Call +44 800 9755 164

Public tenders for construction in Mainz Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Kraftwerke Mainz-Wiesbaden AG | Published February 3, 2017  -  Deadline March 6, 2017
cpvs
45000000, 44000000, 42000000, 31000000

Provision of supplies and services for the contract works (excl construction main trade union. Construction preparation) at a thermal storage system consisting of 2 heat storage and 2 Volumenausgleichs- u. Nitrogen tanks at site Ingelheimer Aue in Mainz.

Subject of procurement are entitled to provide the contract works (building main Gewerk excl. Construction preparation) required supplies and services for the construction of a thermal storage system. This complex consists of 2 heat storage with 4 000 m 3 Net capacity and a diameter of about 12 m, 2 volume expansion tanks each with 265 m 3 Net capacity and a diameter of max. 6 m, and two nitrogen tanks with a diameter of 3.5 m and a height of 6 m. The services include the foundations of 2 heat storage means of piling and foundation, which foundation of 2 volumes of reservoirs and 2 nitrogen tanks, the construction of the premises with the necessary heating, cooling, ventilation devices and the smoke heat extraction systems, without the electrical installation (other than HVAC systems up to and including cabinet) and lighting, the establishment of the foundations and the steel structure for the pipeline route of a cogeneration (CHP) for heat storage and the necessary roads and fortified places and connecting the drainage to the existing drainage systems.

The subject of this notice forming receivable are as Los 9 part of the project to implement a heat storage facility on the premises of the client at the power plant site Ingelheimer Aue in Mainz.

Office block construction work

Zweites Deutsches Fernsehen | Published May 11, 2017  -  Deadline June 13, 2017
cpvs
45213150

Construction project: fire protection renovation Verwaltungshochhaus ZDF Mainz? Main measure.

The administrative center of ZDF in Mainz has to be upgraded by fire protection. The total measure will be in 16 construction sections (office days) from October 2017? December 2020. 45 working days are planned for each construction phase.

Construction project: fire protection renovation Verwaltungshochhaus ZDF Mainz,

main measures

Work: 325-2-1 - screed work

Nature and scope of services:

Approx. 960 m 2 ZE 7 cm Removal of floor screeds and renewal in individual areas approx. 30 m 2

Approx. 360 m 2 ZE 7 cm supplement in small areas

Approx. 150 m 2 ZE 7 cm Replace defective parts

Approx. 300 m building joint ZE 7 cm cut open, grout joint with

Fire protection cord and joint profile, screed

Approx. 200 pcs. Work fire protection doors

Approx. 125 m of screed cut and work on new chessboard

Approx. 100 m screed Cut and work on pre-coating tray GK 1.UG

Approx. 24 m screed work on MW walls 2.UG

Performance dates:

Start: October 2017

Finish: December 2020

Execution: 16 construction sections (office days)

45 working days per construction phase

Place of execution: ZDF Verwaltungshochhaus,

Mainz-Lerchenberg.

New construction KiTa, housing, regional office

Bauherrengemeinschaft Ev. Emmausgemeinde und Stiftung Nieder-Ramstädter Diakonie | Published June 9, 2017  -  Deadline July 4, 2017
cpvs

Metal construction (windows and doors)

MAINZ Goethestr. 52 Drywall construction

Wohnbau Mainz GmbH; Dr.-Martin-Luther-King-Weg 20; 55122 Mainz | Published May 26, 2017  -  Deadline June 19, 2017
cpvs

The construction project is a complete modernization of the building Goethestraße 52, Mainz-Neustadt. This is affected by all development projects.

Tramway platforms construction work

Mainzer Verkehrsgesellschaft mbH | Published January 17, 2015  -  Deadline January 30, 2015
cpvs
45234128, 45230000

The MVG plans to extend the tram network in Mainz, the so-called "Mainzelbahn". The expansion of the tram network is a new 10 km section between Hauptbahnhof / West and Lerchenberg. In addition to the construction of transportation facilities and the technical equipment of the stations is required. Portion here is the electrical equipment. The construction is to take place approximately from July 2015.

MAINZ Goethestr. 52 Metal construction work

Wohnbau Mainz GmbH; Dr.-Martin-Luther-King-Weg 20; 55122 Mainz | Published May 18, 2017  -  Deadline June 13, 2017
cpvs

The construction project is a complete modernization of the building Goethestraße 52, Mainz-Neustadt. This is affected by all internal building structures.

Laboratory building construction work

LBB Niederlassung Mainz | Published October 27, 2015
Winner
Karl Gemünden GmbH & Co. KG
cpvs
45214610

Structural work (new construction). Vergabeunterlagen can be loaded up to the opening date downloaded free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 05.06.2015. For applicable terms and conditions of procurement marketplace.

Laboratory building construction work

LBB Niederlassung Mainz | Published December 16, 2015
Winner
Lenhart Metallbau
cpvs
45214610

Metal construction - exterior doors + windows Vergabeunterlagen can be downloaded for free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 06.19.2015 until the opening date down. For applicable terms and conditions of procurement marketplace.

Laboratory building construction work

LBB Niederlassung Mainz | Published June 6, 2015  -  Deadline July 21, 2015
cpvs
45214610

Structural work (new construction) tender documents can be downloaded free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 06/05/2015 until opening date down. For applicable terms and conditions of procurement marketplace.

Construction project management services

Land Rheinland-Pfalz, vertreten durch das Ministerium der Finanzen, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Mainz, vertreten durch die Niederlassungsleitung | Published February 24, 2017
Winner
Bilfinger Bauperformance GmbH
cpvs
71541000

9: "project management services in the construction and real estate", as of May, 2014.

Supplemented by a technique new building to house production rooms, studios, editing rooms, etc. are to be housed in the skyscraper Inter I mainly offices and seminar rooms.

The establishment of the media company is carried out in 2 phases.

In a 2nd construction phase, a technique new building is to be erected.

9, 2014 for the project in the areas of action:

- A: organization, information, coordination, documentation;

- B: quality, quantities;

- C: Costs and Financing;

- D: dates, capacity, logistics;

- E: insurance contracts;

about the project stages:

- PS 1: project preparation;

- PS 2: Planning;

- PS 3: execution preparation;

- PS 4: execution;

- PS 5: Project completion.

Services planned.

Services.

Planning Team BA I + II.

Exteriors are od. Be by subject lots, however, awarded for both BAs at the same consultants.

Catenary's construction works

Mainzer Verkehrsgesellschaft mbH | Published July 19, 2016  -  Deadline August 9, 2016
cpvs
45234160, 45234121, 45230000

The service includes the construction of a 1 km long (track length) new catenary system and the adaptation of existing facilities (200 m). The new section consists of a simple contact lines in the form of a turning loop.

The new building comprises mainly the supply and installation of:

Masts, foundations, boom, tension, contact wire, feed points.

The adjustments to the existing system under operation mainly includes:

the establishment of catenary, the reconstruction / adaptation of existing flat chain tension in inventory, building temporary.

Construction work for school buildings

Stadtverwaltung Mainz | Published June 5, 2015  -  Deadline July 2, 2015
cpvs
45214200, 71300000

Construction of 3 Three field gyms in system or Präfabrikationsbauweise at three school sites in Mainz: 1. Otto-Schott-Gymnasium, Mainz Gonsenheim, 2. School Oberstadt, Mainz Oberstadt, 3. IGS Anna Seghers Mainz, Mainz Oberstadt.

Architectural, construction, engineering and inspection services

Land Rheinland-Pfalz, vertreten durch das Ministerium der Finanzen, vertreten durch den Landesbetrieb für Liegenschafts- und Baubetreuung NL Mainz, vertretendurch den Niederlassungleiter | Published April 28, 2017  -  Deadline June 12, 2017
cpvs
71000000

Possibly. Additional special services may also be incurred and recalled (see II.2.4.)

.

He assumes the construction supervision during the execution (LPH 8) and partly the object support (LPH 9).

Part 4 Section 1 HOAI, LPH 2-8 acc. § 55 of the HOAI.

.

The administration building is to be gutted except for the raw construction structures and after the conversion with lecture halls, seminar rooms and office space as a depot building for further basic educational measures of the university are used.

The roof and the elevator system have already been renovated.

.

The load-bearing substance, the elevator system and the preliminary inspections shall be assessed and incorporated.

25 400 000 EUR for KG 200-600

.

Services, are called:

- Preparation of breakthrough plans

- Contribution to the EnEV

.

Scheduled schedule:

Power Level 1:

Preparation and completion LPH 2: November + December 2017

Design planning until delivery HU Construction: January to April 2018

Until release approval procedure: May to October 2018

.

Power Level 2:

Implementation planning and preparation of the award: November 2018 to June 2019

.

Power Level 3:

Participation in the award: September 2019 to May 2020

.

Power level 4 - 5:

Start of construction: June 2020

Completion and start of commissioning: May / June 2022

User submitted: September 2022

Project completion: December 2022

.

The Contractor shall be obliged to fill an office on the spot sufficiently, but with at least one employee, until the building has been handed over.

Reservoir construction works

Stadtverwaltung Mainz, 20-Amt für Finanzen, Beteiligungen und Sport, Postfach 3820, 55028 Mainz | Published May 19, 2017
Winner
Schleith Baugesellschaft GmbH
cpvs
45247270, 45232454

- earth, drainage, concrete masonry and road construction works.

Earth excavation for RRB and GB 45 700 m 3

In-situ concrete for STB flooring 2 200 m 3

Formwork for walls 5 910 m 2

In-situ concrete for STB walls 1 750 m 3

Concrete corrosion protection panels 570 m 2

Formwork for carrier grate 440 m 2

In-situ concrete for STB-carrier grate 1 750 m 3

Formwork for ceilings 160 m 2

In-situ concrete for STB-ceilings 65 m 3

Round steel 700 to

Grounding tapes galvanized 1 300 m 3

Grounding tapes stainless steel 930 m 3 ,

Architectural, construction, engineering and inspection services

Johannes Gutenberg-Universität Mainz | Published October 24, 2015  -  Deadline November 23, 2015
cpvs
71000000, 71500000

The Johannes Gutenberg University Mainz (JGU) is planning on the site between the Botanical Garden and ZVTE to build 2 laboratory building for the life sciences. The basement is designed with a floor height of 4.50 m. Construction is scheduled for the spring of 2015th The creation of FLB is to take place on the basis of the feasibility study, which is currently being prepared for the relevant planning disciplines. A superstructure of archaeological finds is not critical from the perspective of the Department of Archaeology. BA. The planning and realization of the whole farmyard is also carried out with the 2.BA. The interfaces and links between the two buildings will be elaborated in the ongoing feasibility study. This contract are the following services that are optional / commissioned in stages: construction phase, - preparation and monitoring of the GU-award procedure, BA. Further details in the tender documents which will be sent after completion of the qualification competition to the prequalified and invited to submit a tender.

Office block construction work

Zweites Deutsches Fernsehen | Published March 22, 2017
cpvs
45213150

Project: Fire Restoration Administration Building ZDF Mainz - main measure

The administrative building of the ZDF in Mainz has to be upgraded fire protection. The overall measure is in 16 phases (office floors) from October 2017 - executed in December 2020. The construction phase 45 working days are provided.

Project: Fire Restoration Administration Building ZDF Mainz, main measures

Subsection: natural stone and tile work

The nature and extent of the services:

(Shell d = 4cm, disk formats 2x0,60m and 0,80x0,60m with decorative profile transversely

U-profile steel, to Agraffenkonstruktion steel), all undamaged plates that do not

be reused, handed over to the ZDF

African meeting rooms

100m 2 Dismantling incl. UK, plates on ZDF

100m 2 Dismantling and plates and UK cut, interim storage and reassembly cut plates

about 168 m length of cut

Fire compartment doors

100m 2 Dismantling and plates and UK cut, interim storage and reassembly cut plates

about 168 m length of cut

Bauabschnittstrennung

100m 2 Disassembly, UK remains, interim storage and remounting disks

Performance dates:

Start execution (installation): October 2017

End execution (dismantling): December 2020

Place of performance: ZDF Administration Building, Mainz-Lerchenberg.

New Biology / Supplementary Planning and turnkey construction by a general contractor.

Johannes Gutenberg-Universität Mainz | Published October 15, 2014  -  Deadline November 17, 2014
cpvs
45200000, 71000000

The surface program will be implemented by way of four full floors and a basement. On the property is a future extension of the new building biology can be realized as the second phase of construction of the same size. The planning capacity of the contractor (AN = GU) include all planning, appraisal and consulting services that are required for the turnkey construction of the building based on the interfaces described in the tender, ie in particular the necessary planning services, including permit applications, all supplementary sectoral planning, calculations and report to it for implementation, the workshop and assembly planning and audit planning all the necessary trades. The FLB takes into account both matched with the user space program and planning considerations that take into account the specific user requirements. The authority intends to provide a preliminary construction shortly regarding the permissible degree of structural use, and material building code regulatory frameworks. The client therefore reserves in particular a cancellation of the tender for the case of inefficiency of offers received.

Engineering design services for the construction of civil engineering works

Stadtwerke Mainz AG | Published October 7, 2016
Winner
Bewerbergemeinschaft Dillig Ingenieure GmbH/ Sommer Beratende Ingenieurgesellschaft mbH
cpvs
71322000, 71322500

The remuneration of these optional services takes place in this case in accordance with the agreed fee basis, and is not to be included in the fees charged to be offered.

The basic evaluation is not used because the present planning results and coordination with the competent authorities; Partial performance of planning have already been received.

- Coordination (planning and construction) with all other supply sources.

Architectural, construction, engineering and inspection services

Land Rheinland-Pfalz, vertreten durch das Ministerium der Finanzen, dieses vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Mainz | Published December 6, 2014
Winner
Architekten Bernhardt + PartnerBirkenweg 13 FDarmstadt 64295 info@bp-da.de +49 615136200 http://www.bernhardt-partner.de+49 6151362099
cpvs
71000000

Task: 1 000 sqm) and offices. The total height of the building (without elevator crossing, skylights, etc.) is about 17 m. Production costs (KG 300 and KG 400): estimated 33 million EUR. Implementation period: The schedule is based on two binding dates: 1. the necessary infrastructure re-routing, which in September 2015 will take place and 2. The start of construction (building) to be able to these dates observe in spring 2016, start the first preparatory measures for the construction project in a timely manner. The beginning of the execution Baugrubenverbaus (including drainage) is scheduled for June 2015 so that the archaeological excavations carried out from July 2015. For this challenging task a powerful planning agency is wanted, that is versed both in questions of design and derBauabwicklung. Assignment: The following services are charged on the basis of HOAI:

Architectural, construction, engineering and inspection services

Land Rheinland-Pfalz, vertreten durch das Ministerium der Finanzen, dieses vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Mainz, vertreten durch den Niederlassungsleiter | Published February 18, 2015
Winner
Kempen Krause Ingenieure GmbH
cpvs
71000000

The State Office Property and construction management, branch Mainz configured the Sustainable thermal refurbishment of the parliament building Rheinland-Pfalz, Mainz Republic Square 1 in 55116 Mainz. Object of the contract is the planning of structural design of the buildings described below with benefits for service phases 1-6. In addition, the historic seat of the Parliament is to be supplemented by a small farming. In addition, the issues of preservation must be taken into account in the redesign of the building. For the area of ​​cultivation, however, passive house standard is to be sought. Reaching into the supporting structure of the lower floors have therefore the loads from the roof structure during the construction phase - if necessary by temporary structures -. Are removed. 17 m. Basics of planning is to focus on the efficiency and economy in accordance with § 7 Landeshaushaltsordnung, the functional expediency, the design issues and public service requirements. Areas: 8500 m², 37 000 m³. Surface areas include: 650 m² NF, public area with foyer, visitor, exhibition and conference and meeting areas, 2,300 m² NF, NF 1100 m². 2.5 years ago. Scope of Services: Services of phases 1-6 of the performance profile of structural design are commissioned on the basis of § 51 HOAI.