Construction work

WiBau Gesellschaft mbH | Published November 19, 2016  -  Deadline December 22, 2016

Trockenbauarbeiten the course of the construction of a primary school with two-field sports hall:

The Freiherr-vom-Stein School is an elementary school with 200 pupils in Wiesbaden-Biebrich, and is currently distributed on 2 sites. The sites are to be brought together on the grounds of the former branch of Wilhelm Heinrich von Riehl School.

For this purpose it is planned a to build three to four spacious primary school for about 385 children and a two-field sports hall.

The total space requirement of the school is approximately 2 500 meters 2 NF, for the sports hall is a playing surface of 27 x 30 m plus. Schedule storage areas, functional areas and locker rooms.

In order to implement these measures successfully are extensive Trockenbauarbeiten required.

Volume / scope:

Manufacture, delivery and assembly of.:

about 1 750 meters 2 Drywall in different thicknesses, with and without fire protection requirements;

ca. 235 m 2 Facings at various depths;

about 5 300 meters 2 suspended ceilings in different versions (ceiling grid, GK-ceiling).

Museum 8. TES construction, tiling work (VG-0455-2016-2265)

LBIH NL West | Published November 25, 2016  -  Deadline January 24, 2017
Museum 8. TES construction, tiling work (VG-0455-2016-2265)

Roof works and other special trade construction works

WiBau Gesellschaft mbH | Published November 12, 2016  -  Deadline December 16, 2016

Roofing work in the course of constructing a primary school with two-field sports hall:

The Freiherr-vom-Stein School is an elementary school with 200 pupils in Wiesbaden-Biebrich, and is currently spread over two locations. The sites are to be brought together on the grounds of the former branch of Wilhelm Heinrich von Riehl School.

For this purpose it is planned a to build three to four spacious primary school for about 385 children and a two-field sports hall.

The total space requirement of the school is approximately 2 500 meters 2 NF, for the sports hall is a playing surface of 27 x 30 m plus. Schedule storage areas, functional areas and locker rooms.

In order to implement these measures successfully are extensive roof sealing, Dachdämmungs-, Dachbegrünungs- and Bekiesungsarbeiten required.

Volume / scope:

Manufacture, delivery and assembly of.:

about 2 500 meters 2 Roofing (bitumen)

about 2 500 meters 2 Roof insulation (EPS)

about 2 000m 2 Roofs

300m 2 Gravelling.

Museum 8. TES construction, tile work

LBIH NL West | Published November 24, 2016  -  Deadline January 24, 2017
Tile installation (DIN 18 352);

CBI Igstadt, new construction of electric power plants

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published November 28, 2016  -  Deadline December 15, 2016
16FEI24135_Neubau electrical points heating systems, new power and dismantling the old equipment

BKA W1, NSHV, structural work (VG-0455-2016-2257)

LBIH NL West | Published November 29, 2016  -  Deadline December 20, 2016
BKA W1, NSHV, structural work (VG-0455-2016-2257)

Backup and Bauaffine services for the renewal of the CBI Igstadt from km 2.800 to km 19.575 on the route (3501) Wiesbaden - Niedernhausen, and km 42,180 to 42.968 on the route (3505) and km 10.317 to km 11.386 (3509

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published November 25, 2016  -  Deadline January 9, 2017
Protection against the dangers arising from rail operations when working in track and turnout areas of Deutsche Bahn AG and supportive Bauaffine services for handling the construction work Igstadt

Office cleaning services

Hessisches Competence Center -Zentrale Beschaffung- | Published October 29, 2016  -  Deadline December 1, 2016
Implementation of the glass and frame cleaning the object Polizeidirektion Hanau with a floor area of ​​approximately 1,300, - m  2  per year for the Agency of Construction and Real Estate (LBIH) Rhine-Main branch.

Metalworking

WiBau Gesellschaft mbH | Published November 19, 2016  -  Deadline December 22, 2016

Locksmith and metal construction in the course of the construction of a primary school with two-field sports hall:

The Freiherr-vom-Stein School is an elementary school with 200 pupils in Wiesbaden-Biebrich, and is currently distributed on 2 sites. The sites are to be brought together on the grounds of the former branch of Wilhelm Heinrich von Riehl School.

For this purpose it is planned a to build three to four spacious primary school for about 385 children and a two-field sports hall.

The total space requirement of the school is approximately 2 500 meters 2 NF, for the sports hall is a playing surface of 27 x 30 m plus. Schedule storage areas, functional areas and locker rooms.

In order to implement these measures successfully are extensive locksmith and metal construction work required.

Volume / scope:

Manufacture, delivery and assembly of.:

- 1 stair tower as galvanized steel structure with grating steps, 2-storey, 2-in heat, including rods banister.

- 35 m rods railing on internal staircase STB,

- Approximately 325 m stainless steel handrail, round tube 42.5 mm,

- 1 canopy construction of clothing made of aluminum sheet cassette, floor area approximately 12 x 2 m,

- Sichschutzeinhausung art equipment on the roof of expanded metal about 365 m²,

- Substructure for Haustechnische equipment from galvanized steel profiles about 3,200 tons.

Cleaning services

Land Hessen, vertreten durch das Hessisches Competence Center -Zentrale Beschaffung- | Published December 7, 2016  -  Deadline January 17, 2017

Execution of routine cleaning and the special cleaning the object Regierungspräsidium Kassel.

Implementation of results-based maintenance cleaning in the object Regierungspräsidium Kassel, Wall Street / Kurt-Schumacher-Straße 2, 34119 Kassel on an annual cleaning area totaling 2,186 486.39 m 2 (Full cleaning: 876 156.12 m 2 / View Cleaning: 1310 330.27 m 2 ) And the special cleaning for the State Enterprise Construction and Real Estate Hessen - North branch.

Electrical installation work

WiBau Gesellschaft mbH | Published November 25, 2016  -  Deadline December 22, 2016

Electrical installation and lightning protection work in the course of the construction of a primary school with two-field sports hall:

The Freiherr-vom-Stein School is an elementary school with 200 pupils in Wiesbaden-Biebrich, and is currently spread over two locations. The sites are to be brought together on the grounds of the former branch of Wilhelm Heinrich von Riehl School.

For this purpose it is planned a to build three to four spacious primary school for about 385 children and a two-field sports hall.

The total space requirement of the school is approximately 2 500 meters 2 NF, for the sports hall is a playing surface of 27 x 30 m plus. Schedule storage areas, functional areas and locker rooms.

In order to implement these measures successfully are extensive electrical installation and lightning protection work required.

Scaffolding work

WiBau Gesellschaft mbH | Published November 12, 2016  -  Deadline December 16, 2016

Scaffolding work in the course of the construction of a primary school with two-field sports hall:

The Freiherr-vom-Stein School is an elementary school with 200 pupils in Wiesbaden-Biebrich, and is currently distributed on 2 sites. The sites are to be brought together on the grounds of the former branch of Wilhelm Heinrich von Riehl School.

For this purpose it is planned a to build three to four spacious primary school for about 385 children and a two-field sports hall.

The total space requirement of the school is approximately 2 500 meters 2 NF, for the sports hall is a game area of ​​27.00 x 30.00 m plus. Schedule storage areas, functional areas and locker rooms.

In order to implement these measures successfully, extensive scaffolding work are required.

Scope of the essential works:

Approximately 2 615m 2 Facade scaffolding,

Approximately 360m roof safety,

Approximately 1 440m Scaffolding widening 70cm,

Approximately 1 440m Scaffolding widening 30cm,

Approximately 4 pieces stair towers,

Approximately 230m 2 Space frame, height 6,5m.

Thermal insulation work

WiBau Gesellschaft mbH | Published November 12, 2016  -  Deadline December 16, 2016

Wärmedämmverbundsystem work, exterior plaster and clinker works in course of the construction of a primary school with two-field sports hall:

The Freiherr-vom-Stein School is an elementary school with 200 pupils in Wiesbaden-Biebrich, and is currently spread over two locations. The sites are to be brought together on the grounds of the former branch of Wilhelm Heinrich von Riehl School.

For this purpose it is planned a to build three to four spacious primary school for about 385 children and a two-field sports hall.

The total space requirement of the school is approximately 2 500 meters 2 NF, for the sports hall is a game area of ​​27.00 x 30.00 m plus. Schedule storage areas, functional areas and locker rooms.

In order to implement these measures successfully are extensive Wärmedämmverbundsystem work, exterior plaster and clinker work required.

Volume / scope:

Manufacture, delivery and assembly of.:

about 1 600,00m 2 Wärmedämmverbundsystem, mineral wool 280mm,

about 1 600,00m 2 Plaster surface,

about 1 350,00m 2 Wärmedämmverbundsystem, mineral wool 20mm,

about 1 350,00m 2 Klinkerrriemchen.

Electrical installation work

WiBau Gesellschaft mbH | Published November 19, 2016  -  Deadline December 22, 2016

Electrical installation and lightning protection work in the course of the construction of a primary school with two-field sports hall:

The Freiherr-vom-Stein School is an elementary school with 200 pupils in Wiesbaden-Biebrich, and is currently distributed on 2 sites. The sites are to be brought together on the grounds of the former branch of Wilhelm Heinrich von Riehl School.

For this purpose it is planned a to build three to four spacious primary school for about 385 children and a two-field sports hall.

The total space requirement of the school is approximately 2 500 meters 2 NF, for the sports hall is a playing surface of 27 x 30 m plus. Schedule storage areas, functional areas and locker rooms.

In order to implement these measures successfully are extensive electrical installation and lightning protection work required.

Volume / scope:

Manufacture, delivery and assembly of.:

1 St. safety light device including emergency lights and pictograms.

1 St. low voltage distribution including RU measuring device and KNX installations.

8 St. subdistributions including KNX installations.

approximately 37 000 m of Stark, - weak, - E-30 and ground line;

about 1 300 pcs installation equipment;

ca. 165 St. KNX actuators, control and presence detectors;

960 St. arrival, recessed lighting;

3 St. Intercoms;

1 St. electroacoustic emergency warning system (ENS) with approximately 260 St. Deckenein, - construction of loudspeakers;

1 St. fire alarm system with intrusion firefighters and about 150 St. automatic detectors;

1 St. data cabling with 3 data cabinets, approximately 19 000 m of data line and approximately 270 data terminals;

1 St. emergency and identification Response System (NgRs) with server and 31 St. wall, and 9 St. desk stations;

1 St. exterior LED lighting system with 17 wall bracket and St. 8 St. mast lighting;

1 St. lightning protection system with drip lines and fishing rods.

  • 1