Rain-water basin construction work

Landeshauptstadt Erfurt, Stadtverwaltung, Stadtkämmerei, Verdingungsstelle | Published April 29, 2017  -  Deadline June 6, 2017
cpvs
45232454

RÜB Karlstraße-lot 3.1 RÜB / separation building HS 10 Adalbertstraße; Component and machine technology (separation building on a pro rata basis).

1 500 m³ of reinforced concrete C 30/37;

1 400 m;

Roofing, lightning protection, tile and screed work, drywall construction, plumbing, painting and plastering work as well as metalwork and locksmith works;

10 m pipe DN 600 1.4571 and other built-in parts made of stainless steel 1.4571;

- Installation of connecting pipelines and ducts, among others

30 m duct DN 1500 reinforced concrete

30 m duct DN 1200 reinforced concrete

10 m channel Eiprofil WN / HN 900/1350 reinforced concrete;

Construction of 2 units of shaft construction DU 2.0 m

70 m AW pressure line 315 x 18.7 mm, PE-HD

10 m AW pressure line 400 x 23.7 mm, PE-HD;

Shaft equipment, such as ladder, cover, etc .;

Shaft equipment;

Embankment and bottom attachment on and in the receiving water (Gera);

Relocation of:

1.345 m² concrete pavement

148 m² Rasengitter plates

75 m drainage channel Nominal width 150 mm

6 pieces Drainage control ducts DU 0,60 m made of concrete.

Civic centre construction work

Freistaat Thüringen Landesamt für Bau und Verkehr | Published September 26, 2017  -  Deadline November 2, 2017
cpvs
45215222

Renovation and modernization of the Thuringian State Chancellery in Erfurt.

Demolition and drywall work:

- 1 pc personal cleansing facility (§14 GefStoffV),

- 500 m 2 Dust protection, foil,

- 800 m 2 Demolition Roof and ceiling coverings GK,

- 200 m 2 Demolition floor construction,

- 450 m 2 Gk + OSB panel, steam brake, wall,

- 900 m 2 Insulation MiWo,

- 35 pcs. Working on windows,

- 450 m 2 Gk + OSB paneling, steam brake, ceiling,

- 100 m 2 Stand wall GK,

- 250 m Supplementary flooring 25 t Residual waste disposal.

Construction work for military buildings and installations

Freistaat Thüringen Landesamt für Bau und Verkehr | Published September 9, 2016
Winner
WM Bauelemente
cpvs

Löber field army barracks Erfurt, Zeppelin Straße 18 in 99096 Erfurt, new accommodation building (Building 017), metal construction - interior doors and interior windows, award-Nr .: 0324-16-B-EO-21st

Construction work for military buildings and installations

Freistaat Thüringen Landesamt für Bau und Verkehr | Published September 9, 2016
Winner
RB Stahl- & Metallbau Bednarek GbR
cpvs

Löber field army barracks Erfurt, Zeppelin Straße 18 in 99096 Erfurt, new service building Career Center with AC (Building 016), metal construction - interior doors and interior windows, award-Nr .: 0094-16-B-EO-21st

Construction work for military buildings and installations

Freistaat Thüringen Landesamt für Bau und Verkehr | Published February 4, 2016  -  Deadline March 15, 2016
cpvs
45216200

Löber field army barracks Erfurt, Zeppelin Straße 18 in 99096 Erfurt,

New service building Career Center with AC (Building 016),

Metal construction - interior doors and interior windows,

Award-Nr .: 0094-16-B-EO-21st

Construction work for military buildings and installations

Freistaat Thüringen Landesamt für Bau und Verkehr | Published March 19, 2016  -  Deadline May 19, 2016
cpvs
45216200

Löber field army barracks Erfurt, Zeppelin Straße 18 in 99096 Erfurt,

New hotel building (Building 017),

Metal construction - interior doors and interior windows,

Award-Nr .: 0324-16-B-EO-21st

Metal construction and glazing work (0249-15-B-E-21)

Landesamt für Bau und Verkehr Freistaat Thüringen | Published March 3, 2015  -  Deadline March 25, 2015
cpvs

Metal construction and glazing work: - 1 pc Windfanfanlage octopartite - 1 pc door system in two parts

Construction work for houses

KoWo-Kommunale Wohnungsgesellschaft mbH Erfurt | Published October 31, 2015
Winner
Schönefeld GmbH & Co. KG
cpvs
45211100

Renovation of 34 apartments in the uninhabited state consisting of 4 homes (1 BA) and of 38 apartments in the uninhabited state consisting of 6 houses (2 BA). Phase 1 and 2 are to be carried out simultaneously from 10/12/2015 to 15/04/2015. The complete action will be carried out in four phases, to be installed at the same time always being in two sections. Phase 1 and 2 are from 10/12/2015 to 04/15/2016, construction stage 3 and 4 (Dortmunder Str. 5-7, Bebelstr. 40-42 and Eugen-Richter-Str. 10-14) are from 03.28.2016 to 28.10. 2016 rehabilitated. The 3 +. 4 BA consists of 11 houses and 77 flats. All apartments are drawn empty until remediation begins. The benefits for lots 1 -Baustelleneinrichtung; Lot 9 insulation attic, item 12 Baureinigung; Lot 13 and Lot 14 Locking basic lines refer to the performances of the construction phases 1 to 4; the remaining lots on the construction phases. 1 and 2

Construction work for houses

KoWo-Kommunale Wohnungsgesellschaft mbH Erfurt | Published July 8, 2015  -  Deadline August 18, 2015
cpvs
45311200

Renovation of 34 apartments in uninhabited state consisting of 4 homes (1 BA) and of 38 apartments in uninhabited state consisting of 6 houses (2 BA). Phase 1 and 2 will be carried out simultaneously from 10/12/2015 to 04/15/2015. The complete action will be carried out in four phases, which should be installed at the same time always in two sections. Phase 1 and 2 are from 10/12/2015 to 15/04/2016, construction stage 3 and 4 (Dortmunder Str. 5-7, Bebelstr. 40-42 and Eugen-Richter-Str. 10-14) are from 03.28.2016 to 28.10. 2016 rehabilitated. The 3 +. 4 BA 11 houses and 77 flats. All apartments are drawn empty until remediation begins. The benefits for lots 1 - site equipment; Lot 9 insulation attic, item 12 Baureinigung; Lot 13 and Lot 14 key systems - basic lines refer to the performances of the construction phases 1 to 4; the remaining lots on the construction phases. 1 and 2

Construction, foundation and surface works for highways, roads

SWE Netz GmbH | Published October 3, 2017  -  Deadline November 1, 2017
cpvs
45233000

In connection with the construction of a substation (Erfurt Nord, An der Lache) the following services are to be provided:

Road and civil engineering works.

Roads Construction of the heavy-load route of the substation between the planned Schalthaus and the transformer stations with the following essential services:

- 160 m 3 Soak and dispose of the floor

- 120 m 3 Frost protection layer

- 290 m 2 Asphalt layer AC 22 TN, 10 cm thick

- 290 m 2 Asphalt cover layer AC 8 DN, 4 cm thick

- 160 m edging with concrete booms

- 15 m frame with brackets

CBI-UZ Naumburg, Turnkey construction of the security system electronic interlocking A Goseck.

DB Netz AG | Published February 5, 2016
cpvs
34632000

CBI-UZ Naumburg, Turnkey construction of the security system electronic interlocking A Goseck

Construction work for military buildings and installations

Freistaat Thüringen Landesamt für Bau und Verkehr | Published September 19, 2015  -  Deadline November 3, 2015
cpvs
45216200

Löber field army barracks Erfurt, Zeppelin Straße 18 in 99096 Erfurt, new hotel building (Building 017), new service building career center with AC (Building 016), new service building LogKdoBw (Building 015), mullion and transom facade, metal construction, glazing work award No .: 1394-15-B-EO-21st

Metal construction and glazing work (0336-15-B-E-21)

Landesamt für Bau und Verkehr Freistaat Thüringen | Published March 18, 2015  -  Deadline April 14, 2015
cpvs

Students Thüringen Erfurt Mensa, Nordhäuserstraße 63 metal construction and glazing work 1 pc light roof arched, insulated 28 x 5.3m 7 St. RWA window 2 x 2.5m

Reception building 1. BA metal construction and glassworks (ega057-2017) in egapark Erfurt - Lot 2

Erfurter Garten- und Ausstellungs gemeinnützige GmbH (ega) | Published September 19, 2017  -  Deadline October 17, 2017
cpvs

Metal-glass construction

Construction work

Landeshauptstadt Erfurt, Stadtverwaltung, Stadtkämmerei, Verdingungsstelle | Published February 28, 2017  -  Deadline April 4, 2017
cpvs
45000000

Drywall 2nd and 3rd BA.

Approximately 245 m 2 Mounting wall metal stud frame CW 75, on both sides a double covering (2x 12.5 mm GKBI), ceiling heights up to 4.08 m;

ca. 220 m 2 Mounting wall metal stud frame as a double stud frame CW 75, on both sides a double covering (2x 12.5 mm GKB) ceiling heights up to 4.08 m;

approximately 175 m 2 Mounting wall metal stud frame as a double stud frame CW 75, F90, on both sides a double covering (2x 12.5 mm Fireproof panel), ceiling heights up to 4.08 m;

ca. 140 m 2 Mounting wall metal stud frame as a double stud frame CW 75, F30, on both sides a double covering (2x 12.5 mm GKB) ceiling heights up to 4.08 m;

60m 2 Mounting wall metal stud frame as an installation wall, on both sides a double covering (2x 12.5 mm GKBI), wall thicknesses 320 and 270mm, ceiling heights up to 4.08 m;

about 28 St. doorways in prefabricated walls;

ca. 195 m 2 Facings for wall installations, metal profiles, single 2-layer planking with GKBI (2x 12.5 mm), ceiling heights up to 4.08 m;

ca. 360 m 2 Facings against masonry walls, detached, for improving sound insulation, metal profiles, single 2-layer planking with GKB (2x 12.5 mm), ceiling heights up to 4.08 m;

about 6 St. doorways in facings;

about 25 m 2 Bulkheads on door systems to ceiling in corridors and stairwells as F30

and F90 constructions in drywall;

300m 2 Protective membranes in drywall of steel beams on ceilings, on three sides, F90;

60m 2 Protective membranes in drywall of steel beams on ceilings, two-sided, F90.

Construction work

Landesentwicklungsgesellschaft Thüringen mbH | Published May 11, 2017  -  Deadline June 13, 2017
cpvs
45000000, 77310000, 45240000

Development of industrial area "Erfurter Kreuz" 3. BA (West, building area 1)

Compensatory and replacement measures.

20.5 ha planted planting with shrubs and forestry plants

3.3 hectares of grassland

2,400 meters of slope machines

90 pcs of high stems plants.

200 m³ Access ramp

225 m of the Fangedamm

250 m Remove the district heating cable

650 m³ concrete demolition

4 300 m³ soil excavation

5 300 m² of the riverbank

640 m³ Digging / shaping

4 300 m² Geotextile installation

850 m³ filter layer

165 m³ Install the sealing layer

1 700 m³ Stone bed from water building blocks

22 pcs. Prepare bottoms

30 pcs of high stems plants

Set 50 pcs of wood

600 pcs shrubs plant

1 400 m².

Construction operator

Karrierecenter der Bundeswehr Erfurt - Berufsförderungsdienst | Published June 14, 2017  -  Deadline July 10, 2017
cpvs

The Bundeswehr's professional development service offers temporary and seasonal volunteers (FWDL), the opportunity to participate in civil-sector education and integration measures during the service period (internal measures).

Architectural, construction, engineering and inspection services

Landeshauptstadt Erfurt | Published May 10, 2017  -  Deadline May 22, 2017
cpvs
71000000

By replacing a large foot-bridge bridge over the surrounding floodplains and Stauffenbergallee, the inner-city railway bridges to be developed jointly within the framework of the central Erfurt city development project "ICE-City" are to be connected with each other. With the "Promenadendeck", the "Promenadendeck" is to be a barrier-free bridge construction, which is easy to use by pedestrians and cyclists. This bridge is characterized by its design and its conciseness, as well as its high function and quality of accommodation. The total area to be covered is approx. 95 m, of which the crossing of the flood trench is approx. 45 m and the Stauffenbergallee approx. 50 m. Approximately in the middle of the future bridging train, a perspective planned tram route with stop is to be taken between the floodplains and Stauffenbergallee.

Architectural, construction, engineering and inspection services

Landeshauptstadt Erfurt | Published May 19, 2017  -  Deadline May 22, 2017
cpvs
71000000

By replacing a large foot-bridge bridge over the surrounding floodplains and Stauffenbergallee, the inner-city railway bridges to be developed jointly within the framework of the central Erfurt city development project "ICE-City" are to be connected with each other. With the "Promenadendeck", the "Promenadendeck" is to be a barrier-free bridge construction, which is easy to use by pedestrians and cyclists. This bridge is characterized by its design and its conciseness, as well as its high function and quality of accommodation. The total area to be covered is approx. 95 m, of which the crossing of the flood trench is approx. 45 m and the Stauffenbergallee approx. 50 m. Approximately in the middle of the future bridging train, a perspective planned tram route with stop is to be taken between the floodplains and Stauffenbergallee.

Architectural, construction, engineering and inspection services

Landeshauptstadt Erfurt | Published May 24, 2017  -  Deadline June 6, 2017
cpvs
71000000

By replacing a large foot-bridge bridge over the surrounding floodplains and Stauffenbergallee, the inner-city railway bridges to be developed jointly within the framework of the central Erfurt city development project "ICE-City" are to be connected. With the "Promenadendeck", the "Promenadendeck" is to be a barrier-free bridge construction, which is easy to use by pedestrians and cyclists. This bridge is characterized by its design and its conciseness, as well as its high function and quality of accommodation. The total area to be covered is approx. 95 m, of which the crossing of the flood trench is approx. 45 m and the Stauffenbergallee approx. 50 m. Approximately in the middle of the future bridging train, a prospectively planned tram line with stop must be taken between the floodplains and Stauffenbergallee.