Construction work

Stadt Freiburg im Breisgau | Published February 10, 2017
cpvs
45000000, 44600000, 45331210, 45332400, 45332000

Haus der Jugend, Uhlandstraße 2-4, 79100 Freiburg-built in 1966 - building data: BGF ca. 4 500m 2 , BRI approximately 18 150 meters 3 - Project: Restoration of the stock: renovation of the façade, Energetic, fire protection and static upgrading of the roof of the great hall considering derVerordnungen for places of assembly, replacing the heating (switching from oil to gas control), ventilation (complete) and Sanitäranlangen (completely) ., electric (distributor and leads to sub-distribution single rooms), installation of a conveyor system (for barrier-free accessibility of the upper floors, formation of fire compartments not in the program is the interior (floors, walls and revision of wooden surfaces) and the renovation of the outdoor facilities - the construction work must be carried out during operation in expected 3 phases.

Dismantling oil tank plant about 88 000 liters, conversion 2x oil burner on the gas burner 240 kW power, dismantling heating pipes, replacing a few radiator (5x Plan-HK and about 12 tubes-HK), maintenance according to VOB 4 years.

Dismantling 2x ventilation units in the basement incl. Sewer system, supply and installation 14x. Classroom ventilation units 400m 3 / H including per unit incl. Sewer system, 1x KWL devices. Sewer system. 1 piece control and switchgear for classroom ventilation units BACnet protocol, maintenance according to VOB 4 years.

Dismantling water pipes incl. Furnishings, renewal of rainwater and wastewater pipes DN 50-DN150 (RW about 120m and SW approx 280m) renovation KW distributor DN50 5 Departures, vent the toilet rooms in accordance with DIN 18017/3 renewal of furnishings (ca . 11x WC, 20x WT, about 3x urinal, 1x Plaster collecting basins).

Construction work for water projects

Regierungspräsidium Freiburg, Abt. 5, Landesbetrieb Gewässer | Published February 16, 2017  -  Deadline April 11, 2017
cpvs
45240000, 44212410, 45112000, 45246400, 45453100

Renovation of an existing Rhine water intake structure, construction of three new Rhine water intake structures, transformation of an existing bottom outlet for functioning fish ladder at Möhlinwehr as a controllable outlet structure.

Excavation work for Baugrunben 6 400m 3 ; Sheet piling: 7400 m 2 ; Reinforced concrete: 2 150 m 3 ; Reinforcement: 250 t; 3 * Retention gate (3.2 * 2.3); Underwater concrete 1 300 meters 3 ; Micropiles: 360 pcs.

Universitätsklinikum Freiburg: construction of the Interdisciplinary Tumour Centre in Freiburg (ITZ), Betonwerksteinarbeiten

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published February 2, 2017  -  Deadline March 7, 2017
cpvs

Universitätsklinikum Freiburg: construction of the Interdisciplinary Tumour Centre in Freiburg (ITZ), Betonwerksteinarbeiten

Universitätsklinikum Freiburg: construction of the Interdisciplinary Tumour Centre in Freiburg (ITZ), painter -Lackierarbeiten

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published February 16, 2017  -  Deadline March 21, 2017
cpvs

Universitätsklinikum Freiburg: construction of the Interdisciplinary Tumour Centre in Freiburg (ITZ), painter -Lackierarbeiten

Universitätsklinikum Freiburg: construction of the Interdisciplinary Tumour Centre in Freiburg (ITZ), rubber floor covering work

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published February 2, 2017  -  Deadline March 14, 2017
cpvs

Universitätsklinikum Freiburg: construction of the Interdisciplinary Tumour Centre in Freiburg (ITZ), rubber floor covering work

Carpentry and timber construction

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published April 1, 2015  -  Deadline July 31, 2017
cpvs
45422

Zimmer- und Holzbauarbeiten

Heating plant construction work

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Freiburg | Published February 1, 2017  -  Deadline March 8, 2017
cpvs
45251200

Heating systems (heating system).

Heating works: pipes and fittings DN 15 - DN 200, fittings and valves, pumps, gas supply, gas boiler 2500 kW with accessories, buffer ca.2x 65 m 3 , Pressure maintenance

Sanitärarbeiten: pipes and fittings DN 15 - DN 65, fittings and valves, waste water pipes DN 50 - DN 90, compressed air system with compressor about 660 liters / minute

Exhaust system: connector of heat generator to the vertical exhaust pipe of CHP and gas boilers, as well as vertical exhaust pipe for CHP

Ventilation heating system: air ducts, grille and duct fan

Disassembly: pipes and fittings, valves and pumps, 2 boilers, each with about 3 500 kW, 1 boiler with 1900 kW, distributors, collectors, containers, insulation

In addition, the award of "maintenance services" subject of the proceedings.

Bidders and their demand and rental business owners have with tender the relevant commitments under § 5 LTMG, available at "https://rp.baden-wuerttemberg.de/Themen/Wirtschaft/Tariftreue/Seiten/Mustererklaerungen.aspx" express.

This process is under the Vergabe.Nr. 17-00637 performed. (Please specify when making inquiries).

Structural work

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published April 1, 2015  -  Deadline May 31, 2017
cpvs
45223

Rohbauarbeiten

Structural shell work

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Freiburg | Published February 3, 2017  -  Deadline March 9, 2017
cpvs
45223220

Structural work.

Earthworks: Excavation 700 m³.

Geotechnical works: piles approximately 750 linear meters, underwater barrier about 460 m³, micropiles 200 yds.

Concrete work: reinforced concrete floor slabs about 90 m³, reinforced concrete walls about 180 m³.

Masonry work: masonry interior walls about 150 m².

To carry out the services only personnel may be employed, which was previously reliability checked and there are no negative indications.

Bidders and their demand and rental business owners have with tender the relevant commitments under § 5 LTMG, available at "https://rp.baden-wuerttemberg.de/Themen/Wirtschaft/Tariftreue/Seiten/Mustererklaerungen.aspx" express.

This process is under the Vergabe.Nr. 17-00719 performed. (Please specify when making inquiries).

Low and medium voltage systems

Vermögen und Bau Baden-Württemberg | Published April 1, 2015  -  Deadline December 30, 2017
cpvs
45311

University Hospital Freiburg: Construction of the Interdisciplinary Tumor Center Freiburg (ITZ)

University of Freiburg: Sports institute, sports hall I, energy renovation, structural work

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published February 23, 2017  -  Deadline March 16, 2017
cpvs

University of Freiburg: Sports institute, sports hall I, energy renovation, structural work

New student dormitories, Georges-Koehler-Allee, Freiburg, metal door work and metal window work

Studierendenwerk Freiburg | Published January 26, 2017  -  Deadline March 2, 2017
cpvs
45421131, 45441000, 45443000

Studierendenwerk Freiburg, public institution, represented by Managing Director Clemens Metz intends in the Georges-Köhler-Allee the construction of two student dormitories including grounds and outbuildings. It is about 3.350qm two 5-storey buildings without a basement with length approx 36,50m, width approx 19.40 m and GFA.

New student dormitories, Georges-Koehler-Allee, Freiburg, Bodenbelagsarbeiten

Studierendenwerk Freiburg | Published January 26, 2017  -  Deadline March 2, 2017
cpvs
45432113, 45432100

Studierendenwerk Freiburg, public institution, represented by Managing Director Clemens Metz intends in the Georges-Köhler-Allee the construction of two student dormitories including grounds and outbuildings. It is about 3.350qm two 5-storey buildings without a basement with length approx 36,50m, width approx 19.40 m and GFA.

New student dormitories, Georges-Koehler-Allee, Freiburg, tile work

Studierendenwerk Freiburg | Published January 26, 2017  -  Deadline March 2, 2017
cpvs
45431100, 45431200, 45432130

Studierendenwerk Freiburg, public institution, represented by Managing Director Clemens Metz intends in the Georges-Köhler-Allee the construction of two student dormitories including grounds and outbuildings. It is about 3.350qm two 5-storey buildings without a basement with length approx 36,50m, width approx 19.40 m and GFA.

New student dormitories, Georges-Koehler-Allee, Freiburg, repainting

Studierendenwerk Freiburg | Published January 26, 2017  -  Deadline March 2, 2017
cpvs
45442100, 45432220

Studierendenwerk Freiburg, public institution, represented by Managing Director Clemens Metz intends in the Georges-Köhler-Allee the construction of two student dormitories including grounds and outbuildings. It is about 3.350qm two 5-storey buildings without a basement with length approx 36,50m, width approx 19.40 m and GFA.

New student dormitories, Georges-Koehler-Allee, Freiburg, plate Fassadenarbeiten

Studierendenwerk Freiburg | Published January 26, 2017  -  Deadline March 2, 2017
cpvs
45443000

Studierendenwerk Freiburg, public institution, represented by Managing Director Clemens Metz intends in the Georges-Köhler-Allee the construction of two student dormitories including grounds and outbuildings. It is about 3.350qm two 5-storey buildings without a basement with length approx 36,50m, width approx 19.40 m and GFA.

Lightning protection systems

Vermögen und Bau Baden-Württemberg Universitätsbauamt Freiburg | Published April 29, 2015  -  Deadline December 30, 2017
cpvs
45312

Universitätsklinikum Freiburg: construction of the Interdisciplinary Tumor Center Freiburg (ITZ) Type of service: lightning protection systems Scope of services: new installation earthing and lightning protection system on new ITZ consisting of approximately 3,500m foundation earth, ring earth, ground bus, derivatives, interconnections execution of lines galvanized as stainless and 45 St. Joint Housing; 30 St. termination rods length 2m bidders and their demand and rental business owners have with tender the relevant commitments in accordance with § 5 LTMG, available at "www.rp- stuttgart.de/servlet/PB/menu/1359260/index.html" deliver.

Painting work

Heiliggeistspitalstiftung – vertreten durch: Stiftungsverwaltung Freiburg i. Br. | Published February 18, 2017  -  Deadline March 22, 2017
cpvs
45442100

Drywall - New Heiliggeist pin;

Construction of a nursing home with 71 care places and 8 apartments:

Gross volume 24,637 m³;

Gross floor area 7576 m²;

Usable area 5610 m².

25.1 painting and coating work:

Paintings wall: 12 000 m²;

Paints Ceiling: 5000 m²;

Wallpaper wall / ceiling: 160 m²;

Paints Metal: 230 m²;

Paintings doorframes: 230 St .;

Coatings Floor: 850 m².

Tiles

Heiliggeistspitalstiftung – vertreten durch: Stiftungsverwaltung Freiburg im Breisgau | Published February 18, 2017  -  Deadline March 22, 2017
cpvs
44111700

Tile work - New Heiliggeist pin.

Construction of a nursing home with 71 care places and 8 apartments

Gross volume 24,637 m³;

Gross floor area 7576 m²;

Usable area 5610 m².

17 tile work.

Large format tiles 60x30: 680 m² Floor, 250

m² wall;

Small format tiles 10x10: 110 m² Floor, 105

m² wall;

Waterproofing A0: floor 85 m², A0 wall 85

m²;

Waterproofing A: Floor 55 m², wall 160 m²;

Waterproofing C: floor 55 m².

Installation of windows

Stadt Freiburg im Breisgau | Published February 1, 2017
cpvs
45421132, 45212190

Haus der Jugend, Uhlandstraße 2-4, 79100 Freiburg-built in 1966 - building data: BGF about 4 500 meters 2 , BRI approximately 18 150 meters 3 - Project: Restoration of the stock: renovation of the façade, Energetic, fire protection and static upgrading of the roof of the great hall, taking into account the regulations for places of public assembly, replacing the heating (switching from oil to GAs, control), ventilation (complete) and Sanitäranlangen (complete ), electric (distributor and leads to sub-distribution single rooms), installation of a conveyor system (for barrier-free accessibility of the upper floors, formation of fire compartments not in the program is the interior (floors, walls and revision of wooden surfaces.) and the renovation of the outdoor facilities - the construction project must be performed during operation invoraussichtlich 3 phases.

Supply and fit of approximately 345 m 2 Wooden windows IV68 with 2-pane insulating glazing.

Supply and fit of approximately 280 m 2 Light metal venetian blinds, electrically operated.

  • 1