Public tenders for construction in Euskirchen Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published February 23, 2017
Winner
AVS Overath GmbH
cpvs
45233110

Position of traffic safety for the construction of the 5th phase of construction for the reconstruction of the AK Aachen.

Architectural, construction, engineering and inspection services

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published February 16, 2017
Winner
Bietergemeinschaft Schüßler-PlanInverFischer c/o.: Schüssler-Plan Ingenieurgesellschaft mbH
cpvs
71000000

Project planning of traffic facilities with surveying, traffic studies, noise and pollution studies, channel inventories, SiGeKo for planning phase, land acquisition / compensation cost update and project planning of engineering structures, technical planning, structural engineering, geotechnical engineering and project management.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published February 23, 2017
Winner
Bauunternehmung Tholen GmbH
cpvs
45233110

Establishment of an approximately 81 m long temporary bridge, making the makeshift roads with protective devices and VZ-bridges.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published February 9, 2017
Winner
Oevermann Verkehrswegebau GmbH, Niederlassung Düren
cpvs
45233110

A 44n / A61, AK Jackerath, surface works, west side, Sub-section 2 with earthworks on a length of about 1 000 meters on the A 44n and 900 meters on the A 61st

Construction, foundation and surface works for highways, roads

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published December 28, 2016
Winner
Heinz Schnorpfeil Bau GmbH
cpvs
45233000

Expansion of Rastanlage "Ruraue" west side, permanent way / dressing.

Construction work

Regionalniederlassung Ville-Eifel | Published April 12, 2017  -  Deadline April 26, 2017
cpvs
45000000

The junction Bonn-Ost is in the field of Bonn east of the district Ramersdorf links the motorways A 59 from / towards Cologne and A 562 from / towards Bonn center and the road B 42 from / towards Konigswinter.

930 m 3 erode topsoil, store u. einb again.,

Signpost einb., 1 VZB einb.

Building-cleaning services

Kreis Euskirchen | Published April 12, 2017  -  Deadline May 11, 2017
cpvs
90911200, 90919200, 90919300, 90911300

The subject of the call, the Gebäudeunterhalts- and the lens / frame cleaning in a total of 14 objects of the circle Euskirchen and basic cleaning in 4 of these objects. These include four administrative buildings (district office, extension Schwalbenberg and job center in Euskirchen, job center in Kall), 4 school buildings (Thomas Esser vocational college and Hans Verbeek School in Euskirchen, Berufskolleg Eifel and St. Nicholas School in Kall), 4 rescue stations (Euskirchen Weilerswist, Schleiden Mechernich), the fire protection center Schleiden and the waste management center incl. construction yard in Mechernich-Strempt.

Contracts will be awarded in five lots.

Implementation of maintenance cleaning in the five above-mentioned buildings.

Implementation of maintenance cleaning in the two above-mentioned buildings.

Implementation of maintenance cleaning in the 7 og buildings.

Carrying the glass and frame cleaning in the 14 above-mentioned buildings.

Implementation of the basic cleaning in the four above-mentioned buildings.

Construction work

Regionalniederlassung Ville-Eifel | Published February 4, 2017  -  Deadline March 16, 2017
cpvs
45000000

The motorway junction Bonn-Ost is in the area of ​​Bonn east of the district Ramersdorf, connects the federal motorways A 59 from / to Cologne and the A 562 from / towards Bonn center and the main road B 42 from / to Königswinter.

930 m 3 Topsoil erode, store u. Einb again.,

1470 m Sickerrohrleitungen einb.,

56 bays einb ,,

2 480 m 3 Frost protection layer (d = 40 cm)

3800 m 2 Asphaltttragschicht (d = 18 cm) manuf. ,,

1 530 m 2 Asphalt base layer (d = 10 cm) manuf.,,

3590 m 2 Asphalt binder (d = 8.5 cm) einb.,

1 400 m 2 Asphalt concrete 0/11 einb.,

700m flat curbs FB 200 x 200 einb. .

Directory einb.,

1 VZB manufacture.

Architectural, construction, engineering and inspection services

Regionalniederlassung Ville-Eife | Published December 6, 2016  -  Deadline December 15, 2016
cpvs
71000000

Project planning of traffic facilities with surveying, traffic studies, noise and pollution studies, channel inventories, SiGeKo for planning phase, land acquisition / compensation cost update and project planning of engineering structures, technical planning, structural engineering, geotechnical engineering and project management.

Engineering services.

Construction work for highways, roads

Regionalniederlassung Ville-Eifel | Published December 1, 2016
cpvs
45233100

B 56n, construction of the eastern bypass Düren.

Length about 6.60 km, asphalt construction, earthworks.

Construction of a total of 5 bridges.

Construction of about 6 light systems.

The construction project is divided into 2 phases of construction.

Two buildings have been built in advance.

Motorway construction works

Regionalniederlassung Ville-Eifel | Published November 25, 2016
cpvs
45233110

Approximately 4.4 km Road Construction - Construction of highways,

Preparation of 3 bridges - including building "Wings".

about 2 km of noise barriers, 1.4 km noise barriers.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 30, 2016  -  Deadline January 17, 2017
cpvs
45233110

Position of traffic safety for the construction of the fifth

Phase of construction for the reconstruction of the AK Aachen.

- Produce about 25 St traffic sign plans;

- About 28 St Traffic safety of longer duration including set up of temporary road;.

- 90 St Setting Day / Night construction site as traffic safety of shorter duration;

- Establish or implement approximately 4 750 m Transportable guard;

- Produce about 33 250 meters yellow marking.

- Produce about 25 St traffic sign plans;

- About 28 St Traffic safety of longer duration including set up of temporary road;.

-ca. 90 St Setting Day / Night construction site as traffic safety of shorter duration;

- Establish or implement approximately 4,750 m Transportable guard;

- Produce about 33 250 meters yellow marking.

Architectural services for buildings

Stadt Euskirchen – Stadtbetrieb Zentrales Immobilienmanagement | Published January 7, 2017
Winner
sic architekten GmbH
cpvs
71221000, 71320000

Negotiated procedures for the award of services for property and specialist planning in accordance with § 34 HOAI 2013 in conjunction with Annex 10 no. 10.1, for structural engineering in accordance with § 51 HOAI 2013 in conjunction with Annex 14 no. 14.1 and for technical building equipment (asset groups 1-6) in accordance with § 55 HOAI 2013 in conjunction with Annex 15 no. 15.1.

The city Euskirchen intends to build a new triple sports hall including ancillary facilities for schools and club sport at the site Erftstraße. The gross floor area will comprise approximately 2 450 m². The construction costs (cost group 300 + 400) is estimated at approximately 3.9 million EUR. A multifunctional use is not provided. The demands of the regulation on the construction and operation of special (former Assembly Ordinance) should be considered nonetheless. The use of the property with more than 199 people for educational purposes should be possible in principle.

The contract was awarded through a negotiated procedure according to § 17 VgV with a prior call for competition (without planning services).

Construction work for bridges

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 15, 2016
Winner
Strabag AG Bereich Düren
cpvs
45221100, 45233000

B 56n, construction of the eastern bypass Düren. here 2. BA;

approximately 4.5 km of B56n between B 264 "Kölner Landstrasse" (Good Distelrath) and B56 old (Stock Landstrasse) and the structure 04 (underpass of the railway Düren-Zülpich and an economic way).

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 23, 2016  -  Deadline January 4, 2017
cpvs
45233110

A 44n / A61, AK Jackerath, surface works, west side, Sub-section 2 with earthworks on a length of about 1 000 meters on the A 44n and 900 meters on the A 61st

Approximately 3570 m 3 Topsoil erode and store,

about 7 535 m 3 record stored topsoil and andecken,

about 4 650 meters 3 Loosen soil and store,

about 4 280 m 3 Loosen soil and dispose of,

approximately 18 800 m 3 Loosen soil and installing,

about 12 650 meters 3 record stored soil and installing,

about 2 650 m drainage pipes manufacture,

about 67 St. precast manhole precast concrete manufacture,

approximately 31 230 m 3 Frost blanket manufacture,

about 35 440 tonnes installing Asphalttragschichtmischgut,

approximately 13 600 tonnes installing Asphaltbinderschichtmischgut,

about 6030 t installing Asphaltdeckschichtmischgut.

BLB K / Bund / Rheinbach / Rheinbach MunLager / Road construction / VNr .: 025-16-01164

BLB NRW Köln | Published October 7, 2016
cpvs
45233120

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published October 6, 2016
Winner
Bietergemeinschaft Strabag AG / F. Meyer GmbH
cpvs
45233110

A 562 AK Bonn / Ost, new exit ramp; here 2. BA. New WARC-conditioning;

pave Baufeld, abort drainage pipes, pipelines tamping, soil erosion, soil supply and installation; Geomembranes, filter layers, reed mats, plastic pipes DN 400, DN 150 Teilsickerrohrleitungen, DN 250, concrete pipes DN 300-DN 900, rebar, formwork, concrete and delivered and installed another.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published October 19, 2016
Winner
Oevermann Verkehrswegebau GmbH, Niederlassung Düren
cpvs
45233110

Soil erosion, asphalt milling, producing erosion control blankets gullies, inline skating, antifreeze, steel sheet piling, reinforced concrete, asphalt base and binder course Gußasphaltdeckschicht.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published September 29, 2016
Winner
Oevermann Verkehrswegebau GmbH Niederlassung Düren
cpvs
45233110

During the reconstruction of the motorway junction Aachen the cross on a length of approximately 1 250 m is the section (6.1), A44, north expanded.

Including the ramp "Dusseldorf / Cologne". The existing building on the tracks of the EVS will be demolished and rebuilt.

Furthermore, drainage works and laying of AUSA lines must be carried out.

Construction, foundation and surface works for highways, roads

Regionalniederlassung Ville-Eifel Hauptsitz Euskirchen | Published October 25, 2016  -  Deadline November 30, 2016
cpvs
45233000, 45233120, 45223300

In the course of the renovation / expansion of farmed Rastanlage "Ruraue" West, on the road of the A44 following main benefits / -Work are essentially perform: