Public tenders for construction in Potsdam Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Architectural, construction, engineering and inspection services

Studentenwerk Potsdam | Published October 17, 2015  -  Deadline November 12, 2015
cpvs
71000000, 45214700

The client is planning to build a dormitory with about 290 residential units in basement construction. The apartments are to be adapted to the living conditions of students. Approximately 90% of apartments to be built should therefore be 1-bedroom apartments; the other rooms are planned as a 2-in shared apartment. For the projected building is a piece of land at the Karl-Liebknecht-Straße in Potsdam-Golm available. Particular emphasis is placed on the timely implementation. The apartments are equip each with a bathroom and kitchen. The contract covers the performance of the project planning (building and room-creating interior), the planning of the technical equipment, the structural design, fire protection and the free plant design. The appointment is in line with the power images and performance phases of the HOAI within the meaning of the work phases 2 to 9 according to §§ 33, 38, 49 and 58 HOAI.

Architectural, construction, engineering and inspection services

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published January 27, 2017  -  Deadline February 24, 2017
cpvs
71000000, 71240000

The contract includes the object planning services gem. HOAI phases in the LP 2-9 for the construction of the gymnasium (dual sports hall, 22 mx 45 m) gem. DIN 18032 (without tribune, with equipment rooms, locker rooms, showers, technical and utility rooms). In addition to school sports is planned that the hall is used by various clubs.

Auftragssgegenstand:

The contract includes the object planning services gem. HOAI phases in the LP 2-9 for the construction of the gymnasium (dual sports hall, 22 mx 45 m) gem. DIN 18032 (without tribune, with equipment rooms, locker rooms, showers, technical and utility rooms). In addition to school sports is planned that the hall is used by various clubs.

The sports hall is to be at the school site Haeckelstraße which is located in a prefab housing estate, built (cadastral Potsdam, hall 22, Parcel 1104). The parcel is located within a groundwater protection area.

On school site Zeppelin Elementary School (S23) and the New School long Potsdam are located West (S5).

The object is to be built next to the redeveloped gym before adjacent embankment. Following this new building project a 100m -Laufbahn and Newton's facility at the needs in the immediate vicinity of the hall and others. Still be built.

Opening up the site via the Haeckel road leading to Kastanienallee.

The gym should be possible realized without altering the position of an existing district heating pipeline.

The construction work must be carried out during ongoing school operations at the school site.

The estimated realization period after commissioning should be no longer than 24 months.

Compliance with the force at the time of application and the EnEV EEWärmeG be observed.

Architectural, construction, engineering and inspection services

Technologie- und Gewerbezentren Potsdam GmbH | Published October 31, 2015  -  Deadline November 27, 2015
cpvs
71000000, 45214610, 45213150

The intention of the new construction of one or more office and laboratory building in Potsdam. The part is to be built plot is located in the Science Park Golm and is 3 800 m2. The available floor space number is estimated 2055 m2, the building area is about 1 überbaubare 100 m2. Permitted is a four-storey construction. For the plot consists of Zoning 100-1, Golm Science Park. This is the part surface GEe4 in the northern part of the land corridor 1 Parcel 1244 between the street at Mühleberg and the Golm Innovation Centre. The plan is the establishment of one or more office and laboratory building. About 50% of the area to be used for laboratory purposes. Approximately 40% are for office space, approximately 10% should be available for social space. The aim is a modular design to ensure the highest possible flexible and customizable and upgradeable use. The security levels 1 or 2 must be fulfilled in the labs, but different tenants are tailor-made solutions can be offered. The basis for planning an existing concept study from 2014, which will be provided to applicants available. The contract covers the performance of the project planning (building and room-creating interior), the planning of the technical equipment, the structural design, fire protection and the free plant design.

New construction Kita am Schragen - ETICS (facade b.)

Entwicklungsträger Bornstedter Feld GmbH Treuhänder der Stadt | Published September 18, 2017  -  Deadline October 18, 2017
cpvs
45320000, 45321000, 45443000

The building stands on the edge of a part of the residential area, which is being developed in the beginning, on a public street. It consists of a 1-storey building and a two-storey building, which are arranged in an L-shape with an offset to one another. The children's areas are provided in the substructures, the central service areas and the movement room are accommodated in the enclosure. The building is built as a fully insulated masonry building with concrete flooring, the roof of the two-storey is constructed as a carpenter's construction with bow ties, the foundation is on a floor plate with frost apron. Required services: - construction site equipment - ETICS (façade work)

Building construction work

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published May 6, 2017  -  Deadline May 31, 2017
cpvs
45210000

Renovation of town hall - VE 10 - Joinery, 1. BA (west wing).

Carpentry work - 1st construction section outside (west wing):

- demolition window lattice - 19 pcs .;

- demolition single window - 4 pcs .;

- Demolition roller shutter - 9 pcs .;

- demolition window sills / outside of the building - approx. 250 m;

- demolition cover boards window exterior - approx. 170 m;

- carpentry and painting repairs Kastendoppfenster incl. Replacement of the inner glazing with K-glass, different sizes - approx. 67 pcs .;

- carpentry and painting repairs Composite windows incl. Exchange of the inner glazing with K-glass, different sizes - approx. 50 pcs .;

- carpentry and painting repair Simple window incl. New frameless front window made of K-glass, mounted on the inside window window, approx. 1.50 x 2.80 m - 4 pcs .;

- carpentry and painting restoration historical exterior door, 2fl. With hatch, incl. Metal garnitures and applications approx. 2,40 x 3 m - 1 pcs .;

- wooden boards outside on timber - 200 m;

- Repair of roller shutter boxes - 34 pcs .;

- Maintenance Rolladenpanzer Holz - 25 Stk .;

- Roller shutter wood new - 9 pcs .;

- Kastendoppfenster new, approx. 1,40 x 1,60 m - 5 pcs .;

- Composite window new, approx. 0.90 x 1.15 m - 2 pcs .;

- Wooden frame door new, with laminated safety glass, approx. 1,30 x 2,10 m - 1 pcs.

Lot 57 shell construction works 2.BA

KIS-Kommunaler Immobilien Service Landeshauptstadt Potsdam | Published November 3, 2017  -  Deadline November 28, 2017
cpvs
45000000, 45110000, 45200000, 45210000, 45214000, 45400000

Lot 57 - structural work 2nd construction phase - demolition and disposal about 300 to. - Dangerous waste about 10 to. - demolition plaster 2700 m² - demolition MW walls 200 m² - deconstructing ceiling cladding 900 m² - dismantling sports floor 600 m² - new brickworks 150 m² - wall connection to the roof 200 m - steel rebate installation and renovation 100 m - Ausgleichschüttungen - connections to existing windows 260 m

Park Babelsberg, paths on Wilhelm waterfall, roads construction

Stiftung Preußische Schlösser und Gärten Berlin-Brandenburg,Vergabestelle | Published January 17, 2017  -  Deadline February 15, 2017
cpvs
45112700, 45112711

By building project in a first part diestark damaged footpaths from Pleasureground amSchloss Babelsberg be rehabilitated. Since the partition was added artfully dasbewegte terrain, diewirkungsvolle drainage of highly flushed Wegein the slopes is an object of the construction project. From derMitte 19th century historic rainwater shafts are present and operational. They are a historical unteridisches Rohrleitungssysteman a central historic sewer Ange hailstones that drains into the Havel. Partially If the newly constructed shafts at this drainage line to be connected. The narrow width of the channels of 0.95 m (3 feet) to 1.88 meters (6 feet) leaves a biking the paths during construction only with smaller and lighter equipment. Set 250 m edging stones re Excavating 220 m² way and produce basic Planum, 220 m² provide support layer and installing, delivering 110 m² Small stone paving and manufacture, deliver 110 m² top coat for water-bound paths and manufacture, deliver 33 m parking levels with natural stone and manufactured, 600 m² floor modeling work

New construction Kita "Am Schragen", Horst-Bienek-Str. 4, 14469 Potsdam - Extended shell construction

Entwicklungsträger Bornstedter Feld GmbH Treuhänder der Stadt | Published September 4, 2017  -  Deadline October 6, 2017
cpvs
45112500, 45223220, 45262311, 45262320, 45262500, 45320000, 45410000

The building stands on the edge of a residential part of a public road. It consists of a 1-storey building and a two-storey building, which are arranged in an L-shape with an offset to one another. The children's areas are provided in the substructures, the central service areas and the movement room are accommodated in the enclosure. The building is built as a fully insulated masonry building with concrete flooring, the roof of the two-storey is constructed as a carpenter's construction with bow ties, the foundation is on a floor plate with frost apron. Required services: - Building site equipment - Earthworks - Concrete work - Foundations, floor slabs - Walls Reinforced concrete - Ceiling slabs, underlays - Finished parts, Recessed parts - Reinforcement - Masonry work - Insulation and waterproofing work - Scaffolding - Internal plastering, screed -

Construction work

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published February 15, 2017  -  Deadline March 14, 2017
cpvs
45000000

Restoration Hall - VE 3 - Air conditioning systems west wing.

Ventilation systems West Wing:

- Dismantling of 2 exhaust strands over 4 floors,

- Removing any room fans in the sanitary areas,

- Reinstalling 2 exhaust strands together and Deflector

Fire protection equipment,

- New installation of 8 single room incl fans line connections.

The exhaust duct.

Construction work

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published February 21, 2017  -  Deadline March 29, 2017
cpvs
45000000

Restoration Hall - VE 4 - Starkstromtechnik west wing.

Power Installations West Wing:

- Demonatgearbeiten with about 160 pieces lights, about 10 distribution closets, about 150 piece installation equipment, 20 m cable trays, 800 m lines. 40 piece floor tanks, about 400 meters lightning protection;

- Reinstallation of about 10 pieces closet distributors F30, circa 150 head lights, about 60 pieces The rescue walkway lights, 50 m cable trays, about 1 200 meters lines of various cross-sections, about 80 pieces Components Setting for lighting control, 150 pieces Installationsgeräe, about 50 pieces fire barriers, approximately 350 m lightning protection lines and approximately 20 ground rod;

- 1 central battery system for emergency lighting.

Construction work

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published February 10, 2017  -  Deadline March 8, 2017
cpvs
45000000

Restoration Hall - VE 1 - site equipment overall.

Site equipment - overall exercise:

- Place 1 piece sanitary containers, connect, hold, break down;

- 150 m site fence with gates for barrier incl provision 100 weeks;.

. - 13 pieces Baustrom - up connection distributor incl leads, group distribution and final distribution, wait degrade, hold, implement;

- 4 pieces Bauwasseranschlüsse incl associated fresh and waste water lines: production, maintenance, conversion and deconstruction..

Construction work

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published February 10, 2017  -  Deadline March 9, 2017
cpvs
45000000

Restoration Hall - VE 7 - Demolition West Wing.

Demolition West Wing:

- Concrete Demolition sole unbewehrt: 500 m 2 ;

- Demolition Floor structure DG: 600 m 2 ;

- Distance Flooring: 2000 m 2 ;

. - Demolition tiling floor, including floor to bare ceiling: 150 m 2 ;

- Demolition interior doors 1flg .: 30 pcs .;

- Demolition G-walls: 300 m 2 ;

- Demolition walls MW, to 64 cm: 200 m 2 ;

- Teeing Wandputz: 900 m 2 ;

- Excavation: 100 m 3 ;

- Demolition pollutants KMF in sanitary areas: 100 m 2 ;

- Demolition plastic blinds: 20 pcs .;

- Include temporary backup Site passages: 6 pcs.

Construction work

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published February 11, 2017  -  Deadline March 15, 2017
cpvs
45000000

Restoration Hall - VE 2 - plumbing / heating installations west wing.

Plumbing / heating installations West Wing:

- Dismantling of 2 sanitary strands with SW and TW installations over 4 floors;

- Dismantling in 8 sanitary facilities, fittings, porcelain and furnishings;

- Reinstalling 2 sanitary strands with SW and TW installations;

- Reinstallation of 8 sanitary facilities, fittings, porcelain and furnishings;

- Fire safety upgrade of cable bushings of existing heating installations;

- Exchange of existing radiators to a small extent;

- Disassembly and reassembly of existing radiators;

- Completion of the thermal insulation of TGA installations in the Central Heating;

- Exchanging Strangabsperrventilen and differential pressure regulators;

- Adjustments Flow balancing;

- Rebind existing heating circuits.

Construction work

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published April 11, 2017  -  Deadline May 2, 2017
cpvs
45000000

Renovation Town Hall - VE 5 - Schwachstromtechnik West Wing.

Construction work

Landeshauptstadt Potsdam | Published September 24, 2016  -  Deadline November 22, 2016
cpvs
45000000, 45112710, 45112711, 45112712

Framework Agreement for the repair of public green areas (2017 to 2020). The framework contract will be concluded with a maximum of three contractors.

Architectural, construction, engineering and inspection services

Landesamt für Umwelt, Gesundheit und Verbraucherschutz Brandenburg | Published June 6, 2015  -  Deadline July 17, 2015
cpvs
71000000

The contract includes design services in preparation of flood Herzberg (Elster). It will be awarded the following services: basic services according to HOAI - Property planning HOAI 2013 § 41: Gradual award, 1st stage: LP 3 + 4, 2nd stage: LP 5-8, - Structural design HOAI 2013 § 49: Gradual award, 1 . stage: LP 3 + 4, 2nd stage: LP 5 + 6. Special Services: - Geotechnics: There is already available a Baugrundvoruntersuchung. Compaction and integration of the existing preliminary study including drafting the terms of reference, participation in the award of benefits, care of additional explorations. - Survey: It is before a survey. Compaction and integration of existing surveying as required. Development of Terms of Reference, participation in the award of benefits; - Hydraulic Modeling the Effects of dike route shifts in Section 3; - Obtaining the consent of affected landowners; - Monthly Project consulting the contracting authority (Potsdam). The beginning of the first construction lot is scheduled for 2020.

Water-treatment plant construction work

Stadtwerke Potsdam GmbH | Published June 2, 2015
Winner
Wassertechnik Wertheim GmbH & Co. KG
cpvs
45252120, 45332000, 45332200, 45316000, 45330000

Installation of complete bath water installations for the construction of a sports and leisure bath consisting of: - Circuit 1: lap pool / slides, Q = 676 m3 / h, 8 vacuum filter A = 2.8 m²; - Circuit 2: Vario pool, Q = 92 m3 / h, 1 vacuum filter A = 3.1 m²; - Circuit 3: leisure pool, Q = 325 m3 / h, 4 vacuum filter A = 2.8 m²; - Cycle 4: splash pool, Q = 40 m3 / h, 1 vacuum filter A = 2.1 m²; - Cycle 5: Ausschwimmbecken, Q = 93 m3 / h, 1 steel pressure filters DM 2 000 mm; - Circulation 6: Sauna plunge pool, security separation station Qmax = 4.0 m3 / h; - Piping of the circuits made of HDPE pipes; - Full vacuum chlorine gas conditioning plant for 1-5; - Analysis and needed dosing.

Clinic construction work

St. Josefs Krankenhaus Potsdam (SJKP) – Sanssouci | Published July 2, 2015
Winner
Roland Flachdachbau F. Waldmann GmbH
cpvs
45215130, 45210000, 45261410, 45261300

Erweiterungsneubau 2. BA of SJK Potsdam - Roofing work and plumbing work (SJP-2-A07). The area is divided into two components: - Component North with about 1 000 m2 on 2nd floor approx 12.50 m over OKG; - South part with about 900 m2, 3rd floor approx 16.00 m over OKG; - Terrace in the yard about 85 m2 of EC about 5.50 m above OKG. Roof structure gradient loose inverted roof: ca. 1900 m². - 10 cm layer of gravel 16/32; - Water draining separation layer; - Insulation 20 cm, λ = 0.031 W / mK (gravel) λ = 0.033 W / mK (with greening) fire protection class B1; - Roof insulation 2 layers with primer (elastomeric bitumen sheeting); - Concrete slab 25 cm. Terrace construction: (for flat roof directive): 85 m². - Paving slab d = 4 cm on adjustable spacers; - On 8 mm rubber granulate as Building / drainage mat; - Multi-ply bituminous waterproofing membrane. 1st layer roof waterproofing bituminous membrane resistant to high pressure; 2nd layer roofing as bituminous membrane; - Thermal insulation as slope insulation WLG 040, Minimum d = 12 cm, maximum d = 16 cm; - Vapor barrier on vapor pressure equalization layer; - Starboard ceiling d = 26 cm. The extensive green roof is done by the landscape architect.

New construction Kita Am Schragen - Flooring work

Entwicklungsträger Bornstedter Feld GmbH Treuhänder der Stadt | Published October 12, 2017  -  Deadline November 8, 2017
cpvs
44112230, 45432130

The building stands on the edge of a part of the residential area, which is being developed in the beginning, on a public street. It consists of a 1-storey building and a two-storey building, which are arranged in an L-shape with an offset to one another. The children's areas are provided in the substructures, the central service areas and the movement room are accommodated in the enclosure. The building is built as a fully insulated masonry building with concrete flooring, the roof of the two-storey is constructed as a carpenter's construction with bow ties, the foundation is on a floor plate with frost apron. Required services: - flooring (linoleum)

Architectural, construction, engineering and inspection services

ProPotsdam GmbH | Published April 5, 2017  -  Deadline May 2, 2017
cpvs
71000000, 71240000

The ProPotsdam GmbH intends to undertake a complex renovation of the buildings Gaußstraße 51-54 and 55-58 as well as the vacancy elimination.

1. The main objectives for the development:

- Complex renovation and vacancy elimination,

- Plan changes must be checked

- renewal of the courtyard side balconies,

- barrier-free access to the house Sunrises,

- Improving the quality of housing, essential use value increase of the property to secure a long-term rental potential of the apartments,

- attractive design of the outside plant areas

- the durability of measures to be implemented to grant long-term low maintenance and operating costs,

- Reconstruction in uninhabited state (tenants are between reacted)

- existing commercial unit is maintained.

2. Information on the building or structure:

- Construction: Built in 1987 and not renovated (uninsulated GDR plate)

- Levels: 5,

- Sunrises: 8,

- Apartments Gaußstr. 51-54: 45 (. Z. thereof such vacancy: 3),

- apartment sizes from 34.63 m to 68.73 m,

- Living space ca. 2 531.84 m²,

- Apartments Gaußstr. 55-58: 37, 1 Commercial thereof (e.g. Z. vacancy. 3),

- apartment sizes from 40.98 sqm to 122.21 sqm, commercial 123.36 m²,

- Living space ca. 2 315.25 m²,

- Total living area Gaußstr. 51-58: 4 970.45 m²,

- Roof Education: flat roof,

- Heating / WW: district heating,

- courtyard side: parks and playgrounds / play area.

3. the expected planning and construction:

- application: 12/2017,

- Scheduled start on: 08/2018.