Call +44 800 9755 164

Public tenders for construction in Schwandorf-in-bayern...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionGermanyschwandorf-in-bayern

Demolition - Earthworks - Structural

Asklepios Verwaltungsgesellschaft mbH | Published December 12, 2016  -  Deadline January 24, 2017
At an existing clinic building part a new building with 3 main storeys is for central sterilization facility (CSSD), created a technology projectile and a projectile for 5 new operating rooms with associated equipment rooms. On the flat roof, an additional ventilation engineering headquarters is aufgesetzt.Das building is essential in concrete with ETIC system as a sheath and an expansion in dry construction created.The adjoining clinic operation will continue running.

Mechanical engineering installation works

Ostbayerische Verwertungs- und Energieerzeugungsgesellschaft mbH | Published December 7, 2016  -  Deadline January 26, 2017

The delivery and services includes planning, manufacture, supply, turnkey installation, commissioning and trial operation for the construction of a treatment plant for the treatment of bulky waste and energetic waste (industrial waste). The entire system needs to operate for assured, safe, easy to maintain, its ecological quality and energy efficient. Clean material transfers and a high level of availability within the delivery limits must be guaranteed. The client is beistellen no aggregates and expects the contractor to take over the responsibility as a general contractor (GC).

S. II.1.4) and procurement documents.

Scaffolding

Asklepios Verwaltungsgesellschaft mbH | Published December 12, 2016  -  Deadline January 24, 2017
At an existing clinic building part a new building with 3 main storeys for Central Sterilisationsanlge (CSSD), a technology projectile and a projectile for 5 new operating rooms with associated equipment rooms will be created. On the flat roof, an additional ventilation center is aufgesetzt.Das structure is substantially created in concrete with ETIC system as a sheath and an expansion in dry construction. The adjacent hospital operations running while on.After completion of the new building of the adjoining building stock on the 1st floor will be rebuilt.

Dachabdichtungsarbeiten

Asklepios Verwaltungsgesellschaft mbH | Published December 12, 2016  -  Deadline January 24, 2017
At an existing clinic building part a new building with 3 main storeys for Central Sterilisationsanlge (CSSD), a technology projectile and a projectile for 5 new operating rooms with associated equipment rooms will be created. On the flat roof, an additional ventilation center is aufgesetzt.Das structure is substantially created in concrete with ETIC system as a sheath and an expansion in dry construction. The adjacent hospital operations running while on.After completion of the new building of the adjoining building stock on the 1st floor will be rebuilt.

Exterior plaster / EIFS

Asklepios Verwaltungsgesellschaft mbH | Published December 12, 2016  -  Deadline January 24, 2017
At an existing clinic building part a new building with 3 main storeys for Central Sterilisationsanlge (CSSD), a technology projectile and a projectile for 5 new operating rooms with associated equipment rooms will be created. On the flat roof, an additional ventilation center is aufgesetzt.Das structure is substantially created in concrete with ETIC system as a sheath and an expansion in dry construction. The adjacent hospital operations running while on.After completion of the new building of the adjoining building stock on the 1st floor will be rebuilt.

Exterior windows and doors

Asklepios Verwaltungsgesellschaft mbH | Published December 12, 2016  -  Deadline January 24, 2017
At an existing clinic building part a new building with 3 main storeys for Central Sterilisationsanlge (CSSD), a technology projectile and a projectile for 5 new operating rooms with associated equipment rooms will be created. On the flat roof, an additional ventilation center is aufgesetzt.Das structure is substantially created in concrete with ETIC system as a sheath and an expansion in dry construction. The adjacent hospital operations running while on.After completion of the new building of the adjoining building stock on the 1st floor will be rebuilt.

Construction management, construction supervision

ABDN Dienststelle Wuerzburg | Published December 23, 2016  -  Deadline February 16, 2017

Road construction DSK

Staatliches Bauamt Wuerzburg | Published January 5, 2017  -  Deadline January 26, 2017

Infrastructures and construction of a replacement bypass

Staatliches Bauamt Nuernberg | Published January 13, 2017  -  Deadline February 1, 2017

Rahmenveträge f. Forstl. Operations Working without logging

Forstbetrieb Neustadt | Published December 20, 2016  -  Deadline January 26, 2017
Manual evacuation plantation crop care Jungwuchs- and young stand tending fence construction chemical bite protection otherwise. Ancillary works
  • 1