Call +44 800 9755 164

Public tenders for construction in Schwerin Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Road bridge construction work

Straßenbauamt Schwerin | Published October 11, 2016  -  Deadline November 15, 2016

Overpass construction than 2 field with 2-stegigem prestressed T-beam superstructure, shallow foundation incl. The necessary access roads.

Building construction work

Helios Kliniken Schwerin GmbH | Published October 7, 2016  -  Deadline November 10, 2016
- Site equipment without scaffolding;

Heine - Hort Schwerin - New construction - scaffolding work

Zentrales Gebäudemanagement Schwerin | Published October 6, 2016  -  Deadline November 3, 2016
scaffolding work

Turntable-ladder trucks

Landeshauptstadt Schwerin; Die Oberbürgermeisterin, Fachdienst Brandschutz und Rettungsdienst | Published October 8, 2016  -  Deadline November 11, 2016
Construction and delivery of 1 turntable ladder vehicle DLA (K) 23/12 according to DIN EN 1846 (or equivalent) and DIN EN 14043 (or equivalent), chassis, suitable for the construction and loading, with road drive 4 x 2, fully automatic transmission, diesel engine min with emission class. EURO 6 and a fully automatic Drehleiteiteraufbaus with articulated arm and basket (load min. 400 Kg) and a career in the fire equipment gem. DIN 14043, Table 1 (or equivalent), plus. Installation of additional equipment.

Optimize groundwater monitoring network - exploring tag sites with optional GWM-Bau

Staatliches Amt für Landwirtschaft und Umwelt Westmecklenburg / Abteilung Naturschutz, Wasser und Boden | Published August 29, 2016  -  Deadline November 1, 2016
The StALU Westmecklenburg intends to optimize the country's monitoring network in his jurisdiction the construction of new groundwater quality monitoring stations. To reduce the risk of dry holes in the selected new locations, an exploration is provided by means of a small-caliber dry hole respectively. Based on the geological conditions and the nitrate levels in the groundwater should be made locally, a decision regarding the measures envisaged for the sites groundwater monitoring wells.
  • 1