Public tenders for construction in Potsdam Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for art and cultural buildings

Stiftung Preußische Schlösser und Gärten Berlin-Brandenburg, Vergabestelle | Published February 2, 2016
cpvs
45212300, 45452000, 90911300, 90910000, 90911200

Construction work for art and cultural buildings

Construction work

Stiftung Preußische Schlösser und Gärten Berlin-Brandenburg, Vergabestelle | Published June 12, 2015
Winner
Holzwerkstatt Schumacher GmbH
cpvs
45000000, 45421000, 45421132, 45421100, 45212350, 45441000

For the renovation of the shell of the Schloss Charlottenburg wooden windows are extensively revised in the fifth stage of construction and repair. It is very different window types of single windows on casement windows and doors that are processed. Much of the window is fragmented sprossiert (interior carpentry, exterior as steel frame rung grid). A damage and mapping activities should be carried out for each window and agreed with the AG and the monuments before construction starts. After completion of work this is the basis for the documentation to be drawn up of the work carried out. All windows are to make gear and closed and repaired joiner and painter moderately. As a coating system containing oil alkyd resin is provided. The work will take place in a Grade II listed building and park area and shall comply with carefully while being gentle. The woodwork of the 5th phase of construction begin v.

Construction work

Stiftung Preußische Schlösser und Gärten Berlin-Brandenburg, Vergabestelle | Published February 7, 2015  -  Deadline March 13, 2015
cpvs
45000000, 45421000, 45421132, 45421100, 45212350, 45441000

For the renovation of the envelope of Schloss Charlottenburg wooden windows be revised in the fifth stage of construction and repair. It is very different window types of single windows on casement windows and doors that are processed. Much of the window is fragmented sprossiert (wood inside, outside and shoot steel frame grille). An action for damages and mapping is performed for each window and agreed with the AG and monument before construction begins. After completion of the work, this serves as a basis for the created documentation of the work performed. All windows are to make the gear selected and closed and repaired joiner and painter default. The coating system containing oil alkyd resin system is provided. The work will take place in a listed building and parking area and shall comply with gently while being gentle. The joinery of the 5th phase of construction is expected to begin in early May 2015 and shall be submitted by the end of October 2015 ready.

Clinic construction work

St. Josefs Krankenhaus Potsdam (SJKP) – Sanssouci | Published January 8, 2016
Winner
Marotzke Malereibetrieb GmbH
cpvs
45215130, 45210000, 45442110, 44800000, 44820000

Erweiterungsneubau 2. BA of SJK Potsdam - painting and decorating work for a hospital construction with corresponding quality requirements.

Clinic construction work

St. Josefs Krankenhaus Potsdam (SJKP) – Sanssouci | Published October 7, 2015  -  Deadline November 16, 2015
cpvs
45215130, 45210000, 45442110, 44800000, 44820000

Erweiterungsneubau 2. BA of SJK Potsdam - painting and decorating work for a hospital construction with corresponding quality requirements.

Secondary school construction work

KIS – Kommunaler Immobilen Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published March 11, 2015  -  Deadline April 7, 2015
cpvs
45214220

Roof seals with elastomer bitumen membranes, slope insulation with mineral wool and EPS, green roof construction, Attica covers.

Construction work

Leibniz-Institut für Agrartechnik und Bioökonomie e. V. (ATB) | Published September 29, 2017  -  Deadline October 30, 2017
cpvs
45000000, 45311200, 45314000, 45312100

The ATB is planning a new center for technology and knowledge transfer at the institute's location in Potsdam. The space program includes areas for meetings, communication and scientific conferences as well as for user training, workshops and seminars for employees and guests. In addition, the new building will also provide the ATB with facilities for laboratories for chemico-physical, microbiological and molecular biological analyzes, as well as associated office spaces and IT infrastructure. In total. the new building is about 2 000 m 2 Floor space, of which approx. 900 m 2 for laboratories, approx. 500 m 2 for communication and transfer of knowledge and another 500 m 2 for offices.

The construction works are advertised as individual awards in EU-wide and national procurement procedures. According to the award concept, from today's perspective, approximately 43 separate procurement procedures will be carried out until the beginning of 2018.

This contract notice covers exclusively the telecommunications and information technology installations.

Telecommunication and information technology installations for new construction, approx. 5 000 m 2 GFA:

> LAN network consisting of 2 data cabinets 42 U, equipped with passive and active components for approx. 380 ports;

> Fire detection system for 5 rings complete with key deposit and FIPS with approx. 300 pieces of various sensors, line-shaped smoke detector and smoke suction system;

> Associated cable system consisting of:

- approx. 12 000 m Cat 7 cable,

- approx. 3 000 m Cat 7 double cable,

- approx. 240 m LWL outdoor / indoor cable,

- approx. 5 000 m fire detection cables.

Clinic construction work

St. Josefs-Krankenhaus Potsdam (SJKP) – Sanssouci | Published July 1, 2015
Winner
Radbruch GmbH
cpvs
45215130, 45210000, 45262670, 45421000, 45421100, 45421144

Erweiterungsneubau 2. BA of SJK Potsdam - Manufacture and installation of wooden and aluminum windows for the new construction and wooden windows for a listed façade by historical standards.

Drainage construction works

Stiftung Preußische Schlösser und Gärten Berlin-Brandenburg, Vergabestelle | Published September 2, 2015
Winner
HTK Gesellschaft für Hoch-, Tief- und Kulturbau mbH
cpvs
45232450, 45000000, 45232431

The construction project concerns the remaining line-opening for the new "Science and Restoration Center (WRZ)" as well as the renewal of Abwasseranlagehn for Pineapple House. The road and Webebau confined to the departure and the restoration of fortifications in the area of ​​pipe trenches and manhole pits. The premisses specified in the contract documents are executed in several subareas and periods.

Drainage construction works

Stiftung Preußische Schlösser und Gärten Berlin-Brandenburg, Vergabestelle | Published April 28, 2015  -  Deadline June 9, 2015
cpvs
45232450, 45000000, 45232431

The construction project relates to the rest of the line-bound development for the new "Science and Restoration Center (WRZ)" as well as the renovation of wastewater treatment plants for the pineapple house. The road and Webebau limited to the departure and the restoration of fortifications in the area of ​​pipe trenches and manhole pits. The front phrases specified in the contract documents are run in several areas and periods.

New construction Kita - Screed work

Entwicklungsträger Bornstedter Feld GmbH Treuhänder der Stadt | Published September 5, 2017  -  Deadline October 5, 2017
cpvs
45262320, 45262321

The building stands on the edge of a residential part of a public road. It consists of a 1-storey building and a two-storey building, which are arranged in an L-shape with an offset to one another. The children's areas are provided in the substructures, the central service areas and the movement room are accommodated in the enclosure. The building is built as a fully-insulated masonry building with concrete flooring, the roof of the two-storey is constructed as a carpenter's construction with bow ties, the foundation is on a floor plate with frost apron. required services: - construction site equipment - insulation ground floor - screed ground floor - screed upper floor

Construction services for the expansion of contaminated soil material

Stadtkontor GmbH | Published December 5, 2016  -  Deadline January 12, 2017
cpvs
45230000, 90420000, 90722000, 90740000

Construction services for the expansion of contaminated soil material

Roof works and other special trade construction works

ProPotsdam GmbH | Published July 16, 2016  -  Deadline August 2, 2016
cpvs

Roof works and other special trade construction works

New construction of the Staedtter ditches Mittelteichgruppe Buchwäldchen

Landesamt für Umwelt | Published June 29, 2017  -  Deadline July 14, 2017
cpvs
90700000

New construction of the Staedtter ditches Mittelteichgruppe Buchwäldchen

Metal construction, glazing and sun protection work

Nutzergemeinschaft desWissenschaftspark"Albert Einstein" | Published October 19, 2017  -  Deadline November 14, 2017
cpvs

Metal construction, glazing and sun protection work

Dyke construction work

Landesamt für Umwelt, Gesundheit und Verbraucherschutz | Published November 13, 2015
Winner
Streicher Tief- und Ingenieurbau Jena GmbH & Co. KG, Niederlassung Berlin-Brandenburg
cpvs
45247230, 45247210, 45232310, 45223200, 45112500, 45246400, 45240000

Restoration of the Oder main dike between sluice and harbor Schwedt Schwedt (dike-km 28 + 800-31 + 000). Essentially: earthworks, landscaping and road construction; next piling, Stahlwasserbau-, concrete and reinforced concrete work. In about 40% of the dikes range of existing dike is completely ablate and 20 m in the Polder 10 empathised rebuild. Because little or no footing the dike is to be based on Geogitterlagen. The delivery of all bulk materials carried by water and the purpose-built jetty in the Schwedter Querfahrt. In addition, the dike parallel communication cable of the ESC is re embarrassed.

Dyke construction work

Landesamt für Umwelt, Gesundheit und Verbraucherschutz | Published June 6, 2015  -  Deadline July 14, 2015
cpvs
45232310, 45232300, 45232000

Restoration of the Oder main dike between lock and harbor Schwedt Schwedt (dike-km 28 + 800-31 + 000). Essentially: earthworks, landscaping and road construction; In addition, piling, Stahlwasserbau-, concrete and reinforced concrete work. In about 40% of the dikes range of existing dike is completely ablate and 20 m in the Polder 10 empathised rebuild. Because little or no footing the dike is to be based on Geogitterlagen. The provision of all bulk materials carried by water and the purpose-built jetty in the Schwedter Querfahrt. In addition, the dike parallel communication cable of the ESC is re embarrassed.

B1505G Drywall construction

Helmholtz-Zentrum Potsdam Deutsches GeoForschungsZentrum GFZ | Published July 13, 2017  -  Deadline August 8, 2017
cpvs
45000000

The building of the Albert Einstein Str. 42-46 consists of a three-storey masonry building from the 1950s with a converted attic storey and a floor space of 1,636 m² (house A) and a building with approx. 968 built in 1993 in three-storey wooden-panel construction M² floor space (house B), both of which are fundamentally renovated and adapted to the new conditions of use. Scope of supply: Production of approx. 330 m² of plasterboard metal stand walls, prefabricated shells, prefabricated installations and bins, approx. 390 m² suspended plasterboard and owacoustic ceilings, 20 m² double floor system as well as fire protection of approx steel components

Architectural, construction, engineering and inspection services

Landesamt für Umwelt (LfU), Referat W21 | Published March 11, 2017  -  Deadline April 10, 2017
cpvs
71000000, 71240000, 71247000, 71248000, 71311100, 71520000, 71521000

The LfU Brandenburg plans to Deichrückverlegung by building a dike portion connected to the Altdeichrückbau for the upgrading of its flood defenses on the Oder.

On the crown of Deichverteidigungsweg is disposed of asphalt.

With completion of the contract section 51 all temporary construction roads, storage areas and jetties are to dismantle in the lowland.

As things stand, is of a value scope of the construction work (listing the minimum demanding) in the net amount of 6549 437.07 EUR assumed.

Following the HOAI §43, performance image engineering structures, installation 12 with amendments and specifications by the contracting authority 8 The following special services are within the power stage to be provided by tenderers:

7.1 Incorporation into the present planning (additional expense to HOAI § 8 (3)).

7.2 Cost Control.

7.3 Checking the inventory plans BL51 of Works supplier.

Notice of default.

7.5 Construction supervision:

1) validity check of the staking;

2) monitoring the performance of the work:

- Participating in warding of the contractor in the construction project,

- Monitoring the implementation of the object in accordance with the approved for carrying documents, the building contract and the specifications of the AG,

- Testing and evaluation of the authorization of supplements (progress test, checking the existence and the amount after checking the impact on the construction, assisting in claim negotiation, logging the Supplement negotiation,

- Performing or causing of control tests (Geotechnical control test is ordered separately from LfU, in consultation with AG)

- Monitoring the rectification of identified deficiencies in the acceptance of the services,

- Documentation of the construction process (in the weekly report of the Consultancy and occasion further dates between Baurapporten);

Check the allowances;

4) Assist with regulatory inspections;

5) assisting in the purchase of goods and services;

6) audit, comparison of the results of audits of the contract price.

7.6 Participation in additional coordination tasks including: testing LfU, appraiser, etc. KMBD

7.7 Creation and Bautagebuch Bauabschlussbericht.

7.8 Inspection of the documentation of the contractor for the construction process.

Construction project management services

AOK Nordost – Die Gesundheitskasse | Published April 5, 2017  -  Deadline May 2, 2017
cpvs
71541000

Project management services, including for the construction of a medical center. Service Center AOK Northeast at the site Müllerstraße / Ostend road or Müllerstraße 143, 13353 Berlin. The new building is to be constructed with a floor space (NF) according to DIN 277 of about 5400 m 2 (About 4000 m NF 2 Health center / 700 m NF 2 Service Center / NF 700 m 2 Banquet Facilities / reserve areas) have. The planning services of the already entrust the general planner include the demolition of the existing building and the construction of the requirements of the client. This includes the creation of a functional and spatial program and a budget. The works are to be performed by a general contractor. Detailed description of the project management services see. II.2.4).

Projektsteuerungsleistungen gem. AHO, Issue no. 9, project management services in the construction and real estate, as of May 2014 (concretized in the tender documents). The contract includes significant portions of the power levels and areas of action after AHO-performance image.

A gradual commissioning is provided:

Stage 1: Preparation project;

Stage 2: planning;

3rd stage: design preparation;

4th stage: design;

5th Stage: project completion.

The general contractor for the execution of the works is expected to be contracted 01.06.2018.