall at the port of Esbjerg MHI Vestas.

The project comprises the design and construction of a new hall located in Esbjerg east port.

The building consists of three grouped halls with different functions and headroom. The total floor area is expected to be approximately 5600 m 2 .

The halls are divided into an area for the warehouse, a preassembly and a region which is divided into test and shipment. In test and shipment area there shall be a crane that can carry 75 tons of preassembly shall be provided a crane to lift 30 tonnes.

Access to the hall and between halsektionerne via doors and gates in facades and interior walls.

In the warehouse area established changing and shower facilities, meeting room and a work spread over two levels.

Warehouse hall's height above ground is about 8 m, preassembly hall's height is about 20 m, while test and shipment hall's height is about 28 m.

Total contract comprises in outline the following elements:

- post

- slab

- Unfinished buildings (steel columns and -spær alternatively concrete)

- Closure and outfitting

- Installations.

It should be particularly noted that the schedule is very tight and that is likely to occur both day, evening, night or weekend, why turnkey contractor in its offer must demonstrate that complexity is understood and that the timetable can be met.

Construction consultancy services

Region Syddanmark, Sygehus Sønderjylland | Published February 9, 2017  -  Deadline March 10, 2017
cpvs
71530000, 71300000, 71200000

South Denmark, South Jutland Hospital, providing comprehensive advice regarding Sønderborg Phase 2 »Ambulatorietorvet '.

The following specialties is expected to have the main features of Ambulatorietorvet:

- Respiratory Medicine

- Nephrology

- Endocrinology

- Orthopedic surgery - elective

- Eye area

- Ear / nose / throat area.

Furthermore a number of other specialties have local deals in Ambulatorietorvet.

5250 m², of which about a quarter is easy renovation, while the rest are respectively heavy renovation (around 1,800 m²) and renovation of a standard nature.

The project's total construction budget is 70,205,000 DKK excl. VAT.

The execution of the project is expected EU offered to trade contracts on the basis of the main project and divided into 3 stages.

Expected commissioning of the final stage in the first half of 2020.

South Denmark, South Jutland Hospital wants a total consultant team with both engineering and architectural skills, while this can be stated that it is estimated that the emphasis of the total offered counseling job is on the engineering disciplines.

Please provide a team of consultants, in addition to field a strong project management and general disciplines with emphasis on the engineering disciplines, also can put up with specialist competence in conversion of (health) buildings in operation.

The offered consultancy agreement for overall initial advice in the form of the construction program as well as advice for project management, design, construction management, site supervision, project monitoring and defense of the 1-year inspection.

Only pre-qualified bidders will be able to bid for the job. If you wish to be pre-qualified, you must submit an application.

The tender notice and the prequalification conditions of the tender documents containing information on the conditions for submission and evaluation of prequalification applications.

Second

Construction work for school buildings

HF & VUC FYN | Published February 16, 2017  -  Deadline March 17, 2017
cpvs
45214200, 45214000

In connection with the construction of new building for HF FYN offered hereby In limited offer 9 separate contracts.

The new building is 6,282 gross square meters teaching building in 3 levels and 1,443 square meters parterre / cellar with 632 gross square meter teaching and 811 sq.m. technique, depots, etc.

Consultative engineering and construction services

Hofor A/S | Published January 26, 2017  -  Deadline March 2, 2017
cpvs
71310000, 71200000, 71320000, 71330000, 71350000, 71400000, 71600000

Offering includes technical and economic optimization of the parties' joint Capacity Plan 2016 for handling a 100-year rain event in and around Harrestrup. There must be a number of facilitation of delprojektgrupper to be mature construction projects. Moreover 4 range, respectively. conceptual design, contingency planning and planning management / monitoring should be prepared. The tender includes an option that is not specified in the service description, but which may consist of the same kind as the other tasks.

Offering includes building consultancy to technical and economic optimization of the parties' joint Capacity Plan 2016 for handling a 100-year rain event in and around Harrestrup. Capacity Plan includes projects at 50 different locations along Harrestrup. Capacity plan was drafted by the use of a three-way coupled hydraulic model. The project is a collaboration between 10 municipalities and their water companies. Under capacity project, a number of sub-projects set in motion the maturation of a portion of the construction projects. This work must advise facilitate. Moreover 4 range of conceptual and respectively preparedness and management / monitoring should be prepared.

Foul-water piping construction work

Odsherred Spildevand A/S | Published February 8, 2017  -  Deadline March 7, 2017
cpvs
45232411, 45232400, 45232440, 45231100, 45231110

A number of existing wastewater treatment plant be dismantled in the coming years, and replaced by a central treatment plant.

In that connection is established cutoff transport lines for wastewater from existing wastewater treatment plants for the upcoming wastewater treatment plant in Tengslemark.

The anticipated contract includes the construction of transport lines on the following routes:

- Vig - Højby

- Højby and Nyrup-Tengslemark

- Lumsås - Tengslemark.

Establishment of intercepting transport on the route Vig - Højby.

Establishment of intercepting transport on the lines Højby-Tengslemark and Nyrup-Tengslemark.

Establishment of intercepting transport on the lines Lumsås - Tengslemark.

Architectural, construction, engineering and inspection services

Københavns Kommune, Økonomiforvaltningen, Byggeri København | Published January 26, 2017  -  Deadline February 23, 2017
cpvs
71000000, 71200000, 71300000, 71500000, 71600000

With this contract would Constructions Copenhagen (BYK) to complement the client organization

a building consultancy team to be in charge of programming, including feasibility studies and

participation in user and stakeholder processes, developing procurement strategy, client counseling and

scrutiny in connection with the implementation of baseline surveys and

range of demolition and new construction.

It is the client adviser primary task is to support and supplement the client organization

Client Adviser shall perform and

Client Advisory Service is expected to

should start immediately after contract conclusion, in early June 2017.

336 youth club seats and sports center, located at the corner of Ingerslevsgade and Skelbækgade, 1704 Copenhagen.

Client Advisory Service is expected to commence immediately after the contract is concluded in early June 2017.

Consulting Performance is divided into two phases: The planning and construction phase, the latter is offered as an option.

In the planning is in charge of Client Advisor preparation of draft proposals and building program, and participation in brugerinddragelses- and stakeholder processes.

The building program must be written so that it can be used for the award procedure so as to ensure the best possible quality architectural and functional, expected as outlined construction program.

If the political decision is made to implement the project must client advisor during the construction phase include contribute to the development of a procurement strategy to ensure performance of the task in a process that takes into consideration its success criteria and the current market situation.

On the basis of the construction program is responsible client advisor both supply the project on. land and demolition and tender regarding. new construction and contracting.

In the planning and construction period, the client consultant contract on delivery (s) n (e), including coordination of the project's frame timing and hit economy.

Client Advisor leader and coordinates the scrutiny of the remaining (s) supplier (s) 's project and main project, or similar phase by early tender.

For a detailed description of adviser services refer to tender documents.

Architectural, construction, engineering and inspection services

Region Midtjylland, Hospitalsenheden Horsens | Published January 26, 2017  -  Deadline February 24, 2017
cpvs
71000000

Region Midtjylland hereby offers total consultant premium for the refurbishment and renovation of bldg. 5 bed building at the Regional Hospital Horsens, also called the tower block.

Total Counselor performance in the design and construction process includes architectural and engineering advice in the design, supply of all construction works, stage shared execution and commissioning as well as derivative work thereof.

Total Counselor allowance covers all services related to the safeguarding of client's obligations concerning health and safety, Work Coordinator at the design stage (P). Client's obligations concerning health and safety at the building site, Working environment coordinator (B) shall be provided by the developer.

Total Advisor provides in addition to project monitoring and site supervision up to and including the construction commissioning and overall consultant ensure that deficiencies identified by AB92 followed to full completion.

Total Counselor handles construction management.

Please see section II.1.4).