Road construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published August 13, 2016
Winner
Backes Bau- und Transporte GmbH
cpvs

B 477 in Mechernich, removal of a level crossing, construction of roundabout 2 (Bahnstraße).

Bridge construction work

Regionalniederlassung Ville-Eifel Hauptsitz Euskirchen | Published April 19, 2017  -  Deadline May 23, 2017
cpvs
45221110

Preparation of bridge structure (BW no. 5205 521 / forest road) having an internal diameter of 14.75 m and a passage (BW No .: 5205 520 / Schnocksgraben) having an internal diameter of 3.16 m in the course of the construction of the bypass Soller - catching home.

produce 770 m³ excavation; supply and inbauen 1850 m³ building material; produce 645 m³ reinforced concrete including formwork. 85 t installing reinforcing steel; 2 t installing prestressing steel; produce 190 m² sealing layer of bitumen membrane; 12 t produce asphalt protective layer; Install 117 m steel railings; 480 m³ solve ground; Record 14 m³ asphalt surface; produce 288 m³ forest protection layer; 100 t paving asphalt material.

Architectural, construction, engineering and inspection services

Kreis Euskirchen | Published May 4, 2017  -  Deadline June 2, 2017
cpvs
71000000, 71200000, 71300000

Construction work is expected to start in 2018, with completion scheduled for 2020 at the latest.

Alternative solutions for energy supply are also to be investigated.

The object of the contract shall be adjusted subsequently.

As of performance phase 3, the following planning services are commissioned separately by the client and are thus no longer part of the planning services described here: fire protection, outdoor systems, land surveying, surveying and test statics.

In the event that the granting of the basic services in accordance with the HOAI 2013 is also intended to award special services, a detailed listing is provided in the further procedure.

The aim is to achieve a shorter construction period for individual units of use (in particular, a rescue management center).

With regard to the architect, a) the copyright information to be retrieved in the procurement portal (see the heading "Participation documents") must be observed.

A close cooperation with the already commissioned specialist planners of control center technology is necessary.

Construction work for bridges

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 15, 2016
Winner
Strabag AG Bereich Düren
cpvs
45221100, 45233000

B 56n, construction of the eastern bypass Düren. here 2. BA;

approximately 4.5 km of B56n between B 264 "Kölner Landstrasse" (Good Distelrath) and B56 old (Stock Landstrasse) and the structure 04 (underpass of the railway Düren-Zülpich and an economic way).

Construction work

Regionalniederlassung Ville-Eifel | Published April 12, 2017  -  Deadline April 26, 2017
cpvs
45000000

The junction Bonn-Ost is in the field of Bonn east of the district Ramersdorf links the motorways A 59 from / towards Cologne and A 562 from / towards Bonn center and the road B 42 from / towards Konigswinter.

930 m 3 erode topsoil, store u. einb again.,

Signpost einb., 1 VZB einb.

Construction work

Regionalniederlassung Ville-Eifel | Published February 4, 2017  -  Deadline March 16, 2017
cpvs
45000000

The motorway junction Bonn-Ost is in the area of ​​Bonn east of the district Ramersdorf, connects the federal motorways A 59 from / to Cologne and the A 562 from / towards Bonn center and the main road B 42 from / to Königswinter.

930 m 3 Topsoil erode, store u. Einb again.,

1470 m Sickerrohrleitungen einb.,

56 bays einb ,,

2 480 m 3 Frost protection layer (d = 40 cm)

3800 m 2 Asphaltttragschicht (d = 18 cm) manuf. ,,

1 530 m 2 Asphalt base layer (d = 10 cm) manuf.,,

3590 m 2 Asphalt binder (d = 8.5 cm) einb.,

1 400 m 2 Asphalt concrete 0/11 einb.,

700m flat curbs FB 200 x 200 einb. .

Directory einb.,

1 VZB manufacture.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 23, 2016  -  Deadline January 4, 2017
cpvs
45233110

A 44n / A61, AK Jackerath, surface works, west side, Sub-section 2 with earthworks on a length of about 1 000 meters on the A 44n and 900 meters on the A 61st

Approximately 3570 m 3 Topsoil erode and store,

about 7 535 m 3 record stored topsoil and andecken,

about 4 650 meters 3 Loosen soil and store,

about 4 280 m 3 Loosen soil and dispose of,

approximately 18 800 m 3 Loosen soil and installing,

about 12 650 meters 3 record stored soil and installing,

about 2 650 m drainage pipes manufacture,

about 67 St. precast manhole precast concrete manufacture,

approximately 31 230 m 3 Frost blanket manufacture,

about 35 440 tonnes installing Asphalttragschichtmischgut,

approximately 13 600 tonnes installing Asphaltbinderschichtmischgut,

about 6030 t installing Asphaltdeckschichtmischgut.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 16, 2016  -  Deadline December 13, 2016
cpvs
45233110

Establishment of an approximately 81 m long temporary bridge (bridge system as screwed together steel bridge, consisting of 2

Single-span girders), including related foundations, earthworks and shoring.

Single span [m]: 40,27 m (this value may vary slightly depending on the manufacturer)

Total length between the transition structures: 80.79 m

Width between abutments: ca. 79,30 m

Minimum Headroom (in the area of ​​the middle cross member): 4.70 m

Crossing angle: 37.1642 gon

Width between railings: 7.90 m

Bridge area: 638.2 m 2

Fabrication of temporary roadways:

about 43 500 meters 3 earthwork

Lay / concrete DN 300 to DN 600 - 900 m from pipelines (steel)

10: 645 m 3 Frost blanket 0/45

about 3685 t asphalt base AC 32 TS

about 8 720m 2 Asphalt binder AC 16 BS

about 10 600 meters 2 Asphalt pavement SMA 8 S

Demolition of 2 VZ-bridges

Preparing a new VZ Bridge

Approximately 600 m Remove protective devices

Approximately 1 000 meters protective equipment manufacture.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 9, 2016  -  Deadline December 14, 2016
cpvs
45233110

Approximately 3570 m 3 Topsoil erode and store,

A 4 / A 44 / A 544, conversion of AK Aachen here: 4 BA, A 4 / A 544, new construction and expansion of RF Netherlands and Europe AC space.

Regionalniederlassung Ville-Eifel | Published October 17, 2014  -  Deadline November 25, 2014
cpvs
45000000

A4 / A44 / A544, conversion of AK Aachen here: 4 BA, A 4 / A544, new construction and expansion (ground, ceiling construction and channel construction) RF Netherlands and Europe AC course and as well as demolition and reconstruction v sign gantries..

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published April 30, 2016
Winner
Strabag AG Bereich Düren
cpvs
45233110

Expansion of Rastanlage "Ruraue" east side, permanent way / dressing.

Road construction works

Regionalniederlassung Ville-Eifel | Published December 1, 2015
cpvs
45233120, 45221100

B 56n, Neubau der Ortsumgehung Soller-Frangenheim.

Motorway construction works

Regionalniederlassung Ville-Eifel | Published November 27, 2015
cpvs
45233110

A4/44/544 Umbau AK Aachen.

Construction depot - here: Infrastructure

Kreis Euskirchen - Zentrale Vergabestelle | Published July 20, 2015  -  Deadline August 13, 2015
cpvs

Errichtung Betriebshof - hier: Infrastruktur

Bridge construction work

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 17, 2017
Winner
Bauunternehmung Bruno Klein GmbH & Co. KG
cpvs
45221110

B56n, OU Soller new building BW 1 (Budepützweg).

Construction work

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published October 26, 2017
cpvs
45000000

The Autobahnkreuz Bonn-Ost is located on the territory of the federal state of Bonn, east of the Ramersdorf district, linking the federal motorways A 59 / towards Cologne and the A 562 from / towards Bonn-Zentrum and the federal road B 42 from / towards Königswinter.

Construction depot - here demolition work

Kreis Euskirchen - Zentrale Vergabestelle | Published June 15, 2015
cpvs

Errichtung Betriebshof - hier Rückbauarbeiten

Rehabilitation City-Forum - Drywall Construction

Kreisstadt Euskirchen - Fachbereich 05- Stadtbetrieb Kultureinrichtungen | Published June 7, 2017  -  Deadline June 27, 2017
cpvs
45343100, 45000000, 45323000, 45410000, 45450000, 45324000

Construction work

Regionalniederlassung Ville-Eifel | Published November 24, 2015  -  Deadline January 5, 2016
cpvs
45000000

A4n, 6-lane expansion betw AS Düren u Kerpen..; here: dismantling the BAB 4 (about 2 580 m).

Construction work

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 4, 2015
Winner
Fritz Meyer GmbH
cpvs
45000000

B 265N, OU Huerth-Hermühlheim; Here Preparation of infiltration basins and stormwater treatment I Appendix I (BW 5107 750).