Call +44 800 9755 164

Public tenders for construction in Ludwigsburg Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for school buildings

Stadt Ludwigsburg, vertreten durch den Fachbereich Hochbau- und Gebäudewirtschaft | Published December 2, 2016

Renovation of a primary school consisting of buildings Year 1909 and 1953, and construction of a new cafeteria with care spaces in 2 phases

Phase 1: Building renovation Year 1909 BGF 1 421 m 2 , BRI 4606 m 3 and construction BGF 2 191 m 2 , BRI 9600 m 3

Phase 2: Building renovation Year 1953 BGR 2 511 m 2 , BRI 7675 m 3

Estimated construction (all lots / trades):

Start of construction: Juni.2017

Completion of construction: September 2020th

Rohbauarbeiten August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

Creating new construction, BRI 9600 m 3 .

3000 m 3 , Duct work, conversions in existing buildings.

Implementation of Dachabdichtungsarbeiten August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

970 m 2 roof

Roof insulation, roof insulation, roof greening, paving, roofing system.

Implementation of fire protection spray plaster works August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

1960 m 2 Inventory ribbed ceilings Fire protection spray plaster applied.

Heating systems, central heating, heating installation August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

250 m metal composite pipe of DN 15-DN 20

4500 m carbon steel pipe from DN 15 - DN 80

radiator

CHP

2 100 m thermal insulation of exposed heating pipes

800 m Thermal insulation of heating pipes in installation shafts with laminated aluminum sheathing

180 m fire insulation of rock wool

1 000 meters of insulation exposed heating pipes with plastic coating.

Ventilation systems August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

10 000 m 3 /H

6000 m 3 /H

500 m 3 /H

800 m 3 /H

1 000 meters ventilation ducts around

2000 m 2 Ventilation pipes square

1800 m 2 Armaflex duct insulation

200 m 2 Insulation with mineral wool for ventilation duct

800 m 2 Insulation with mineral wool for ventilation pipes

65 m 2 L90 fire protection clothing.

Implementation of sanitary engineering August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

500 m waste water pipes

lifting plant

about 800 m water pipes stainless steel from DN 12-DN40

350 m water pipes Multilayer pipe of DN 12 DN 32

WC and accessories.

Vanity and accessories.

Schulwaschtisch- and accessories.

Urinal and accessories.

Shower and accessories.

Disabled Vanity conditioning.

Disabled toilet facility.

400 m Thermal insulation of exposed cold water pipes with plastic coating

600 m Thermal insulation of exposed cold water pipes with flexible hose insulation

360 m waste water pipes

120 m rainwater pipes

250 m fire insulation of rock wool.

Implementation of electrical engineering with power, communication and information technology systems, lightning protection August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

Main / sub distributions

850 m gutters / pipes / channels

21 500 m cable and wires

19 "cabinets

10 500 m phone / data lines

420 St KNX / EIB subscriber

Switch / Outlet

lighting Equipment

Emergency lighting system / Substations

SAA / ELA facility

1 St. external lightning protection system

PV system.

Implementation of the building automation and control technology August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

The complete construction of the MSR technology of the trades heating, ventilation and sanitation.

3 cabinets,

20 to be driven valves

95 field devices.

3 ISP systems.

Implementation of the plaster and stucco August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

Distribution kitchen

4 refrigerators,

1 Combi steamer Crested

1 through dishwasher with hood

15 m table systems

1 disposal cooler

Accessories.

Installation elevators August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

200 m 2 Planking slanted roof

190 m 2 Basement ceiling insulation.

Gerüstbauarbeiten August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

3460 m 2 up scaffolding.

Implementation of Betonwerksteinarbeiten August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

Production and installation of 50 St. sandblasted precast columns

  • 1