infra Infrastrukturgesellschaft Region Hannover GmbH | Published January 10, 2017  -  Deadline February 16, 2017

Track and Road Construction.

The present construction project for the construction phases 3 in the area of ​​Stone Gate Square to the Goethestrasse overall measure Ten / Seventeen - Expansion of city railway line D-West for the lines 10 and 17 in downtown Hanover includes rail and road construction work including preparation of the side rooms. , Kabeltiefbau- and drainage services and the preparatory civil works of the raised platform of the station Steintor and temporary adjustments to the MIV in rail and road space.

Main amounts Tender Project 10/17 sections 4 + 3

2 250 m 2 Asphalt pavement break and use;

1550 m 2 and dispose of concrete paving;

and dispose of 1130 m concrete track with grooved rail;

and dispose of 2580 m2 large paving in the track area;

1100 m3 under concrete slab sawing, break up and dispose of;

5000 m 2 Making subgrade for traffic areas;

4350 t crushed stone base material delivery and installation 0/32;

8050 m 2 manufacture asphalt surfacing for traffic areas;

640 m concrete sleeper track RhedaCity Asphalt od. Glw. manufacturing;

230 m concrete sleeper track RhedaCity Green od. Glw. manufacture.

Building construction work

Landeshauptstadt Hannover, Zentrale Submission für Fachbereich Gebäudemanagement | Published January 3, 2017  -  Deadline January 25, 2017

Excavation, base course and backfill, concrete and reinforced concrete, reinforced concrete precast and prestressed concrete ties, constructive steel construction, KS-masonry, brickwork foreseeable implementation: March 2017 to January 2019.

Secondary school construction work

Landeshauptstadt Hannover, Zentrale Submission für Fachbereich Gebäudemanagement | Published January 21, 2017  -  Deadline February 24, 2017
The operation and recovery will not be awarded with and fall within the remit of the state capital of Hanover. 

The buildings are to be constructed to passive house standards.

Currently about 938 students, the school and for the future of the new building up to 1362 students is aligned.

The planned construction work can be implemented with the current development plan.

The first phase must be completed by autumn 2020 at the latest.

The completion of the last phase of construction is planned for 2018th

In their place, an extension is to be built, which is to cover the space shortfall for the introduction of G9.

Construction work

Handwerkskammer Hannover | Published January 11, 2017  -  Deadline February 14, 2017

The Handwerkskammer Hannover intends at Campus crafts in Garbsen, Seeweg 4, parts of the building [K] - department: Body, painter and varnishing, [J] - Department: Joiners, Glaziers and Painters' and [F] - Department: Painters and Electrical - energetically to modernize. The construction project is depending on the component, staggered in three sections. Component [K] in 2016/2017, component [J] in 2017/2018 and component [F] in 2018/2019. The total area of ​​the conversion measure is approx 3 750m 2 , Tenders must be written in German.

Tenders are invited to work the outside facilities as earthwork and paving, excavating gravels inventory including deep Borden, delivering and introducing new deep shelves with concrete back, gravel layers with fleece and bubble wrap, delivering and placing pavement with base mineral mixture, grit, shaking off and one walls in front of the façade surfaces. Furthermore Low Goss stones reroute them and bring topsoil and Raseneinsaat.

Component [K]: approximately 75 running meters facades, total approximately 1 m wide

Component [J]: approximately 70 running meters facades, total approximately 1 m wide

Component [F]: approximately 75 running meters facades, total about 1 m wide.

Construction work

üstra Hannoversche Verkehrsbetriebe AG | Published December 14, 2016  -  Deadline January 31, 2017

Plumbing in buildings.

Plumbing in buildings with 500 m drainage pipes made from plastic pipes PE / PP, about 430 m drinking water pipes made of copper or stainless steel tube, sanitary ware for a toilet facility and a disabled toilet, 1 drinking water separation station 96 m 3 /H.

Construction work

üstra Hannoversche Verkehrsbetriebe AG | Published December 14, 2016  -  Deadline February 2, 2017

Installation of ventilation central units, roof fans, duct fans, rectangular duct, outdoor refrigerators, cold indoor units, refrigerant piping with hose insulation, dismantling supply and exhaust air and ventilation ducts.

galv installing 2 central ventilation devices, 14 roof fans, tube fans 7, 355 m². Rectangular duct, 1 550 meters galv. Wickelfaltrohr, 310 outlets, 29 pc. BSK, 195 m² Wärmdämmung alukaschiert, 55 m² sheet metal casing, 35m² foam insulation, 40 m² L90 Abkleidung, 2 outdoor refrigerators, 9 cold indoor units, 290 m refrigerant piping with hose insulation, 3 Dismantling supply and exhaust units, 13 Disassembly exhaust fans, 330 m² dismantling ventilation ducts.

Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry

Landeshauptstadt Hannover, Zentrale Submission für Stadtentwässerung Hannover | Published January 12, 2017

The Phase 1 includes the construction of a power station with gas storage and media channel. Subject of Gewerkes LV 1090-07 are the benefits "construction with expansion".

The main benefits are:

- Site equipment,

- 4000 m 3 Earthwork,

- 3600 m 3 Concrete work,

- 15 000 m 2 Formwork,

- 450 t reinforcement,

- 79 pcs windows, interior and exterior doors.

- 1500 m 2 Facades (Wärmedämmverbundsystem)

- 24 t of steel and metal construction,

- 1 000 meters 2 Roofing works,

- 2700 m 2 Screed, tile and floor coating work,

- 10 000 m 2 Repainting.

See I.2.4.

Catenary's construction works

infra Infrastrukturgesellschaft Region Hannover GmbH | Published December 6, 2016  -  Deadline February 2, 2017

Content of these specifications is the reconstruction of the catenary system in

The course of the barrier-free expansion of the new station Hauptbahnhof / ZOB. The

Building project is located in the city of Hannover, Mitte district.

9 St. tube ups;

. 2 St. prov foundations;

11 St. catenary, Peiner-profile or round steel poles;

2 St. prov catenary.

590 m 2 Bridge protection;

52 St. elastic ceiling mount;

1200 m high catenary;

750m simple contact lines as a double-contact wire;

7 St. transverse fields;

10 St. curve extracts;

2 St. oblique boom;

15 St. E-connector;

1 St. dome switch with manual drive;

1 St. Cable Mounting for feed switch;

2 St. lightning protection;

1 St. switch-box;

Switching work for foreign trades;

2200 m dismantling high catenary incl. Bracing.

Load-bearing structure design services

Landeshauptstadt Hannover, Zentrale Submission für Fachbereich Gebäudemanagement | Published December 24, 2016  -  Deadline February 3, 2017
In the renovation of the stock and the necessary expansion of the increased demands inclusion, fire protection and energy saving regulation should be considered. 

EUR gross (KG 200-700).

quarter 2017

Estimated construction period: 2018-2020.

Specialized services in the power stage. 8

Gradual commissioning:

The client reserves the right to limit the assignment to partial performance of individual service phases or on individual sections of the building project.

The authority intends in continuing the planning and execution of the construction work more services - individually or as a whole - retrieve.

When deciding on the demand of the other services the customer is taken into account that this is the political decisions and the approval of the HU-construction / building board presupposes normally.

A legal claim to commission further work phases does not exist.

From the gradual commissioning the contractor may not derive any increase in his fee.

Special services must be agreed in writing prior to execution.

Applicable for planners based in Germany is the HOAI in the currently valid version assignment.

In addition are the AVB's for architects and engineers of the client under the access referred to in paragraph I.3 available.

Works for complete or part construction and civil engineering work

üstra Hannoversche Verkehrsbetriebe AG | Published December 10, 2016  -  Deadline January 26, 2017

Lot 1: supply of patterned stone floor panels;

Lot 2: Natural and stone work in indoor and outdoor applications.

Lot 1 (VOL): procurement and delivery free site of patterned stone floor plates in different formats. Total about 290 m². Execution of various surface treatments and cuts to prepare various non-slip classes.

Lot 2 (VOB): The measures described below is natural and stone work in indoor and outdoor applications. So it is small-scale measures, such as giving workup work of existing floors, as well as large-scale installation work of natural and cast stone. In the processed pads is marble, stone and granite, which must be partly necessarily patterned to meet the historic preservation requirements. Particular attention will be paid to the transition between the old and new floor coverings.

Partial are exact allowances and documentation required onsite to accommodate a particular joint grid z. B.. An embodiment is possible only in separate time segments.

Construction and ancillary works for telephone and communication lines

Niedersächsische Landesbehörde für Straßenbau und Verkehr | Published January 4, 2017  -  Deadline February 9, 2017

Distance telecommunications cables, delivery and installation.

10.65 km distance telecommunication cables 24 DA, 12 km fiber optic cable 48 F, ran. and mont.

Hannover Medical School, construction of a PET hot labs in Building K7 - monitoring system for clean room and a hot cell complex

Staatliches Baumanagement Hannover | Published January 18, 2017  -  Deadline February 1, 2017

Structural shell work

infra Infrastrukturgesellschaft Region Hannover GmbH | Published January 17, 2017  -  Deadline February 23, 2017

This bid document includes the execution of the building shell and insulation services and locksmith services for elevators and stairs in the course of the project Ten / Seventeen Section 3 in the stop Steintor.

The newly constructed high platform (not part of the LV) must be connected by a staircase structure with the distribution level of the existing underground station. In addition, the street level is connected by a new elevator with the distributor level and two more lifts lead from the distributor level to platform level. The body shop and Waterproofing services and locksmith services for these measures are provided for the period mid-May to September 2017th

Road / LSA Technology

Region Hannover | Published December 14, 2016  -  Deadline January 31, 2017
Action: - road / LSA technology projects: construction of a crossing aid and a traffic signal in Gestorf; Springe Scope: road construction, civil engineering and paving work for the construction of a crossing aid and the reconstruction of an intersection: including Straßenaufbruch-, Entwässerungsleitungsbau-, paving. -, Asphaltbau- and road marking works

Firefighting vehicles

Kommunale Wirtschafts- und Leistungsgesellschaft (KWL) | Published January 11, 2017  -  Deadline February 21, 2017

1 Rüstwagen RW according to DIN 14555-3.

Lot 1: Chassis;

Lot 2: construction.

Firefighting vehicles

Kommunale Wirtschafts- und Leistungsgesellschaft (KWL) | Published January 11, 2017  -  Deadline February 21, 2017

1 Rüstwagen RW / L in accordance with DIN 14555-3.

Lot 1: chassis,

Lot 2: construction.

Firefighting vehicles

Kommunale Wirtschafts- und Leistungsgesellschaft (KWL) | Published January 6, 2017  -  Deadline February 14, 2017

1 turntable ladder DLAK 23/12 according to DIN EN 14043

Lot 1: Chassis

Lot 2: construction.

Demolition work

Staatliches Baumanagement Hannover | Published January 13, 2017  -  Deadline February 2, 2017

Lower Saxony State Health Department - Extension;

Demolition 16 E 40788th

Partial demolition of an existing building. Outboard closed stair tower with elevator shaft in

Solid construction. Area approximately 60 m 2 ; Height 11 m (5 floors).

Detached garage and storage building in solid construction with a pitched roof as wooden construction. Area approximately 80 m 2 , Ridge height 5 m. Bicycle shed as freestanding wooden structure with a gable roof. Area approximately 45 m 2 , Ridge height of 2.50 m. Foundations and pollutants are considered.

Screed works

Leibniz Universität Hannover | Published January 21, 2017  -  Deadline March 14, 2017

New Faculty of Mechanical Engineering in Garbsen, 2.BA - VE009 Estricharbeiten.

College campus with an area NF 22,250 sqm, 4 Building Institute of mechanical engineering with testing facilities, laboratories, workshops, technical buildings, auditorium and cafeteria building, house for students and dean's office. Including outdoor facilities. The construction project will be tendered and awarded in accordance with VOB Part C in about 50 procurement units.

- Approximately 2 160 m² floor bituminous waterproofing,

- Approximately 25 695 m² topping 15 mm - 50 mm,

- Approximately 9960 m² Hartkorneinstreuung the topping in the halls,

- Approximately 220 m² Cement screed on separating layer 30 mm / 85 mm,

- Approximately 460 m² Floating floor 45 mm,

- Approximately 4500 m² Floating floor 65 mm - 75 mm,

- Approximately 345 m² special cement screed, floating 100 mm - 123 mm,

- Increased flatness requirements,

- Large multi-storey buildings, appropriate paths length,

- 7 buildings with different starting work.

  • 1