Call +44 800 9755 164

Public tenders for construction in...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionGermanyrothenbach-an-der-pegnitz

Steel construction work Fleherstraße

Landeshauptstadt Düsseldorf, Der Oberbürgermeister, Rechtsamt - Submissionsstelle | Published April 24, 2017  -  Deadline May 17, 2017
cpvs
45421132

Steel construction work

Road construction works

Stadt Neuburg a. d. Donau | Published April 11, 2017  -  Deadline May 16, 2017
cpvs
45233120, 34928230

Awarding Body: City Neuburg; Action: B 16 height-free connection South Park Neuburg.

Significant masses contract section 1 road Eternitweg, BA I:

2700 m;

1200 m;

2900 m;

1300 m;

70 m;

Significant masses contract section 2 noise barriers Eternitweg, BA I:

88 m.

Total measure:

The plan is to be implemented by a height-free hub.

For this reason, the city Neuburg intended as Vorhabens- and construction authorities the expansion of Eternit path at a release for general use.

Contract Section 1: Staßenbau Eternitweg, BA I:

expanded 300 m and receives, designed for the use claims a main road in commercial areas and compliant width of 6.50 m to 06 RASt Table 7 below.

The banquet is formed with a width of 0.75 m and produced with gravel turf.

On the opposite, in the south edge of the carriageway which is also deposited by a granite large paving line, street accompanying walkway includes ( "cyclists free") in a width of 2.50 m on.

It is envisaged this to produce by the road-related retaining wall, with L-shaped precast concrete parts.

Total measure:

The plan is to be implemented by a height-free hub.

In this context, the construction of noise barriers along the existing buildings will be required.

Contract Section 2: Noise barriers Eternitweg, BA I:

Along the path Eternit wood noise protection walls are partially built with glass elements at a height of 2.50 m on a total length of 88 m.

This is to absorbent wood protection walls (noise level 24 dB (A)).

The foundation consists medium piles.

This is interrupted in areas of access roads.

Marker n. 2017 LK construction Mr u Gi (VG-0529-2017-0011)

Hessen Mobil Marburg | Published April 7, 2017  -  Deadline May 17, 2017
cpvs

Type of service mark for construction LK MR and pouring 2017 circumference of the performance about 12000m agglomerate, about 40000m color marking, about 4000m hot plastic marker

Construction work for school buildings

Stadt Biberach, Hochbauamt | Published March 31, 2017  -  Deadline May 4, 2017
cpvs
45214200

Trockenbauarbeiten, painting and cleaning, exterior painting works inside, Estricharbeiten, tile installation, toilet partitions.

Construction and turnkey supply of Verkehrssicherungsprähmen (open barges)

Wasserstraßen- und Schifffahrtsamt Koblenz | Published April 7, 2017  -  Deadline June 1, 2017
cpvs
34500000, 34500000, 34500000, 34500000

New Combined Kita in massive construction, Lot 13 lifts

wobra Wohnungsbaugesellschaft der Stadt Brandenburg an der Havel mbH | Published April 7, 2017  -  Deadline May 2, 2017
cpvs
45000000

Lot 13 - Elevators - 1 machine room-less elevator with cabin for wheelchair users with accompanying person access one-sided, 2 stops, lifting height 3.96 m, rated load 675 kg, 9 persons, cabin dimensions: width 1200 mm, depth 1400 mm, height 2150 mm - 1 Servicelift bilaterally with floor-hinged doors, access, 2 stops, lifting height 3.96 m, nominal load: 200 kg, cabin dimensions: width 1000 mm, depth 800 mm, height 1200 mm - elevator systems with on-site elevator shafts of concrete and gearless drives in the shaft head

Structural steel erection work for structures

Landkreis Neustadt an der Waldnaab | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
45262420, 45262400

Prefixed escape stairway with escape balcony

Steel roof construction

Inside railing posts

Steel stair construction

Scope:

Supply and inputs and construction of a steel structure with escape balcony and 2 escapes. Metal roof, railing posts, internal steel staircase construction.

Prefixed escape stairway with escape balcony, steel roof construction, interior railing posts, steel stair construction

Scope: supply and inputs and construction of a steel structure with escape balcony and 2 escapes. Metal roof, railing posts, internal steel staircase construction.

Stahlbauarbeiten School Neustadt / WN

Landkreis Neustadt a. d. Waldnaab | Published March 30, 2017  -  Deadline May 2, 2017
cpvs

Prefixed escape staircase with escape balcony railing post steel roof inner steel staircase construction Scope: supply and inputs and construction of a steel structure with escape balcony and 2 escapes. Metal roof, railing posts, internal steel stair construction

Barracks Road, Channel Construction

Stadt Neustadt an der Weinstraße | Published March 30, 2017  -  Deadline May 10, 2017
cpvs

Building cleaning

Stadtverwaltung Pfaffenhofen a. d. Ilm | Published April 21, 2017  -  Deadline April 28, 2017
cpvs
90910000

New construction of primary and secondary school

Sewer rehabilitation "Rotenburg 4"

Stadtwerke Rotenburg an der Fulda | Published April 13, 2017  -  Deadline May 18, 2017
cpvs

Sewer rehabilitation works in grave less construction

Scaffolding

Landkreis Neustadt an der Waldnaab | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
44212310, 44212317, 45262100

Facade scaffolding, birdcage scaffolding.

Scope:

Construction and provision of all the facade scaffolding and scaffolding space indoors.

Facade scaffolding and space frames / construction and provision of all the facade scaffolding and scaffolding space indoors.

Screed work Expansion Landratsamt Neustadt / WN

Landkreis Neustadt a. d. Waldnaab | Published April 24, 2017  -  Deadline May 9, 2017
cpvs

Screed work for the new construction of the 4-storey expansion building of the Landratsamtes Neustadt ad WaldnaabNew construction of the 4-storey extension building of the Landratsamtes Neustadt ad Waldnaab as administrative building on a hillside, U-shaped building up to 3 floors integrated into the slope.

Wood construction, repair of Paukrierbrücke (bridge in the course of Reckahner path over the sand Furth trench) in Brandenburg, renewal of the coating

Stadt Brandenburg an der Havel, FB VII, FG 66 Straßen und Brücken | Published April 4, 2017  -  Deadline April 27, 2017
cpvs
45000000

Holzbauarbeiten: 11m³ wood beam roadbed (softwood 14 x 14 cm) Remove and dispose of properly, produce 2m³ Kippverbände and installing (oak 10 x 10 cm), 12 pieces clamping anchor (steel) installing, 11m³ wood beam roadbed (oak 14 x 14 cm) provide delivery and installation, 29m wooden railing made of oak and install.

Roofing incl. Roof sealing

IHK Nürnberg für Mittelfranken | Published April 7, 2017  -  Deadline May 9, 2017
cpvs

Roofing including roof sealing with the following partial services: -. Brick cover the sloping roofs including roof battens, insulation and roof insulation, as well as Verblechungenca.. 1200 m2- adjust / complete the brick cover Besatdnsdächer to the new roofs incl. Roof battens, insulation and roof insulation, as well as Verblechungen- RWA skylights including in the field of Flachdächer- flat roof construction. Slope insulation (mineral wool), Dachababdichtung and flashings about 220m2- flat roof, including . slope insulation (foam glass), Dachababdichtung and flashings 50 m2- flat roof, terrace incl. gap insulation (mineral wool portion of Foamglas) Dachababdichtung and flashings about 330 m2

Installation of doors and windows and related components

Eigenbetrieb Schule + Gebäudewirtschaft Kreis Bergstraße | Published April 13, 2017  -  Deadline May 17, 2017
cpvs
45421100, 44115900, 44221100, 44221200

Facade construction aluminum / glass.

Scope:

. - Aluminum window elements 7 pcs, 3 250x2 200;

. - Aluminum window elements 5 pcs, 3 900x2 200;

.; - 2 aluminum window-door member pc, 3 250x3 090

. - Aluminum window elements 5 pcs, 3 250x2 200;

. - Aluminum window elements 2 pcs 3 250x2 200;

.; - 3 aluminum window elements pc, 3 900x2 200

.; - 157 pcs Supply air, 420x50

. - 11 195 + 130/220 cm External Venetian blinds with guide rails pieces;

. - 7 195 + 195/220 cm External Venetian blinds with guide rails pieces;

- 82 running meters underground shield.

District heating

Wärmeausschreibung Paul-Winter-Realschule Neuburg a. d. Donau | Published January 27, 2017  -  Deadline May 11, 2017
cpvs
09323000

The provided heat has to be generated from renewable energy sources within the meaning of EEWärmeG.

The at all times be provided by the contractor is in total 830 kW, the expected annual amount of heat of the two delivery points is in total 790 000 kWh / a.

The contract term is 15 years and starts on 09/01/2018.

The heat supply is carried out in 3 phases, each with different heating requirements. The 3 phases arising in respect of the construction process:

- Phase 1: 09/01/2018 - 31/03/2019 (temperature control of the building site)

- Phase 2: 04/01/2019 - 08/31/2019 (heating processes),

- Phase 3: 09/01/2019 (school system) - 01.09.2033.

The heat supplied has a primary energy factor according EnEV2014 i. V. m. DIN V 18599-1, 2011-12 to meet a maximum of 0.4.

17A0063 (LBB NL Kaiserslautern) Construction of a large sports hall with gallery

Landesbetrieb Liegenschafts- und Baubetreuung, Regionale Vergabestelle Kaiserslautern | Published March 29, 2017  -  Deadline April 28, 2017
cpvs
45212225

Other building completion work

Eigenbetrieb Schule + Gebäudewirtschaft Kreis Bergstraße | Published April 8, 2017  -  Deadline May 10, 2017
cpvs
45450000, 45214220

Trockenbauarbeiten.

prefabricated walls

- construction of a space frame in a staircase 350 m 3,

- plasterboard partition (d = 100 to 250 mm; partly with Brandschutzbzw,..

Sound insulation requirements) about 260 m 2,

- plasterboard facings about 195 m 2,

- plasterboard Vorschott (500-5000 cm 2 ) About 62 St,

- cladding of steel strips F90 about 12 m,

- dry plaster coverings 200 m Second

Prefabricated ceilings

- Acoustic grid ceiling with frieze (smooth) ca. 1000 m 2,

- cap ceiling with frieze (smooth) 250 m 2,

- Store remove, reassemble prev element ceiling about 120 m. 2

Suspended ceilings - plasterboard

- ceilings smooth (some with fire protection quality.) About 950 m 2,

- Acoustic suspended ceiling, plasterboard, round holes about 40 m 2,

- suspended ceiling outdoor, cement bound approximately 45 m 2,

- Vest beamed ceilings, among other, F90-B 20 m 2,

F90 - Floor System

- Pre-fab screed made of composite elements (F90)

on light leveling mortar (2K epoxy resin) 170 m Second

Structural shell work

Landkreis Marburg-Biedenkopf | Published April 19, 2017  -  Deadline May 30, 2017
cpvs
45223220, 45262210, 45233222, 45262310, 45262520

Approximately 203 m 3 Foundation excavation;

about 96 m steel precast concrete foundation beam;

about 102 m 2 Supplementary bottom plate tr .;

1 PSCH. . Various demolition and dismantling work in the building;

about 142 m 2 Exposed brickwork;

about 1 psch. Create and Close breakthroughs for building services.

about 1 psch. Concrete repair of various components in the building;

150 m 2 Concrete slabs and concrete paving.

approximately 113 m 2 Supplementary cementitious screed as margins in the basement.

The Marburg-Biedenkopf intends to carry out an energy renovation with Passive House components and renewal of the building at the comprehensive school Niederwalgern.

The complex comprises 4 storeys and consists of two parts, which were built in different phases. Construction period 1972-1978. The parts of the building are connected by a staircase tower.

The complex includes a BGF 8698 m 2 , BRI 37,855 m 3 u. NGF 7928 m 2 ,

Structural work, excavation, foundation work, minor demolition-u are for energy-efficiency improvements. to build dismantling work, fretwork, minor concrete repair work, masonry and paving work.