Call +44 800 9755 164

Public tenders for construction in Koblenz Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Road construction works

LBM Cochem-Koblenz Projektmanagement | Published May 21, 2016  -  Deadline June 23, 2016
cpvs

Road construction

Road construction works

Stadt Koblenz | Published June 10, 2016
cpvs

Road construction

Road construction works

LBM Cochem-Koblenz Projektmanagement | Published May 4, 2016  -  Deadline June 9, 2016
cpvs

Road construction

Architectural, construction, engineering and inspection services

Bundesrepublik Deutschland, vertr. d. d. Bundesministerium der Verteidigung, dieses vertr. d. d. Amt für Bundesbau -ABB-, dieses vertr. d. d. Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Koblenz,vertr. d. d. Niederlassungsleitung | Published July 16, 2016  -  Deadline August 12, 2016
cpvs

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Kreisverwaltung Mayen-Koblenz | Published August 4, 2016  -  Deadline August 31, 2016
cpvs

Architectural, construction, engineering and inspection services

Construction work

LBB Niederlassung Koblenz | Published April 12, 2016
Winner
K.L.P. Metall-Innovation GmbH &
cpvs
45000000

Metal construction and locksmith work.

Vergabeunterlagen can be loaded up to the opening date down free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 25.11.2015. For applicable terms and conditions of procurement marketplace.

Architectural, construction, engineering and inspection services

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch das Amt für Bundesbau -ABB-, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, NL Koblenz, vertreten durch die Niederlassungsleitung | Published May 17, 2017  -  Deadline June 13, 2017
cpvs
71000000, 71300000, 71314100

Part 4 Section 2 HOAI for the construction of an energy center for the Bundeswehrzentralkrankenhaus Koblenz, service phases 2-9 (partly only in parts, LPH 4 only special services) acc. § 55 HOAI, supplemented by

Special services, in particular:

- Inventory electrical structure of the property

- Accounting of the electrical energy requirement of the property

- Pre-vote and later coordination with the responsible RU

- Factory acceptance network replacement

- Preparation of construction and inventory documentation according to RBBau Section H

- Supervision of rectification within the limitation periods

,

The customer shall provide the Contractor with ES-Bau, Part I to IV as the basis for further planning.

The property is located on the L52, Rübenacher Straße 170 in the Koblenz-Metternich district.

Currently there is a bed-house with 160 beds in the construction.

The construction of an energy center is to be implemented along with these structural measures.

In the planning, tendering and construction work of the energy center are the valid laws and regulations according to the state of the art, the regulations of the RBBau, as well as the federal regulations, directives and regulations (eg: Baufachliche Richtlinien (BFR)), applicable basic military infrastructure requirements and regulations ) Must be observed.

The following performance levels include:

Energy Source:

- Heavy current systems with medium voltage switchgear, transformers, low voltage main distribution, power supply systems

- Telecommunication and information technology installations

,

Infrastructure:

- Connection of the energy center to the medium voltage supply of the responsible RU, including the existing and remaining transfer station

- Connection of NEA's fuel supply pipeline to the energy center as well as expansion for the supply of the new building 1.BA

- IT connection of the energy center

,

13,000,000 EUR gross.

,

The following dates are to be considered:

Construction of the ES construction in EW construction quality: 28 weeks after order placement.

Construction project management services

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, dieses vertreten durch das Amt für Bundesbau -ABB-; dieses vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Koblenz, vertreten durch die Niederlassungsleitung | Published November 10, 2015  -  Deadline December 7, 2015
cpvs
71541000

The execution of each measure in the construction program is closely scheduling and spatial context. Specifically, these measures are as follows:. Z for site clearing, access to the new, and of persistent building (F1, F, A, P, S, T, M, U, Q) in the property. , A direct connection within easy walking over a bridge to the new Hospital later finished is provided. , Construction phase) dismantled. , The new ambulance station can accommodate 5 emergency vehicles and a vehicle wash bay and is resting and readiness building for staff. , The rectangular, compact shape of the building over several floors penetrated inside atriums, to achieve a supply of daylight into the rooms of the basement. ,

Architectural, construction, engineering and inspection services

Kreisverwaltung Mayen-Koblenz | Published December 24, 2016
Winner
RUMPF Architekten + Ingenieure
cpvs
71000000, 71221000, 71247000, 71251000

The awarding body is school carrier of existing IGS Pellenz in Plaidt. It intends the award of planning services for the realization of an additional space required for the establishment of a school. To plan are 9 general classrooms, 2 science rooms with appropriate collection rooms, 3 special rooms with adjoining rooms and 7 administrative rooms totaling about 1 200 meters 2 new used planning area.

It is intended (in Los 01) the award of Building Design, § 34 HOAI Phases 1-9 and (in Lot 02) the allocation of technical equipment, investment groups 1-6 according to § 53 HOAI Phases 1-9 within the meaning of § 55 HOAI. A gradual commissioning of Phases 1-3 and then the work phases 4-9 is provided. The planning services are to be provided partly in view of the existing building. An extension for the extension area is planned as a new construction. The construction project is to be implemented on the fly.

Construction project management services

Land Rheinland-Pfalz, vertreten durch das Ministerium der Finanzen, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Koblenz, vertreten durch die Niederlassungsleitung | Published May 6, 2017  -  Deadline June 1, 2017
cpvs
71541000

The purpose of this procedure is to provide project management services in accordance with AHO Issue No.9, "Project Management Services in the Construction and Real Estate Industry", 4th edition, 2014.

The Contractor's services (AN) comprise the project management services for the project in the fields of action

- A: organization, information, coordination and documentation;

- B: qualities and quantities;

- C: costs and financing;

- D: dates, capacities and logistics;

- E: insurance and contracts;

On the project stages:

- PS 3: preparation preparation;

- PS 4: execution;

- PS 5: Project Completion.

At the moment, the organizational units of the Landesunforschungamt (LUA) are spread over 4 properties in the urban area of ​​Koblenz. The planned new building will bring these together at one location. This results in synergy effects, particularly in the field of laboratory technology as well as in administration.

Architectural, construction, engineering and inspection services

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch das Amt für Bundesbau -ABB-, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, NL Koblenz, vertreten durch die Niederlassungsleitung | Published May 17, 2017  -  Deadline June 27, 2017
cpvs
71000000

These are supplemented by optional services (see II.2.4).

The development of the property is achieved by connecting to the existing infrastructure of the property.

The contractor will provide the Contractor with the results of the preliminary planning as the basis for the execution.

The buildings, which are essentially the same, are the same

1925 m 2 (Wiederholungsbauten)

Building type 2 with 120 residential units, including four disabled-friendly rooms with a total floor space of approx.

2250 m 2

These are supplemented by the following optional services:

This must be coordinated with LBB in advance and a certified sustainability coordinator (to be activated by the Contractor) is to be involved throughout the planning and construction process in order to ensure proper implementation and documentation

- Creation of simple information and orientation systems

- Creation of escape and rescue plans

- Creation of fire brigades

- Transfer of the planning and cost data to the digital collection documents according to K6 RBBau

- Creation of the inventory and construction documentation according to RBBau, section H

- Supervision and rectification within the statute of limitations

The construction works are to be advertised in the form of a performance description with a performance program

The preliminary planning was prepared in advance.

The costs acc. Of the current cost estimates for all three buildings are for the cost groups 300 and 400 gross:

KG 300 11,250,000 EUR gross

KG 400 5.850.000 EUR gross

A total of 17,100,000 EUR gross.

Construction project management services

Land Rheinland-Pfalz, vertreten durch das Ministerium der Finanzen, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Koblenz, vertreten durch die Niederlassungsleitung | Published May 4, 2017  -  Deadline June 1, 2017
cpvs
71541000

Edition, 2014

The contractor's services (AN) comprise the project management services for the project in the fields of action

,

- A: organization, information, coordination and documentation

- B: Qualities and Quantities

- C: Cost and financing

- D: dates, capacities and logistics

- E: insurance and contracts

,

Project levels

,

- PS 3: Preparatory preparation

- PS 4: Execution

- PS 5: Project Completion

,

This results in synergy effects, particularly in the field of laboratory technology as well as in administration.

This results in synergy effects, particularly in the field of laboratory technology as well as in administration.

,

In the area of ​​the laboratory function, the following functional areas are to be depicted in particular by the new program:

Inorganic analysis

Basic analysis food

histology

information and communication

Microbiology (S3 laboratory)

Molecular Biology

breeding ground kitchen

Organic analysis

parasitology

pathology

sample preparation

radionuclides

school

serology

service

TSE

virology

War investigation

Central sampling input

,

If necessary, the laboratory building is equipped, for example, with a canteen area.

,

Contradictions within the regulations are to be examined and taken into account before the service is provided.

,

In particular, it is pointed out that, in addition to the currently applicable legal requirements for barrier-free building and sustainable construction, additional requirements of the client must be taken into account.

,

On the basis of these investigations a decision is made according to the assessment system Federal Sustainable Building (BNB).

Cleaning of concrete and steel construction areas water at the lock loams

Wasser- und Schifffahrtsamt Koblenz | Published February 24, 2015  -  Deadline March 23, 2015
cpvs

Cleaning of concrete and steel construction areas water at the lock loams. The services include cleaning of about 10,129 m² concrete and steel construction areas water in the lock chamber and into the entrance and exit areas (upper and lower main) the ship lock system in the period from 09.06.2015 to 12.06.2015, and residual water drainage until 16.06.2015 , The construction cleaning involves solving, accommodating and transporting the goods to be cleaned. There are approximately 2,445 m² of floor space, 5,758 m² panel and approximately 275 sqm of other areas edit. Furthermore, approximately 1,850 m² surfaces of steel parts water to clean the upper gate lock and -untertor. The surfaces to be cleaned are in operation of the lock mostly under water. The lock is drained prior to this action by the client (AG). The degree of purity is so constructed that damage to concrete or steel hydraulic engineering, especially cracks, preliminarily are clearly visible for a structural inspection. Here are adhering to the surfaces mussel sentence and algae, as well as seasoned stones, gravel, mud, scrap and rubbish of any kind and of different sizes, etc. remove, load and store. The total amount of those to be moved from the clean-en divisions of materials is approximately 1- 3 m³. The water to be cleaned steel components are all provided with a PAH-containing paint.

Ravensteynstraße_Neubau bridge construction

Stadt Koblenz | Published April 5, 2017  -  Deadline May 10, 2017
cpvs
45111100, 45233120, 45221000, 45113000, 45262100, 45223500

Construction work

LBB Niederlassung Koblenz | Published May 26, 2016
Winner
Leymann Keramikbau GmbH & Co. KG
cpvs
45000000

Tiling work.

Vergabeunterlagen can be loaded up to the opening date down free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 24.02.2016. For applicable terms and conditions of procurement marketplace.

Construction work

LBB Niederlassung Koblenz | Published April 8, 2016  -  Deadline May 12, 2016
cpvs
45000000

Repainting;

Vergabeunterlagen can be loaded up to the opening date down free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de from 05.04.2016. For applicable terms and conditions of procurement marketplace.

Construction work for bridges

LBM Cochem-Koblenz Projektmanagement | Published February 3, 2017  -  Deadline March 14, 2017
cpvs
45221100, 45233120, 45453100

B 266 bypass Bad Neuenahr,

Rehabilitation and reinforcement of the bridge Schwertstal incl. Noise barriers and road.

About 150 daily traffic backups, approximately 590 m² Asphalt milling on Structure Pick up approx 690 m² seal, cancel and restore approximately 120 m Hats, replace 1 St. transitional structures, renew 1 St. roadway conclusion, installing ca.122 St. Plates anchor , about 740 m² concrete surface sealing, producing about 600 m² asphalt layers on building, producing about 330 m² reinforcement of the superstructure by reinforced shotcrete, about 4 produced t steel posts for noise protection wall, about 5 600 m² asphalt milling, ca. 5800 Making m² asphalt binder, producing approximately 5600 m² asphalt surface.

Road construction works

Stadt Koblenz | Published November 27, 2015
cpvs
45233120

L 52 Nordtangente_Straßenbauarbeiten.

New construction Kita Neuendorf_Aussputz

Stadt Koblenz | Published June 10, 2017  -  Deadline July 12, 2017
cpvs
45320000, 45410000

New construction Kita Karthause_Rohbauarbeiten

Stadt Koblenz | Published May 3, 2017  -  Deadline May 24, 2017
cpvs
45210000, 45200000