DB Netz AG (Bukr 16) | Published February 16, 2017
cpvs
45000000, 45234113, 45221000, 45200000, 45234110

New Highway Bahnhof Altona,

3 platforms with 6 tracks for long-distance traffic,

a platform with 2 tracks for the S-Bahn, platform roofs, approximately 25 kilometers of track,

about 48 points, Construction, Electronic Interlocking, garage, parking, pedestrian underpass, bridge construction, about 2.5 km of noise barriers.

New Highway Bahnhof Altona,

3 platforms with 6 tracks for long-distance traffic,

a platform with 2 tracks for the S-Bahn, platform roofs, approximately 25 kilometers of track,

about 48 points, Construction, Electronic Interlocking, garage, parking, pedestrian underpass, bridge construction, about 2.5 km of noise barriers.

Primary school construction work

Stadt Frankfurt am Main, Hochbauamt | Published February 1, 2017
cpvs
45214210, 45223500, 45214200, 45000000

Construction of a primary school, 4 compartments, with a cafeteria and gym as 1 Field Hall.

Earthworks and reinforced concrete works, wood works, Roof insulation, metal roofing, supply and disposal, wood-aluminum windows, curtain wall as sandwich panels, wood interior doors, drywall work, domestic technology (ELT, H / L / S, GLT), steel construction, metal work, floor coverings , carpentry, painting, sports facilities, raised floors, tiling, glass walls, locksmithing, wood baffles, partitions, exterior plaster, scaffolding.

Railway bridge construction work

DB Netz AG (Bukr 16) | Published February 14, 2017  -  Deadline March 29, 2017
cpvs
45221112, 45222000, 45234115, 45234160

16FEI22114, Complex renovation and expansion station Niesky Niesky and route - Horka (a).

Second track and electrification of the line from Niesky (e) - Horka (a) the route 6207 (16 km of track).

Construction: new building superstructure according to Ril 820.2010 (tracks and switches; construction material provides AG); Replacement construction of 5 ew (largest span 11,10 m, maximum length 110 m), adjustments for LSW to 3 ew, construction of a pedestrian underpass (pedestrian tunnel with elevators), Replacement construction of 2 Sue, 2 passages; New support structure 220 m; New construction of noise barriers (total length of 3.1 km); New passenger facility Bf. Niesky with 2 platforms and techn. Equipment; Tipping designed for 160 km / h twin-track railway embankment ink. Damm widening, installation of base courses, soil replacement, 1km milling mixing-injection method, installation of geosynthetics; Deep drainage, cable management systems; trasse close LBP measures;

railway equipment services: Re-equipment of 3 level crossings with adaptation to the electronic interlocking technology; Re-equipment with fiber and copper cable systems; Building new PBXs; New overhead line systems; New Electrical Equipment for lighting and power including New point heating system and track field illumination.

Implementation planning and surveying; Building in partial total shutdown and running of trains.

Construction work

Hochbauamt | Published February 1, 2017  -  Deadline March 9, 2017
cpvs
45000000, 45262100

Scaffolding work.

The entire facade surface of Bolongaropalastes is a working and protective scaffold for roofing, carpentry, natural and artificial stone, carpentry, plaster, - einzurüsten and repainting. (About 5 500m 2 ), 7-9 scaffolding levels, expansion to the roof scaffold.

It is set up a working and protective scaffold for the clock tower on the central block on a steel substructure on site created. (Approx 4 scaffold levels).

Furthermore, to provide internal scaffolding for the rehabilitation and reconstruction work as stairwells and roof patio.

Structural shell work

Bürgerhospital und Clementine Kinderhospital gGmbH | Published January 25, 2017  -  Deadline March 7, 2017
cpvs
45223220

New construction to accommodate a surgical department, a maternity ward and nursing areas for the Department of Neonatology and the Women's Hospital. Creation of parking spaces and additional secondary areas (changing rooms, archives and storage areas). Restructuring the station N4 to a neonatal intermediate care unit. Relocation of the maintenance area of ​​the Department of Neugeborene-, pediatric surgery and -urologie. Reorganization and structuring of food supply and the entire logistics concept in the Civil Hospital.

Los 305 - Trailing Rohbauarbeiten

When Auern of about 500 openings to house art installation,

180 m² - Close of shear walls

4 St. - Crane manhole cover, prefabricated

about 29 St. - machine foundations,

Betonsägearbeiten, door breakthrough, Anbetonage jamb with injection reinforcement.

Ballast construction works

DB Netz AG (Bukr 16) | Published February 16, 2017  -  Deadline March 17, 2017
cpvs
45234130

Package 17FFP7 WE GE maximum, EÜ Nidda Bridge

about 7 300 meters track renewal with ballast,

produce about 5 pcs. turnouts renewals with gap closure,

Security services;

See II.1.4 (short description).

Primary school construction work

Hochbauamt | Published February 7, 2017  -  Deadline February 28, 2017
cpvs
45214210, 45261300, 45261200, 45261410

Roof insulation and plumbing roof.

School-building:

Sealing reinforced concrete floor slabs 200m 2 ;

Demolition and renovation of about 1 200 meters 2 Standing seam cover;

Demolition and renovation of approximately 580 m 2 bituminous waterproofing membranes;

Work on existing wooden formwork;

Fall protection for the aforementioned areas;

Associated plumbing drainage.

New Mensa:

Sealing reinforced concrete floor slabs approximately 440 m 2 ;

460 m 2 bituminous insulation and waterproofing flat roofs;

Fall protection for the aforementioned areas;

Associated Plumbing Attica.

Construction of a boarding school in Weiterstadt

Handwerkskammer Frankfurt-Rhein-Main | Published February 21, 2017
cpvs
45210000

Planning, construction management and construction supervision for the renovation of the parquet high in the AOF

Hochbauamt Stadt Frankfurt am Main | Published February 23, 2017
cpvs
71300000

17FEI25120 - BIM_Zweigleisiger expansion Homburger dam, construction of the electrical power system

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published February 3, 2017  -  Deadline March 9, 2017
cpvs
45311000

In the second track Homburger Damm in Frankfurt following electric power systems will be constructed (EEA): Track field illumination, electrical points heating systems (Ehwa), power electronic interlocking (CBI-A) including emergency power system from the catenary, low and medium voltage systems and various cable assignment work.

German Bundesbank, Central, construction of a busbar - Niderspannungsschaltanlagen and electrical installations

Deutsche Bundesbank | Published February 20, 2017  -  Deadline March 16, 2017
cpvs
45000000

Construction of exhibition furniture and interactive exhibition units - redesign permanent collection Museum of Communication Frankfurt

Museumsstiftung Post und Telekommunikation | Published February 13, 2017  -  Deadline March 6, 2017
cpvs

See Annex (Auslobungstext)

Backup and bauaffine services for the project "Preparation of the duality Homburger dam" from km 0.422 to km 5.777 on the route (3613) Frankfurt / Main - Frankfurt-Rödelheim

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published February 8, 2017  -  Deadline March 22, 2017
cpvs
79710000

Protection against the dangers arising from rail operations when working in track and turnout areas of Deutsche Bahn AG and supportive Bauaffine services for handling the construction work Frankfurt / Main

Architectural, engineering and planning services

DB Netz AG (Bukr 16) | Published February 14, 2017  -  Deadline March 13, 2017
cpvs
71240000

Construction supervision of renovation LSW NIM of Obermenzing to Rohrbach.

Control measure: LSW-renewal Obermenzing-Rohrbach, ABS Ingolstadt - Munich (NIM).

PD Munich Obermenzing - Petershausen.

PD Augsburg: Petershausen - Rohrbach.

Deliverables performance areas:

- With construction contracts specialist technical services Ing.-Bau / traffic infrastructure. according to Appendix 1.1;

- Railway operational performance and security monitoring in accordance with Annex 1.2;

- Services to VV BAU and VV BAU-STE of EBA pursuant to Annex 1.3;

- Benefits under Baustellenverordnung (execution phase) in accordance with Appendix 1.4.

Building-cleaning services

Bürgerhospital und Clementine Kinderhospital gGmbH | Published January 28, 2017  -  Deadline March 7, 2017
cpvs
90911200

New construction to accommodate a surgical department, a maternity ward and nursing areas for the Department of Neonatology and the Women's Hospital. Creation of parking spaces and additional secondary areas (changing rooms, archives and storage areas). Restructuring the station N4 to a neonatal intermediate care unit. Relocation of the maintenance area of ​​the Department of Neugeborene-, pediatric surgery and -urologie. Reorganization and structuring of food supply and the entire logistics concept in the Civil Hospital.

Lot: 359 - initial wax resilient flooring.

Security services

DB Netz AG (Bukr 16) | Published February 14, 2017  -  Deadline March 14, 2017
cpvs
79710000

Security benefits against the risks of railway operation * Project: construction of noise barriers on Route 6081/6002 between Berlin Pankow and Blankenburg.

Security benefits against the risks of railway operation: approx 2000 hours assurance supervisor, about 4000 hours flagman, Fixed barrier, completely insulated Fixed barrier, automatic warning system signaling.

Installation of doors and windows and related components

Deutsche Bundesbank, Beschaffungszentrum | Published January 25, 2017  -  Deadline February 28, 2017
cpvs
45421100

As part of the renovation of 276 apartments in 44 buildings of the 1950s and 60s all (timber) to be expanded inventory window of heated rooms and replaced by new, triple-glazed plastic windows. The window frames are internally insulated and encased. Roller shutters, blinds and window sills are replaced. Partial be lintels, wall projections, interior windowsills u. Ä. Aborted. The entrance doors are removed and replaced with new wood and aluminum elements including letterboxes. The construction work is carried out in bauabschnittsweise uninhabited state.

Metalworking

Bürgerhospital und Clementine Kinderhospital gGmbH | Published January 27, 2017  -  Deadline March 7, 2017
cpvs
45262670

New construction to accommodate a surgical department, a maternity ward and nursing areas for the Department of Neonatology and the Women's Hospital. Creation of parking spaces and additional secondary areas (changing rooms, archives and storage areas). Restructuring the station N4 to a neonatal intermediate care unit. Relocation of the maintenance area of ​​the Department of Neugeborene-, pediatric surgery and -urologie. Reorganization and structuring of food supply and the entire logistics concept in the Civil Hospital.

Los 358 - metal banisters and handrails;

180 running meters Bannister (fulling) including handrail.

20 running meters handrail.

Glazing work

Bürgerhospital und Clementine Kinderhospital gGmbH | Published January 28, 2017  -  Deadline March 7, 2017
cpvs
45441000

New construction to accommodate a surgical department, a maternity ward and nursing areas for the Department of Neonatology and the Women's Hospital. Creation of parking spaces and additional secondary areas (changing rooms, archives and storage areas). Restructuring the station N4 to a neonatal intermediate care unit. Relocation of the maintenance area of ​​the Department of Neugeborene-, pediatric surgery and -urologie. Reorganization and structuring of food supply and the entire logistics concept in the Civil Hospital.

Los: 411.1 - Glass / tub Trennwandanlagen

27 pcs. Shower with frame

8 pcs. Frameless.

Joinery work

Hochbauamt | Published February 16, 2017  -  Deadline April 4, 2017
cpvs
45421000, 45421131, 45421111

Joinery, interior doors wood.

The existing school building is completely renovated. The renovation includes the fire protection and energy upgrading, renovating the entire interior area with the gym and the installation of an elevator. In the basement, the floor plate, the ceiling will be renewed in some areas, open to EC and built a staircase. The existing temporary roof will be canceled and replaced by a new attic in wood construction. Since the existing ceiling is not viable for a school use on the top floor (floor attic), a laminated timber ceiling is on a new steel girder grid mounted. The outbuilding is converted into a kiosk.

The existing school building is built in solid construction and has a floor area of ​​approximately 1835 m². The eave height is about 20.70 m; the new First height is about 28.00 m. The annexe has a floor area of ​​approximately 113 m², the eaves height is approximately 3.50, the ridge height approximately 5.00 m.

Work will, with greater zeitl. Interrupt that is not remunerated separately carried out in three phases. The benefits extend across all floors (5 levels). The execution period extends over approximately 12 months.

Joinery doors and glass elements inside:

25 pcs. Interior doors with wooden Stockzarge, partly. M. Glass cut;

50 pcs. Interior doors wooden solid walls;

about 7 pcs. Interior doors wood with fire protection requirements T30 / T30RS;

20 pcs. Interior doors wood with fire protection requirements DS;

approx 28 pcs. Doors with Umfassungszargen o fire protection requirements.

15 pcs. Doors zweiflgl. With u without Brandschtzanforderungen.

40 pcs. Door elements one to mehrflügl. In corridors;

15 pcs. Glass partition elements m. Door leaves room height / -broad;

about 1 pc. historical door replica (Aula access);

about 4 pcs. Arc segments about 3.5 x 0.52 to 1.29 m;

200 pcs. Door stopper.