Call +44 800 9755 164

Public tenders for construction in Leipzig Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

LESG mbH | Published December 20, 2016  -  Deadline January 25, 2017

Gerüstarbeiten old building portico and construction magazine.

> Working scaffolds, face scaffolding, scaffolding Panel, Aerial

- Labor and working scaffolds SC4, WO6, to 16 m, tw.. Bridging, consoles, about 3 300 meters 2

-. U work scaffolds SC4, WO9, h 14 m, tw. Bridging, consoles, about 5 000m 2

- Labor and working scaffolds LK 3, stairwells, tw.. Bridging, consoles, about 1 500 meters 2

- Scaffolding covering film and net, about 3 100 meters 2

- Surface scaffolding, h to 10 m, 200 m 2

- Platform mobile, h to 8 m, about 5 pieces.

Secondary school construction work

Stadt Leipzig – Amt für Gebäudemanagement | Published December 28, 2016  -  Deadline January 30, 2017

Demolition work.

1 Psch create a written Abbruchanweistung and a work and safety plan,

1 Psch complete demolition inventory Gymnasium Type "GT 60 L", built in 1973, External dimensions b / l / h = ca. 48,75 x 32,20 x 9:50 (First)

Building volume 15 700m 3 , Steel structure with adjusted two-storey massive social section, incl.

Bottom plate and foundations,

Emission report is available, there are containing PAH Teerpappen and KMF mineral fiber insulation and expand

dispose of (waste key number 170303 * und170603 *);

The outer shell contains polystyrene foam insulation boards,

Thickness 20mm wall insulation, roof insulation thickness 40mm,

Total 100 m 3 , It is not expected to HBCD exposure, sampling is required;

The nachfolgnden construction deadlines are non-binding orientation. The concrete construction to done

specific request.

Construction work

Stadt Leipzig – Amt für Gebäudemanagement | Published January 10, 2017  -  Deadline February 10, 2017

Trockenbauarbeiten.

2 200.00 m 2 Plasterboard, various. Request

320.00 m 2 Facings,

90.00 St. Revi-openings in walls, diff. Sizes,

200.00 St. openings in prefabricated walls, ZT F90,

170.00 St. soft bulkheads in prefabricated walls,

1 300.00 m 2 Plasterboard ceiling smooth,

5 400.00 m 2 perforated plasterboard ceilings Acoustic,

4 000.00 m Ceiling edge connections, diff. Versions,

350.00 St. inspection openings in plasterboard ceilings, diff. Sizes,

1 300.00 St. recesses in plasterboard ceilings, diff. Sizes.

Works for complete or part construction and civil engineering work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Leipzig 2 | Published December 28, 2016  -  Deadline January 31, 2017

Lot 33 - paved areas.

Production of hard surfaces with borders and drainage facilities, cable trenches, equipment elements with the following scope:

- Approximately 3070 m 2 Concrete block paving,

- Approximately 1 670 m 2 large-sized concrete paving units,

- 800 m 2 Blacktop,

- Approximately 1 500 meters curb,

- Approximately 500 m sewer PVC (DN 100 to DN 315)

- 15 m pressure pipe made of PE (DN 63 to DN 100)

- 2 manholes, grease traps 1, 1 double lifting station,

- 300 m facade gutter, galvanized steel,

- Approximately 110 m slotted channel,

- Approximately 85 m Drainage channel with slotted grating,

- Approximately 14 m base wall as reinforced concrete,

- 30 m concrete block level,

- Approximately 41 m Bank as precast concrete,

- 140 St Bicycle parking steel.

Works for complete or part construction and civil engineering work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Leipzig 2 | Published December 28, 2016

Production of hard surfaces with borders and drainage facilities, cable trenches, equipment elements with the following scope:

- Approximately 3070 m 2 Concrete block paving;

- Approximately 1 670 m 2 large-sized concrete paving;

- 800 m 2 Blacktop;

- Approximately 1 500 meters curb;

- Approximately 500 m sewer PVC (DN 100 to DN 315);

- 15 m pressure pipe made of PE (DN 63 to DN 100);

- 2 manholes, grease traps 1, 1 double lifting station;

- 300 m facade gutter, galvanized steel;

- Approximately 110 m slotted channel;

- Approximately 85 m Drainage channel with slotted grating;

- Approximately 14 m base wall as reinforced concrete;

- 30 m concrete block level;

- Approximately 41 m Bank as precast concrete;

- 140 St. Bicycle parking steel.

Production of hard surfaces with borders and drainage facilities, cable trenches, equipment elements with the following scope:

- Approximately 3070 m 2 Concrete block paving;

- Approximately 1 670 m 2 large-sized concrete paving;

- 800 m 2 Blacktop;

- 1,500 m curb;

- Approximately 500 m sewer PVC (DN 100 to DN 315);

- 15 m pressure pipe made of PE (DN 63 to DN 100);

- 2 manholes, grease traps 1, 1 double lifting station;

- 300 m facade gutter, galvanized steel;

- Approximately 110 m slotted channel;

- Approximately 85 m Drainage channel with slotted grating;

- Approximately 14 m base wall as reinforced concrete;

- 30 m concrete block level;

- Approximately 41 m Bank as precast concrete;

- 140 St. Bicycle parking steel.

16FEI24095 second award Structural changes of railway systems measures complex Leipzig Thekla, Route 6360 Leipzig Hbf- Eilenburg km 1,790 - 5,720 km, distance 6369 Leipzig Wahren- Engelsdorf, km 7,820 - 11,850 km

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published December 27, 2016  -  Deadline January 31, 2017
SBAD Leipzig

Architectural, engineering and planning services

Stadt Leipzig, Amt für Gebäudemanagement | Published January 13, 2017  -  Deadline February 13, 2017

The school building Höltystr.51 in Leipzig in 1973 in bricks as a type project Ratio 74-720, type A (5 floors, 3 staircases) built, already dismantled with three entrances on the south side, the main entrance north side. The building is classified in the building class 5 according SächsBO (special construction).

At the building were / are already under construction with the goal of setting up a refugee center in 2016/2017.

The exterior renovation of the building was carried out in accordance with EnEV 2014 (Requirements 2016). Achieving the Passive House standard is to examine in further planning of economy.

The building is prepare for the establishment of a 2.5-spacious Junior High. There are 420 students are taught in the barrier-free design building.

The schedule provides for the start of construction in spring 2018 and the use Starting Date Aug of 2019. The total project costs (KG 200-700) were estimated with 4.5 million EUR gross.

With this call for tenders are awarded for planning the project planning in accordance with § 34 HOAI in a first stage for LP 1 to LP. 3

Engineering services

Zoo Leipzig GmbH | Published December 28, 2016  -  Deadline January 23, 2017

In Leipzig Zoo are in the next few years to some construction work. These are, firstly, through the implementation of the master plan "zoo of the future" determines the other by smaller contracts that are partially realized in the short term. This includes infrastructure, such. As part of the flood protection. In any case detailed knowledge of both the infrastructure and the Zoobetriebes required. Therefore, the Leipzig Zoo seeks long term one or more consultants, the forthcoming construction house technology planning each in all plant groups and engaged in site management. The first contract is awarded to the Counting at No. 1 planning office for the renovation of the building complex aquarium / terrarium AG 1-8 without the specific water technology for the aquarium. The budget is 4 500 00 EUR gross KG 200-700.

This contract is to conclude a framework agreement on planning services TGA:

- Fachplanung HOAI Part 4 Section 2 Technical equipment investment groups 1-8 § 55 LP 1-9.

The client reserves the right to special planning services, eg. As the water engineering project in the aquarium, to entrust themselves and the performance beizustellen the be selected here planning office. It accepts the integration into the overall planning and coordination of services in particular in connection with the construction of such a special planning service.

Specifically, the project Aquarium: The structural reaction takes place in two phases:

1.BA:

Project start: March 2017;

Start of construction: April 2018;

Completion June of 2019.

2. BA:

Completion March 2021st

The completion of individual orders arising from this framework agreement, according done. § 21 VgV, the conditions are named in the tender documents for the negotiated procedure.

Architectural, engineering and planning services

Stadt Leipzig, Amt für Gebäudemanagement | Published January 6, 2017  -  Deadline February 6, 2017
Appendix 1 HOAI: 

As a result of this call, the work phases are first commissioned as 1-3 level. 1

2,670,000 EUR gross.

The center is located not on the property and is not subject to planning.

This is intended to ensure by a stairway and lift the barrier-free access of both parts of the building.

The planning of technical equipment, the structure and the open space design are not the subject of this tender.

The scheduling provides a construction 2018 and the completion of the 2020th

Architectural and related services

Zoo Leipzig GmbH | Published December 28, 2016  -  Deadline January 23, 2017

The building complex aquarium / terrarium in Zoo Leipzig must be redeveloped structurally. The major renovation work done established in 1902 and listed building Aquarium building with the renovation of the roof structure and a building extension in the rear area on the banks of the Parthe. About necessary rehabilitation work in neighboring terrarium and the round basin-growing inventory first performed will decide. The budget amounts to 4.5 million EUR gross KG 200-700. The structural implementation is carried out in 2 phases:

Phase 1:

Project start: March, 2017

Construction: April 2018

Completion June of 2019.

Phase 2:

Completion March 2021st

This contract are the following planning services

- Project planning HOAI Part 3 buildings § 34 LP 1-9.

- Structural design HOAI Part 4 Section 1 § 41 LP 1-6.

- Building physics (thermal building physics, moisture protection and room acoustics.

Depending on the result of the inventory, and thus the scope of the construction work outside the authority reserves the right to instruct the services of free plant planning additionally when substantially only the inventory is restored and are to make no new animal enclosures.

Police cars

Polizeiverwaltungsamt, Logistikzentrum | Published December 24, 2016  -  Deadline February 1, 2017

Police Typical Construction and delivery of five vehicles from the segment middle class or upper middle class.

Minimum Requirements Vehicle (excerpt)

Passenger cars closed, estate, 5-door

Maximum speed of the production car: greater than or equal 200 km / h

Payload / load of the empty vehicle series: greater than or equal 470 kg

Trunk size: greater than or equal 540 l

Base of the loading area: greater than or equal 1 x 1 m

Diesel engine; Soot particle filter

Power: 140 kW greater than or equal

Displacement: 1 950 cc greater than or equal

Automatic or automated manual transmission

all wheel drive

Dressing

Police Typical expansion (Sosi with special function, radio features, order system boot)

Further requirements with the performance specifications.

Construction and delivery of five vehicles.

Metalworking

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Leipzig 1 | Published December 10, 2016  -  Deadline January 26, 2017

Facades pilot.

- 120 pieces Single sliding windows in aluminum construction, 25 fixed panels, 9 Paneelfelder, 6 vent fields, each about 0.95 x 2.10 m, with intervening Blindpaneelfeldern to 2 rows of windows of about 97m and 107m length summarized (ground and first floor) ;

- 2 pieces dipterous escape doors within the window band;

- 1 piece window EI 30 (F30), 3.5 * 2 m, in three parts;

- 2 piece-leaf exterior doors in aluminum with blind filling and clothing products to the wall;

- 1 piece of double-leaf exterior door in aluminum with blind filling and clothing products to the wall;

- 2 pieces folding sliding wall panel, steel frame construction with dummy fill and clothing, WxH approx 4 x 3 m;

- Glass facade in post and beam construction, with substructure made of steel profiles, about 4.5 m high, 100 m long;

- 3 pieces Faltschiebetore with glass panel, with wicket door, the facade installation, WxH approx 5 x 4.50 m;

- 6 piece window UG in aluminum, with a motor drive, each about B / H 2.20 / 0.80 m;

- Associated monitoring elements, locking elements, door controls, NC, overhead door closers, etc.

Roof insulation work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Leipzig 1 | Published January 12, 2017  -  Deadline February 21, 2017

Dachabdichtungsarbeiten.

- Approximately 4040 m 2 , Roof, consisting of a vapor barrier, mineral wool insulation and double-layer gradient polymer bitumen membrane;

- Approximately 2 300 meters 2 , Roof structure as before, but on a wooden surface with nagelbarer vapor barrier wall connection;

- Behind backstops cellular glass insulation gradient within the roof structure, about 220 m 3 Foam glass;

- Approximately 3 910 m 2 , Gravelling;

- Approximately 2 190 m 2 , Green roof construction on the roof structure;

- Square skylights with electric motor drive, from 0.80 to 1.25 meters on each side; 13 pieces on various roofs distributed;

- Square skylights with electric motor drive; 2.50 meters on each side; 14 pieces on technical halls;

- Attachment points according EN 795, location by ballast, 103 pieces;

- Emergency drains as Attica throughs, with extension tubes and partial fixing in the façade, 55 pieces;

- Various bushings, connectors, prefabrication.

Security and communication technology, Lot 10

Berufsförderungswerk Leipzig gemeinnützige GmbH Vergabestelle | Published January 3, 2017  -  Deadline January 31, 2017
Renewal of security and communication technology, including conversion of the reception area in House3 Lots 1 - 10 Scope: 1. Lot: 1 Scaffolding: about 2 pcs scaffolding load class VI, Dimensions of work each about 1.50 mx 3.00 m, including. height Request ego frame 2. Los: 2 bodyshell, demolition, concrete cutting work: approximately 40 running meters. Slots in existing screed close, width 50 cm approx 14 pcs. Openings in reinforced concrete walls closing, respectively to 0.5 m² approx 4 pcs. Deliver lintels as precast reinforced concrete and installing approximately 240 m² dismantling and disposal of metal Drop Ceiling 10 Removing m² dismantling and disposal of metal studs 25 m² dismantling and disposal of dry plaster approximately 5 pcs. interior doors incl. steel frames and discard approximately 240 m² cautious dismantling of granite flooring about 315 m² dismantling and disposal of putty on floor, ca. 20 mm about 35 running meters. Slots in floor construction create incl. Waste disposal, width 50 cm 1 pc. Dismantling and disposal of reception counter incl. Wall paneling approx 13 pcs. Creating core drilling, to DN 300 approx 1 pc. Creating hole in reinforced concrete wall, dimension 1, . 51 mx 2,135 m approx 1 pc applying opening in reinforced concrete wall, dimensions 1.01 mx 2.135 m 3 Los 3 tile and natural stone works: clean approximately 196 m² ground about 40 m² bumps beispachteln to about 5 mm ca . 196 m² priming the existing subsoil approx 196 m² porcelain stoneware flooring laid about 52 running meters. Base tiles and approximately 72 linear meters. Tile joints Finishing profiles 4. Lot: 4 joinery / Interior doors:.. 1 pc wooden door element 1 leaf 1 pc wooden door element, 2-panel

Woodwork

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Leipzig 1 | Published January 13, 2017  -  Deadline February 21, 2017

Wooden facade.

Holzfassade:

- Substructure of squared timber, two layers about 3 935m 2 , It facade membrane and counter;

- Substructure without insulation, single layer, on battens; ca. 380 m 2 ;

- Thermal insulation on the facade, 22cm, made of mineral wool> 1000 ° C, mounted between the substructure, about 3 935m 2 ;

- Facade formwork, as strips deck formwork, softwood, rough-cut, approximately 22m thick, strips 30mm; with heavily pigmented highly resistant paint;

- Attica cover made of anodized aluminum sheet, 3 mm thick, settlement 800-1 200mm, approximately 830lfm;

- Plinth insulation, XPS, 220mm, approximately 160 m 2 ;

- Base clothing of plates 1,25mx55cm, about 30mm thick, slate, black, glued to insulation, about 120 m 2 ;

- EIFS in light shafts, about 40 m 2 ;

- Ventilated facade to the insides of Attica, with mineral wool insulation, aluminum substructure with radii between 150 and 280mm, clothing made of fiber cement boards 8mm 950m 2 ;

- Suspended ceiling made of sheet metal panels, from cassettes from aluminum panels, anodized, 3mm thick, dressed with wooden slats, with substructure 1m suspension height;

- Accessories such as connectors, joint construction, fire barriers, over ladders.

  • 1