Bus station construction work

Hamburger Hochbahn AG | Published November 22, 2016  -  Deadline December 20, 2016

As part of the construction of a new Busbetriebshofs following buildings are constructed on the approximately 6-hectare plot.

Office buildings (9345m3 BRI), repair shop (39577m3 BRI), maintenance hangar (17019m3 BRI)

To this end, earthworks and road construction projects incl. Underground tanks are advertised.

Bus station construction work

Hamburger Hochbahn AG | Published November 16, 2016  -  Deadline December 20, 2016

As part of the construction of a new Busbetriebshofs following buildings are constructed on the approximately 6-hectare plot.

Administrative buildings (9 345 m 3 BRI), service station (39 577 m 3 BRI), maintenance hangar (17 019 m 3 BRI).

To this end, earthworks and road construction projects incl. Underground tanks are advertised.

There are planned following earthworks and road construction:

- Road construction from:

- Approximately 13 500 meters 2 paved roads;

- Approximately 19 200 meters 2 paved roads for stationary traffic;

- Approximately 3 600 meters Borde;

- 90 m 2 WHG-surface;

- Approximately 1 000 meters 2 Paving slabs;

- 150 m 2 heated area;

- 30 m 2 markers;

- Construction of underground tanks (6 pieces) and underground catch basin (3 pieces);

- Basement excavation and disposal of approximately 5 000m 3 ;

- Creation of final two ramps as earth system;

- Reacting existing access roads with gravel base layer (about 3 000m 2 );

- Removal and disposal of soil (about 5 000m 3 );

- Construction of Sielanlagen for supply and disposal of different media.

Secondary school construction work

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published November 22, 2016  -  Deadline December 22, 2016

It is to realize two new buildings on the land In the Paul-Gerhardt-Kirche 1-3 and on the plot Daimlerstraße 40 for the Max-Brauer-school. In each case, a two-story building with classrooms with about 1 600 meters 2 or 1030 m 2 BGF create in wood construction with solid wooden walls and timber-concrete composite floors. There are planning- and implementation services required.

1600 m 2 BGF than two-storey building in wood construction.

1030 m 2 BGF than two-storey building in wood construction.

Primary school construction work

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published November 22, 2016  -  Deadline December 20, 2016

Construction of Goldbek-school, 3-storey primary school with single span Gymnasium, warm kitchen with dining room, technical rooms, 15 general classrooms plus differentiation and administration area, NGF total about 4 390 m 2 And open space design incl. Underground drainage.

Approximately 75 m 2 Wall and ceiling coverings, Rollladen- space separation plant for kitchen output, built-in furniture for kitchens.

Construction work for university buildings

GMH | Gebäudemanagement Hamburg GmbH | Published November 15, 2016  -  Deadline December 2, 2016

GMH is building for the University of Hamburg, Department of Chemistry on campus Bundesstraße / Sedan road in Hamburg's Rotherbaum a single storey, underground engineering building with about 440 m 2 BGF to house the central compressed air supply, the BMA, the Fermwärmeübergabestation, medium voltage switchgear and low voltage distribution boards, a diesel emergency generator as NEA. (Component C).

Another ground-underground building with approximately 65 m 2 BGF as water supply structure and redundant fire water tanks to ensure the fire water supply (part D). The access to the site is via Sedanstraße.

In stock a two-storey extension for a new lodge with utility room on the ground floor and 2 storage rooms will be built in the basement, BGF total ca. 70 m 2 created. The site may only be operated with crane. A direct access road to the construction site is not possible. (Component e) the commencement and completion of the entire construction is expected from September 2016 to July 2017.

Covered market construction work

Freie und Hansestadt Hamburg; Großmarkt Obst, Gemüse und Blumen | Published November 11, 2016  -  Deadline December 2, 2016

Advanced structural work.

There are e-carts sweep of reinforced concrete, which connect the EC on the ZG with the basement on the west and east sides of the 40,000 m2 hall.

It may be necessary due to static requirements reinforcement measures. In the area of ​​charging stations in the CC carried out a new pitch division.

The construction work carried out in 4 parts during operation.

Major works:

Dust protection and enclosures

450 m concrete curbs cancel u. Restore

erode and leave 1 150 m² floor covering

170 m² demolition and restoration of masonry

Cancel 120 m³ ceiling panels by HDW

600 m² new inclined Stahlbetondecken

Installation of steel beams with intumescent underside of existing ceilings

Support reinforcements with in-situ concrete

1 150 m² concrete surface smooth, shot blasting, fitted floor coating OS 8

120 m² floor incl. Reinforcement insert, shot-peening, surface, recessed Floor Coating OS 8

1100 m² New aerated concrete masonry with fitted doors.

Primary school construction work

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published November 19, 2016  -  Deadline December 21, 2016

The listed property (built in 1928) school Leuschnerstraße located in Hamburg Bergedorf district. The property is currently owned by 2 types of school, primary school Leuschnerstraße and of the Regional Training and Consulting Center (ReBBz) used. The main building, an elongated structure with a north

facing east wing has a basement (Teilunterkellerung and crawl space), the ground floor and three upper floors. The facade renovation began on the south side is continued, further reconstruction and renovation measures are carried out inside the building.

In the basement, moisture damage is remedied. The gently sloping pitch roof gets a new fascia and a new covering.

New fire protection interior doors 17 pcs.

Painting the interior surfaces about 7 000m 2 ,

Construction and relaying approximately 2 100 m 2 Linoleum for the floor, about 1 475 linear meters of wood baseboards.

Facade scaffolding as working scaffold LK 3 life 47 KW.

Office block construction work

Freie und Hansestadt Hamburg – Finanzbehörde Landesbetrieb Immobilienmanagement und Grundvermögen Projektentwicklung | Published November 16, 2016  -  Deadline December 15, 2016

In the construction project "New Bezirksamt Hamburg-Mitte" is a reconstruction measure within a building, mainly to the expansion of trades.

The LIG is developer in the reconstruction measures for the main tenant Bezirksamt Hamburg-Mitte.

The building is located within the city in the metropolitan area of ​​Hamburg in Hamburg's Neustadt and has 2 entrances:

- Kaiser-Wilhelm-Strasse 18-20,

- Caffamacherreihe 1

in 20355 Hamburg.

38 874 m 2 ,

The office building is a 13-storey high-rise complex with 2 basements, whose floor areas decrease in three steps upwards.

Doors without debris disposal,

- Creating partitions made of gypsum boards, metal stud framing and insulation,

- Creating false ceilings in the small area.

Execution on the upper floors (2nd to 12 floor).

Electrical installation:

- Delivery and retrofitting of circuit breaker,

- Delivery and retrofitting of GFCI,

- Supply and installation low voltage equipment,

- Delivery and installation floor tanks with plug and data boxes,

- Supply and installation of cable trunking,

- Supply and installation of cables and wires,

- Supply and installation of disabled pagers,

- Supply and installation of video door entry system,

- Supply and installation of escape door control systems.

Datentechnik:

- Unlocking and dismantling of telecommunication and data cables and junction boxes and floor boxes,

- Supply and installation of floor boxes, wall outlets and data cable (category 7),

- Supply and installation of a fiber optic backbone to the central connection of all existing wiring closet,

- Drilled holes and install cable fire boxes on stock cable,

- Documentation based Command manufacturer FNT.

Secondary school construction work

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published November 19, 2016  -  Deadline December 19, 2016

The Brothers Grimm Stadtteilschule located in Hamburg's Horn district Horn Geest. The construction project comprises a two-storey building to replace the torn off building The GFA of the building is approximately 3 320 m 2 ,

The construction site is independent of the school system can be approached on the street cross Kamp. Large components can be delivered just over the road cross Kamp. Restricted storage areas are located on the property.

Approximately 540 m 2 Cladding of aluminum corrugated profiles on the substructure and thermal insulation, about 130 m Window sills made of extruded aluminum profile, approximately 22 m Cladding from fiber cement boards, 12 exterior doors made of steel or aluminum with skylights and / or side panels, 4 exterior doors T30 steel, 5 internal doors fixed glazing made of steel with side panels, 3 interior doors steel T30-RS, 6 inner window, 4 exterior windows RWA.

Elevator installation / 3-lift stops, load capacity up to 300 kg / 4 persons, pursuant equipment for use by the disabled. EN 81, without the need for under- and over-ride, provided by the customer in shaft made of reinforced concrete.

Secondary school construction work

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published November 19, 2016  -  Deadline December 15, 2016

The vocational school is converted into 2 phases and rehabilitated. On the ground floor recreation hall, canteen and administration are rebuilt in the inventory. On the ground and in the two upper floors also classrooms are rebuilt as compartments in the portfolio. The building envelope and roofing, sanitary facilities, as well as all the building services are restored.

The school continued operation during construction in other parts of buildings.

6 pcs. Steel exterior staircases incl. Equipment levels and railings, about 60 m 2 Metal cladding, around 45 m steel flight lands; Spandrel panels about 65 m 2 , Metal roofs 30 m 2 , Including dismantling existing escape staircases. Ladders with safety cage.

Structures construction work

Sprinkenhof GmbH – Projektrealisierung | Published November 9, 2016  -  Deadline December 12, 2016

The new building for the opera workshops and -fundi the Hamburg State Opera (Project acronym OWF) includes the creation of a backdrop fundus with rack system (approximately 6700 m² GFA), a multi-storey costume and mask fundus (approximately 5200 m² GFA) and scenery workshops (ca. 10,250 m² GFA). Subject of the services described herein are services for the production of roofs with the following main positions: trapezoidal cover plate, insulation, roof seals, skylights, RWA flaps and RWA skylights.

Structures construction work

Universität Hamburg | Published November 15, 2016  -  Deadline December 13, 2016

The University of Hamburg performs a negotiated procedure with a call for competition for the procurement of a refrigeration plant for the Department of Physics, Jungiusstraße 9 and 11 by. For facilities in the laboratory and research areas of the Institute refrigeration is required, which is previously supplied by decentralized refrigeration systems.

In the future, the advertised here refrigeration equipment to a central unit to supply all present in the property buyers cold with cold energy. As the installation location for this plant a free contiguous area has been set, the most suitable for a connection to the consumer. The cold generated by the new cooling center is transported via a distribution to the consumers. This refrigerant distribution is not the subject of this tender. The cooling capacity must be "modular" expandable. It will set a maximum cooling capacity for the final development. Likewise, the module sizes and the initial cooling capacity are determined.

Structures construction work

Sprinkenhof GmbH – Projektrealisierung | Published November 19, 2016  -  Deadline December 22, 2016

The new building for the opera workshops and -fundi the Hamburg State Opera (Project acronym OWF) includes the creation of a backdrop fundus with rack system (approximately 6700 m² GFA), a multi-storey costume and mask fundus (approximately 5200 m² GFA) and scenery workshops (ca. 10,250 m² GFA). Subject of the services described herein are benefits for the facade -Metallbau façade cladding.

Structures construction work

Sprinkenhof GmbH – Projektrealisierung | Published November 19, 2016  -  Deadline December 22, 2016

The new building for the opera workshops and -fundi the Hamburg State Opera (Project acronym OWF) includes the creation of a backdrop fundus with rack system (approximately 6700 m² GFA), a multi-storey costume and mask fundus (approximately 5200 m² GFA) and scenery workshops (ca. 10,250 m² GFA). Subject of the services described herein are benefits for facade - structural steelwork and steel cassettes.

Construction work

Asklepios KlinikenHamburg GmbHKB Architektur und Bau | Published November 10, 2016

Approximately 1400 m² mineral Slope insulation with bituminous roofing on 4 roof planes (ü2.OG - ü9.OG), balcony waterproofing, Dachklempnerrarbeiten.

Construction work

Asklepios KlinikenHamburg GmbHKB Architektur und Bau | Published November 16, 2016  -  Deadline December 12, 2016

Approximately 70 outdoor Raffstoreanlagen, about 12 vertical awnings incl. Supply all components and turnkey assembly.

Construction work

Sprinkenhof GmbH | Published November 19, 2016  -  Deadline January 12, 2017
14 m. 

The contractor is the planning and execution services (functional specification) commissioned (contractor).

In the first and second floor follows a vast office use.

As bands of windows of the office wing are, for the production of the connection to the hall in the form of the facade of the hall planned.

The entrance to the office building will have a canopy.

The roofs are flat produce both indoor as well as in the office.

More Fassa denbegrünungen and shrubs are also among the planting.

Indication of the district Bergedorf provided.

Construction work for university buildings

GMH | Gebäudemanagement Hamburg GmbH | Published November 9, 2016  -  Deadline December 9, 2016
Automatic Sprinkler

Clinic construction work

Asklepios Kliniken Hamburg GmbH – KB Architektur und Bau | Published November 4, 2016  -  Deadline December 2, 2016
Enhanced Structural work:

Construction work for tunnels

Freie und Hansestadt Hamburg, Landesbetrieb Straßen, Brücken und Gewässer | Published November 18, 2016  -  Deadline December 20, 2016

The Wallringtunnel is an inner-city tunnel in Hamburg Hamburg-Mitte. It consists of

two tubes with 2 lanes and a closed length of approx. 550 m, the permissible at a

Driving speed of 50 km / h can be operated in the direction of traffic.

The tunnel shall be repaired and in compliance with the guidelines for the equipment and operation

be retrofitted Road Tunnels (RABT).

Partial lot 3: operational and safety technology

The renovation and retrofitting of operating and safety equipment in the contract section 3 essentially comprises:

- Supply, installation of emergency contact devices in existing niches;

- Video surveillance;

- Traffic / Radio;

- Public address system;

- Orientation lighting;

- Guiding devices;

- Fire detection systems;

- Monitoring of air quality;

- Switchgear including UPS;.

- Traffic Data Collection / incident detection;

- Conversion Gebäudelüftungs- and air conditioning;

- Host.