Construction work for highways, roads

Regionalniederlassung Ville-Eifel | Published December 1, 2016

B 56n, construction of the eastern bypass Düren.

Length about 6.60 km, asphalt construction, earthworks.

Construction of a total of 5 bridges.

Construction of about 6 light systems.

The construction project is divided into 2 phases of construction.

Two buildings have been built in advance.

Motorway construction works

Regionalniederlassung Ville-Eifel | Published November 25, 2016

Approximately 4.4 km Road Construction - Construction of highways,

Preparation of 3 bridges - including building "Wings".

about 2 km of noise barriers, 1.4 km noise barriers.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 30, 2016  -  Deadline January 17, 2017

Position of traffic safety for the construction of the fifth

Phase of construction for the reconstruction of the AK Aachen.

- Produce about 25 St traffic sign plans;

- About 28 St Traffic safety of longer duration including set up of temporary road;.

- 90 St Setting Day / Night construction site as traffic safety of shorter duration;

- Establish or implement approximately 4 750 m Transportable guard;

- Produce about 33 250 meters yellow marking.

- Produce about 25 St traffic sign plans;

- About 28 St Traffic safety of longer duration including set up of temporary road;.

-ca. 90 St Setting Day / Night construction site as traffic safety of shorter duration;

- Establish or implement approximately 4,750 m Transportable guard;

- Produce about 33 250 meters yellow marking.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 23, 2016  -  Deadline January 4, 2017

A 44n / A61, AK Jackerath, surface works, west side, Sub-section 2 with earthworks on a length of about 1 000 meters on the A 44n and 900 meters on the A 61st

Approximately 3570 m 3 Topsoil erode and store,

about 7 535 m 3 record stored topsoil and andecken,

about 4 650 meters 3 Loosen soil and store,

about 4 280 m 3 Loosen soil and dispose of,

approximately 18 800 m 3 Loosen soil and installing,

about 12 650 meters 3 record stored soil and installing,

about 2 650 m drainage pipes manufacture,

about 67 St. precast manhole precast concrete manufacture,

approximately 31 230 m 3 Frost blanket manufacture,

about 35 440 tonnes installing Asphalttragschichtmischgut,

approximately 13 600 tonnes installing Asphaltbinderschichtmischgut,

about 6030 t installing Asphaltdeckschichtmischgut.

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 9, 2016  -  Deadline December 14, 2016
Approximately 3570 m  3  Topsoil erode and store,

Motorway construction works

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ville-Eifel | Published November 16, 2016  -  Deadline December 13, 2016

Establishment of an approximately 81 m long temporary bridge (bridge system as screwed together steel bridge, consisting of 2

Single-span girders), including related foundations, earthworks and shoring.

Single span [m]: 40,27 m (this value may vary slightly depending on the manufacturer)

Total length between the transition structures: 80.79 m

Width between abutments: ca. 79,30 m

Minimum Headroom (in the area of ​​the middle cross member): 4.70 m

Crossing angle: 37.1642 gon

Width between railings: 7.90 m

Bridge area: 638.2 m 2

Fabrication of temporary roadways:

about 43 500 meters 3 earthwork

Lay / concrete DN 300 to DN 600 - 900 m from pipelines (steel)

10: 645 m 3 Frost blanket 0/45

about 3685 t asphalt base AC 32 TS

about 8 720m 2 Asphalt binder AC 16 BS

about 10 600 meters 2 Asphalt pavement SMA 8 S

Demolition of 2 VZ-bridges

Preparing a new VZ Bridge

Approximately 600 m Remove protective devices

Approximately 1 000 meters protective equipment manufacture.

Architectural, construction, engineering and inspection services

Regionalniederlassung Ville-Eife | Published December 6, 2016  -  Deadline December 15, 2016

Project planning of traffic facilities with surveying, traffic studies, noise and pollution studies, channel inventories, SiGeKo for planning phase, land acquisition / compensation cost update and project planning of engineering structures, technical planning, structural engineering, geotechnical engineering and project management.

Engineering services.

Planting of the 3rd phase of construction in Ipas / Großbüllesheim

Kreisstadt Euskirchen - Fachbereich 8 | Published November 11, 2016  -  Deadline December 8, 2016

Construction of a new building locker Lilienstraße in Euskirchen-Roitzheim - general contractor

Kreisstadt Euskirchen - ZIM | Published October 31, 2016  -  Deadline December 1, 2016