Call +44 800 9755 164

Public tenders for construction in Frankfurt-am-main...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionGermanyfrankfurt-am-main

Construction work

Hochbauamt | Published December 16, 2016  -  Deadline February 7, 2017

Plaster and stucco work.

The existing school building is completely renovated. The renovation includes the fire protection and energy upgrading, renovating the entire interior area with the gym and the installation of an elevator. In the basement, the floor plate, the ceiling will be renewed in some areas, open to EC and built a staircase. The existing temporary roof will be canceled and replaced by a new attic in wood construction. Since the existing ceiling is not viable for a school use on the top floor (floor attic), a laminated timber ceiling is on a new steel girder grid mounted. The outbuilding is converted into a kiosk.

The existing school building is built in solid construction and has a floor area of ​​approximately 1 835 m 2 , The eave height is about 20.70 m; the new ridge height is approximately 28 m. The annexe has a floor area of ​​approximately 113 m 2 , The eaves height is approximately 3.50, the ridge height about 5 m.

The work will be in several sections, partly. With small surfaces, running on all floors (5 levels). The execution period extends over about 16 months.

Plaster and stucco work:

200m 2 Test the substrate and remove loose;

about 2 500 meters 2 Clean the surface;

approximately 11 000m 2 Paint grind;

close about 270 m wall slots;

about 3 000m 2 Bonding agents applied;

about 1 600 meters 2 Gipskalkputz;

about 2 800 meters 2 Cement plaster inside 2 layers;

150 m 2 Acoustic ceiling plaster;

approximately 470 m 2 RFP;

550 m edge profile steel / stainless steel;

ca. 320 m 2 Clean exposed brickwork and downstream / grouting;

300m 2 Interior insulation calcium silicate boards.

Drainage canal construction work

Deutsche Bundesbank, Beschaffungszentrum | Published January 17, 2017  -  Deadline February 16, 2017

The German Bundesbank built in Dortmund a new branch, consisting of 4 building structures. It must be carried out corresponding sewer construction and road works.

sewer:

about 1 300 meters concrete pipes DN 300 to DN 600;

760 m PP pipes DN 150- DN 300;

2 stormwater sedimentation tanks as a finished part;

1 coalescence.

road:

approximately 11 000 m² of concrete pavement;

approximately 3700 m² Asphalt road;

approximately 4100 m² patch;

about 3 000m Borde.

Construction work

Stadt Frankfurt am Main, Hochbauamt | Published January 7, 2017
1 listed building. 

The building will be completely refurbished and given new uses.

The division of the lot is for components.

Natursteinarbeiten facade - The allocation of the lot is for components.

- Cleaning (steam cleaning, particle beam cleaning);

- Conservation and restoration work on architectural structure of the

Strengthening work, plan treatment,

Exchange of mortar supplements, joint renewal, desalination, installation of

Vations and building stone etc.);

- Conservation and restoration work on the building base of basalt and

aufgeputztem artificial stone;

- Removal and replacement of window grilles;

- Installation of new plants stages of basalt;

- Renewal of elnzelnen stairs of artificial stone.

Natursteinarbeiten Facade The division of the lot is for components.

- Cleaning (steam cleaning, particle beam cleaning);

- Conservation and restoration work on the architectural structure of the

Strengthening work, plan treatment,

Exchange of mortar supplements, joint renewal, desalination, installation of

Vations and cut stones etc.);

- Conservation and restoration work on the building base of basalt and

aufgeputztem artificial stone;

- Removal and replacement of window grilles;

- Installation of new plants stages of basalt.

- Renewal of eiinzelnen stairs of artificial stone.

Natural stone work Facade The division of the lot is for components.

- Cleaning (steam cleaning, particle beam cleaning);

- Conservation and restoration work on the architectural structure of the

Strengthening work, plan treatment,

Exchange of mortar supplements, joint renewal, desalination, installation of

Vations and cut stones etc.);

- Conservation and restoration work on the building base of basalt and

aufgeputztem artificial stone;

- Removal and replacement of window grilles;

- Installation of new plants stages of basalt;

- Renewal of individual stairs of artificial stone.

Railway construction works

DB Netz AG (Bukr 16) | Published January 17, 2017  -  Deadline February 13, 2017

Slope Stabilization Schreck Berg km 38.7 to 39.4.

Rock stabilization of various buildings (STW, DL, rock support gen., Drywall ...)

1) Shotcrete - ca. 330 m 3 ,

2) nailing, permanent soil nails D = 28-32 mm; L = 5-10 m - about 1 330 m.

3) backfilling / injections (Verfüllbohrungen vertical and horizontal) D = 90 mm; Depth = 15 m

- Approximately 1,365 m; Filling material 220 t; Steel 510 kg.

4) Horizontal Dränagebohrungen the mountain drainage D = 120 mm; L = 5-10 m

- 1,100 m.

5) drainage incl. Water stairs and gutters,

- Drainage ditches 700 m, concrete floor Shell 500 m, underground passages about 75m, Raubettmulden 130m, water Stairs about 15 meters, soil replacement concrete about 1 110 t.

6) Building ground investigations - core drilling depth 10-30 m, D = 100 mm - 900 m.

7) Dränagebohrungen in drywall L = 100-200, D = 100 mm - 1030 pcs.

Construction of a boarding school in Weiterstadt

Handwerkskammer Frankfurt-Rhein-Main | Published December 23, 2016

Secondary school construction work

Hochbauamt | Published January 18, 2017  -  Deadline February 7, 2017

Kitchen appliances.

Kitchen appliances for a cafeteria in a primary school with all-day service.

New construction of a medical center - building automation

Frankfurter Rotkreuz-Kliniken e. V. | Published December 8, 2016  -  Deadline February 1, 2017

Architectural, engineering and surveying services

DB Netz AG (Bukr 16) | Published January 4, 2017  -  Deadline February 3, 2017

Project management of stages 2 and 3 for the construction phases 4 and 5 of the ABS 46/2.

ABS 46/2 project management for the construction phases. 4 and 5

Engineering services

DB Netz AG (Bukr 16) | Published January 17, 2017  -  Deadline February 2, 2017

ZBA and node hall construction noise management

(Tender package 98).

ZBA and node hall construction noise management

Principal contractors and 2 options.

Engineering design services

Universitätsklinikum Frankfurt | Published December 31, 2016  -  Deadline January 30, 2017

Generalplanerleistungen for a new parent-child center.

The following functional areas are needed: ambulances, surgical suite, maternity, intensive care unit - Children's Hospital Neonatal Intensive Care Unit, normal care unit - Geburtshilfe.Ein space program is in preparation.

3500 m 2 ,

In order to create the new building quickly and put into operation to an erection in modular It is absolutely essential.

To can print the planning required also develop as soon as possible, the necessary architectural and engineering services are awarded to a general planner.

Generalplanerleistungen for a new parent-child center with perinatal center (Level 1)

The following performance areas:

Project planning according to § 34 HOAI

Structural design in accordance with § 49 HOAI

Medical)

Building Physics in Appendix 1 point 1.2 HOAI

17

Construction law aspects have been here not been reviewed or considered.

The concept is annexed to the application documents and is used for a rough estimate of the required physical structure.

The underlying space program is currently adapted to the current needs of the users and then to carry out the general planning in one for Modulbau appropriate, new planning.

The measure is financed through the University Hospital Frankfurt.

The implementation is subject to approval of the Supervisory Board.

The approval of the Supervisory is beginning in March 2017 is expected so that this will be available to the intended award end March 2017 is expected.

Himself therefrom possibly resulting requirements regarding EMC are to analyze the general planner.

A pile foundation of the floor panel is expected to be required.

Construction is in autumn 2017 provided the handing over to the user in the summer 2018th

Tiling work

Hochbauamt | Published January 17, 2017  -  Deadline March 7, 2017

Tile installation.

The existing school building is completely renovated. The renovation includes the fire protection and energy upgrading, renovating the entire interior area with the gym and the installation of an elevator. In the basement, the floor plate, the ceiling will be renewed in some areas, open to EC and built a staircase. The existing temporary roof will be canceled and replaced by a new attic in wood construction. Since the existing ceiling is not viable for a school use on the top floor (floor attic), a laminated timber ceiling is on a new steel girder grid mounted. The outbuilding is converted into a kiosk.

The existing school building is built in solid construction and has a floor area of ​​approximately 1 835 m 2 , The eave height is about 20.70 m; the new First height is about 28.00 m. The annexe has a floor area of ​​approximately 113 m 2 , The eaves height is approximately 3.50, the ridge height approximately 5.00 m.

The work will be in several sections, partly. With small surfaces, running on all floors (5 levels). The execution period extends over about 16 months.

Tile installation:

about 2 300 meters 2 Underground (cement or asphalt screed, walls GK plates or plaster.) Clean;

400m 2 Troweling plaster wall surfaces;

ca. 850 m 2 Spatulas bottom surfaces;

approximately 650 m 2 Composite waterproofing;

about 1 300 meters Fugendichtband;

about 900 meters 2 Wall tiles;

about 1 200 meters 2 Floor tiles;

about 150 m marble windowsills and -Abdeckplatten;

850 m base tiles.

Building-cleaning services

DomRömer GmbH | Published December 10, 2016  -  Deadline January 31, 2017

As part of the redevelopment of DomRömer area in downtown Frankfurt are to be built (referred to below as parcels) on an already constructed 2-storey parking in city center location in cramped construction site conditions 35 houses. Of this power subject to the contract described here: The Baureinigung the subsequent 35 pitches in the DomRömer Areal.

Baufeld North-West: B29, B27, B25, HDL2, HDL4, HDL6, HdL8

Baufeld North East: B23b, B21, B19, B17, M8, M10, M12, M14, M16, M18, M20, B23a

Baufeld South West: M22, M24, M26, M28, M30, M32, M34, M36, M38, M40

Baufeld South East: M5, M7, M9 + 11, M13, M15, M17

The aforesaid construction work is divided into 2 lots:

Lot 1:

Baufeld North-West: B29, B27, B25, HDL2, HDL4, HDL6, HdL8

Baufeld South West: M22, M24, M26, M28, M30, M32, M34, M36, M38, M40

Lot 2:

Baufeld North East: B23b, B21, B19, B17, M8, M10, M12, M14, M16, M18, M20, B23a

Baufeld South East: M5, M7, M9 + 11, M13, M15, M17.

Lot 1 comprises approximately the following main materials:

- Flooring 8857 m 2 ;

- Window 990 pcs .;

- Interior doors 524 pcs.

In the embodiment in particular, the limited space, resulting noted from the downtown location and the small-scale structure of the produced development. The details of site logistics manual are to be considered in this regard.

Lot 2 comprises approximately the following main materials:

- Flooring 8737 m 2 ;

- Window 670 pcs .;

- Interior doors 545 pcs.

In the embodiment in particular, the limited space, resulting noted from the downtown location and the small-scale structure of the produced development. The details of site logistics manual are to be considered in this regard.

Installation of suspended ceilings

Hochbauamt | Published January 7, 2017  -  Deadline February 28, 2017

Trockenbauarbeiten ceiling.

The existing school building is completely renovated. The renovation includes the fire protection and energy upgrading, renovating the entire interior area with the gym and the installation of an elevator. In the basement, the floor plate, the ceiling will be renewed in some areas, open to EC and built a staircase. The existing temporary roof will be canceled and replaced by a new attic in wood construction. Since the existing ceiling is not viable for a school use on the top floor (floor attic), a laminated timber ceiling is on a new steel girder grid mounted. The outbuilding is converted into a kiosk.

The existing school building is built in solid construction and has a floor area of ​​approximately 1 835 m 2 , The eave height is about 20.70 m; the new ridge height is approximately 28 m. The annexe has a floor area of ​​approximately 113 m 2 , The eaves height is approximately 3.50, the ridge height about 5 m.

The work will be in several sections, partly. With small surfaces, running on all floors (5 levels). The execution period extends over about 16 months.

Trockenbauarbeiten ceiling:

approximately 650 m 2 Wandabkofferungen;

about 1 040 m 2-side pipe coverings;

50m 2 Aprons to ceiling finishes;

about 6 St. segmental arch with 3-sided clothing; Overall width about 3.15 m;

ca.4.150 m 2 GK Pladur 1 layer;

about 2 400 meters edge joint Pladur;

about 2 500 meters frieze hole ceiling;

ca. 120 m 2 Wood wool;

350 St. holes in plasterboard ceilings;

400 St. Deckensegel- / wall panel 600 x 1 200 mm Acoustics;

approximately 550 m 2 Acoustic ceiling system;

400m 2 Acoustic plaster.

Installation of doors and windows and related components

Deutsche Bundesbank, Beschaffungszentrum | Published January 21, 2017  -  Deadline February 28, 2017
The construction work is carried out in bauabschnittsweise uninhabited state. 

Focus is improving the energy efficiency of the envelope, getting and working up of quality surfaces, as well as the renewal of sanitation including the building services installation, so that the existing residential use will also be ensured in the future.

The project is divided into four sections rehabilitation as follows:

Phase 1 is divided into:

BA 1.1: 10.07.2017 to 23.01.2018;

BA 1.2: 15.11.2017 until 07.05.2018.

Phase 2 is divided into:

BA 2.1: 15.03.2018 to 09.21.2018;

BA 2.2: 17.07.2018 until 01.09.2019.

Bauabschnitt 3 is divided into:

BA 3.1: 20.11.2018 to 11.06.2019;

BA 3.2: 27.03.2019 until 09.12.2019.

Bauabschnitt 4 divided into:

BA 4.1: 16.08.2019 to 03.04.2020;

BA 4.2: 12.11.2019 until 06.22.2020.

The following services are subject of the tender "window and sunscreen work":

Dismantling / Disposal:

4490 m² Bestandsfenster- / doors;

345 m² staircase windows;

Ringer / letterbox system;

Shutter boxes;

6965 m indoor windowsills and Leibungsverkleidungen;

Exterior window sills cast stone.

Manufacture / supply / installation:

4490 m² assembly 3-glazed plastic windows and doors (with tw Fensterfalzlüfter.);

345 m² assembly 3-glazed plastic windows - staircase;

Ringer / letterbox system;

Assembly mounted roller shutter box system;

Mounting indoor window sill made of wood materials;

Mounting indoor window sill of wooden materials - staircase;

Installation outer windowsill artificial stone;

Installation outer windowsill fiber concrete blocks;

Installation outer sill aluminum;

Interior insulation.

BIM_Zweigleisiger expansion Homburger dam; Construction Equipment, Part 1, forward work

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published December 21, 2016  -  Deadline February 20, 2017
BIM_Zweigleisiger expansion Homburger dam; Construction Equipment, Part 1, forward work

Railway construction works

DB Netz AG (Bukr 16) | Published January 11, 2017  -  Deadline February 10, 2017

VB_Ge + PSS between Mündling- Otting / Weilheim, Route 5310 Donauwörth - Treuchtlingen.

VB_Ge + PSS between Mündling- Otting / Weilheim, Route 5310 Donauwörth -

Treuchtlingen.

Construction of a new childcare facility (crib) with 4 groups - open space design of the hotel grounds

Magistrat der Stadt Rüsselsheim am Main, Fachbereich Gebäudewirtschaft | Published January 20, 2017

New construction / remodeling ABz Frankfurt (Oder), site supervision and coordination by SiGe BaustellV

Wasser- und Schifffahrtsamt Eberswalde | Published January 10, 2017  -  Deadline February 7, 2017

New construction / remodeling ABz Frankfurt (Oder), site supervision and coordination by SiGe BaustellV

Wasser- und Schifffahrtsamt Eberswalde | Published January 10, 2017

Lifting and handling equipment

Versorgungshaus und Wiesenhüttenstift Stiftung des öffentlichen Rechts | Published January 10, 2017  -  Deadline February 14, 2017

Lift plant construction,

Maintenance work.

Lift plant construction,

Maintenance work.