Call +44 800 9755 164

Public tenders for construction in Stuttgart Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Earthworks, Road construction

Staatliches Hochbauamt Baden-Baden | Published August 6, 2015  -  Deadline December 23, 2016
KA BImA BW BR General Dr.Speidel-Kas. - BU 2014 Type of service: Earthworks, Road construction Din 18300, 18317 et seq scope of services: Dismantling: curbs concrete about 140 m, ceiling mill approximately 215 m², concrete slabs about 16 t, gutter boards about 160 m, asphalt surface ca. 57 t, Schooter-grit crushed sand mixture about 350 t, demolition of gutter plates including mortar 200 m, construction. Asphalt concrete covering layer approximately 155 m², plate gutters Concrete block about 26 m, gravel layer about 315 t, concrete paving div sizes total 260 m² , div. concrete Borde 200m

Construction work for buildings relating to health

Landeshauptstadt Stuttgart -Dienstleistungszentrum Bauvertragswesen | Published December 6, 2016  -  Deadline January 24, 2017

Fire doors as hall degree in steel and glass construction.

4 steel glass elements with 1 flügl. Door T90 RS 250 x 270 cm;

1 steel glass elements with 2 flügl. Door T90 RS 250 x 270 cm;

2 steel glass elements with 1 flügl. Door T30 RS 250 x 270 cm;

1 steel glass elements with 1 flügl. Door T30 RS approx 180 x 300 cm;

4 steel glass elements with 1 flügl. TDS door 250 x 270 cm;

7 Stahlglas- door elements T90-RS (1), TDS (2), RS (4) 120 x 220 cm.

Landscape Construction

 | Published November 26, 2015  -  Deadline April 30, 2018
Garten- und Landschaftsbauarbeiten

Construction-site supervision services

Landeshauptstadt Stuttgart, Tiefbauamt | Published November 23, 2016  -  Deadline December 22, 2016
742 m produced in mining techniques. 

150 m on the Ausfahrportal from 2 to 3 lanes.

For operational and safety equipment are two operating building.

The Rosenstein Tunnel provides thereby a direct connection between the Leuze Tunnel and node Pragsattel.

Site supervision for the operational and safety equipment in accordance with § 55 HOAI LP 8.

The following performance areas are to serve in the architectural supervision:

Power supply;

Medium-voltage switchgear;

transformers;

Low-voltage distribution;

UPS;

Lighting;

Adaptation lighting;

Tunnel lighting;

Active guide;

Measurement, and control technology;

Control and automation systems;

Connection to superordinate monitoring center;

Data acquisition;

Operating software;

Safety equipment;

Fire alarm system;

Emergency cabins;

Orientation- and escape lighting;

Video system;

Public address system;

Wireless Analog, Digital, BOS, Radio;

Tunnel ventilation with central suction;

axial fans;

Jet fans;

Rauchabsaugklappen;

Fire tests;

Fire water supply and fire fighting equipment;

Operating room equipment;

Ventilation;

Sanitary;

Double bottom;

Lightning protection;

Telephone and burglar alarm system;

Factory acceptance tests.

Railway bridge construction work

DB Projekt Stuttgart-Ulm GmbH | Published November 19, 2016

NBS, PA 2.2, Albaufstieg, EÜ Filstal.

Railway construction works

DB Station & Service AG Regionalbereich Südwest | Published November 9, 2016  -  Deadline December 5, 2016

Waghäusel - Conversion Station

Converted Bahnhof Waghäusel Accessible expansion.

Railway station construction work

DB Station & Service AG Regionalbereich Südwest | Published November 8, 2016
Conversion Station.

Metal construction and locksmith work outdoors

LHS Stuttgart - | Published November 17, 2016  -  Deadline December 6, 2016

Wind farm

EnBW Albatros GmbH | Published November 19, 2016  -  Deadline December 9, 2016

Combined property damage and loss of profit insurance as well as liability insurance for the construction and first operational phase of the offshore wind farm EnBW Albatros. This wind farm comprises (including but not limited to):

— wind turbine generators with an overall capacity of 112 MW,

— inner array cables including one interlink cable to then existing offshore wind farm EnBW Hohe See,

— offshore substation.

Insurance Package Policy comprises Construction/Erection All Risks Insurance, Delay in Start-up Insurance and Third Party Liability Insurance (construction phase) as well as Operation All Risks Insurance including Business Interruption (operational Phase). Sums insured will be approx. 450 000 000 EUR for property damage and 118 000 000 EUR for loss of profit (18 month indemnity period foreseen) plus some additional limits for extra costs.

Policy foreseen to start in March 2017. Offshore activities are scheduled to start in Q3 2018, installation phase expected to be completed in Q4 2019. Operational phase cover will automatically follow for two full calendar years.

Structural shell work

EnBW Energie Baden-Wuerttemberg AG | Published November 12, 2016  -  Deadline December 9, 2016

Foundation excavation, Underground drainage, concrete and reinforced concrete work for a power plant building consisting of:

Engine building (about 1 000 meters 2 Base with foundations and floor slab and reinforced concrete walls and a reinforced concrete slab on +8.20 m),

Boiler building (about 1 000 meters 2 Base with foundations and base plate) and

District heating buildings (about 1 500 meters 2 Base with foundations and base plate).

More concrete and reinforced concrete work for district heating storage (base plate, diameter 26m), storage tanks (bottom plate 270 m 2 ), Switchgear, transformers and containers (single floor panels about 660 m 2 Total area).

University of Stuttgart, Seasons contract 2017 Campus Vaihingen, structural work

Staatliche Vermögens- und Hochbauverwaltung Baden-Württemberg | Published December 8, 2016  -  Deadline December 22, 2016
University of Stuttgart, Seasons contract 2017 Campus Vaihingen, structural work

University of Stuttgart, season contract in 2017, downtown campus, structural work

Staatliche Vermögens- und Hochbauverwaltung Baden-Württemberg | Published December 8, 2016  -  Deadline December 22, 2016
University of Stuttgart, season contract in 2017, downtown campus, structural work

University of Hohenheim, season contract in 2017, the range of Hohenheim + yards, structural work

Staatliche Vermögens- und Hochbauverwaltung Baden-Württemberg | Published December 8, 2016  -  Deadline December 22, 2016
University of Hohenheim, season contract in 2017, the range of Hohenheim + yards, structural work

Stuttgart, Löwentorzentrum 1, remediation toilet and sewers 3rd strand C, demolition and structural work

Staatliches Hochbauamt Reutlingen | Published November 3, 2016  -  Deadline December 6, 2016
Stuttgart, Löwentorzentrum 1, remediation toilet and sewers 3rd strand C, demolition and structural work

Engineering design services for mechanical and electrical installations for buildings

terranets bw GmbH | Published November 9, 2016  -  Deadline December 6, 2016
Engineering services including for the construction of the compressor station Nordschwarzwald (VDS-NOS). All necessary auxiliary units and devices on a completely new to erschließendem land near Ettlingen or Rheinstetten and connection to the northern Black Forest pipeline (NOS).

Railway signalling works

DB Projekt Stuttgart-Ulm GmbH | Published November 26, 2016

Reconstruction of SpDr S60 - relay signal box, type Siemens, Ulm railway, construction stages N2-0-15, N2-1-6, based module contract RSTW.

Reconstruction of SpDr S60 - relay signal box, type Siemens, Ulm railway, construction stages N2-0-15, N2-1-6, including creation of the detailed design plan Part 2 (PT 2).

Support services for water transport

EnBW AG | Published December 2, 2016  -  Deadline January 13, 2017

Planning, construction and operation of a "Marine Coordination Office" during the deployment phase of the offshore wind farms High Seas / optional Albatros. The construction and operation carried out in accordance with legal requirements, including the implementing Directive Seeraumbeobachtung ", the" Offshore Wind Energy - Security Framework "1 and the" G9 Offshore Wind Good Practice Guidelines ". The contractor shall provide all personnel (MarineCoordinator) as well as the associated VTMS software and hardware.

Marine Coordinator in 1- to 3-shift operation incl. Assistance and the necessary VTMS software and hardware.

Preparatory work from mid-2017 shifts from early February 2018 to the end of 2019 (with option to extend).

Automatic measuring system

Hahn-Schickard-Gesellschaft für angewandte Forschung e.V. – Institut für Mikroaufbautechnik in 70569 Stuttgart | Published November 11, 2016  -  Deadline December 12, 2016
As part of an investment package for new construction technology for optical sensors and sensor systems, a new automatic measuring system is procured at the Hahn-Schickard Institute for Micro Assembly Technology. The emphasis is on the fully automated measurement of electronic and optical components in plastic and metal, for example, SMD components on circuit boards, optoelectronic components, lens holders, microlens arrays on carrier elements, injection molded parts. The automatic measuring system is intended to be used sensibly and in particular for small quantities as in prototypes and small series.

Substructure for setting up flexible robotic cells

Fraunhofer Gesellschaft e.V. | Published November 16, 2016  -  Deadline December 12, 2016
On the occasion of the cover of a new experimental field, the Fraunhofer IPA builds some robot cells scratch. These are standardized base modules are designed and delivered that • the installation of robot cells, particularly by means solid construction dimensions and laid in the ground module lines • device to the establishment of typical safety devices permit (especially safety fences and light curtains) • allow the transport of robot cells, both within a building as well as from one location to another • Central connection of the system

Servers

Landesoberbehörde IT Baden-Württemberg (BITBW) | Published November 26, 2016  -  Deadline January 12, 2017

Framework agreement on the purchase of Palo Alto products, support for hardware and software, training in the systems supplied and optional services.

The tender includes the following services:

- Hardware and licenses for Palo Alto Products;

- Support for hardware and software (new equipment plus optional legacy hardware);

- Briefing on the delivered systems;

- Optional Services.

The term of the framework contract is two years with the maturity extension to twice year Option.

The contractor will deliver to the customer within the framework of ordered single retrieving components within 14 days after receipt of order. Within another week, the construction takes place incl. Induction of operational readiness and the introduction to the systems.