Museum construction work

Deutsches Museum von Meisterwerken der Naturwissenschaften und Technik (AdöR) | Published November 17, 2016
Museum construction

Construction work

Flughafen München GmbH | Published November 26, 2016  -  Deadline December 19, 2016

Various accompanying construction works, Repair emergency measures, customer notification of loss processing and remediation maintenance work.

Various accompanying construction works, Repair emergency measures, customer notification of loss processing and remediation maintenance work of various kinds.

The workload within the airport area (about 200 buildings) in the public and non-public area is approximately 50%, in all parts of buildings and planes (3.Tiefgeschoss up to the 7th floor).

The majority power demand in the terminal zones 1 and 2 (passenger handling areas).

In the vicinity of the airport (counties Erding u. Freising) Flughafen München GmbH owns 90 leased properties and 300 buildings. These properties are mostly single and multi-family houses of building class 1-3.

The passenger handling volume in Terminal 1 is about 16 million in Terminal 2 at about 24 million passengers. Building occupants / tenants are airliners, handling agents and the authorities and any subsequent service companies of A, such as car rental, to Z, such as customs export office. To improve operations / -Optimize and ensure quality / -Nutzeransprüche renovations and minor refurbishment work or repairs are carried out continuously. The affected areas within the passenger handling area are in the public and non-public sector (approximately 50% workload) in all parts of buildings and planes.

Construction work

Staatliches Bauamt München 1 | Published December 8, 2016

Built in 1969 the service building of the "Supreme Building Authority in the Bavarian Ministry of Proposed measures:

The overall project includes the energy efficiency of the building envelope and the partial renovation and refurbishment of the electrical installation, the HVAC installations and the modernization of toilets. As part of the measure, existing fire protection deficiencies of EC are fixed to the 4th floor. As a result of construction of the buildings and the grounds incl. Underground seal to be completely replaced.

The action takes place in two phases. The section north building is finished.

During the construction of the main building rooms can still be used on the ground and must remain accessible.

Not aspects of the measure are high construction work in the area of ​​the 5th floor and in the basement.

- Site equipment,

- Protection measures

- Demolition and structural work,

- Scaffold

- Schadstoffsanierung,

- Metallbauarbeiten facade,

- Sunscreen,

- Roof sealing and plumbing works,

- Fiber concrete facade,

- Screed,

- Interior plaster,

- Trockenbauarbeiten walls / ceilings / fire / doors,

- Inner facades / interior RS-doors,

- Carpenter,

- Tiles,

- Painter,

- Anti-glare inside,

- Floor coverings,

- Natural stone works,

- Outdoor,

- Concrete repair,

- Baureinigung,

- High-voltage installation,

- Telecommunications,

- HKLS- installations (heating, air conditioning, ventilation, plumbing)

- Science of measuring and control engineering,

- Hazard detection and surveillance equipment,

- Power generation plants,

- Lightning protection systems.

Motorway construction works

Autobahndirektion Südbayern | Published December 8, 2016

Ground and ceiling construction, bridge construction, Lärmschutzwandbau, road equipment, gantries and VBA.

Ground and ceiling construction; bridge; Lärmschutzwandbau; Road equipment; Gantries and VBA.

Construction work

Studentenwerk München | Published November 18, 2016  -  Deadline December 13, 2016
Development construction site: 

Signboard with company strips 1 pc .;

Assembly line 600 m²;

Protective cover for preserving clinker outer covering 250 m².

1.2 site equipment:

Setting crane, hold, clear 2 pcs .;

up fence closed, hold, evacuate 370 m;

install safety fence steel tube frame, hold, evacuate 340 m.

Precautions:

Protective cover staircases 4 pcs .;

Wall 350 m².

1.4 Winter section:

Mobile Baubeheizung up fuel oil, hold u. Operate 3 pcs .;

Film enclosure vertically 500 m².

Bauabwasser:

Bauwasseranschluss with measuring device set u. Hold 1 pschl.

2.1 Earthworks:

. Excavation work space BK 3 + 4 u Loosen store 1240 m³;

Excavation Ground plate BK 3 + 4 Loosen, upload, promote 390 m³;

Structure backfill, compact, floor mounted seiltich 1020 m³;

Filter layer gravel-sand mixture supply u. Install 300 m².

3.1 Demolition stair towers:

2 pieces.;

95 m² 2 pcs.

3.2 Interruption improvement facilities Outside:

Pedestrian zone 123 m;

T-1 supports pschl;

6 pcs .;

Demolition Allcourt concrete composite stones 600 m².

3.3 partial demolition in stock:

Demolition bottom plate reinforced concrete, D 10 cm, 470 m² residential buildings;

Demolition bottom plate reinforced concrete, D 16 cm, underground parking 405 m²;

Demolition outer wall, 1-shell, masonry, D 20-28 cm 810 m².

3.4 Dismantling precast concrete:

Dismantling balcony / porch plates, reinforced concrete prefabricated elements, L 600 cm 48 pcs .;

Dismantling canopy panels, prefabricated reinforced concrete parts, L 600 cm 78 pcs .;

Dismantling Attica plates, reinforced concrete prefabricated elements, L 600 cm 18 pcs .;

Dismantling Kragteräger, prefabricated reinforced concrete parts, L 120 cm, Betonsägetechnik 124 pcs .;

Dismantling wall panels, prefabricated reinforced concrete parts, WxH 120x260 cm 32 pcs.

4.1 Concrete and reinforced concrete works:

Subbase C16 / 20, D 5 cm 875 m²;

Base plate, C 35/45, XC4, XD3, XF4, WF, D = 18 cm 475 m²;

Base plate, C 35/45, XC4, XD3, XF4, WA, D = 20 cm, the edge slope of 1% 405 m²;

Outer wall, StB C25 / 30, XC4, XF1, WF, D = 29 cm, SB3 190 m²;

Formwork outer wall SB 3455 m²;

Parapets, SB 482 m²;

Ceiling / pedestal plate SB3, H <3m 54 m²;

Running / pedestal plate ramp, SB 340 m².

4.2 Precast concrete:

Balcony slabs reinforced concrete precast units C35 / 45, L 598 cm 26 pcs .;

Portico boards reinforced concrete precast units C30 / 37 (LP), L 598 cm 26 pcs .;

Canopy panels reinforced concrete precast units C35 / 45, L 598 cm 78 pcs .;

Cantilever reinforced concrete precast balcony / porch, C45 / 55 - Connection stock 31 pcs .;

Cantilever reinforced concrete precast canopy, C45 / 55 - Connection stock 93 pcs .;

Attica plates reinforced concrete precast units C35 / 45, L 848 cm 14 pcs .;

End wall reinforced concrete precast units C45 / 55, WxH 122x249 (259) cm 18 pcs .;

Outer wall plates stair towers reinforced concrete precast units C35 / 45, D 15 cm, WxH 278x128 cm 12 pcs .;

490-915 cm 11 pcs .;

16.25 / 30, B 97,5cm - stair tower 10 pcs .;

Building construction work

Staatliches Bauamt München 1 | Published October 29, 2016  -  Deadline December 1, 2016
Roof sealing / plumbing works for the construction of an accommodation building for student officers at the Bundeswehr University Munich, in Neubiberg

Construction work for houses

GWG Städtische Wohnungsgesellschaft München mbH | Published November 19, 2016  -  Deadline February 8, 2017

Construction of 2 residential buildings with 6 floors in massive construction and 6 buildings with 3 storeys in timber construction, and a two-storey underground garage. Location: Munich-Hadern, Ludl-Menaristr. within an existing condominium GWG München. A total of approximately 90 units. A high degree of prefabrication possibly a complete prefabricated is required by the site conditions. The design services for project planning from the performance phase 5 in accordance with §§ 34 ff HOAI is included in the contract, as well as all other technical planning services from this phase and all works.

Construction of 2 residential buildings with 6 floors in massive construction and 6 buildings with 3 storeys in timber construction, and a two-storey underground garage. Location: Munich-Hadern, Ludl-Menaristr. within an existing condominium GWG München. A total of approximately 90 units. A high degree of prefabrication possibly a complete prefabricated is required by the site conditions. The contract includes the design services for project planning from the power stage 5 in accordance with §§ 34 ff HOAI is included in the contract, all the other professional planning services from this phase and all works.

Track construction works

Stadtwerke München GmbH | Published December 3, 2016  -  Deadline January 10, 2017

Rail and road 2017th

350 m Vignoleinzelgleis 41e1 on concrete sleepers in the ballast bed, the Trambehelfsbrücken and the remaining Verbaumaterials below the auxiliary bridges.

Gewerk track construction:

1320 m 2

660 m 2

135 m 3

400 m 3

670 m 3

560 m

Remove Soft on concrete slab: 2 pieces

Remove track intersection on concrete slab: 1 piece

Fine grading in the track area produce concrete slab: 3 470 m 2

1 210 m 3

Install Soft on concrete slab: 8

Install track intersection on concrete slab: 2 pieces

1050 m

1050 m

640 m 3

165 pieces

Gewerk road:

2 240 m 2

1325 m 2

650 m

Artificial stone panels 35/35 / 6,5 cm expand: 1 150 m 2

520 m

340 m 2

1 190 t

520 m

670 m

1750 m 2

690 m 3

1540 m 2

1200 m 2

1300 m 2

2900 m 2

230 m 2

860 m 2

860 m 2

100 m

2880 m

2880 m.

Construction project management services

Deutsches Museum von Meisterwerken der Naturwissenschaft und Technik (AdöR) | Published December 7, 2016  -  Deadline January 5, 2017

The German Museum as one of the largest science museums conveys to about 45 000m 2 Exhibition space knowledge of science and technology. Thus, the German museum views its function also can perceive in an attractive manner in the future, the German Museum is modernized in operation under the future initiative in a period from 2011 to 2025 and restored. The construction costs amount to more than 200 000 000 EUR. For this complex, to be performed during operation long-term project, which is divided into 6 subprojects and 2 implementation sections, a contract for services for project management was awarded in 2014, which had to be completed for 31/10/2016 unexpectedly. The project is located at the end of the planning phase and the beginning of the tendering phase. Some anticipation measures are already in execution. The performance must start after placing the order immediately.

Subject of this performance include (1) implementation of section 1 sub-project construction all basic services of the action areas AE in the project stage 3 -5, in accordance with § 205 AHO issue no. 9, as of May 2014 inclusive of parent coordination and control of all interfaces between the sub-projects construction , exhibitions and parades. Control planning of sampling in accordance with § 205 AHO issue no. 9, as of May 2014, the Project construction. Installation, tuning and updating of control schedules under § 205 AHO issue no. 9, as of May 2014, taking into account the current project status for the Project construction. (2) Additional parent benefits (for all 6 subprojects) by the end of RA1: Superior project communication system; Parent Project Manual; Parent reporting; The overall change management; Cost tracking overall project.

Building construction work

GWG Städtische Wohnungsgesellschaft München mbH | Published December 6, 2016  -  Deadline January 12, 2017

Window Works.

New construction of an apartment building with 44 residential units.

Building construction work

GWG Städtische Wohnungsgesellschaft München mbH | Published December 6, 2016  -  Deadline January 12, 2017

Metal roof.

New construction of an apartment building with 44 residential units.

Construction work for research buildings

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V. | Published November 30, 2016

Fraunhofer IPM Freiburg building new dikes Institute building: 018/755 788th

It is planned the construction of a new building for the Fraunhofer Institute of Physical Measurement Techniques (IPM) in Freiburg. The new building will be constructed near the existing institute building on the university campus in the north of Freiburg in the direct vicinity of the new stadium and the airport. The new building will be built on part of the parcel 6256/19, district Freiburg. The IPM requires spaces for offices, administration, mainly physical but also chemical laboratories, workshops and a two-storey technical center. Furthermore, a cafeteria, foyer and conference rooms are provided, which shall be publicly accessible. Flooring includes 7 300m 2 , It is a building with about 40m in width and 100m in length on 15 000m 2 BGFA summarized. It is divided into 3 parts with courtyard. The building is fully built.

It is intended to advertise to individual trades.

Construction project management services

Flughafen München GmbH | Published November 18, 2016  -  Deadline January 12, 2017

Project description:

Due to the intended use of this area, it is necessary to the existing infrastructure of the existing supply and disposal lines to expand.

See II.2.4).

A) Project description:

Due to the intended use of this area, it is necessary to the existing infrastructure of the existing supply and disposal lines to expand.

The contractor will advise the client with respect to the property, adequate allocation strategy.

b) subject of performance

The by project managers overall to accompanying services of a general contractor (Bauabschnitt BA 0) and services of general designer (BA I - BA V) primarily include planning and implementation services of the following trades:

- Engineering structures;

- Transport systems;

- Structural engineering;

- Cable and pipe laying;

- Decommissioning of facilities;

- Construction logistics;

- Site planning.

SiGeKo services to commission separately.

These relate to all essential building trades of civil engineering, to the interfaces of the trades of the respective property development.

VI.3 l) of this notice excluded.

d) Further details about the project or to complement the advertised performance, refer to the tender documents, which are transmitted to the successful candidates.

Construction work for school buildings

Erzdiözese München und Freising KdöR | Published December 3, 2016  -  Deadline January 18, 2017

General repair of a monastery building of about 1695 in 3 phases with the following single craft of the 3rd phase of construction: Landschaftsbauarbeiten 2 (7:10 school entrance).

Car park building construction work

Staatliches Bauamt München 2 | Published November 18, 2016  -  Deadline December 20, 2016

Intending the award of benefits:

State Building Authority Munich. 2

Construction phase, ES-3

Place of performance: On Coulombwall, 85748 Garching

The technical development of technology-basement (heavy duty station) takes place on site.

Cladding, and the planning and execution of construction partially the structural works for the new heavy-duty station in the basement of Parkhaueses.

The planning and implementation of the expanded carcass of heavy duty station has to be based on a tendering accompanying preliminary design, with simple system-dependent adjustments in the plan in response to be given by the contractor preliminary design for the parking deck are possible.

Special importance is placed on the implementation of the requirement according to the functional specifications additional cladding of the building by means of vertical, color powder coated, AL-flat profiles.

The grounds are not part of the services provided by the general contractor, which supply and disposal connections within the plot area are in parts according to the specifications of functional specifications in the capacity of general contractor.

The client reserves the right to the (FLB) implement the functional specifications given façade of P7 by renewed Award also in the future parking garages on campus.

To be delivered with the offer of proof to the selection criteria of the bidder, specified in the contract documents (FLB) is explicitly mentioned.

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published November 16, 2016  -  Deadline December 13, 2016

Structural design in accordance with § 51 HOAI, LPH. 2-6, for the new depot road maintenance district center and parking management.

Construction of a new depot with a heated and unheated warehouse, a vehicle depot, free warehouse, storage boxes, heating system and a social building with canteen and caretaker's house.

The construction project includes the following areas:

GFA: about 6 500m 2

BRI: approximately 31 000 m 3

HNF: about 6 450m . 2

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published November 23, 2016  -  Deadline January 10, 2017

Objektplanung gem. § 34 HOAI, Phases 6-9, Schulzentrum Pfarrer-Grimm-Straße (Städt. Louise-Schroeder-Gymnasium), Munich.

Expansion of prev. 2 div. Recreation hall by enclosing a currently landscaped courtyard (demolition of the courtyard surrounding facade, construction of a glass roof, a floor construction, modernization of enclosing corridor areas). Expansion of the auditorium and the music hall by demolition of the existing facade and new construction of an offset to the outside facade. Modernization of equipment and technology of the auditorium and the music hall, incl. Alterations. Renovation of the ventilation system of the auditorium. Asbestos removal of certain roof areas. Renewal of the tiled floor throughout the EC.

Objektplanung gem. § 34 HOAI, Phases 6-9, Schulzentrum Pfarrer-Grimm-Straße (Städt. Louise-Schroeder-Gymnasium), Munich

The construction project includes the following areas / volumes

BGF extension recreation hall (. Former courtyard): ca. 159 m 2

BRI extension recreation hall (former courtyard.): 1 307 m 3

NGF extension recreation hall (. Former courtyard): ca. 159 m 2

BGF recreation hall Total: 1 162 m 2

BRI total recreation hall: approximately 6 488 m 3

NGF recreation hall Total: 1 113 m 2

BGF Hall / music hall total :: ca. 502 m 2

BRI Aula / music hall total: ca. 1972 m 3

NGF Aula / music hall total: ca. 477 m 2

F to renewing tile floor on the ground floor: approximately 450 m . 2

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published December 7, 2016  -  Deadline January 10, 2017
All design services are on the performance phases 1-4 execute (execution of the service Phase 4 in parts). 

The in operation since 1997 sludge incineration plant of the clarification plant Gut Großlappen has a fundamental need for renewal.

Continued II.2.14) Additional information.

Planning of a new sludge incineration plant with fluidized bed furnace and associated flue gas cleaning with upstream sludge dewatering and drying as well as all necessary ancillary facilities at WWTP Good Großlappen in the work phases 1 to 4 (performance of services Phase 4 in parts).

After the award to the JV the system concept proposed must be incorporated into the frame design.

The contract also includes consultancy services in the further process course to support the client in execution and settlement of the construction process and consulting services for geotechnics, in the form of soil and foundation report and fire protection certification.

The knowledge gained in the course of planning results in an advantage to be compensated under the tender for the general contractor and other project management.

Architectural, construction, engineering and inspection services

Innung für Elektro- und Informationstechnik München | Published November 19, 2016  -  Deadline December 19, 2016

The Guild for electrical and information technology Munich awards the achievements Objektplanung building LPH 1-5 HOAI § 34 and Objektplanung Freianlagen LPH 1-5 HOAI § 39 for the construction of the training center in Munich-Riem.

The facilities planning is not part of the order, this will be awarded separately at a specialist's office.

The facilities planning is not part of the order, this will be awarded separately at a specialist's office.

An already approved by the funding provider space and function program is available to the client.

In planning points of ecological criteria catalog of the City of Munich should be observed.

The designed for that purpose and tailored to the requirements of use concept is based on an outline of the workshops and classrooms the following functional areas:

- Reception, course presentation, management, catering supplies;

- Workshops, practical lessons;

- Specialized theoretical lessons;

- Underground car park.

For the plot a supply is provided by district heating.

The cost limit is the basis for the subsequent approval of the grant giver.

The outdoor areas are to be planned according to the specifications of the development plan.

Construction work for multi-dwelling buildings and individual houses

GWG Städtische Wohnungsgesellschaft München mbH | Published December 3, 2016  -  Deadline January 20, 2017

Construction of a residential development consisting of three 4-storey buildings with 80 apartments in subsidized housing (EOF) and 2 underground garages with 64 underground parking spaces. The living area is approximately 5090 m 2 And the constructed area incl. Basement about 28 900 m 3 , The gross floor area of ​​approximately 1 660 m underground 2 ,

Excavation and shoring.

Excavation and shoring.

Shoring: pile wall about 850 m 2 ;

Excavation for excavation: approximately 14 500 meters 3 ,