Call +44 800 9755 164

Public tenders for construction in Mainz Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

LBB Niederlassung Mainz | Published January 18, 2017  -  Deadline February 21, 2017

Demolition / structural work 2. BA.

Vergabeunterlagen can be downloaded for free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 01.18.2017 until the end of the offer period down. For applicable terms and conditions of procurement marketplace.

Clinic construction work

Universitätsmedizin Joh.-Gutenberg-Univ. | Published December 2, 2016  -  Deadline January 18, 2017

facades

Vergabeunterlagen can be loaded by the end of the offer period downloaded for free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 12.03.2016. For applicable terms and conditions of procurement marketplace.

Construction work for university buildings

Universitätsmedizin Joh.-Gutenberg-Univ. | Published December 3, 2016  -  Deadline January 19, 2017

Roofing.

Vergabeunterlagen can be loaded by the end of the offer period downloaded for free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 12.03.2016. For applicable terms and conditions of procurement marketplace.

Restoration water supply line in SZ1

Zweites Deutsches Fernsehen | Published December 9, 2016
Construction project 1 - supply channel

Metalworking

ZDF, Zweites Deutsches Fernsehen, Anstalt des Öffentlichen Rechts, Hauptabteilung Rechtemanagement und Zentraleinkauf, Abt. Produktions-, Verwaltungs- und Baueinkauf, Vergabenummer: ZDF-170-OV-16-007 | Published January 4, 2017

Project: Fire Restoration Administration Building ZDF Mainz - main measure

The administrative building of the ZDF in Mainz has to be upgraded fire protection. The overall measure is in 16 phases (office floors) from October 2017 - executed in December 2020. The construction phase 45 working days are provided.

Subsection: 331-2-1 - Metallbauarbeiten

The nature and extent of the services:

dismantle and dispose of approximately 200 ST Steel doors

supply and install 200 St fire / smoke protection steel doors

ds to T90 RS, 1 - 2 flg.

dismantle and dispose of about 2 St frame doors

deliver approximately 2 St frame doors and mount - RS and T30

20 St inventory steel doors revise (adjust, service)

Performance dates:

Start implementation: October 2017

End execution: December 2020

Execution flow: 16 construction phases (office floors)

45 days for each stage of construction

Place of performance: ZDF Administration Building, Mainz-Lerchenberg.

Architectural, engineering and planning services

Stadtverwaltung Mainz Abt. Vergabe und Einkauf | Published January 18, 2017  -  Deadline February 14, 2017

Objektplanung buildings - Energy renovation of cultural home Mainz-Weisenau (KI 3.0 measure) The Kulturheim Weisenau was built in 1949 by the cultural community Mainz-Weisenau e. V.. The complex consists of a two-storey building with a gabled roof at the Friedrich-Ebert-Straße and an adjoining hall building and a sports hall. Downstairs at the Friedrich-Ebert-School is a restaurant with adjoining rooms. On the 1st floor there is a club room, including sections of the hall and gallery in the attic, a caretaker's house and staff quarters. The buildings have been recently modernized 1977th The building is to be energetically renovated and upgraded fire protection. Under the measures, the barrier-free access to the building is to be prepared. The measure is sponsored by the federal government, and the state of Rhineland-Palatinate in part. A neighboring property can eingepla for infrastructural measures in the context of the reorganization measure.

The total cost of the construction project are estimated at around 3 million EUR gross. It is intended the work phases 1 to 9 object planning building HOAI 2013 part to forgive 3 section. 1

A present condition diagnosis and fire protection analysis determine the structural conditions and can be used as part of the further planning as a basis.

The building is to build barrier-free and energy in accordance with the passive house standard.

The appointment is in stages - first to the power stage 4 - and no legal claim on the commissioning of all work phases or power units based on the corresponding model contract.

Since there is a 3.0 KI measure funded by federal and state funds, the guidelines and restrictions contained in the grant and approval notice must be observed.

  • 1