ZBA and node hall construction noise management (procurement package 98)

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published January 17, 2017  -  Deadline February 2, 2017
ZBA and node hall construction noise management (procurement package 98) Halle / Saale

WWTP Halle-North, new aeration basins, Lot 1 - Construction

Sachsen-Anhalt: HWS GmbH Einkauf | Published November 21, 2016  -  Deadline January 24, 2017

Hospital facilities construction work

Landratsamt Schwäbisch Hall | Published January 20, 2017  -  Deadline February 23, 2017

Structural work.

Tags:

Construction of a 2-storey entrance hall / extension (component 1B) in the massive construction / reinforced concrete, the basement in wu-concrete with appropriate caulking elements (Alternatively: waterproof construction).

masses:

Concrete about 1 000 m³,

Ceiling and wall formwork of approximately 2 800 m²,

Monolith (excluding bars and rods) about 140 tons,

Exposed concrete surfaces about 360 m².

Others:

Underpinning made of reinforced concrete 150 m³,

Ceiling reinforcement with CFRP strips about 100 m.

Roof works and other special trade construction works

GWG Grundstücks- und Wohnungsbaugesellschaft Schwäbisch Hall GmbH | Published January 20, 2017  -  Deadline February 24, 2017

The GWG estate and housing association Schwäbisch Hall mbH plans the renovation and remodeling of the former barrel factory building in Schwäbisch Hall - Hessental at Karl-Kurz-Straße 44 (so-called "short-Areal"). In addition to commercial and restaurant space, a large part of the building from the district of Schwäbisch Hall to apply to essential parts of the administration. Compliance with the highest energy standards is a key objective of the construction project. With this procurement procedure the roofer / Flaschnerarbeiten be tendered.

The services of the contractor include all services that are required for creating the operative system and to fulfill the regulatory requirements with the exception of on-site services.

The roofer / Flaschnerarbeiten are free on site including packaging, all materials in accordance with the drawings and descriptions, installation and commissioning offer by specialist fitters. Costs of accommodation, tripping, directional and fares are to be included in the offer prices. For further details, please refer to the specifications.

Summary:

Approximately 2400 m² Systemfalzdach aluminum incl. Mineral wool thermal insulation,

Approximately 1900 m Wood substructure of squared timber,

Approximately 215 m Bracket mounted gutter titanium zinc,

Approximately 95 m² sandwich roof.

Structural shell work

GWG Grundstücks- und Wohnungsbaugesellschaft Schwäbisch Hall GmbH | Published January 20, 2017  -  Deadline February 24, 2017

The GWG estate and housing association Schwäbisch Hall mbH plans the renovation and remodeling of the former barrel factory building in Schwäbisch Hall - Hessental at Karl-Kurz-Straße 44 (so-called "short-Areal"). In addition to commercial and restaurant space, a large part of the building from the district of Schwäbisch Hall to apply to essential parts of the administration. Compliance with the highest energy standards is a key objective of the construction project. With this award procedures the structural work will be advertised.

The services of the contractor include all services that are required for creating the operative system and to fulfill the regulatory requirements with the exception of on-site services.

The structural works are freely offering construction including packaging, all materials in accordance with the drawings and descriptions, installation and commissioning by qualified fitters. Costs of accommodation, tripping, directional and fares are to be included in the offer prices. For further details, please refer to the specifications.

Summary:

Approximately 600 m² saw cut; 590 m² ceiling demolition; about 320 m channel; 70 m³ concrete walls 24 cm thick; about 210 m² concrete floors; 370 steps, 630 m² HWL plates, approximately 680 m³ masonry KS, 700 m² site road.

Replacement construction daycare 29413 Dähre, remediation and cultivation Los 9 heating and plumbing work

Sachsen-Anhalt Verbandsgemeinde Beetzendorf-Diesdorf | Published January 16, 2017  -  Deadline February 9, 2017

Replacement construction daycare 29413 Dähre, remediation and cultivation Los 10 electric work

Sachsen-Anhalt Verbandsgemeinde Beetzendorf-Diesdorf | Published January 16, 2017  -  Deadline February 9, 2017

Smoke-extraction equipment

GWG Grundstücks- und Wohnungsbaugesellschaft Schwäbisch Hall GmbH | Published January 20, 2017  -  Deadline February 24, 2017

The GWG estate and housing association Schwäbisch Hall mbH plans the renovation and remodeling of the former barrel factory building in Schwäbisch Hall - Hessental at Karl-Kurz-Straße 44 (so-called "short-Areal"). In addition to commercial and restaurant space, a large part of the building from the district of Schwäbisch Hall to apply to essential parts of the administration. Compliance with the highest energy standards is a key objective of the construction project. With this procurement procedure the clerestory is advertised.

The services of the contractor include all services that are required for creating the operative system and to fulfill the regulatory requirements with the exception of on-site services.

The clerestory is free to offer construction including packaging, all materials in accordance with the drawings and descriptions, installation and commissioning by qualified fitters. Costs of accommodation, tripping, directional and fares are to be included in the offer prices. For further details, please refer to the specifications.

Summary:

Skylight band as gable roof 30 °, 20 m long, 5 m wide.

Roof insulation work

GWG Grundstücks- und Wohnungsbaugesellschaft Schwäbisch Hall GmbH | Published January 20, 2017  -  Deadline February 24, 2017

The GWG estate and housing association Schwäbisch Hall mbH plans the renovation and remodeling of the former barrel factory building in Schwäbisch Hall - Hessental at Karl-Kurz-Straße 44 (so-called "short-Areal"). In addition to commercial and restaurant space, a large part of the building from the district of Schwäbisch Hall to apply to essential parts of the administration. Compliance with the highest energy standards is a key objective of the construction project. With this procurement procedure the Dachabdichtungsarbeiten be tendered.

The services of the contractor include all services that are required for creating the operative system and to fulfill the regulatory requirements with the exception of on-site services.

The Dachabdichtungsarbeiten are free on site including packaging, all materials in accordance with the drawings and descriptions, installation and commissioning offer by specialist fitters. Costs of accommodation, tripping, directional and fares are to be included in the offer prices. For further details, please refer to the specifications.

Summary:

Demolition of about 900 m² flat roof structures, partially insulated;

New construction of approximately 1200 m² bituminous flat roof; partially with thermal insulation made of PU;

Approximately 90 m building connections with liquid foil.

Lifts

GWG Grundstücks- und Wohnungsbaugesellschaft Schwäbisch Hall GmbH | Published January 20, 2017  -  Deadline February 24, 2017

The GWG estate and housing association Schwäbisch Hall mbH plans the renovation and remodeling of the former barrel factory building in Schwäbisch Hall - Hessental at Karl-Kurz-Straße 44 (so-called "short-Areal"). In addition to commercial and restaurant space, a large part of the building from the district of Schwäbisch Hall to apply to essential parts of the administration. Compliance with the highest energy standards is a key objective of the construction project. With this award procedures the lift systems are advertised.

The services of the contractor include all services that are required for creating the operative system and to fulfill the regulatory requirements with the exception of on-site services.

The lifts are free on site including packaging, all materials in accordance with the drawings and descriptions, installation and commissioning offer by specialist fitters. Costs of accommodation, tripping, directional and fares are to be included in the offer prices. For further details, please refer to the specifications.

Summary:

2 passenger elevators as traction elevator without machine room; 1 goods lift as traction elevator without machine room; 1 elevator group with 2 lifts than traction elevators without machine room.

Carpentry installation work

GWG Grundstücks- und Wohnungsbaugesellschaft Schwäbisch Hall GmbH | Published January 20, 2017  -  Deadline February 24, 2017

The GWG estate and housing association Schwäbisch Hall mbH plans the renovation and remodeling of the former barrel factory building in Schwäbisch Hall -Hessental at Karl-Kurz-Straße 44 (so-called "short-Areal"). In addition to commercial and restaurant space, a large part of the building from the district of Schwäbisch Hall to apply to essential parts of the administration. Compliance with the highest energy standards is a key objective of the construction project. With this procurement procedure the carpentry work are advertised.

The services of the contractor include all services that are required for creating the operative system and to fulfill the regulatory requirements with the exception of on-site services.

The carpentry work are free on site including packaging, all materials in accordance with the drawings and descriptions, installation and commissioning offer by specialist fitters. Costs of accommodation, tripping, directional and fares are to be included in the offer prices. For further details, please refer to the specifications.

Summary:

Approximately 2400 m² demolition Sandwich roof; about 1 325 m demolition purlins; 5,5 m³ BSH; approximately 1 250 m scantlings KVH; about 4 m³ timber; about 2 400m² formwork; about 2 450 m² vapor barrier; approximately 995 m² insulation blanket.

  • 1