Public tenders for construction in Kronach Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

HRB Goldbergsee Coburg - road construction and construction of embankment stairs.

Freistaat Bayern, vertreten durch das Wasserwirtschaftsamt Kronach | Published October 10, 2014  -  Deadline November 4, 2014
cpvs
45233120, 44233000

HRB Goldbergsee Coburg - road construction and construction of embankment stairs.

Fire station construction work

Stadt Kronach – Hochbau | Published October 3, 2017
Winner
Fa. AMG Bau GmbH
cpvs
45216121

New construction fire station Kronach with respiratory protection district Kronach

26, screed.

New construction fire station Kronach with respiratory protection district Kronach,

26, screed.

Construction work for school buildings

Landkreis Kronach | Published May 19, 2016  -  Deadline June 10, 2016
cpvs

Construction work for school buildings

Construction work

Wasserwirtschaftsamt Kronach | Published November 28, 2015  -  Deadline January 12, 2016
cpvs
45000000, 45120000, 45122000

13 Kleinrammbohrungen, depth 2 m to 6 m, a total of 61 meters of drilling; 5 core holes, depth 10 m to 12 m, a total of 56 meters of drilling; 5 Heavy probing, 8 m to 12 m, a total of 56 Sondiermeter; 3 Hand trial pits for exploring the road construction.

Construction work for school buildings

Landkreis Kronach | Published January 12, 2017  -  Deadline February 7, 2017
cpvs
45214200, 45262670, 45341000

Subsection: Bannister (BA 4.2).

Approximately 220 m steel railings dismantling,

220 m steel railings painted new construction, with stainless steel handrail

(About 150 m. Central TrH / 4 Stockw .; rd 70 m:. TrH Verb.Gang BA 3 BA 4/2 floors.).

Construction work

Wasserwirtschaftsamt Kronach | Published January 27, 2016
Winner
Dr. Stadtbäumer Baugrunduntersuchungen GmbH
cpvs
45000000, 45120000, 45122000

13 Kleinrammbohrungen, depth 2 m to 6 m, a total of 61 meters of drilling;

5 core holes, depth 10 m to 12 m, a total of 56 meters of drilling;

5 Heavy probing, 8 m to 12 m, a total of 56 Sondiermeter;

3 Hand trial pits for exploring the road construction.

General construction work for pipelines

ZV Wasserversorgung Frankenwaldgruppe | Published January 24, 2017  -  Deadline March 9, 2017
cpvs
45231100

Pipeline laying from the village to the village Effelter Lahm.

- Oberbodenab- and order about 8 500m 3 ;

- Pipe laying DN 350/300 GGG about 3 410 m;

- Conduit DN 100 approximately 3 410 m;

- Telecommunication cables about 3 410 m;

- Fibre optic cable about 3 410 m;

- Lead-in shafts approximately 8 St .;

- Begehbahre Ortbetonschachtbauwerke about 2 St .;

- Begehrbarer precast manhole about 1 St .;

- Precast reinforced concrete construction part as precast about 1 St.

Fire station construction work

Stadt Kronach – Hochbau | Published October 11, 2017  -  Deadline November 14, 2017
cpvs
45216121

See page 4.

29 Construction work

CPV 45262670,45262680,

(the services essentially comprise)

1 escape stairs, consisting of

- ca.13 x Cantilever beam T-steel S235, l = 1,700mm

- approx. 0,9to Profistahl S235, Wangen U200,

- approx. 10m² of catwalk Pressgitterost

- approx.18 steps of pressed grating, b = 1,500 mm

- ca.11.5 m² Railing made of steel sheet, color coated

- ca.15 m Handrail round steel d = 42mm, stainless steel

1 garbage house consisting of:

- approx. 0.8 to profile steel, hollow profiles, angle steel IPE S235;

- approx. 45m Associations Round steel with clamping locks;

- approx. 22m² trapezoidal sheet metal roofing;

- approx. 5m chest groove;

- approx. 3 m drain pipe DN 80;

- ca.1 St. 2-leaf door 2,01 * 2,135m

1 tower stairway system consisting of:

- approx. 4,7 to profile steel S235;

- approx. 35 m² platforms made of pressed metal;

- approx. 140m steel angle support;

- approx. 75 steps of pressed grating, b = 1 150mm;

- approx. 115 m² railings made of sheet steel panels;

- approx. 85m handrail round steel d = 42mm, V2A.

Fire station construction work

Stadt Kronach – Hochbau | Published September 21, 2016  -  Deadline November 3, 2016
cpvs
45216121, 45422000, 45422100, 45261100

The city Kronach is planning to build a fire station with breathing protection center for the district Kronach.

Gewerk 05 carpentry work:

Approximately 20 m 2 Construction timber;

Approximately 41 m 2 Leimholz;

Approximately 1300 m 2 Wooden formwork;

Approximately 1300 m 2 Thermal insulation;

Approximately 1300 m 2 Vapor barrier;

Approximately 1300 m 2 Vapor barrier;

Approximately 2400 m setting, erection, installation of timber.

Construction work of elevated tanks for drinking water

ZV Wasserversorgung Frankenwaldgruppe | Published March 1, 2017  -  Deadline April 4, 2017
cpvs
45232154

New high containers for drinking water in Reichenbach, storage volume 400 m 3 ,

Structural work:

Excavating approximately 2,700 m 3 ;

Backfilling approximately 2,100 m 3 ;

Reinforced concrete: 280 m 3 ;

Formwork approx 1140m 2 ;

Rebar 60 t;

Masonry 25m 2 ,

Finishing works:

Plastering works about 30 m 2 ;

Repainting approximately 190 m 2 ;

Estricharbeiten about 80 m 2 ,

Locksmith workshop:

Sealing work about 380 m 2 ;

Facade construction about 50 m 2 ;

Roofing works about 60 m 2 ;

Gerüstbauarbeiten about 420 m 2 ,

Outside:

Pipeline construction about 300 m;

Grassing about 3 100 meters 2 ;

Erosion control blankets about 280 m 2 ;

paved areas about 340 m 2 ;

Cantilever walls approximately 19 m;

Grid mat fence about 120 m;

Earthworks and topsoil work.

Construction work of elevated tanks for drinking water

ZV Wasserversorgung Frankenwaldgruppe | Published March 8, 2017  -  Deadline April 11, 2017
cpvs
45232154

New high containers for drinking water in Eibenberg, storage volume 500 m 3 ,

Structural work:

Excavation / backfilling weighing approximately 1 750 meters 3 ;

Reinforced concrete: 350 m 3 ;

Formwork 1400 m 2 ;

Rebar 65 t;

Masonry 25m 2 ,

Finishing works:

Putzarbeiten 20m 2 ;

Repainting 140m 2 ;

Estricharbeiten about 80 m 2 ,

Locksmith workshop:

Sealing work about 420 m 2 ;

Facade construction about 50 m 2 ;

Roofing works about 60 m 2 ;

Gerüstbauarbeiten about 480 m 2 ,

Outside:

Pipeline construction about 250 m;

Grassing about 2 500 meters 2 ;

Erosion control blankets 500m 2 ;

paved areas about 1 000 meters 2 ;

Cantilever walls approximately 17 m;

Grid mat fence about 120 m;

Earthworks and topsoil work.

Fire station construction work

Stadt Kronach – Hochbau | Published March 10, 2017  -  Deadline April 12, 2017
cpvs
45216121

See page. 4

The city Kronach is planning to build a fire station with breathing protection center for the district Kronach.

Gewerk 07 LM facade and sunscreen.

Approximately 370 m 2 / 60 pcs aluminum windows, partly Inner panel.

Approximately 30,00 m 2 / 15 pcs aluminum exterior doors.

Approximately 12 pcs Aluminium - corridor doors.

Approximately 300 m 2 motorized sun blinds Outboard, rope out.

Road and bridge construction

Staatliches Bauamt Bamberg | Published June 12, 2015  -  Deadline July 14, 2015
cpvs

B 303, renewal of the retaining wall in Gehülz

Road and bridge construction

Staatliches Bauamt Bamberg | Published February 27, 2015  -  Deadline March 23, 2015
cpvs

B 173, crossing change south Kronach

Construction work for school buildings

Landkreis Kronach | Published December 2, 2016
cpvs
45214200, 45262670

Bannister (inside).

Renewal of railing at several staircases; Indoors.

Building construction work

ARGE der Volkshochschulen im Landkreis Hof e. V. | Published October 9, 2015  -  Deadline October 29, 2015
cpvs
45210000

I-02 Builder: 3 800 m2 demolition flooring; about 2 000 m2 demolition wood subfloors; 150 m3 demolition masonry; 700 m2 demolition floor plates; 400 m pipes PVC DN 100-300; approximately 140 m2 vertical waterproofing foundations; 600 m2 masonry KS + HLZ; approximately 230 m3 reinforced concrete floor slabs; approximately 110 m3 reinforced concrete walls; 140 m3 reinforced concrete floors; about 26 to beams / support / support from.

General construction work for pipelines

ZV Wasserversorgung Frankenwaldgruppe | Published April 20, 2017  -  Deadline June 2, 2017
cpvs
45231100

Water line installation for drinking water over a length of approximately 2 700 m.

- Oberbodenab- and order about 7 000 cubic meters;

- Pipe grave excavated about 5 000 cubic meters;

- Pipeline laying DN 300/250/200/125/100 GGG approximately 2685 m;

- conduit DN 100 approximately 2685 m;

- Telecommunication cables approximately 2685 m;

- Fiber optic cable about 2,685 m;

- Cable drawing pits about 8 St .;

- begehbahre Ortbetonschachtbauwerke about 2 St .;

- Reinforced concrete buildings Part as a finished part about 1 St.

Construction work for school buildings

Landkreis Kronach | Published April 13, 2017  -  Deadline May 9, 2017
cpvs
45214200, 45262670, 45341000

Gewerk 2: Bannister retrofit, TrH South (BA 4.2).

(Approx)

35 m retrofitting additional handrail, as a railing increase.

35 m railing retrofit: stainless steel nets, rope tension (about 90 cm high).

General construction work for pipelines

ZV Wasserversorgung Frankenwaldgruppe | Published October 4, 2017  -  Deadline October 26, 2017
cpvs
45231100

Water drainage for drinking water over a length of approx. 3 830 m.

Pipeline installation:

2 260 m DN 200 GGG, PN 16/25/40;

approx. 1 270 m PE 100 RC 180 x 16.4 SDR 11;

approx. 3 300 m cable protection pipe DN 100;

approx. 3 100 m Telecommunication cable;

approx. 3 100 m FO cable;

7 h Cable ducts;

2 units of walk-in in-situ concrete shafts;

1 piece of finished building block for shafts.

Construction work for school buildings

Landkreis Kronach | Published April 12, 2017
Winner
Japp Stahlbau GmbH
cpvs
45214200

Bannister (BA 04.02).