Call +44 800 9755 164

Public tenders for construction in Frankfurt-am-main...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionGermanyfrankfurt-am-main

Construction work

DB Netz AG (Bukr 16) | Published April 15, 2017
cpvs
45000000, 45221000, 45222000, 45230000, 45112700

The zoning area (PFB) 1 comprises expanding the distance between Cologne and Langenfeld. The pfb1 consists of individual plan sections (PA 1.1, PA 1.2, PA 1.3). The performance relates to the preparation of the detailed design and execution of the construction work. For the PA 01/01 were since 2015, after the publication of the first periodic notice / Release (2015 / S 162-297498) already announced several contract notice.

The scheduling section (PA) 1.1 includes the expansion of Cologne Mülheim to Cologne master home. The performance refers to the preparation of the detailed design and implementation of the construction project is expected to train trades Mark, cable civil engineering, KIB, LBP, OLA, EEA, LST and backup performance.

RRX, PA 1.2 of Leverkusen Chemical Park - Leverkusen-Rheindorf, km 9.45 to 16.10 and PA 1.3 of Leverkusen-Rheindorf - Langenfeld-Berghausen km 16.10 to 24.05: The performance relates to the preparation of the detailed design and implementation of the construction project is expected for the trades Transportation, KIB, cable civil engineering, LBP, OLA, EEA, TK, LST and backup performance.

Construction work

DB RegioNetz Infrastruktur GmbH (Bukr 76) | Published March 31, 2017  -  Deadline April 28, 2017
cpvs
45000000

New two-track rail car workshop with Betriebsgeäude and cleaning plant with functional buildings in Korbach: Lot 1 construction / traffic infrastructure.

Workshop hall:

- The newly constructed workshop hall is a double track, single-storey plant, each with a work stand.

- The building is about 63.34 m long and 22.22 m wide. The height is about 11.40 m at the ridge of the saddle roof.

Industrial buildings:

- The long side adjacent to the workshop building, two-storey factory building is monolithic built in masonry construction.

- It is about 46.6 m long, 8.7 m wide and 7.8 m (First) high.

ARA with functional buildings:

- ARA consists of the wash bay and functional buildings and is built west to the workshop on the track 14th

- The car wash has a length of approximately 56.80 m and a width of 8.19 m.

Track construction:

- provide 430 m of track and install.

- 3 points from 49 to 190, only All-incl points heating..

road:

-. 2400 m² mainly asphalt construction, including drainage.

Kabeltief- and line.

Stormwater retention basin surface 750 m² with dividing structure, and, sedimentation choke structure.

Railway bridge construction work

DB Netz AG | Published April 22, 2017
cpvs
45221112, 31730000, 34946120

The new transport infrastructure to be manufactured provides for the following measures in the 2nd. Expansion Homburger Damm

in front:

Construction of the new, second track "Homburger Damm" (route 3619).

The route 3619 begins at the switch 568, km 0,6 + 32 in the Frankfurt main station and ends at the Weiche 213, km 3,1 + 99 of the route 3613.

50 Hz power supply, DB power.

50 Hz power supply, DB mains.

Overhead line DB Power.

Overhead line DB network.

Construction services Main activity (intersection building, railway overpass, ramps, supporting walls).

PBX systems.

NEA BZ.

ESTW-A building (modular building including earthing).

Secondary school construction work

Hochbauamt | Published April 15, 2017  -  Deadline May 23, 2017
cpvs
45214220

Structural work and preparatory work bauabschnittsweise, safeguards, earthworks, underground pipes, sheeting and shaft construction, precast and formwork.

Structural work and preparatory work bauabschnittsweise, safeguards, earthworks, underground pipes, sheeting and shaft construction, precast and formwork

Scope:

Fall Protection about 1 800 m, earth excavation about 2 600 m³, formwork about 5200 m².

.-Situ about 2 500 m³, full-finished parts wall element inner and outer approximately 4150 m², full-finished parts Deckenelemete approximately 5600 m², full-finished parts stairs 25., Perimeter insulation exterior walls approximately 1600 m², perimeter insulation under the floor plates of approximately 2 800 pcs m².

Railway construction works

DB Netz AG (Bukr 16) | Published April 15, 2017  -  Deadline May 4, 2017
cpvs
45234100

diving; Engineering construction, railway systems, platforms

main construction work

Construction roads and access roads):

vacate areas and nursery eliminate 37,000 m²;

BE-areas and access roads in unbound fastening 43,000 m²;

6000 m²;

4250 m;

5500 m;

2700 m;

8000 m²;

32 St .;

600 m.

Civil engineering:

20 St .;

100 St .;

5300 m;

8000 m;

6500 m;

22,000 m³;

17 500 m³;

5000 m.

Cable civil engineering:

11000 m.

superstructure:

7400 m;

Dismantling course: 13 pieces;

Dismantling Track closure: 2;

7140 m;

Mounting points: 11 pieces;

Installation Track closure: 1 piece;

Original building 1 Bauweiche;

100 m.

Civil engineering structures:

Railroad Overpass km 9.360 + road trough - Portitzer Street;

6.00 m;

12 500 m²;

12, 000 m³;

30,000 m³;

17 500 m³;

7000 m;

4500 m;

5500 m;

300 m²;

Railroad Overpass km 9.087 - walk;

175 m

1400 m;

3600 m;

3 900 m³;

1150 m;

900 m³;

2000 m;

1200 m;

200 m²;

415 m.

Platforms:

Demolition of 2 platforms of conventional design and a provisional platform;

Equipment;

Overall length = 160 m; Effective length 155m;

Nominal height = 55cm platform edge.

machine-technical installations:

New passenger lift as Bahnsteigzuwegung;

Construction of 2 lifting plants for rainwater drainage;

continue See II.2.4).

Works for complete or part construction and civil engineering work

DB Netz AG (Bukr 16) | Published April 15, 2017  -  Deadline May 18, 2017
cpvs
45200000

During the project CBI kochelsee railway construction for cables.

In the wake of the CBI's new premises kochelsee railway construction for cables.

Railway construction works

DB Netz AG (Bukr 16) | Published April 13, 2017  -  Deadline April 27, 2017
cpvs
45234100

diving; Engineering construction, railway systems, platforms

main construction work

Construction roads and access roads):

vacate areas and nursery eliminate 37,000 m 2

BE-areas and access roads in unbound fastening 43,000 m 2

6,000 m 2

4250 m 3

5500 m 3

2 700 m 2

8 000 m 2

32 St.

600 m

Civil engineering:

20 St.

100 St.

5300 m

8 000 m 3

6500 m 3

22000 m 3

17 500 m 3

5,000 m

Cable civil engineering:

11000 m

superstructure:

7400 m

Dismantling points: 13 pieces

Dismantling Track closure: 2 pieces.

7140 m

Mounting points: 11 pieces

Installation Track closure: 1 piece

Original building: 1 Bauweiche

100 m

Civil engineering structures:

Railroad Overpass km 9.360 + road trough - Portitzer road

6.00 m

12,500 m 2

12000 m 3

30000 m 3

17 500 m 3

7,000 m 3

4500 m 3

5500 m 3

300 m 2

Railroad Overpass km 9.087 - walk

175 m

1 400 m 2

3600 m 3

3 900 m 3

1150 m 3

900 m 3

2,000 m 3

1200 m 3

200 m 2

415 m

Platforms:

Demolition of 2 platforms of conventional design and a provisional platform

equipment

Overall length = 160 m; Effective length 155 m

Nominal height platform edge = 55 cm

machine-technical installations:

New passenger lift as Bahnsteigzuwegung

Construction of 2 lifting plants for rainwater drainage

continue See II.2.4).

Railway construction works

DB Netz AG (Bukr 16) | Published April 13, 2017  -  Deadline June 2, 2017
cpvs
45234100

New 15 km cable route incl. Rail and road crossings Fund elements for signals and barrier drives (Rammgründungen) and three level crossing switching houses.

Road and Track at four crossings, turnouts expansion / space closure of seven switches, power supply 50 Hz including four railway crossings and four points heating (detailed design, supply, installation), new two platforms. Access, equipment and lighting.

New construction including 15 km cable route. Track and road crossings,

Fund members for signals and barrier drives (Rammgründungen) and three level crossing switching houses.

Road and Track at four crossings, turnouts expansion / space closure of seven switches, power supply 50 Hz including four railway crossings and four points heating (detailed design, supply, installation), new two platforms. Access, equipment and lighting.

Track construction works

DB Netz AG (Bukr 16) | Published April 20, 2017  -  Deadline April 27, 2017
cpvs
45234116

Approximately 13,431 m of track, about 13,431 m complete ballast renewal, about 200 m formation improvement, approximately 13 364 m Geo-textile, about 3070 m deep drainage, about 161 bridge beam, 11 switches (4 x 190 3 x 300 , 3 x 500, 1 x 760), accompanying works LST, e technology and security performance. Rebuilding process conventional.

Architectural, construction, engineering and inspection services

Hessen Mobil – Straßen und Verkehrsmanagement – Dezernat Instandhaltung Ingenieurbauwerke - | Published April 12, 2017  -  Deadline May 16, 2017
cpvs
71000000, 71300000

The building is located in the course of the BAB 643 and bridges the adjacent embankment, the Rhine bypass that Rettbergsaue, the Rhine main stream and the K 648th

Building characteristics:

Total length: 1 285.85 m;

Building Width: 21.71 m.

Part Structures:

Axis AC: composite steel superstructure with reinforced concrete deck slab; 2 fields, spans 48m, 55m;

Axis CF: steel superstructure with orthotropic deck; 3 fields, spans 102,50m, 205m, 102,50m;

Axis FG: composite steel superstructure with reinforced concrete slab; 1 Field, span 89m;

Axis GJ: steel superstructure with orthotropic deck; 3 fields, spans 102,50m, 205m, 102,50m;

Axis JN: composite steel superstructure with reinforced concrete slab; 4 fields, 70m, 60m, 60m, 52m;

Axis NO: frame-biased semi-finished parts for floor; 1 Field, 29,90m;

Expansion joints: mehrschläuchige noise emission expansion joints;

DIN FB;

Spherical plain bearing.

II.1.4) of this notice, project referred to are to provide the following services mainly:

DIN 1076th

In particular should be examined:

The Sohl- and bearing calculator provided by the customer and are to be incorporated according to the report.

5.2.4;

5.2.5;

5.2.7;

5.2.8;

5.2.10;

5.2.11;

5.2.12;

- Any sign gantries;

- noise barrier.

Period of performance, deadlines:

Quarter 2017th

Test time 12 weeks.

Other interim deadlines resulting from the tender documents.

Works for complete or part construction and civil engineering work

DB Netz AG (Bukr 16) | Published April 12, 2017  -  Deadline April 24, 2017
cpvs
45200000, 45314310

Cable civil engineering projects for equipment trades LST, WHZ, Buesa and TK km Sections 23.539 to km 23.645, km 25.872 to km 39.032 and km 39.382 in 2810 on the route to km 40.105 (Hagen-Oberhagen - Dieringhausen) and km 1.200 to km 0.306 on the track 2813:

Construction work for engineering works except bridges, tunnels, shafts and subways

DB Netz AG (Bukr 16) | Published April 12, 2017  -  Deadline April 28, 2017
cpvs
45222000

Track renewal in-service multi-track railway existing route under the railway operating conditions (incl. OLA).

Construction work for engineering works except bridges, tunnels, shafts and subways

DB Netz AG (Bukr 16) | Published April 20, 2017  -  Deadline April 28, 2017
cpvs
45222000

Track renewal in-service multi-track railway existing route under the railway operating conditions (incl. OLA).

Dismantling and partial renewal of a turnout control, dismantling and construction of a turnout heating system

Stadtwerke Verkehrsgesellschaft Frankfurt am Main mbH | Published April 20, 2017  -  Deadline May 10, 2017
cpvs
34941800, 34944000

Clinic construction work

Schön Klinik Bad Aibling SE & Co. KG | Published April 12, 2017
cpvs
45215130, 33190000

Clinic construction

Fire station construction work

Stadt Monheim am Rhein – Zentrale Vergabestelle | Published April 13, 2017  -  Deadline July 6, 2017
cpvs
45216121, 45210000, 45216100, 45216120, 45216125, 45216127, 45220000

Construction and renovation of a fire and rescue station in operation.

General contractor services.

Structural shell work

Stadt Frankfurt am Main, Hochbauamt | Published April 20, 2017
cpvs
45223220, 45111100

A listed school, built in 1904, renovated. In this window inside supplemented, canceled a staircase, built a new staircase and smaller reinforced concrete construction work required. For a new ventilation system existing masonry shafts must be opened and closed again. A single-storey toilet facility will be canceled. Another toilet cultivation is to be collected. A building-pollutant register is created, it must be disposed of properly small amounts of asbestos-containing floor coverings and some MMF-containing drywall.

new staircase Auschreibung and award of construction output (Erstelllen of window openings inside the building, demolition staircase, construction, smaller reinforced concrete construction, opening and closing wall bays for new ventilation system, demolition storey toilet facility, underpinning a further toilet cultivation, disposal of small quantities of asbestos-containing floor coverings and KMF-containing drywall).

Construction work

Fraport AG | Published April 8, 2017  -  Deadline May 12, 2017
cpvs
45000000

The building 251/252 is free standing on the apron area of ​​the airport. It is used for baggage handling (major hub in the network of baggage handling systems).

The construction site is not accessible from public areas made, but must be operated in compliance with the regulations and restrictions of the apron.

The building consists of 251 three floors (basement 8 800 m 2 , EC 7000 m 2 and OG 7000 m 2 ).

The building consists of 252 two storeys (EC 5500 m 2 and OG 700 m 2 ).

The east side of the building 251 is extended around an axis.

The work is carried out partly during operation (especially in the basement).

As part of the revitalization of the building services completely renewed in large parts.

This includes the building automation.

Further information under II.2.4.

Starting: approx Q1 2017th

Execution End: approx Q2 2020th

The building automation system includes the following services:

3.1 ISP 01 - SSK001;

3.2 ISP 01 - SSK002;

3.3 ISP 01 - SSK003;

3.4 ISP 01 - SSK004;

3.5 ISP 01 - SSK005;

3.6 fire indicator panel Bldg 251;

3.6 fire indicator panel Gab. 252;

3.7 field devices (sensors, actuators, other sensors, encoders, etc.);

3.8 Installation (paths, laying systems, cables, connectors);

3.9 Interim building automation services (temporaries, cabinets);

3.10 disassembly building automation services (disassembly of MSR-wiring, cable support systems and existing sensors / actuators in the field;

11.3 inventory documentation, inspections, maintenance.

Railway bridge construction work

DB Netz AG (Bukr 16) | Published April 8, 2017  -  Deadline May 24, 2017
cpvs
45221112, 45234100, 45234116

Second Eastern bypass track stitches.

Construction of a bypass track with a length of about 3.5 km on the track in 1280; Dismantling with gap-closure of 3 switches, incorporation of 7 points, dismantling of 3 points; Preparation / widening web twill for the new bypass track including drainage; Preparation cable route (Kabelgefässystem) and cable laying LST, cable laying LST cable establishment signal ups; Baufreiheitsmaßnahmen / relocation of a drinking / water supply line; Extension of an existing passage DN 1000; New EÜ Deichstraße; Preparation of impact protection SÜ mesh / Hörsten; New STP Seeve including dismantling of a stair access and preparation of a support wall to the stock rail of the track 1280th

Electrical engineering installation works

DB Netz AG (Bukr 16) | Published April 13, 2017  -  Deadline May 4, 2017
cpvs
45315100

Bf Augsburg - Mobility Hub Augsburg (MDA) - II construction - Production of electrical equipment.