Call +44 800 9755 164

Public tenders for construction in Kiel Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for water projects

Wasserstraßen- und Schifffahrtsamt Kiel-Holtenau | Published February 17, 2017  -  Deadline April 19, 2017
cpvs
45240000

The old locks are secure due to lack of stability. Safety is guaranteed by the construction of cofferdams in the lock heads and the subsequent filling of the cofferdams and the lock chambers with sand, mostly in the underwater installation. Ancillary works, general civil engineering and pipeline construction, installation of sand containers.

Quantities: 3 800 m 2 Piling, 135 000 m 3 Sand.

Road bridge construction work

Landesbetrieb Straßenbau und Verkehr Schleswig-Holstein | Published January 27, 2017  -  Deadline February 28, 2017
cpvs
45221111

In the course of the A21 Bornhöved renewal to Stolpe, the building is to be replaced in 1927 by a new building 504. Width between railings: 30,10 m clear width 14.50 m crossing angle 53.54 gon.

In 2017 the following activities are planned:

Demolition and new construction of the building side Rifa Segeberg the existing building.

In 2018, the following be done:

Demolition and new construction of the building side Rifa Kiel; Dismantling and new construction of a noise barrier at about 150 m length.

In the course of the A21 Bornhöved renewal to Stolpe, the building is to be replaced in 1927 by a new building 504. Width between railings: 30,10 m clear width 14.50 m crossing angle 53.54 gon.

In 2017 the following activities are planned:

Demolition and new construction of the building side Rifa Segeberg the existing building.

In 2018, the following be done:

Demolition and new construction of the building side Rifa Kiel; Dismantling and new construction of a noise barrier at about 150 m length.

Office block construction work

Investitionsbank Schleswig-Holstein | Published February 9, 2017  -  Deadline March 31, 2017
cpvs
45213150, 71221000, 71240000, 79993000, 50700000, 71631300, 90911200

Planning, turnkey construction and building operation of a multi-storey office building (about 21 800 square meters of gross floor area DIN 277: 2005) for the Investment Bank on the grounds with a management period of expected 25 years as part of a life cycle model (PPP model).

The contract includes all of the above II.1.4 called building necessary planning and construction, the construction financing and operating performance of the technical and infrastructural building management. Operate VAT Service (maintenance, inspection, repair) and energy management (media management), maintenance and glass cleaning, pesticides, possibly some installation and support of immobile equipment, exterior building maintenance and insurance. The scope of operation services subject to negotiation.

The long-term financing of investments (after delivery) is not subject of performance of the contractor.

Details are given in the tender documents, which are available publicly at the above Internet address substantially.

Architectural, construction, engineering and inspection services

Land Schleswig-Holstein vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published February 15, 2017  -  Deadline March 17, 2017
cpvs
71000000

Generalplanerleistungen following output images in accordance with HOAI and Special Services:

1-8 and Special Services per JVA

2-4 and 6-8 and Special Services per JVA

Gradual commissioning.

It is the JVAen in Flensburg, Schleswig, Lübeck, Kiel and Neumünster.

The need for measurements (radio field measurements TMO and DMO) in the 5 institutions were provided already through the country and are in the planning basis before.

Depending on the scope of the institution size (number of buildings) are introduced one or more ring compounds with the appropriate number of technical rooms for radio cabinets and roof antennas and feed lines and fiber optic connections.

in those institutions are new or renovation work planned, the planning services are complementary and work in cooperation with the planning of the conversion or new construction.

As the refurbishment of technical rooms with the radio cabinets, laying slit ribbon cables and leads in concealed quality or in panels, the installation of roof antennas, production of ring and fiber optic connections between buildings in partially of underground works, etc ..

Where no NEA is present, such a plan and implement the digital radio network.

When editing the individual JVAen the institutions in Lübeck, Kiel and Neumünster are to be considered the first priority.

The commissioning of planning services is gradual and property-based, the services are accessed respectively.

The works are expected to institution based tendered and contracted in individual trades.

Only the general planning services are ordered jointly commissioned for all 5 JVAen.

B. planning to regulatory requirements, the preparation of the approvable financial documents and the processing of invoices and supplements of exporting companies in the administrative regulations of the country.

Procedural Vergabeunterlagen are set to the e-procurement platform for method http://www.e-vergabe-sh.de/vergabeplattform/bekanntmachungen/.

Construction work for waterways

Wasserstraßen- und Schifffahrtsamt Kiel-Holtenau | Published February 10, 2017  -  Deadline March 30, 2017
cpvs
45247100

Replacement of bestehnden Holzdalbenbündel to turnout Kudensee (Lot 1), Breiholz ​​(Lot 2), Oldenbüttel (item 3) and Brunsbüttel (item 3) by Stahlmonodalben.

Spare Weichendalben Kudensee.

Spare Weichendalben Breiholz.

Spare Weichendalben Oldenbüttel.

Spare Weichendalben Brunsbüttel.

Project-management services other than for construction work

Ministerium für Justiz, Kultur und Europa des Landes Schleswig-Holstein vertreten durch die Gebäudemanagement Schleswig-Holstein AöR | Published February 24, 2017  -  Deadline March 23, 2017
cpvs
79421000

In the states of Brandenburg, Berlin, Bremen and Schleswig-Holstein, the electronic commercial register AUREG is operated. With this system, the generation, storage and retrieval of stored in the trade, cooperative, partnership and association Registration information is possible. The method provides a fully electronic system with an attached strain gages available with which all operations are mapped in the register court.

The states concerned have joined together in a composite development AUREG and formed a steering committee.

Advertised is a composite management AUREG to complete the task, the existing structures of the participating countries and to provide an overarching and coordinating composite control safely. The composite management is to act on behalf of the steering committee and promote the implementation of network goals and cooperation between the alliance partners to the proviso.

Here, the composite management is responsible, inter alia, the following tasks:

- General planning, control and coordination of interconnected events;

- Ensure the flow of information in the network;

- Management and coordination of external partners;

- Coordination and coordination with the international projects.

This should have a smooth as possible and targeted cooperation of stakeholders.

Assignment of the pipe and locks Kabeldükeranlage Kiel - Electrical Equipment and Construction

Wasserstraßen- und Schifffahrtsamt Kiel-Holtenau | Published February 5, 2017
cpvs

New house 6

Städtisches Krankenhaus Kiel GmbH, Chemnitzstraße 33, 24116 Kiel | Published February 1, 2017
cpvs

Demolition and new construction of a hospital building under operation and maintenance of

Engineering services

Landeshauptstadt Kiel, Der Oberbürgermeister | Published February 10, 2017  -  Deadline March 9, 2017
cpvs
71300000

The state capital Kiel intends to historical water-connection between Kiel Fjord and Small Kiel at least visually restore. The core project, the Small Kiel Canal, is centrally located in the street Holsten bridge between the marina and Small Kiel. Implementation of the measure requires diverse building interventions such. B. groundwater lowering, earthworks for making excavations, making the deep foundation with full displacement piles, as well as the preparation of the water basin made of reinforced concrete.

For this measure, construction management services to the professional focus channel and Engineering (deep foundations, reinforced concrete) from autumn 2017 required that are advertised in Europe, two-stage negotiated procedures:

- Stage 1: pre-qualification process with selection 5 participants for attending Level 2

- Level 2: Negotiated.

Construction supervision services according to performance image (see contract documents).

The construction costs for the functions to the local construction supervision tasks are net rd. 3,700,000 EUR.

The site management is taken over by the Civil Engineering Civil Engineering Department, Department.

Details of the production costs and project and planning documents, see previously-called Link (I.3) below information documents.

We remind that the mentioned in the Project times may change in the course of implementation planning in detail yet.

Architectural and related services

Bundesrepublik Deutschland vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published February 24, 2017  -  Deadline March 23, 2017
cpvs
71200000

On the grounds of the Marine NCO School in Plon the construction of a rescue exercise hall is to be created.

The new building is to be erected on the site of the former farm building. The required geotechnical report is created.

The dimensions of the hall will be approximately 34.5 mx 18.5 m, without the accompanying Attachments / Outbuildings. The size of the pool should be 12.5 mx 25 m. The basin is equipped with 2 diving boards (1 m and 3 m), and a jump platform. The pool depth varies from 4 m to 1.3 m. The height of the hall is in the range of about 8.5 m diving platforms. A detailed space program exists.

For Beck training, stainless steel or reinforced concrete, is a variant of examination be performed.

After commissioning of the new building of the old building will be demolished.

The current ENEV and the EEWärmeG should be adhered to. Selected BNB's characteristics are implemented.

Construction costs amount to about 7.74 million EUR gross, of which about 1/3 of the KGR 400 and 300 T EUR for outdoor facilities.

The following deadlines are to be met:

The delivery of the ES-Bau in EW construction quality is to take place by November 2017th

The execution is to take place beginning in March of 2019. The end of the construction period will be in May 2021st The demolition of the old building follows in the wake.

The project will be completed in December 2021st

  • 1