Call +44 800 9755 164

Public tenders for construction in Schwabach Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Redesign Neutor- / Friedrich / Hördlertorstraße (NFH); here: Road Construction BA1 - Friedrichstrasse

Stadt Schwabach | Published January 13, 2017  -  Deadline February 7, 2017
The contiguous east-west one-way road train of Neutor-, Friedrich and Hördlertorstraße (short NFH) is located in the heart of Old Schwabach's and to be completely redesigned. For this purpose, in a first phase (BA1) in 2017, the middle section, Friedrichstrasse, fully ausgebaut.Die works mainly comprise: - approx. 2,250 m² granite large paving on WD-asphalt for traffic - Gehwegs- and parking areas including, termination of prev. superstructure from granite and concrete paving and asphalt about 30 m² grout renewal prev. Granitpflasterflächen- adaptation of three Anschlußstraßen- about 315 m Kabelverlegearbeiten- recreating the complete Straßenentwässerung- 30 St. channel service lines-replacement of delivery u. formation diverse city furniture and PflanztrögeDie overall length of BA1 is approx. 250 m, there prevail some very tight -and therefore difficult circumstances; the driveway is -dependent from Baufortschritt- over various partly narrow old town streets under changing traffic management possible. It has worked subsection wise Vollsperrung werden.Lagerflächen the construction site are only partially available. An urban interim storage area for excavation is located approx. 2.2 km south-east in the city area, near the train station. The right on the road body adjacent residential and commercial buildings are often very old and no basement; the fußläufigen entrances to the property at all times to ensure, also through production temporarily changing temporaries. After canceling the existing superstructure cable laying and partly channel-house terminal renovations are carried out before the road construction can begin, and it is with interruptions or delays in road construction so lie rechnen.Pläne the LV in, advice on soil and contaminant studies exist. The AG can perform a litigation before construction begins.
  • 1