Construction project management services

AOK Nordost – Die Gesundheitskasse | Published April 5, 2017  -  Deadline May 2, 2017
cpvs
71541000

Project management services, including for the construction of a medical center. Service Center AOK Northeast at the site Müllerstraße / Ostend road or Müllerstraße 143, 13353 Berlin. The new building is to be constructed with a floor space (NF) according to DIN 277 of about 5400 m 2 (About 4000 m NF 2 Health center / 700 m NF 2 Service Center / NF 700 m 2 Banquet Facilities / reserve areas) have. The planning services of the already entrust the general planner include the demolition of the existing building and the construction of the requirements of the client. This includes the creation of a functional and spatial program and a budget. The works are to be performed by a general contractor. Detailed description of the project management services see. II.2.4).

Projektsteuerungsleistungen gem. AHO, Issue no. 9, project management services in the construction and real estate, as of May 2014 (concretized in the tender documents). The contract includes significant portions of the power levels and areas of action after AHO-performance image.

A gradual commissioning is provided:

Stage 1: Preparation project;

Stage 2: planning;

3rd stage: design preparation;

4th stage: design;

5th Stage: project completion.

The general contractor for the execution of the works is expected to be contracted 01.06.2018.

Architectural, construction, engineering and inspection services

ProPotsdam GmbH | Published April 25, 2017  -  Deadline May 23, 2017
cpvs
71000000, 71300000, 71320000, 71321000

ProPotsdam GmbH intends to carry out a complex refurbishment of the buildings Gaussstraße 51-54 and 55-58 as well as the vacancy clearance.

8 can be awarded.

Key objectives for the construction project:

- Complex redevelopment and vacancies,

- changes in floor plan must be examined,

- renovation of balconies on the side of the courtyard,

- barrier-free access to house entrances,

- improvement of the quality of the accommodation, a substantial increase in the value of the property to ensure the long-term leasing of the apartments,

- attractive design of the outdoor areas,

- durability of the measures to be implemented to ensure long-term low maintenance and operating costs,

- refurbishment in unused condition (tenants are put in between),

- existing business unit is maintained,

- adaptation work at the district heating station,

- Installation of an automation system for remote monitoring of the heating system,

- DIN-compliant manufacture of the entire indoor and outdoor lighting,

- equipment with smoke alarms,

- modernization of bathrooms and sanitary facilities,

- renewal of all media.

Information about the construction:

- Erection: 1987 erected and rehabilitated (uninsulated DDR-Plattenbau),

- floors: 5,

- Elevations: 8,

Vacancy rate: 3),

- housing sizes from 34.63 m² to 68.73 m²,

2.531.84 m²,

Vacancy rate: 3),

- residential sizes from 40.98 m² to 122.21 m², commercial space 123.36 m²,

2,315.25 m²,

51-58: 4970.45 m²,

- roofing: flat roof with bitumen cover,

- heating / WW: district heating connection,

- Courtyard: green areas and playgrounds / toys.

3. Projected planning and construction times:

- building application: 12/2017,

- planned start of construction: 08/2018.

Construction work

KIS – Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam | Published April 11, 2017  -  Deadline May 2, 2017
cpvs
45000000

Renovation Town Hall - VE 5 - Schwachstromtechnik West Wing.

Architectural, construction, engineering and inspection services

ProPotsdam GmbH | Published April 5, 2017  -  Deadline May 2, 2017
cpvs
71000000, 71240000

The ProPotsdam GmbH intends to undertake a complex renovation of the buildings Gaußstraße 51-54 and 55-58 as well as the vacancy elimination.

1. The main objectives for the development:

- Complex renovation and vacancy elimination,

- Plan changes must be checked

- renewal of the courtyard side balconies,

- barrier-free access to the house Sunrises,

- Improving the quality of housing, essential use value increase of the property to secure a long-term rental potential of the apartments,

- attractive design of the outside plant areas

- the durability of measures to be implemented to grant long-term low maintenance and operating costs,

- Reconstruction in uninhabited state (tenants are between reacted)

- existing commercial unit is maintained.

2. Information on the building or structure:

- Construction: Built in 1987 and not renovated (uninsulated GDR plate)

- Levels: 5,

- Sunrises: 8,

- Apartments Gaußstr. 51-54: 45 (. Z. thereof such vacancy: 3),

- apartment sizes from 34.63 m to 68.73 m,

- Living space ca. 2 531.84 m²,

- Apartments Gaußstr. 55-58: 37, 1 Commercial thereof (e.g. Z. vacancy. 3),

- apartment sizes from 40.98 sqm to 122.21 sqm, commercial 123.36 m²,

- Living space ca. 2 315.25 m²,

- Total living area Gaußstr. 51-58: 4 970.45 m²,

- Roof Education: flat roof,

- Heating / WW: district heating,

- courtyard side: parks and playgrounds / play area.

3. the expected planning and construction:

- application: 12/2017,

- Scheduled start on: 08/2018.

Architectural, construction, engineering and inspection services

Landesamt für Umwelt, Referat W 21 | Published April 12, 2017  -  Deadline May 9, 2017
cpvs
71000000, 71241000, 71242000, 71220000, 71300000, 71240000, 71243000, 71310000

Some portions of the seawall have incorrect heights and an existing mobile system that is not sized for ice pressure, is not for use in winter floods.

The project aims to create a 1.8 km long section of inner-city all-year flood protection for the design flood HW 200th

Here, the construction of new mobile comes (only fixed mobile systems) or solid flood protection systems that meet the requirements of DIN 19712, optionally in combination with a stationary basic protection and / or physical protection measures in question.

Boundary conditions: HW200, rated for ice pressure, adequate investment and maintenance costs, building, management inventory and urban planning, historic preservation, conservation law and cross-border issues.

Budget HW protection system: 3 300 000.

The integration of the planned facilities in the urban landscape and the planned urban development are to be taken into account here.

The following exercises are to be processed:

- Acquisition flood hazard areas (of flood risk management planning);

1998 (annexed);

- Preparation of a concept of a task and a service specifications for soil investigation with geophysical studies according to the current rules of the technology for the solutions (allocation is performed in parallel);

- Preparation of the task and document for supplementary measurements (allocation is performed in parallel);

- cost-benefit analysis (mesoscale according methodology HWRMP, micro-scale on the basis of methodology STRIMA);

- Development of three possible solutions for flood control;

- Urban planning draft to all three solutions;

- Translation services German-Polish / Polish-German;

- Development of a decision-making basis with defined criteria (investment / maintenance costs, advantages and disadvantages, design and construction risks) with vote for preferred solution;

Slubice (Poland).

With an early public participation, coordination with the municipalities of Frankfurt (Oder) and Slubice and a scoping are the basis for the continuation of a standardized, structurally realizable and approvable planning to create.

The services to be provided are divided into basic services according to HOAI and Special Services.

Basic services:

- Objektplanung engineering structures power phase 1 + 2;

- planning of structural engineering work phase 1 + 2;

- planning of traffic facilities power phase 1 + 2;

- planning of outdoor installations phase power. 1 + 2

Special services:

- Update cost-benefit analysis;

- Urban Design;

- Identification of affected parcels / owner;

- Translation services German-Polish / Polish-German;

- imagination and coordination Dates authorities;

- public participation;

- Conduct Scoping;

- Creation of reference for expert reviewers (nature conservation contributions).

Architectural, construction, engineering and inspection services

rbb Einkauf | Published March 31, 2017  -  Deadline April 28, 2017
cpvs
71000000

Expert testing services in the areas of supply technology, lighting technology and the ARD studio. The tendered services are divided into 14 lots.

Expert services for the ARD studio in Berlin.

Expert examination of event technical bodies and

technical systems such as: audience platforms, Layer Event lifts, hoists

(DEMAG), stopper systems, tripods, suspension points

Venues Scherenpantographen and telescopic lighting pipes.

The Los 3 deleted.

Expert services: pressure vessel.

Expert services hoists.

Expert services gas detection systems.

Expert services fire detection and alarm systems Electroacoustic.

Expert services lightning protection, electrical engineering and safety lighting systems.

Expert services smoke and heat extraction systems.

Expert services Ventilation (HVAC) systems.

Expert services elevator / conveyor systems.

Experts benefits extinguishing systems (gas or water bound).

Expert services Security services.

Expert services broadcast van.

Shoring and repair of demarcation pillars Spree-Neisse district

Landesvermessung und Geobasisinformation Brandenburg | Published March 10, 2017  -  Deadline May 8, 2017
cpvs
45000000

Shoring and repair demarcation pillars Spree-Neisse district construction

WA South 8.1 - Construction of multi-family dwellings, holiday Gertrud-Straße 2, 4, 6, 8, 14469 Potsdam - Spaces

ProPotsdam GmbH | Published April 13, 2017  -  Deadline May 15, 2017
cpvs
45112700, 45112710

Lot 13 Metal

KIS-Kommunaler Immobilien Service Landeshauptstadt Potsdam | Published April 10, 2017  -  Deadline May 9, 2017
cpvs
45200000, 45400000, 45440000, 45450000

Lot 13 - Metal - Various awnings made of steel / stainless steel (4 pieces) - stair handrails and - other metal and steel construction

Electrical fitting work

ProPotsdam GmbH | Published April 15, 2017  -  Deadline May 16, 2017
cpvs
45311200, 45311000, 45315100, 45315000

The planned modernization and repair work carried out in the uninhabited state.

The buildings were constructed in time typical solid and composite construction with a gable roof.

During the construction of the new main power supply system, all Sunrises get a new main potential compensation with connection of all metallic supply pipe systems.

Construction of five residential buildings with 165 WE, WA 3.1 and 3.2, 14469 Potsdam - electric & telecommunications; Equipment Electrical & Telecommunications in outdoor installations

ProPotsdam GmbH | Published March 22, 2017  -  Deadline April 28, 2017
cpvs
45315100, 45315300, 45314000, 31321000, 45311000

Term contract high and low voltage works

Klinikum Ernst von Bergmann gGmbH | Published March 31, 2017  -  Deadline May 22, 2017
cpvs
45311200, 45312100, 45312310, 45314310, 45314320, 45315100, 45315300, 45315500, 45315600, 45316100

Term contract high and low voltage works high and low voltage services for the period of two years - mostly repair work - individual rooms, part workspaces stations. Changing locations within the locations of the hospital: disassembly, assembly, repair and repair of electrical equipment to 1 kV; Disassembly, assembly, repair and repair of cable systems up to 10 kV; Disassembly, assembly, repair and repairs of low power-plants (BMA, DK network, telecommunications network, SRA). Each contract, the Contractor shall, on the basis of its offer, which he elaborated on the terms of the contract and the time must be confirmed by the client. The immediate proximity to medical work areas and stations requires consideration (no odor, dust and noise pollution), especially during the rest of the patients. Only the immediate construction area for each phase of construction is pulled free. This requires consideration by the contractor ahead and bring temporal restrictions on noisy and dust-generating work with it (eg. As chiseling and drilling 15:30 to 7:30), construction of dust barriers and appointments in the assembly of the supply lines, entry and exit to the site via fixed paths, etc.).

Wall-papering work

ProPotsdam GmbH | Published April 15, 2017  -  Deadline May 4, 2017
cpvs
45432220, 44812400, 45442110

ProPotsdam GmbH intends extensive modernization and repair work on the existing listed buildings. The settlement Brauhausberg is located at the south of the city of Potsdam. Owned by the ProPotsdam are 6 residential buildings with a total of three large courtyards. The building structure form a stylistic ensemble in their basic shapes and the exterior design (roof, facade, building entrances). The roof design is made diagonally sloping surfaces in saddle and hipped roof design. Roof areas are partially used for residential purposes. The construction of the residential complex was carried out in the 1930s. A partial new construction / reconstruction of buildings (BHB 32-35, 30-31 BHB, BHB 28) at the beginning of the 1950s was required due to war damage. The buildings are built in masonry-solid construction with wood-beamed ceilings and cap / steel stone ceilings (in some areas). They consist of 2 to 4 upper floors and a basement.

By necessary slot work for the renewal of the electrical and tile work, a complete painter regular renewal of wall and ceiling surfaces is necessary. The execution takes place in woodchip wallpaper on walls with white emulsion paint on walls. Ceiling obtain a dispersion paint. The design of the staircases incl. The flights of stairs and railings is based on historical models.

Landscaping work for green areas

ProPotsdam GmbH | Published April 14, 2017  -  Deadline May 15, 2017
cpvs
45112710, 45112700

The construction project consists of the construction of two four-storey

Apartment buildings on a common parking in Potsdam, district Bornstedt. The apartment buildings are planned as a compact, rectangular cube with a flat roof. Into the building loggias are cut at the corners. are the two apartment buildings

each rotated 90 °.

Scope:

Elimination of residual vegetation, Bodenab- and order,

Production of motor vehicle parking spaces made of concrete pavement

with lawn joints, FW-access with concrete paving and gravel turf, TG down granite-free patches, accessible areas with concrete paving stones in different formats. Construction of 3 sidewalk crossings. The eaves flashing on buildings made from natural stone grit. The drainage of roof areas and

Traffic areas is done on site piped in existing deep wells. Smaller paved areas be dewatered in turf and vegetation areas. Planting of trees, the plant from seed and lawns, partly on eaves surfaces, incl. Completion, and development care.

Features include:

Mast, wall and recessed lighting, 2 lockable garbage and bike rentals, bike racks, bollards, sand play area, play area,

Fall protection from wood chips, seat walls with wooden coverings, garden gates and signage.

Installation of doors and windows

ProPotsdam GmbH | Published April 14, 2017  -  Deadline May 2, 2017
cpvs
45421130, 45421110, 45421100

The ProPotsdam GmbH intends extensive modernization and repair work on the existing listed buildings. The settlement Brauhausberg is located at the south of the city of Potsdam. Owned by the ProPotsdam GmbH are 6 residential buildings with a total of three large courtyards. The building structure form a stylistic ensemble in their basic shapes and the exterior design (roof, facade, building entrances). The roof design is made diagonally sloping surfaces in the saddle and hipped roof design. Roof areas are partially used for residential purposes.

The construction of the residential complex was carried out in the 1930s. A partial new construction / reconstruction of buildings at the beginning of the 1950s was required due to war damage.

The buildings are built in masonry-solid construction with wood-beamed ceilings and cap / steel stone ceilings (in some areas). They consist of 2 to 4 upper floors and a basement.

Carpentry work:

- Renewal / Revision window elements,

- Revision of home and apartment front doors,

- repair / renovation Wohnungseingangs- / interior doors,

- Revision of wooden stairs.

Free system planning in accordance with §§ 38-40 of HOAI 2013 for the construction of rental on a partial area of ​​the land Gemarkung Potsdam, hall 7, plot 80 in 14473 Potsdam

ProPotsdam GmbH | Published April 12, 2017  -  Deadline May 11, 2017
cpvs
71420000, 71222000, 71200000, 71240000

B1505G Masonry

Helmholtz-Zentrum Potsdam Deutsches GeoForschungsZentrum GFZ | Published April 4, 2017  -  Deadline May 2, 2017
cpvs
45262500

MASON WORKING construction projects. The development of the land Albert Einstein Str 42-46 consists of a three-storey masonry building from the 1950s with an attic and 1,636 sqm of usable space (House A) and a three-storey built in 1993 in timber panel construction building with about 968 m² area (house B) together, both of which a major overhaul and the new use conditions to be adjusted. Scope: Restoration of about 36 m² masonry and concrete surfaces as well as production of approximately 10 m³ masonry in small quantities of gas concrete, vertically perforated bricks and sand-lime bricks, about 8 openings in new and existing walls, about 31 core drilling, wall and ceiling openings, as well as ca. 100 m slots including closure

Architectural and related services

ProPotsdam GmbH | Published April 13, 2017  -  Deadline May 11, 2017
cpvs
71200000, 71240000, 71420000, 71222000

Just off at Heinrich-Mann-Allee subarea the establishment of a five-storey building is among other things provided for commercial and office use.

It is planned to apply for public funding for a portion of the construction project.

In conjunction with a high urban and open space and architectural quality buildings and open spaces are to meet the current and future use expectations in functional, economic and energetic way and be an example of the current requirements of sustainability requirements.

105 euros per square meter outer contact surface.) In light of the required profitability targets these costs represent the cost ceiling is as to be agreed nature of the free plant design.

Benefits are granted according to HOAI (2013).

Provision of planning services:

Quarter 2017th

Quarter 2018th

Quarter of 2018 (building construction).

In the planning and execution is attached great importance to sustainability and efficiency in the manufacturing, operating and maintenance costs.

Structural shell work

Propotsdam GmbH | Published April 15, 2017  -  Deadline May 12, 2017
cpvs
45223220, 45262500, 45262300, 45111100, 45262670, 45262690, 45320000, 45324000

The object is a residential complex built in the 1930s. After modernization and repair to 58 modern residential units are to be distributed to the six sunrises. The planned modernization and repair work carried out in the uninhabited state. The houses in the Großbeerenstraße 155/157 possess plus four full floors attic. the houses in the Green Street 2, 4,6 and 8 have plus a total of three full floors.

Attic on. The buildings were constructed in time typical solid and composite construction with a gable roof.

The extended shell work includes among others:

- site equipment;

- Demolition work;

- earthworks;

- Sealing work;

- brick, concrete and steel construction;

- carpentry work;

- locksmithing;

- Metallverschläge;

- see LV.

Balcony work

ProPotsdam GmbH | Published April 14, 2017  -  Deadline May 12, 2017
cpvs
45262900

The object is a residential complex built in the 1930s. After modernization and repair to 58 modern residential units are to be distributed to the six sunrises. The planned modernization and repair work carried out in the uninhabited state. The houses in the Großbeerenstraße 155/157 possess plus four full floors attic. the houses in the Green Street 2, 4,6 and 8 have plus a total of three full floors.

Attic on. The buildings were constructed in time typical solid and composite construction with a gable roof.

The measure balcony work includes:

Creating a verifiable static as well as carrying out the engineering and structural calculations. be road and facing courtyard new single and double balcony towers as aluminum construction

built and tied back with MW exterior walls. The

Double balconies are equipped with a privacy screen.