Construction-site supervision services

KASIG – Karlsruher Schieneninfrastruktur-Gesellschaft mbH | Published April 5, 2017  -  Deadline May 10, 2017
cpvs
71521000

To improve traffic conditions through the project "combined solution Karlsruhe" a light rail tunnel is built with 7 underground stations in the wake of the sub-project "City railway tunnel Kaiser street with Südabzweig".

It should therefore now begin the finishing works.

The construction supervision services and SiGeKo- to be provided by 31/07/2017 to the planned commissioning on 15/07/2020.

Especially - but not exclusively - the following main services are included:

- construction supervision for all finishing trades;

- Plan management and design review;

- control and coordination of executive finishing trades;

- Surveying services;

- health and safety coordination for all construction services.

The sub-project 1 - rail tunnel is located in the central, most sensitive inner area of ​​the city of Karlsruhe.

In this area is the "imperial road" the central shopping street for the entire region of Karlsruhe.

In the area of ​​this tunnel route 4 underground stops are provided.

This includes the stop Ettlinger gate of the rail tunnels and the overlying part of the road tunnel Kriegsstraße.

The expansion work will begin in July 2017th

The construction supervision services and SiGeKo- to be provided by 31/07/2017 to the planned commissioning on 15/07/2020.

Especially - but not exclusively - the following main services are included:

- Engineering services for construction supervision for all construction work, especially the trades for the architectural construction, building services and industrial engineering;

- Plan management and design review of the detailed design, the workshop and assembly planning as well as all required Stadsicherheitsnachweise and other calculations;

- ENTIRE control and coordination of executive finishing trades on site and support of site management (BOL) of the AG in the overall coordination;

- provision of all required surveying services for the maintenance and continuation of the control network and all control measurements;

- health and safety coordination for all construction work in the construction field to restore the surfaces in the vicinity of the exits and ramps.

Metal construction work

Staatliches Hochbauamt Baden-Baden | Published November 26, 2015  -  Deadline April 30, 2018
cpvs
45232

KA KA BImA BW-Neur. MATL 2 BU 2015 / Geb.8284 ENEV roof + facade Type of service: Metal construction DIN 18360 (Roof + Facade) Scope of services: -ca. 3,500 m² roof sandwich panel steel -ca. 1,200 m² of wall sandwich panel steel

Department for road construction and geotechnical engineering, Gebäudeinnenreinigung

Vermögen und Bau Baden-Württemberg Amt Karlsruhe | Published March 30, 2017  -  Deadline May 9, 2017
cpvs

Department for road construction and geotechnical engineering, Gebäudeinnenreinigung

Building construction work

Volkswohnung GmbH | Published April 8, 2017
cpvs
45210000, 45211100

Residential Park Egon Eiermann Avenue:

6 rental housing with a total of 71 units on

about 5 750 meters 2 Living space on common parking garage.

The residential park is divided into two parts:

Four freely funded, dreieinhalbgeschossige point blocks as Dreispänner each with 11 units, in the rear land area.

2 row houses along the Egon Eiermann Avenue,

27 socially bonded apartments that meet the requirements of the Act for LaWoFö Sozialmietwohnraumförderung.

On the ground seven commercial units.

All staircases have access to underground parking with 78 parking spaces.

Masonry construction with exterior walls made of gas concrete, reinforced concrete ceilings and extensive green flat roofs. Load distribution on the load-bearing interior walls in KS. In the area of ​​underground load distribution on the supports.

District heating.

Energy standard: KfW 70 -30%.

Construction work for residential parking Egon Eiermann Avenue:

Six rental housing a total of 71 housing units on approximately 5,750 m 2 Living space on common parking garage.

Construction-related services

KASIG – Karlsruher Schieneninfrastruktur-Gesellschaft mbH | Published March 21, 2017  -  Deadline May 9, 2017
cpvs
71500000

To improve traffic conditions through the project "Combined solution Karlsruhe" a rail tunnel is built with 7 underground stations as part of the subproject "City railway tunnel Kaiserstraße with Südabzweig".

It will now start the expansion work therefore.

The requested services here for the central logistics management include the planned logistics services

The

Logistics services to be provided by 07/31/2017 to the planned start on 15.07.2020.

In particular - but not exclusively - includes the following main benefits:

- Individuals access control,

- Transport Logistic Services,

- Construction land management,

- Waste logistics / management / maintenance cleaning, etc.,

- Site organization,

Performance areas.

The subproject 1 - rail tunnel is located in the central, most sensitive area of ​​the inner city of Karlsruhe.

In this area is the "Kaiserstraße" the central shopping area for the entire region

Karlsruhe.

2.4km, extending in east-west direction rail tunnel,

In the area of

Tunnel route are 4 underground stations provided.

1.2 km long tunnel in the

In Südabzweig 3

By

Passing under the planned road tunnel in the war road is a junction structure required the

This includes the stop Ettlinger Tor of city railway tunnel and above it

Part of the road tunnel Kriegsstraße.

The expansion work is expected to begin in July 2017th

The requested here logistics services include the planned outputs for the central logistics management

The

Logistics services to be provided by 07/31/2017 to the planned start on 15.07.2020.

In particular - but not exclusively - the following main services are required:

- People access control

Access control system, building site badges, perceiving the householder powers

Security guard ,.

- Transport logistics services

Detection and control of the transport trips to the installation locations; Provision of Equipment,

Performing transportation from terminals to the installation site, management of interim storage

Construction materials.

- Construction land management

B .: Container and media supply, construction site lighting, building site signage, escape and

Escape routes, warehouses and garages, etc.

- Waste logistics / management / maintenance cleaning, etc.

- Site organization

Ask and entertaining site equipment, scaffolding, winter maintenance, hoarding, ventilation etc.

performance areas

B .: Implementation planning logistics, planning emergency exit routes, planning bauzeit pending

Fire protection concept, planning personnel access control, planning site equipment, etc.,

2016 target planning new construction projects House M

Städtisches Klinikum Karlsruhe gGmbH | Published March 31, 2017  -  Deadline May 11, 2017
cpvs

Construction of a hospital building (house M), with medical service areas, central emergency room, intensive care, central OP (20 halls), Central Sterile, General care. Total gross floor area of ​​53,600 sqm, a low-floor, six upper floors, manufacturing costs (KG 200 to 600) excluding VAT: 121 456 800 €.

2016 target planning new construction projects House M

Städtisches Klinikum Karlsruhe gGmbH | Published March 29, 2017  -  Deadline May 16, 2017
cpvs

Bodyshell, earth-moving and construction work steel, and prefabricated wet cells of a new building a hospital building (house M), with medical service areas, central emergency room, intensive care, central OP (20 halls), Central Sterile, General care. Total gross floor area 53,600 m2, a basement, six upper floors, manufacturing costs (KG 200 to 600) excluding VAT .: 121 456 800 EUR.

Engineering design services for the construction of civil engineering works

Volkswohnung GmbH | Published April 26, 2017  -  Deadline May 24, 2017
cpvs
71322000, 71315000

Volkswohnung GmbH, negotiation procedure TNW, planning of the technical equipment § 55 HOAI Lph 1-9, development of the district Daxlanden, construction of about 400 apartments, 76189 Karlsruhe, August-Dosenbach-Straße.

Volkswohnung GmbH intends to build 400 new apartments on the grounds of the former sports field in Karlsruhe Daxlanden. On the basis of ASTOC's award-winning competition, it is planned to train two sub-areas on both sides of the urban railway line, taking into account the existing tree stock.

There are plans for 1 to 5 room apartments as subsidized and freilanced apartments. The noise protection of the apartments represents a special challenge. A total of approx. 30,000 m² of living space is to be realized.

KIT Campus South, reorganization Engler-Bunte-Institute, the first phase of construction, LECTURE HALL-STYLE

Vermögen und Bau Baden-Württemberg Amt Karlsruhe | Published April 6, 2017  -  Deadline May 3, 2017
cpvs

KIT Campus South, reorganization Engler-Bunte-Institute, the first phase of construction, LECTURE HALL-STYLE

Construction work for buildings relating to health

Städtisches Klinikum Karlsruhe gGmbH | Published March 30, 2017  -  Deadline May 16, 2017
cpvs
45215100, 45112400, 45262300, 45262310, 45262522, 45320000, 45211310, 45223821

Bodyshell, earth-moving and construction work steel, and prefabricated wet cells of a new building a hospital building (house M), with medical service areas, central emergency room, intensive care, central OP (20 halls), Central Sterile, General care. Total gross floor area 53,600 sqm, a basement, 6 storeys,

Production costs (KG 200 to 600) excluding VAT .: 121 456 800 EUR.

- about 18 000 m³ excavation, loosening excavated material,

- about 11 000 m³ Disposal of excavated material Z0 - Z2,

- approximately 11 260 m² subbase,

- about 11,500 m² in situ concrete floor slab,

- approximately 3490 m² WU starboard outer walls,

- approximately 11 360 sqm starboard outer walls,

- approximately 11 290 m² starboard inner walls,

- approximately 205 m tr-lnnenstütze round,

- about 725 m³ tr-lnnenstütze rectangular,

- about 48,600 sqm Stb ceiling tiles,

- about 4 550 tons of reinforcing steel,

- approximately 450 m² KS-masonry exterior walls,

- approximately 8300 m² KS-masonry interior walls,

- approximately 10 360 sqm sealing compound system below the base plate / foundations,

- about 9,970 sqm perimeter insulation XPS below the base plate / fund office,

- 22 000 m² piping (concrete core activation)

- about 3 St. assembly and dismantling vacuum drainage system,

- about 129 St. prefabricated bathrooms.

New construction of the KVBW head office, Karlsruhe; Here: floor coating work

Kommunaler Versorgungsverband Baden-Württemberg, Zentrale Vergabestelle | Published April 19, 2017  -  Deadline May 9, 2017
cpvs

The municipal utility association of Baden-Württemberg (KVBW) is planning the construction of its main administration in Karlsruhe. The property is located on the corner of Ludwig-Erhard-Allee / Hennebergstraße on a major main road in the east of the city. The new main administration has a one-storey underground car park with natural ventilation, a ground floor and a total of seven upper floors. From the 4th floor, successive parts of the building are gradually reverted as relays. The office building, with its four upper floors of approx. 14-16 m building depth in the main floors and up to 26 m building depth in the conference area EG, forms a trapezoidal block with an inner courtyard.

Karlsruhe University of Applied Sciences, Building M, facade renovation, metal construction, glazing, hardware and Rolladen- and demolition work

Vermögen und Bau Baden-Württemberg Amt Karlsruhe | Published April 6, 2017  -  Deadline May 9, 2017
cpvs

Karlsruhe University of Applied Sciences, Building M, facade renovation, metal construction, glazing, hardware and Rolladen- and demolition work

Karlsruhe, Materiallager 1 (KA MATLA1 Ernerg San Hall 9852), steel and metal construction work DIN 18335, 18360

Staatliches Hochbauamt Baden-Baden | Published April 20, 2017  -  Deadline May 18, 2017
cpvs

Karlsruhe, Materiallager 1 (KA MATLA1 Ernerg San Hall 9852), steel and metal construction work DIN 18335, 18360

Architectural, construction, engineering and inspection services

Deutsche Bahn AG, Beschaffung Infrastruktur, Region Südwest | Published April 5, 2017
cpvs
71000000

Prequalification of firms for the design of systems of control and safety systems of the German BahnAG and its affiliates.

Karlsruhe, Old Cemetery - Ground restoration, 2nd construction section

Stadt Karlsruhe - Gartenbauamt, Lammstraße 7a, 76124 Karlsruhe | Published April 21, 2017  -  Deadline May 30, 2017
cpvs

ID: 17 16 67 02

Installation of doors and windows

Volkswohnung GmbH | Published April 12, 2017  -  Deadline May 10, 2017
cpvs
45421130, 45421145

New construction of 67 housing units in Oberreut-South, construction site B, 76189 Karlsruhe, Graf-Stauffenberg-Straße 19-24, plastic windows and shutters.

New construction of 67 apartments in Oberreut-South, construction site B,

76189 Karlsruhe, Graf-Stauffenberg-Straße 19-24

Residential units: 67,

Underground parking spaces: 67

Entrances / staircases: 6,

Lifts 6,

BGF with underground parking: about 10,980 sqm,

BRI with underground: 31,851 m³,

WFL: about 5 111 sqm.

Project: A multi-family residential building energy standard KfW 55 with district heating. The building is full basement, with attached parking garage in the range of three doorways. Four entrances with 3 full floors and each an engaged attic. Two entrances, each with four full floors and each an engaged attic. 11 barrier-free apartments in accordance with § 35 LBO and a wheelchair-accessible apartment in accordance with DIN 18040 Part 2. flat roofs with extensive green roofs, underground ceiling greened partially intense, as part of the outdoor facilities. Exterior masonry of sand-lime brick with EIFS.

Plastic windows / shutters

- about 340 plastic windows / doors;

- of which approximately 75 outputs with fixed glazing;

- shutters with crank drive on all windows;

- The buildings are created in KFW-55 standard.

Precise details of the work can be found in the LV.

Roof insulation work

Volkswohnung GmbH | Published April 12, 2017  -  Deadline May 10, 2017
cpvs
45261410, 45261210

New construction of 67 housing units in Oberreut-South, construction site B, 76189 Karlsruhe, Graf-Stauffenberg-Straße 19-24, Dachabdichtungs- and roofing works.

New construction of 67 apartments in Oberreut-South, construction site B,

76189 Karlsruhe, Graf-Stauffenberg-Straße 19-24,

Residential units: 67,

Underground parking spaces: 67

Entrances / staircases: 6,

Lifts 6,

BGF with underground parking: about 10,980 sqm,

BRI with underground: 31,851 m³,

WFL: about 5 111 sqm.

Project: A multi-family residential building energy standard KfW 55 with district heating. The building is full basement, with attached parking garage in the range of three doorways. Four entrances, each with three full floors and each an engaged attic. Two entrances, each with four full floors and each an engaged attic. 11 barrier-free apartments in accordance with § 35 LBO and a wheelchair-accessible apartment in accordance with DIN 18040 Part 2. flat roofs with extensive green roofs, underground ceiling greened partially intense, as part of the outdoor facilities. Exterior masonry of sand-lime brick with EIFS.

Dachabdichtungs- and roofing works

- about 1 450 m 2 Roof;

- 52 loggias + current in the penthouse level;

- bituminous roof sealing;

- extensive planting of roof surfaces;

- The buildings are created in KFW-55 standard.

Precise details of the work can be found in the LV.

Geotechnical engineering services

Regierungspräsidium Karlsruhe, Landesbetrieb Gewässer | Published April 19, 2017  -  Deadline May 19, 2017
cpvs
71332000, 71322400, 71521000

With the upgrading of the flood protection is related. Of stability and accessibility (wall defense pathways) of the dams in accordance with the generally accepted rules of the art are improved, in particular by the dam profile is widened by flattening of the embankments and the production of land-based berms.

These services include the creation of a quality assurance plan geotechnical engineering, geotechnical construction supervision and quality control during construction (external monitoring), verification of installation materials, field work and laboratory work for control tests and general geotechnical consulting.

The structural implementation is partially provided in a total of 8 contract sections.

The scope of services to be awarded includes the following partial services:

1) Creation of a quality plan geotechnical engineering.

2) geotechnical consulting during the detailed design and construction as necessary.

3) on-site visits by the expert for meetings and spot checks.

4) assessing the suitability and release of the materials for the dam structure.

Create audit reports.

More information about the project:

The ertüchtigende to dam portion is located in the district of Rastatt in the districts Au am Rhein, Elchesheim-Illingen, stone walls and Rastatt.

The zoning decision of the District Office Rastatt from 02/15/2016 is final.

Therefore, the improvement measures should be carried out in delayed phases.

The eight building lots set in turn, comprise a total of 19 dam sections.

6.9 km):

- km -1-000 (Murgdamm to 0 + 000) to km 5 + 900

Intermediate section 0.4 kilometers without measures.

EUR 7.6 million

7.1 km):

- km 5 + 900 to km 13 + 020

- with the contract sections BL 5, 6 BL, BL and BL 7 8.2

EUR 10.8 million

The contractor is obliged to work as part of its services to optimize the construction period.

Gradual commissioning

The geotechnical services to be awarded to all eight building lots, with a gradual commissioning is provided (see point II.2.11).

Project participants and staff capacity

The overall completion of the project is characterized by a higher than average complexity.

This is with regard to personnel availability and personnel capacity - even taking into account holiday periods and any sick leave - to be considered.

A more detailed description of the power positions, and stepwise assignment is provided with the contract documents in the negotiation process.

Scaffolding work

Vincentius-Diakonissen-Kliniken gAG | Published April 5, 2017  -  Deadline May 9, 2017
cpvs
45262100

Creation of facade and interior scaffolding during the construction of a hospital building with approximately 56,000 m 2 BGF and a total investment of about 180 000 000 EUR.

Approximately 15,500 m 2 Facade scaffolding, primarily load class 3, height up to 22 m, incl. Consoles,

about 9300 m 2 Space frame predominantly load class 3, height to about 15 m, exterior and interior,

2 Scaffolding lifts 1.5 t incl. Ramp and bridge constructions.

Structural steelworks

Vincentius-Diakonissen-Kliniken gAG | Published April 5, 2017  -  Deadline May 9, 2017
cpvs
45223210

Creation of steel structures and locksmith services in connection with the construction of a hospital building with approximately 56,000 m 2 BGF and a total investment of about 180 000 000 EUR.

Approximately 42 to design / structural steel for structures of grate levels;

about 750 m 2 Gratings;

10 façade insert elements (doors, grilles);

2 pieces staircases exterior and interior;

about 5 ladder stairs in the outer space;

Roof railing, bumper.