Call +44 800 9755 164

Public tenders for construction in Munich Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Staatliches Bauamt München 1 | Published April 13, 2017
cpvs
45000000, 45200000, 45210000, 45300000, 45310000, 45320000, 45330000, 45350000, 45400000, 45410000, 45430000, 45440000, 45450000, 45500000

It is the measure, the main building of a former barracks from the year 1935th

The construction project includes the following areas in the basement: north, east, and south wing of the four wings.

Replace ceiling renovation, pollutants, base plate, replace walls: the main measures

Exchange of technology -heating, ventilation plumbing, insulation, electrical, plumbing, MSR, fire protection.

Construction, pollution, technology and electric HIs.

Construction work

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V. | Published April 21, 2017
cpvs
45000000, 45214610, 45214600, 45214630, 45213150

Construction work for the Fraunhofer Institute ISC HTL in Bayreuth.

Construction work

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V. | Published March 23, 2017
cpvs
45000000, 45214610, 45214600, 45214630, 45213150

Award of construction contracts for the Fraunhofer Institute IWM in Freiburg, extension 2. BA.

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published April 15, 2017  -  Deadline May 16, 2017
cpvs
71000000

Structural design in accordance with § 51 HOAI phases 2 - 6, for the construction of sports tract and the expansion of the primary school in the Amphionpark Welzenbachstraße 12, 80992 Munich.

Structural design in accordance with § 51 HOAI, phases 2 - 6, for the following plans:

The city of Munich intends to tear down the existing and the construction of a new sport tract with 2-fold gym, swimming pool and underground as well as the extension of the primary school Amphionpark in the Welzenbachstrasse 12, in 80992 München to 2 clusters within the school building offensive.

The new building consists of the following units:

- Primary extension to cluster 2;

- Construction of a parking garage;

- Construction of a 2-fold sports hall;

- Construction of a swimming pool.

The construction project includes the following areas:

GFA: about 4 750 m 2

BRI: about 2 850 meters 3

HNF: about 4 400 meters Second

Clinic construction work

Staatliches Bauamt München 2 | Published April 13, 2017  -  Deadline May 17, 2017
cpvs
45215130

Intending the award of benefits:

State Building Authority Munich 2;

Construction of a new portal clinic.

Place of performance: Ziemssenstr. 1, Munich.

Supply and installation of approximately 250 St. rack system made of sheet steel, stainless steel and mineral material, 200 St. appliance standard rails 40 St. foldable screen walls and about 25 St. heat radiator for toddlers.

Construction work for college buildings

Staatliches Bauamt München 2 | Published April 13, 2017  -  Deadline May 16, 2017
cpvs
45214300

Intending the award of benefits:

State Building Authority Munich 2;

Return u. Construction of the institute building u. Gymnasiums for the faculty.

Place of performance:

Munich, Connollystr. 32nd

Portion freeing of the terrain; Expansion of topsoil; Basement excavation; Shoring pile wall; Dismantling of cable systems and components of the irrigation system; Ordnance exploration.

BIM construction of five stops on the route Hergatz-Lindau

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published April 6, 2017  -  Deadline May 10, 2017
cpvs
71240000, 71320000, 71322000, 71322500, 71327000

Planning of five stops on the route Hergatz-Lindau; Renovation and new construction breakpoints Lindau Aeschach, construction of the new breakpoints Lindau Oberreitnau, Weißensberg, butcher, Hergensweiler - General planning services using the BIM methodology; Objektplanung (VA + IBW), planning of TWP and TA, planning Accompanying surveying, Faunistic planning area analysis, Lph 1-7 (8 without supervision of construction) München

Construction work for houses

Stadibau Gesellschaft für den Staatsbedienstetenwohnungsbau in Bayern mbH | Published April 11, 2017
cpvs
45211100

Builder work for the construction of flats 56 and a TG 50 plots with a GF of about 6 260 m² and a BRI of about 19 500 m³ n of conventional brick construction in Prinz-Eugen-Park.

Construction work for water and sewage pipelines

Stadtwerke München GmbH | Published April 14, 2017  -  Deadline June 1, 2017
cpvs
45231300, 45220000

Earthworks and concrete work and Großrohrleitungs- and plant construction.

Construction of a ultraviolet disinfection system in the elevated tank area Deisenhofen (UVA ZW 5 u. 6 Dh).

The accommodation of the UVA is performed in a subterranean well structure with above-ground building access, each in reinforced concrete.

Building volume shaft structure: 1 530 m 3

Building volume access Building: 240 m 3

Basement excavation: approx 4250 m 3

Reinforced concrete: ca. 725 m 3

Of underground piping Great DN 800 to DN 1600: about 120 m

Plant and pipeline construction in DN 600 to DN 1000: approximately 60 m.

Construction work for school buildings

Förderverein Freie Waldorfschule | Published March 25, 2017  -  Deadline May 4, 2017
cpvs
45214200, 45262210, 45262310, 45262500, 45212222, 45112000

BA 1:

to be used for construction work Construction of a gymnasium with administrative wing, the temporarily for classrooms (total 4 pcs) incl.

Outdoor facilities.

Building size / surface area on the ground floor: approximately 1 000 meters 2

Baufeld size with site equipment: approximately 1 600 + 900 = 2 500 m 2

- Site equipment superior;

. - Earthwork including empty pipes under the floor plate;

- Masonry (internal / external walls made of perforated bricks);

- Concrete and reinforced concrete works (foundations, floor slab, walls, ceiling / cantilevers, UZ / TS, staircases, reinforcing).

BA 1:

Work for construction of a new gymnasium with administrative wing, the temporarily for classrooms (total 4pcs) is to be used, incl. Outdoor facilities.

Building size / surface area on the ground floor: approximately 1 000 meters 2 ;

Baufeld size with site equipment: approximately 1 600 + 900 = 2 500 m 2 ,

superior 0. site equipment

1. Earthworks:

1.1 Excavation partial basement / foundation: approximately 1 000 meters 3

1.2 Basic lines: about 60 m

1.2 rough grade EC: 1 100 meters 2

2. Masonry work:

2.1 External walls HLZ 24 cm: ca. 440 m 2

2.2 interior walls HLZ 24 cm: 570m 2

3. reinforced concrete works:

3.1 floorboards d = 25 cm: approximately 1 000 meters 2

3.2 basement walls d = 25 cm: 80 m 2

3.3 Reinforced concrete walls to EC h = 9 m, d = 25/30 cm: ca. 630 m 2

3.4 Stahlbetondecken 24cm - 28cm: ca. 820 m 2

3.5 rebar Quantity: 75 t

3.6 precast concrete stairs: 3 staircases.

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published March 29, 2017  -  Deadline April 25, 2017
cpvs
71000000

HOAI, the system groups 4, 5, 6, to the power phases 2, 3, 5, 6, 8 and 9, for the project redesign of the Olympics - regatta course in Munich Oberschleissheim.

Provision of design services for the redesign (conservation and development) of Olympia - regatta course in Munich Oberschleißheim.

The total output consists of:

HOAI, the system groups 4, 5, 6, with the phases 2, 3, 5, 6, and 8. 9

- -

Depending on the version, units of use are no longer required or are to be built with different requirements new or refurbished or dismantled.

Associations):

- implementation of national / international regattas and seminars organized by the associations (no performance center);

- Construction of a new school home country;

- Renovation of the outdoor facilities of the regatta course with the aim of a modern and accessible Wettkampfstätte- open space design for an attractive leisure and recreation area with school sports facilities for the school camp.

- The construction project includes the following areas:

6000 m²

5.5 ha care measures

- -

V2 | Concentration to the local mass sports (football):

- no implementation of national / international regattas;

- Construction of a new school home country;

- Renovation of the outdoor facilities of the dismantled parts regatta course;

- open space design for an attractive leisure and recreation area with school sports facilities for the school camp;

- The construction project includes the following areas:

11,000 m²

10 ha care measures

V3 | Focusing on other uses:

- Far-reaching dismantling and conversion of Olympia - regatta course in a recreation area in accordance with the nature conservation requirements on the basis of a program to be created needs for future uses in the park

- Construction of a new school home country;

- The construction project includes the following areas:

3000 m²

36 ha design and ecological upgrades including biotopes.

- -

To consider functional units:

General: The structural facilities and leisure facilities are built as barrier-free sports facilities (according to DIN 18040) and can be combined with the sports technical requirements.

The following functional units are to be treated depending on the particular variant by alterations, new construction, renovation or partial demolition.

- Boot halls (uaBootslagerhallen, workshop buildings, toilets etc.);

- Tribune (with functional spaces for regatta);

- functional compartments (for sports clubs / courses / races);

- club room (with kitchen, terrace, etc.);

- Gym;

- caretaker's house;

- archery;

- Schullandheim (with an outdoor area);

- outdoor facilities (with school sports / Schullandheim, jetties, tents, car parks, roads system, asphalt road).

Construction work

Max-Planck-Gesellschaft e. V. | Published April 8, 2017
cpvs
45000000, 45214610

2.BA extension of the Max Planck Institute for Molecular Plant Physiology, NFa 2488 m², BGF 5167 m³, BRI 22,910 m³, 3 full floors, basement 1, reinforced concrete masonry construction.

Clinic construction work

Staatliches Bauamt München 2 | Published March 25, 2017  -  Deadline April 25, 2017
cpvs
45215130

Intending the award of benefits:

State Building Authority Munich 2;

Construction of a new portal clinic.

Place of performance:

Ziemssenstr. 1, Munich.

Manufacturing, supply and install drywall, OP-wall systems, OP-glazing and OP-sliding.

Scope:

79 m 2 Plasterboard partition F90 with radiation protection;

124 m 2 Plasterboard furring F0 with radiation protection;

393 m 2 OP-wall system, fiber cement board with HPL surface;

220 m 2 Wall heating in OP-wall system;

10 St. fixed glazing with blackout;

6 St. OP-sliding, electrically operated.

Clinic construction work

Staatliches Bauamt München 2 | Published April 13, 2017  -  Deadline May 16, 2017
cpvs
45215130

Intending the award of benefits:

State Building Authority Munich 2;

Construction of a new portal clinic.

Place of performance:

Ziemssenstr. 1, Munich.

provide Manufacture and installation of single-leaf door systems with and without requirements D, DS, T30, T30-RS, T90 and T90 RS, radiation protection, sound insulation, with and without glass cutouts:

- swing doors with Stahlblechzarge and engineered wood door panel,

- swing doors with aluminum frame and engineered wood door panel,

- sliding door systems with Stahlblechzargen and engineered wood door panel.

deliver, manufacture and installation of fixed and sliding F30 glazing.

Scope:

. Revolving doors with Stahlblechzarge 643 pcs;

. Swing doors with aluminum frame 127 pieces;

.; 53 sliding pieces

. F30-fixed glazing with wooden frame pieces 12;

F30-sliding glass with wood frame. 16 pcs.

Within the warranty period of the doors and to extend the warranty of the electrical and electronic components maintenance is advertised with.

Construction work

Helios Klinikum München West | Published April 5, 2017  -  Deadline April 27, 2017
cpvs
45000000, 45432210

Protection wall (plastic).

Delivery and laying:

about 510 m of wall protection of plastic sheets, height = approx 60-125 cm.

Construction work for pipelines, communication and power lines

Thüga Aktiengesellschaft | Published April 5, 2017
cpvs
45231000

Creating a list of qualified service providers, are selected from the candidates followed negotiated procedures referred sector regulation for the provision of construction work on distribution networks.

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published April 5, 2017  -  Deadline May 4, 2017
cpvs
71000000

Project planning gem. § 34 HOAI, LPH 2 - 9, for appreciation, fire protection and acoustic action; Project planning gem. § 34 HOAI, LPH 5-9, for open structural changes and transformations of work places;

All activities take place (Beruf- and master schools), Liebherrstraße 13, District 1, Altstadt-Lehel, Munich in the listed building stock of urban Kerschensteiner school center.

The City of Munich is planning renovation work and space structural changes in the listed building stock of urban Kerschensteiner school center for professional and master classes as part of building maintenance. The overall execution takes place during operation of the school center, divided into several with the school coordinated and appropriate construction stages.

Project planning gem. § 34 HOAI, LPH 2 - 9 for the following plans:

Upgrades, fire protection and acoustic measures

- classroom;

- optimization of escape routes;

- Compliance with fire regulations,

- appreciation.

Project planning gem. § 34 HOAI, LPH 5-9 for the following plans:

Transformation of workplaces in existing buildings:

- restoration paint store;

- Renovation spray booth;

- Renovation wood cutting.

The construction project includes the following areas:

GFA: approximately 18,900 sqm;

BRI: about 75 400 m³;

NUF: about 11 300 m².

Construction works for sewage treatment plants, purification plants and refuse incineration plants

Landeshauptstadt München, Münchner Stadtentwässerung, p. A. Baureferat | Published April 19, 2017
cpvs
45252000, 45233120

New construction of the 1st biological stage and process engineering adaptation of the 2nd biological stage in the clarification plant Gut Großlappen, Freisinger Landstraße 187, 12. Stadtbezirk Schwabing - Freimann, 80939 Munich.

BRI: about 212,680 m²,

BGF: approx. 7 084 m².

Construction work for buildings relating to exhibitions

Deutsches Museum von Meisterwerken der Naturwissenschaft und Technik (AdöR) | Published March 25, 2017
cpvs
45212310

Continuation of this notice 2016 / S 039-063063.

The implementation section 1 comprises approximately 35 000m 2 BGF, this will be in the next 12 months

posted:

Conveyor;

Busbars;

Electrical installation;

Telecommunications;

Existing façade;

Interior plaster;

Trockenbauarbeiten interior insulation;

Ventilation works;

Sprinkler / fire extinguishing systems;

Outdoor glass facades F30 window elements;

Object illumination;

Heating / cooling technology;

Sanitary equipment;

Fine locksmith;

MSR / building automation;

Insulation work / art;

Blinds work;

Schlosser-steel construction;

Schlosser glass railing;

Screed works;

Aluminum-glass facade;

Trockenbauarbeiten-acoustic elements;

Fire curtains;

Roofing;

Wooden windows;

Stucco cavity floor;

Interior glass facades;

Sheet steel / metal doors;

Trockenbauarbeiten inner walls;

Carpentry;

Blechfassade (ventilated);

Wooden doors;

Natural stone / artificial stone;

Flooring Lino;

Repainting;

furniture;

Baufeinreinigung;

Catering Equipment;

Tile work;

WC partition walls;

Locking.

Continuation of this notice 2016 / S 039-063063

The implementation section 1 comprises approximately 35 000m 2 BGF, this will be in the next 12 months

posted:

Conveyor;

Busbars;

Electrical installation;

Telecommunications;

Existing façade;

Interior plaster;

Trockenbauarbeiten interior insulation;

Ventilation works;

Sprinkler / fire extinguishing systems;

Outdoor glass facades F30 window elements;

Object illumination;

Heating / cooling technology;

Sanitary equipment;

Fine locksmith;

MSR / building automation;

Insulation work / art;

Blinds work;

Schlosser-steel construction;

Schlosser glass railing;

Screed works;

Aluminum-glass facade;

Trockenbauarbeiten-acoustic elements;

Fire curtains;

Roofing;

Wooden windows;

Stucco cavity floor;

Interior glass facades;

Sheet steel / metal doors;

Trockenbauarbeiten inner walls;

Carpentry;

Blechfassade (ventilated);

Wooden doors;

Natural stone / artificial stone;

Flooring Lino;

Repainting;

furniture;

Baufeinreinigung;

Catering Equipment;

Tile work;

WC partition walls;

Locking.

Engineering design services for the construction of civil engineering works

Flughafen München GmbH | Published April 8, 2017  -  Deadline May 12, 2017
cpvs
71322000, 71322500, 71320000, 71240000

For this purpose, to the C-module 02.5 which is adjacent to existing air traffic areas in the southeastern region, come in a timely manner for realization.

For this purpose, to the C-module 02.5 which is adjacent to existing air traffic areas in the southeastern region, come in a timely manner for realization.

The services include, among others:

140000 m 2 ;

- cable conduit systems;

Storage sewer;

- Drinking and fire water supply;

- Aviation fuel supply;

- lighting installations and rolling guide system;

- apron and exterior lighting systems;

- power supply systems (medium and low voltage systems);

- Technical security systems;

- Central control technology / building automation;

- Telecommunications and IT systems;

- construction logistics planning services.

The construction is carried out partly in the security area or adjacent to the safety area of ​​the airport.

By the general planner following planning services are to be provided:

Objektplanung Engineering (phases 3-7) in accordance with § 43 HOAI 2013 in conjunction with system 12;

Objektplanung traffic facilities (phases 3-7) in accordance with § 47 HOAI 2013 in conjunction with system 13;

Planning of structural engineering (phases 3 - 6) with reference to § 51 HOAI 2013 in conjunction with system 14;

Planning of technical equipment (phases 3-7) with reference to § 55 and HOAI 2013 in conjunction with system 15;

Planning services logistics.

The appointment is divided into the following two stages of the project:

Project Stage 1 - HOAI phases 3-5 (solid retention)

Project Stage 2 - HOAI phases 6 and 7 (Optional power demand).