Chemical Institute Heidelberg, removal of hazardous materials and general building maintenance, metal construction work -. LM single window

Vermögen und Bau Baden-Württemberg Universitätsbauamt Heidelberg | Published March 23, 2017  -  Deadline April 18, 2017
cpvs

Chemical Institute Heidelberg, removal of hazardous materials and general building maintenance, metal construction work -. LM single window

Steel glass doors

Ernst² Architekten AG, Martin- Luther- Str. 40, 70372 Stuttgart | Published March 15, 2017  -  Deadline April 12, 2017
cpvs

The construction project is the expansion of clinics Schmieder in Heidelberg to the II. Phase of construction. The new-build II. Phase of construction is located on the existing underground and extends beyond this, with a projection on the east side and supports over a part of the underground car park. The building will be constructed from the ground floor to the 3rd floor in concrete frame construction with austeifenden walls. The 4th op floor attic, built as a mezzanine floor, in steel construction. The interior non-bearing walls are built as drywalls. An overview of the work that come to perform: 1.) steel and glass elements T30 / RS, EC DG, 8 St. 2.) glass sliding double-wing, DG, 2 St.

locksmithing

Ernst² Architekten AG, Martin- Luther- Str. 40, 70372 Stuttgart | Published March 3, 2017  -  Deadline March 31, 2017
cpvs

The construction project is the expansion of clinics Schmieder in Heidelberg to the II. Phase of construction. The new-build II. Phase of construction is located on the existing underground and extends beyond this, with a projection on the east side and supports over a part of the underground car park. The building will be constructed from the ground floor to the 3rd floor in concrete frame construction with austeifenden walls. The 4th op floor attic, built as a mezzanine floor, in steel construction. The interior non-bearing walls are built as drywalls. A breakdown of locksmith services that come to perform: 1.) Bannister as Staketengeländer with Flachstahlstaketen in two stairwells on 4-and 5 floors 2.) Handrails in hallways, about 160 m 3) railing outdoors, approximately 7.5 m

Tischlerarbeiten- interior doors

Ernst² Architekten AG, Martin- Luther- Str. 40, 70372 Stuttgart | Published March 24, 2017  -  Deadline April 28, 2017
cpvs

The construction project is the expansion of clinics Schmieder in Heidelberg to the II. Phase of construction. The new-build II. Stage of construction is on the existing underground and extends beyond these, with a projection on the east side and supports over a part of the garage entrance. The building is built from the ground floor to the 3rd floor in concrete frame construction with austeifenden walls. The fourth Obergeschoss- attic is built as a mezzanine floor in steel structure. The interior non-load bearing walls are built as drywall. An overview of the work are authorized to execute: Stahlblechzargen two parts, with wooden door panels, as commercial doors, all door panels HPL coated first) patient room doors, about 77 St. 2.) wet cell doors, about 72 St. 3) In addition to rooms, offices, therapy rooms, about 26 St. 4) doors with fire protection requirements, about 25 St. 5.) Sondertüren- glass sliding doors, about 5 St.

Metal construction, fittings, glazing work, plastic window

Staatliches Hochbauamt Baden-Baden | Published August 13, 2015  -  Deadline May 29, 2017
cpvs
45213

. ST Bima - DL THW Horb rehousing conversion Hall 20 Main HBK Type of service: metal construction, hardware and glazing work DIN 18360, 18357, 18361, plastic windows scope of performance: expansion: 2 St metal doors and 3 St windows, Installation: 4 St aluminum door elements and 4 St plastic windows

Recycling center / disposal

Vermögen und Bau Baden-Württemberg Universitätsbauamt Heidelberg | Published March 5, 2015  -  Deadline November 17, 2017
cpvs
45213

New Surgical University Clinic Heidelberg University Hospital, 1 BA Type of service: recycling center / Disposal scope of services: Set up recycling center, operate, recyclable materials recycling, waste dispose of construction debris mineral: about 475 t, rubble plaster base: approx 600 tons of wood-based materials: ca. 400 tons, metal: about 115 t of plastics: about 100 t, Other: 100 t tenderers and their descendants and rental business owners have with their bids the relevant undertakings pursuant to § 5 LTMG, accessible at "www.rp- stuttgart.de /servlet/PB/menu/1359260/index.html "to submit.