Lot B-05 - Room service with steel construction 2. BA (16A20321)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Bautzen | Published August 22, 2016  -  Deadline July 14, 2017
cpvs

16A20321 - Zimmerer services with building construction deconstruction of support structures and temporary flooring, remove approximately 165m² beamed ceilings partially or completely, renew ca. 1150m timbered woods, renew ca. 210m ceiling beams or supplement rehabilitate about 42 pieces ceiling beam heads, about 205m² false floors manufactured from salvaged and installing new plug-Bohlen, approximately 240m² Lehmschüttung new, 300m² floor structure made of OSB panels, joists, mineral fiber insulation and roughcast boards, about 40m ceiling coating of BSH, 14 pieces Wall-blasting works retrospectively finished roof, repaired 2 pieces interior wooden stairs, ca . 2.0t steel profiles as stiffening of masonry and timbered walls installing incl. preparation of the compounds

Lot 3 - metal construction (16A50308)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published August 5, 2016  -  Deadline May 26, 2017
cpvs

Vergabenummer 16 A 50308: Construction of a car wash as a reinforced concrete structure with solid supports and bars as WU-construction. Area is 15,50m x 8,80m. Roof as a flat roof with eaves 6,05m and 6,50m Ridge height. Technology Cultivation Area 10,61 x 5,74m than masonry structure with a flat roof eaves 3,52m and 3,78m Ridge height. Roof structure in reinforced concrete. The outer walls of the hall received a ventilated corrugated metal wall cladding consisting of sub-structure, mineral wool insulation and trapezoidal sheet-weather shell. In cultivation, the inputs should be reconsidered. - 200 m² trapezoidal sheet cladding weather shell wall; - 2 pieces porches.

Expansion TH side wing construction of a passenger lift system

Immobilien Bremen, Anstalt des öffentlichen Rechts | Published August 15, 2016  -  Deadline April 28, 2017
cpvs

It is a MRL (Maschienen Space Loser) to install cable lift ind an on-site elevator shaft (reinforced concrete). Data: Capacity 630 Kg, 3 stops (one side), conveying height ca. 6,2m, speed 1.0 m / s

LVR-Klinik Langenfeld, construction of a new branch in Solingen

LVR - Fachbereich 24 Gebäude- und Liegenschaftsmanagement | Published September 9, 2015  -  Deadline December 29, 2017
cpvs

Main: 42653 Solingen, Frankenstraße 31a NUTS code:

Gießener Straße - construction of a bike trail [BL030] (66-2016-00057)

Stadt Frankfurt am Main, Amt für Straßenbau und Erschließung | Published August 5, 2016  -  Deadline October 13, 2017
cpvs

2,000 m yellow marking produce approximately 1,000 m² Building lot free up approximately 13,000 m² asphalt pavement break or milling about 4,500 m² of concrete pavement break 3.500 m³ excavated 150 m supply cables about 450 meters channel DN 300 / DN rehabilitate 150 ca . 4,000 m² asphalt inclusion produce approximately 9,500 m² asphalt surface installing approximately 3,000 m² of concrete pavement embarrassed about 1,800 St floor indicators embarrassed about 5,300 m mark produce about 2 St LSA precast manholes set or implement 400m induction loops produced approximately 7 St ATA precast manholes put embarrassed 50m cable protection pipes

LVR-Klinik Langenfeld, construction of a new station building for 144 beds

LVR - Fachbereich 24 Gebäude- und Liegenschaftsmanagement | Published September 8, 2015  -  Deadline August 25, 2017
cpvs

Main site:. 40764 Langenfeld, Kölner Str 82 NUTS code: DEA1C

Setting up a Doppelwellenzerkleinerers GW 210 [BL015] (68-2016-00083)

Stadtentwässerung | Published August 3, 2016  -  Deadline April 28, 2017
cpvs

Mechanical Engineering / Pipeline construction

Fences 2016-2017 (UBB 2016-0032)

Umweltbetrieb Bremen | Published September 8, 2016  -  Deadline October 16, 2017
cpvs

Fence construction by individual orders in 5 districts

Refurbished PA and lightning protection, dressing area center (BRW GB2-2016-0105)

Bergisch-Rheinischer Wasserverband | Published August 10, 2016  -  Deadline June 27, 2017
cpvs

Renovation, extension or new construction of lightning protection and potential equalization systems

Overall optimization and restructuring of the group WWTP Burg (WV-2016-0040)

Wupperverband | Published August 3, 2016  -  Deadline December 31, 2017
cpvs

Public Works, construction works, concrete cutting work, machine technical renovation, renewal EI

Renewal BW 38b [BL030] (66-2016-00064)

Stadt Frankfurt am Main, Amt für Straßenbau und Erschließung | Published September 9, 2016  -  Deadline July 21, 2017
cpvs

- Technical work (stability analyzes, measurement, evidence etc.) - dismantling traffic areas, demolition construction - drainage, stream diversion - related work drinking water, power line - construction building - concrete work, sealing, joints, fittings, railings - renewal roadway, sidewalks (asphalt, pavement )

HW 108 Franz Schubert Road (FB 66-B-037/2016)

Stadt Halle (Saale), Fachbereich Recht, Team Vergabe Bauleistungen/Bauplanungen | Published August 3, 2016  -  Deadline July 17, 2017
cpvs

Road • site equipment, traffic safety • Pick up approximately 2,000 m² paved road surface and restore • of which accommodate approximately 350 sqm of granite slabs and store • Pick up approx 260 m natural stone curb and installing again, • 900 m² asphalt base and establish cover layer, including . HGT-layer • 700 m³ excavated soil with waste • processing of natural stone materials • renewal of road drainage with drain and gutter. Sewer • ca. 207 m Ersatzneubau DN 250 Stz • Replacement construction of 3 wells • Substitution of 11 Land connection channels • Roadworks storm sewer • approx 12 m Ersatzneubau DN 300 Stz • approx 17 m Ersatzneubau DN 350 Stz • approx 88 m Ersatzneubau DN 400 Stz • about 53 m Ersatzneubau DN 450 Stz • replacement construction of 7 wells • Substitution of 17 land connection channels • road construction

Constructional Trockenbauarbeiten 2016 - 2020 (DW 16 / 07:14)

Deutsche Welle | Published August 5, 2016  -  Deadline November 20, 2020
cpvs

according Leistungsverzeichnis

Basic cleaning, V0855 / 2016 Klinikum Bremen-Mitte gGmbH, Tei (V0855 / 2016)

Gesundheit Nord gGmbH | Published September 9, 2016  -  Deadline April 30, 2017
cpvs

Approximately 9,800 m² - QN3 - room cleaning (incl. Doors / Built- / bull bar) Ca. 1,400 m² - QN3 - after construction window Ca. 3,170 m² - QN2 -. Room cleaning incl doors Ca. 1,040 m² - QN2 - cleaning sunshade devices (venetian blinds)

ELT + FM Installation (16A30208)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Chemnitz | Published August 4, 2016  -  Deadline May 31, 2017
cpvs

16 A 30208 AG Freiberg: - 1 St. NSHV; - 3 St. UV; - 12 km ELT cable; - 8 km BMA cable; - 600 St. INSTALL.-requisites; - 2,000 m laying systems, breakthroughs, fire barriers; - 280 lights; - 1 St. BMZ; - 80 detectors; - 1 St. RPS; - 2 St. DV cabinets; - 10 km Cat.7 cable, mains for construction / Baubeleuchtungsanlage.

Framework agreement engineering August 2016 [BL030] (16-2016-00002)

Amt für Informations- und Kommunikationstechnik | Published August 12, 2016  -  Deadline July 3, 2017
cpvs

It is a framework agreement for telecommunication cable installation at the municipal telecommunications cable network. Herein included are repair and maintenance work throughout the city Frankfurt. We point out that this performance for a framework agreement for Entstörung- and repair work to be awarded under this call for a public tender on the basis of. Essentially it is in this work to building maintenance works and removal of interference, in which also the work may in assembly pits. Work will be responsible, each as needed. The use and the number of necessary construction and installation teams are determined by the particular need. The requirement of the construction or installation crews made by telephone, by e-mail or fax. Commitment is required to a lesser extent outside of regular working hours. In the case of urgent work (eg removal of interference), the insert-column is required to report on the construction site within 2 hours as requested by the AG. A more detailed description can be obtained with the specifications.

Bauhauptleistungen (16A20281)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Bautzen | Published August 3, 2016  -  Deadline June 23, 2017
cpvs

16A20281 - Bauhauptleistungen - 44 m³ demolition walls, brick - 140 m² Demolition floor construction including base plate -. 110 m² walls, brick - 210 m² floor plate - 256 m² concrete walls, exposed concrete SB4 - 4 pcs precast columns concrete SB4 - 100 m² filigree floor concrete SB4 - 1 pcs precast concrete stairs SB4 -. 5 m² replacement natural stone base including Sockelgesims - 210 m² seal, horizontal - 120 m² seal vertically -. 280 m² Putzarbeiten including EIFS

Road and canal construction; Shellac Street 2. BA (UEST-2016-0014)

Sondervermögen Überseestadt c/o -Wirtschaftsförderung Bremen GmbH | Published September 1, 2016  -  Deadline May 31, 2017
cpvs

Creation of shellac Street 2nd phase, Bremen. 130 m high-board set, producing about 200 m2 paved areas, producing about 85 m2 concrete carriageway, producing about 450 m2 asphalt layers, producing approximately 52 m angle brackets, producing approximately 45 m steel pipe railing, about 110 meters channel (URib) establish

Construction of a 3-class primary school with Single gymnasium and day care

Stadt Frankfurt am Main, Hochbauamt | Published March 2, 2016  -  Deadline April 30, 2018
cpvs

Main: Frankfurt NUTS code: DE712

Earthworks, concrete and masonry work (2016/311)

Stadt Ludwigshafen, Bereich Gebäudemanagement | Published September 7, 2016  -  Deadline June 15, 2017
cpvs

Volume up: The expansion of daycare Ebert Park is a two-storey building with approximately 8400 cubic meters of enclosed space. It runs as a solid construction with EIFS. The foundation of the new building is done as shallow foundation with base plate, the external walls and the internal walls are made of masonry and reinforced concrete according to static dimensioning. The floors and the staircases will be implemented as a reinforced concrete structure. The roof structure as a massive flat roof planned. The tender includes not only the earth, concrete and masonry, also the site equipment.