Call +44 800 9755 164

Public tenders for construction in Dresden Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Dresdner Bäder GmbH | Published February 3, 2017  -  Deadline April 7, 2017
cpvs
45000000

625 qbm excavation pit; 900 m² final grade; 440 qbm backfill work spaces; 1 234 t waste excavation; 34 qbm plinths; 140 m underground pipes DN100-200; 15 St. floor drains cast iron; 730 m² subbase; 82 St. piles abstemmen; 93 m² WU reinforced concrete floor slab 25-40 cm; 1 450 m² reinforced concrete floor slab; 22 qbm plinths; 55 qbm pile head beams; 81 sqm WU Halbfertigteil- reinforced concrete walls D 30-35 cm; 30 sqm WU-situ concrete walls D 20-25 cm; 1277 sqm situ concrete walls; 200 m reinforced concrete columns; 180 qbm wall templates; 1463 sqm girder ceiling D 16-25 cm; 123 sqm Ortbetondecke D 18-25 cm; 123 qbm joists; 682 sqm prestressed concrete ceiling D 20-26 cm; 3 St. precast stairs 4-15 slopes; 125 m Heat bench precast concrete products; 86 m Dehn / construction joints band; 71 m Combination joint tape; 240 t reinforcing steel bars 8-32 mm; 90 m Rebar connections; 8735 St. rebar connections; 720 sqm perimeter insulation; 606 sqm KS masonry; 985 m gain CFRP strips;

625 qbm excavation pit; 900 m² final grade; 440 qbm backfill work spaces; 1 234 t waste excavation; 34 qbm plinths; 140 m underground pipes DN100-200; 15 St. floor drains cast iron; 730 m² subbase; 82 St. piles abstemmen; 93 m² WU reinforced concrete floor slab 25-40 cm; 1 450 m² reinforced concrete floor slab; 22 qbm plinths; 55qbm pile head beams; 81 m² WU Halbfertigteil- reinforced concrete walls.

Road construction works

Landeshauptstadt Dresden, Straßen- und Tiefbauamt | Published February 9, 2017  -  Deadline March 14, 2017
cpvs
45233120, 45232000, 45233222

17-021_Stadtbahn 2020 TA 1.1 Zentralhaltestelle Kesselsdorfer road Reisewitzer road up to and including node Tharandter Straße_Los 20 Public peripheral nodes.

Asphalt departure 1680 m 2 , Demolition and paving plates 2 410 m 2 , Breaking curbs 350 m, departure without binder 940 m 3 Producing and condense Planum, 5100 m 2 , Frost blanket manufacture 1010 m 3 Bituminous supporting and covering layers 630 m 2 , Paving, Plattenverlegung 3040 m 2 , Civil engineering / equipment for drinking water pipe DN 100 70 m, underground construction for energy supply 160 m, Tipping for Traffic signal 2 150 m, civil engineering / Equipment for Public Lighting 83 m.

Construction work for university buildings

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published February 1, 2017
cpvs
45214400, 45261210, 45261300, 45410000, 45262670, 45421132, 45421144, 45311000, 45314320, 45332000, 45332300, 45324000, 45343220, 45331210, 45331220, 45331221, 45262320, 45313100, 45333000, 45330000, 45421131, 45442100, 45431000, 45432130

The construction project "Rehabilitation Wing C" made in the context of the entire project for the renovation of the listed building Barkhausen. Essentially, these are the complete renewal of the development standards according to the prior art as well as measures for fire prevention and removal of hazardous materials, and optimization of land use and transport routes.

The facilities consist of the Faculty of Electrical Engineering and Information Technology at the TU Dresden. The Barkhausenbau is including auditorium, an existing complex of 8 buildings. The total extension of the building in an east-west axis is approximately 165 m, in a north-south axis without auditorium about 105 m.

Roofing / Plumbing.

External plaster work.

Metal construction - windows, exterior doors.

Joinery - windows.

Sunscreen, anti-glare.

Electrical and data installation.

Heating Sanitary.

Ventilation and air conditioning.

Innenputzarbeiten.

Trockenbauarbeiten.

Screed works.

Lift platform.

Industrial gases.

Laboratory equipment.

Joinery - doors.

Painting and decorating.

Tile installation.

Flooring work.

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published January 31, 2017  -  Deadline March 10, 2017
cpvs
45214210

Fachlos 39: interior doors wood materials.

Part Object 1 - House A - stock:

1 Piece historical stock door (porch) in frame construction dimensions 3.44 x 3.12 m reappraise / toughen

11 Pieces historic existing doors in frame construction dimensions 3.44 x 3.12 m reappraise / toughen

3 pieces recreate historical stock doors in frame construction dimension to 1.40 x 2.26 m

12 pieces small-scale Reparaturantragung / stone replacement of door jambs of sandstone, 12 piece removal and re-installation latch

6 pieces interior doors, single-leaf, door leaf made of wood / wood materials, HPL-coated with Stahlumfassungszarge, surface powder coated, dimensions up to 1.135 x 2.135 m, with requirements for sound, fire, smoke humidity and / or Amokschutz as required

Subobject 2 - House A - growing school:

23 piece interior doors, single-leaf, door leaf made of wood / wood materials, HPL-coated with Stahlumfassungszarge, surface powder coated, dimensions up to 1.01 x 2.26 m

5 piece interior doors, single-leaf, with fixed side panel, laminated satin, door leaf made of wood / wood materials, HPL-coated with Stockzarge wooden final painted, dimensions up to 1.90 x 2.26 m

1 interior door, single-leaf, with 2 fixed side panels, laminated satin, door leaf made of wood / wood materials, HPL-coated with Stockzarge wooden final painted, dimensions 1.95 x 2.26 m, all doors with requirements for sound, fire -, smoke humidity and / or as required Amokschutz

Subobject 2 - House N - school building new construction:

21 piece interior doors, single-leaf, door leaf made of wood / wood materials, HPL-coated with Stahlumfassungszarge, surface powder coated, dimensions up to 1.01 x 2.26 m

15 piece interior doors, single-leaf, with fixed side panel, laminated satin, door leaf made of wood / wood materials, HPL-coated with Stockzarge wooden final painted, dimensions up to 2.10 x 2.26 m

6 ...

VE 3010 metal construction and locksmith work I doors

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published January 31, 2017  -  Deadline February 22, 2017
cpvs

VE 3010 metal construction and locksmith work I doors

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published January 26, 2017  -  Deadline March 2, 2017
cpvs
45214210

Fachlos 19 interior doors sheet steel.

Part Object 1 - House A - stock:

12 piece interior doors, single-leaf, door leaf made of sheet steel with Stahlumfassungszarge, surface top coated, dimensions up to 1.135 x 2.01 m, with requirements for sound, fire, smoke and moisture intrusion protection as required.

Subobject 2 - House N - school building new construction:

3 piece interior doors, double-leaf, door leaf made of sheet steel with Stahlumfassungszarge, surface top coated, dimensions up to 1.76 x 2.135 m, with requirements for sound, fire, smoke and moisture intrusion protection as required;

10 piece interior doors, single-leaf, door leaf made of sheet steel with Stahlumfassungszarge, surface top coated, dimensions up to 1.135 x 2.135 m, with requirements for sound, fire, smoke and moisture intrusion protection as required;

1 piece intent roller shutter element dimensions 3,00m x 1,49m for single plant, hangings made of aluminum, powder coated surface, with tubular motor and with inspection aperture.

Subobject 3 - Gymnasium:

3 piece interior doors, single-leaf, door leaf made of sheet steel with Stahlumfassungszarge, surface top coated, dimensions up to 1.01 x 2.135 m, with requirements for sound, fire, smoke and moisture intrusion protection as required.

Between periods:

The performance distributed staggered on several, be partly overlapping construction stages (phases) with work interruptions.

The services are sections such as facade-or each storey object- or floor by floor, staggered to provide the progress of construction, in conjunction with the work of other trades.

Through these dependencies no continuous power processing must be guaranteed.

Planning Preparation:

In addition, the work plans shall, on request of the AG or the supervision within 2 weeks by the contractor.

- Business plans, technical clarifications, all subobjects 8:05:17 to 19:05:17.

Stage 5-ITSB1 (08/28/17 - 15/09/17).

- Existing buildings house A: mounting frames and sheet steel doors.

Stage 6 ITSB2 (13:11:17-15:12:17).

- New house N: mounting frames and sheet steel doors.

- Gymnasium: mounting frames and sheet steel doors.

Stage 7-ITSB3 (11:04:18 to 4:05:18).

- All subobjects: complete wiring, handles, closers, commissioning.

Rest Services (4:05:18 - 05/31/18).

- All subobjects.

Presentation of the original calculation on separate request by the Contracting Authority.

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published January 31, 2017  -  Deadline March 6, 2017
cpvs
45214210

Fachlos 42: ventilation technology.

Ventilation technology and associated building automation for a school complex with:

Old school building - for reinstallation

Small ventilation ABL 60m 3 /H

Gravity ventilation ELT battery room

GA for

Conditioning ZUL / ABL 260 m 3 / H for sanitary facilities

Plants split cold 6kW

GA for

Conditioning ZUL / ABL 1200 m 3 / H for sanitary facilities

Conditioning ZUL / OFA 2 400m 3 / H for kitchen

Conditioning ABL 3500 m 3 / H (+ slipstream) installation room for heating

Gravity ventilation ELT battery room

GA for

Conditioning ZUL / ABL 1600 m 3 / H for sanitary facilities

Conditioning ZUL / ABL 4100 m 3 / H for sports hall

Gravity ventilation ELT battery room

Zwichentermine:

Gym

Assembly planning including all construction data. 13.06.17-28.06.17;

insulation and

Cabling GA: 03.08.17-28.09.17;

Insulation and GA: 29.11.17-16.02.18;

Complete ventilation, completion GA: 05.02.18-28.02.18;

Partial acceptance / radical performance, rework: 5:03:18 to 23:03:18;

House A - Inventory

Installation Klein fans E + 0: 8:11:17 to 2:11:17 p.m.;

Partial acceptance / radical performance, rework: 18:04:18 to 04:05:18;

House A - cultivation

Assembly planning including all construction data:. 01:06:17 to 14:06:17;

Mounting roof penetrations: 13:07:17 to 13:07:17;

Mounting external units Split Refrigeration: 17.08.17-30.08.17;

Insulation,

Wiring and equipment GA: 21.09.17-27.10.17;

Complete ventilation, completion GA: 12:03:18 to 16:03:18;

Partial acceptance / radical performance, rework: 04.04.18-24.04.18;

New SG

Assembly planning including all construction data:. 23:05:17 to 08:06:17;

Installation Ventilation on roof: 31.08.17-20.09.17;

insulation and

Cabling GA: 14.09.17-29.09.17;

Systems incl.

Insulation and wiring GA: 27.07.17-06.09.17;

Insulation and GA: 28.09.17-28.11.17;

Complete ventilation, completion GA: 12.03.18-27.03.18;

Partial acceptance / radical performance, rework: 03:05:18 to 18:05:18

Evidence to be submitted with the offer:

Proof of the room air-hygiene training according to VDI 6022 category A (ventilation)

Maintenance:

Orders are placed under the condition that the company at the offer price for the

Maintenance remains bound until the completion of the maintenance contract.

In the evaluation of tenders indicated in the Wartunsangeboten prices at a scheduled period of 4 years will be considered without applying a present value factor.

Template original calculation on separate request by the Contracting Authority.

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published February 15, 2017  -  Deadline March 20, 2017
cpvs
45214210, 45000000

Fachlos 37: poured asphalt work.

Part Object 1 - House A - stock:

424 m edge insulation strips, including joint formation, separation and final rails.

Subobject 2 - House A - growing school:

719 m edge insulation strips, including joint formation, separation and final rails.

Subobject 2 - House N - school building new construction:

598 m edge insulation strips, including joint formation, separation and final rails.

Single deadlines:

Through these dependencies must be ensured may no continuous power processing.

Stage 5-GA1 existing buildings House A (10.07.2017 - 31.07.2017)

- Existing buildings house A: Installation screeds level from 0 to 1

Stage 6-GA2 cultivation house A and new house N, stairwell TH2 (23.10.2017 - 11.30.2017)

- Existing buildings Building A, here growing TH2: fitted floor pedestals

- New house N: Installation screeds level 1 to 2

- Cultivation house A: Installation screeds level 0 to 3

Template original calculation on separate request.

Rain-water basin construction work

Landesamt für Straßenbau und Verkehr, Zentrale | Published January 21, 2017  -  Deadline February 23, 2017
cpvs
45232454

New construction of federal highway A72 Chemnitz - Leipzig (section 5.2): Construction of rainwater retention basins 1 and 5 including Vorflutleitungen.

32 200 m³ topsoil and earthworks; 4400 m³ surface filter; 8700 m vibro replacement; 300 m pipe laying; 10 St. manholes; 1 St. pumping station; 2 St. rainwater retention basin (about 4 000 m³); 1200 m³ unbound supporting and covering layers; 2100 m² Asphalt wearing courses.

Construction work for buildings relating to health

Universitätsklinikum Carl Gustav Carus Dresden an der Technischen Universität Dresden | Published February 17, 2017  -  Deadline March 8, 2017
cpvs
45215100

Construction of a new 6-storey surgical emergency room and surgical center.

- BGF approximately 21 050 m 2 ;

- BRI approximately 88 500 meters 3 ;

- Construction: reinforced concrete.

Installation of fire protection of plastic sheets:

- Level: UG - 5th floor;

- H = about 60 to 300 cm;

- About 4 550 m.

Construction work for buildings relating to education and research

Stesad GmbH | Published February 7, 2017  -  Deadline March 13, 2017
cpvs
45214000, 45214220, 45212225, 45212220, 45233123

FL 074 Gymnasium Expansion II - sports ground with sports floor heating (TO 2C, 2D).

Supply and installation of a surface flexible sports floor with elastic layer (DIN EN 14904), floor covering linoleum in the 4 field Halle TO C, floor covering parquet in the 2 field Halle TO D

4-field Hall TO-C

- Surface linoleum in the 4-field Hall = 60 mx 27 m

- Primer bitumen emulsion

- Supplying / installing bitumen membrane

- Supplying / installing equipment sleeves, seal on devices sleeves

- Delivering bituminized leveling compound

- Supplying / installing thermal insulation panels

- Sports ground construction, building about 28 mm total thickness of 9 mm birch plywood, dim .: 1 250 x 2 500 mm 9 mm birch plywood, dim .: 1 250 x 2 500 mm 10 mm Elastic layer of PUR composite foam

- Top layer 4.0mm linoleum sheet flooring, directionless marbled, suitable for gymnasiums according to DIN V 18032-2, DIN EN 14904

Layer: homogeneous on jute,

Total thickness: 4.0 mm, weight: 4600 g / m², web width: 200 cm

Lightfastness: Stage 6

- Pitch markings, Special PUR pitch color 2-field Hall TO-D

- Surface sports flooring in the 4-field Hall = approximately 44 mx 22 m

- Primer bitumen emulsion

- Supplying / installing bitumen membrane

- Supplying / installing equipment sleeves, seal on devices sleeves

- Delivering bituminized leveling compound

- Supplying / installing thermal insulation panels

- Sports ground construction with top layer parquet

Construction about 37 mm total thickness of:

10 mm solid hardwood edgewise lamella parquet oak wood Standard EN 13227 raw,

12 mm plywood (wood veneer layers all birch)

10 mm Elastic layer of PUR composite foam

- Pitch markings, Special PUR pitch color.

Structural shell work

Sächsische Aufbaubank – Förderbank | Published February 4, 2017  -  Deadline April 3, 2017
cpvs
45223220

Advanced structural work for the construction of an office building, including parking in waterproof design, micro-pile drilling, features: exposed concrete, spun-concrete columns, inlaid TGA for concrete core activation and electrical conduit system (for more information see the tender documents).

Construction work

Landestalsperrenverwaltung des Freistaates Sachsen, Betrieb Oberes Elbtal | Published February 16, 2017  -  Deadline March 22, 2017
cpvs
45000000, 45350000, 44163000, 45111000

Lot 1: Planning / production / installation of pipes and Gleitschützen the pressure housing in pipe basement of the spool shaft, Corrosion protection of pipelines prev..

Lot 2: Planning / production / installation of platforms and stairways in the slide chute, drilling / anchor / reinforced concrete / shotcrete in the pipe cellar, drilling / grouting in the slide chute, diving work for setting / removing swimming closures, demolition / removal work of platforms, pipes, valves DN1000 with foundations, space expansion of the tubular basement, reconstruction work on prev. shaft ventilation DN800 and DN125 pipe cellar drainage.

- 6 Gleitschütze in pressure housings (1 pc approx 6t.) With hydraulic drive and a hydraulic unit;

- 3 pcs. Poppet valves, each with a knife gate valve DN 500 with electric drive;

- 2 pcs. Valve DN 200 with electric drive;

- Functional tests dry / wet;

- Technical work by the ZTV-W 202nd

- Dismantling of 3 x 5 m pipe lengths, valves 6, 2 podium levels of grating on steel beams;

- 7 GEWI piles 4 to 5 m, diameter 32 and 50 mm, 60 Gebirksanker to 1.5 m in pipe Keller, 4t rebar;

- 30 m² GRP grate, 50 m IPE steel beams 160 and 300, two flights of stairs removable drive 25 m in height;

- 74 console creation, Mechanical processing according to ZTV-W LB202..

Structural shell work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published February 15, 2017  -  Deadline March 21, 2017
cpvs
45223220

Shell.

-. Creation demolition concepts including structural calculations for new components :; - 170 m 2 new concrete ceiling; Built in inventory; - Exchange MW-pillar by pillar STB in inventory KG and the EC 1st floor; - Sections underpinnings strip foundations; - Built new STB staircase as an escape route in inventory with new STB components and structural separation; - Installation of new lift in inventory with Pit; Basic construction for lift manufacturers; - Workshop and assembly planning demolition, concrete and steel construction; - 200 m 2 Demolition Altdecken od as Ackermann ceiling cap ceiling. - Approximately 270 m 2 Demolition floorboards including excavation. - Approximately 1 300 meters 2 Demolition old plaster interior walls and ceilings; - Approximately 95 m 3 Demolition Altmauerwerk total; - Various demolition masonry wall for new openings, hangers, wall slots; - 250 St. core holes on walls and ceilings; - 60 m 3 new masonry for interior walls and Beimauerungen VZ, NF, SFK20; - Approximately 290 m 2 new floor panels with seal and of which approximately 90% perimeter insulation; - 45 m 3 Lean concrete foundation as backfill; - 200 m 2 new STB ceiling, about 5 m 3 STB-pit walls; - 10 m 3 new STB columns, beams and frames in situ; - New STB internal staircase in situ, straight, 9 slopes; - Approximately 18x steel beams IPE, HEB 2x 220, 24x IPE 120 support, length up to 6 m; - Approximately 1x steel beams IPE 500, length about 6 m; - About 6x. Concrete restoration / renovation Mini balconies; - Approximately 180 m 2 Concrete repair garage canopy; - Various Concrete restoration at Traufgesimsen, beams, lintels; - 600 m 3 Space frame as shoring and working scaffold, provision, modification as falsework;

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published January 31, 2017  -  Deadline March 7, 2017
cpvs
45214210

Fachlos 12: exterior plaster EIFS.

Existing buildings:

100 m 2 Fassadenputz as cement plaster, facade paint with pure silicate paint;

100 m 2 Renovation coat with pure silicate paint.

Neubauten:

500 m patch Fensterfaschen from 20 mm EPS rigid foam insulation, the formation of connections with various profiles and joint sealing tapes,

160 mm,

25 pieces Mauersegler- and bat facade installation quarters,

2 piece grille elements with steel frame, galvanized and powder coated,

200 m outdoor window sills made of aluminum, natural anodised.

Between periods:

Through these dependencies must be ensured may no continuous power processing.

Preparation:

Clarification and wind load calculation 21:06:17 - 06/28/17

Clarification and wind load calculation 05:07:17 to 12:07:17

- Gymnasium engineering ventilation grille: 21.06.17- 05.07.17.

Position 5/6 FA1 existing building with cultivation house A (20:07:17 - 09/27/17):

- Existing buildings house A: Cleaning supplement Bestandsbaufassade, painting facade.

- Existing buildings Building A, here growing TH2: windowsills, species protection districts, insulation, reinforcement, plaster, paint,

- Cultivation house A: windowsills, species protection districts, insulation, plaster, coatings.

Position 5/6 FA2 Gymnasium (07/31/17 - 10/06/17)

- Gymnasium: windowsills, species protection districts, insulation, plaster, coatings.

Position 5/6 FA3 new house N (31/07/17 - 25/10/17)

- New house N: windowsills, species protection districts, insulation, plaster, coatings.

Stage 6-FA4 new house N (26/10/17 - 24/11/17)

- All subobjects: residual benefits.

Stage 7-FA5 connector (12:03:18 -20.04.18)

- House N + cultivation house A: adaptation façade connector 12:03:18 to 23:03:18;

- House N + cultivation house A: adaptation façade connector completion 24/03/18 - 20:04:18.

Template original calculation on separate request.

Construction work for school buildings

Landeshauptstadt Dresden, GB Personal und Recht, Zentrales Vergabebüro | Published February 7, 2017  -  Deadline March 6, 2017
cpvs
45214200, 45300000

Fachlos 14 - drawers cabinets chemistry.

On this listed building C are 2 chemical drawers cabinets with 28

Student workstations, each with a media lift with 9 student terminals are fully equipped. Both drawers cabinets get together a panoramic deduction and one whiteboard double pylon board. Likewise, the preparation room with laboratory workstation, 5 teacher workstations and related cabinets is equipped. Another preparation room is equipped with 2 teacher workstations and laboratory cabinet walls.

The following documents must be submitted on separate request:

- Original calculation;

- Certification "TÜV Mark P", "GS" and "CE" symbol;

- VDE certificate with test according to VDE 0789 / part 100;

- DVGW type examination certificate, worksheet G 621;

- Reference list with the same system features elements including object name and address within the refurbishment.. The reference list must be at least. 5 contain references.

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published February 18, 2017  -  Deadline March 21, 2017
cpvs
45214210, 45431000

Fachlos 23: tile installation.

Part Object 1 - House A - Inventory

15 m 2 Bottom clothing unglazed porcelain stoneware 30 x 60 cm;

97 m stairs unglazed porcelain stoneware 30 x 120 cm with aluminum stair nosing profiles;

Processing, cleaning and replacement ceramic porcelain stoneware tiles, unglazed (runners depositors octagon with net decor) of stored inventory.

Subobject 2 - House A - growing school

65 m 2 Bottom clothing unglazed porcelain stoneware 60 x 60 cm; 4 piece crystal mirror 1.40 x 90 cm; 1 piece Crystal mirror 60 x 1.15 cm; 2 pieces Crystal mirror 60 x 90 cm;

Subobject 2 - House N - New school building

100 m stairs unglazed porcelain stoneware 30 x 120 cm with stair nosing profiles; ; 4 piece crystal mirror 1.40 x 90 cm; 1 piece Crystal mirror 60 x 1.15 cm; 3 piece Crystal mirror 60 x 90 cm;

Subobject 3 - Gymnasium

20 m Kehl base unglazed porcelain stoneware 7.5 x 7.5 cm; 2 pieces crystal mirror 1.40 x 1.05 cm; 1 piece Crystal mirror 60 x 1.15 cm; 3 piece Crystal mirror 60 x 90 cm; 2 pieces crystal mirror 1.50 x 1.15 cm.

Single deadlines:

Through these dependencies must be ensured may no continuous power processing.

Position 5/6 FL1 existing buildings House A (18:09:17 to 15:12:17):

- Dismantling historical plates and additions;

- Tiles main platforms TH2;

- Tiles Rooms Level 0;

- Cleaning tiles.

Stage 6-FL2 Neubauten restrooms Part 1 (13:11:17 to 19:01:18):

- Gymnasium: bricks Walls sanitary facilities;

- Cultivation house A and new house N: tiles toilet building walls, floors on poured asphalt.

Stage 7-FL3 restrooms Part 2, stairways, hallways (22:01:18 to 09:02:18):

- Gymnasium: Ceramic tiles Sanitary rooms and corridors on cement screeds;

- Cultivation house A and existing buildings TH2: tiled stairs and corridors.

Stage 7-FL4 stairways, hallways (12:02:18 - 03/31/18):

- New house N: tiled floors restrooms on cement screeds, tiles stairs and corridors.

Template original calculation on separate request.

Secondary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published February 3, 2017  -  Deadline March 3, 2017
cpvs
45214220

Fachlos 45: sanitary and heating engineering.

Sanitary facility:

Installing 102 sanitary items, each compl. with accessories; about 950 m supply lines from stainless steel pipe with insulation, about 65 taps, 680 m sewers from SML / KML / HT, insulation, fire protection bushings.

Heating system:

Installation of 1 district heating transfer station 120 kW with 5 heating circuits;

200 l DHW cylinder loading system; Fresh water system with 1 000-liter buffer tank; Heat distribution with 6 heating circuits, pumps, valves, heat distribution network with about 1 650 meters copper pipes and insulation; 450m 2 Underfloor heating system knobs; 42 column radiators and 7 Profile valve radiators with accessories; Fire penetrations; Winterbauheizung with 8 convection heaters and approximately 270 m of pipes made of PE-X pipe.

Single deadlines:

School TO 1

Rough assembly including pressure tests and insulation. 1.8.-12.7.2017

Precision assembly 19.2.-17.4.2018

Trial operation / commissioning 17.4.-18.5.2018

Winterbauheizung: 20.10.-10.30.2017

Installation - Commissioning substation: 20.10.-10.30.2017

Gymnasium TO 2 / TO 4

Rough assembly including pressure tests and insulation. 10.8.-11.27.2017

Precision assembly 14.2.-27.3.2018

Trial operation / commissioning 3.4.-28.4.2018

Winterbauheizung: 20.10.-10.30.2017

Installation - Commissioning heating distribution: 20.10.-10.30.2017

Stock Gymnasium TO 5

Rough assembly including insulation: 1.6.-14.6.2017

Precision assembly 21.6.-28.6.2017

Trial operation / commissioning 7.8.-08.18.2017.

Maintenance:

In the evaluation of tenders indicated in the Wartunsangeboten prices at a scheduled period of 4 years will be considered without applying a present value factor. The maintenance contract is signed by the School Administration Office Dresden.

Construction work for buildings relating to health

Landeshauptstadt Dresden; Städtisches Klinikum Dresden | Published February 15, 2017  -  Deadline March 14, 2017
cpvs
45215100, 45112700

Fachlos 5.11.0 outdoor facilities.

130 m 3 Demolition of traffic areas; 1 000 meters 3 Earthwork; 5 m 3 Concrete foundations; 10 m linear drainage; 8 pcs Point drainage; 35 m stormwater sewer line; 330 m board; 210 m flume; 300 m 3 Making SoB; 170 m 2 Natural stone paving; 730 m 2 Blacktop; 4 pcs waste bin; 7 pcs Fahrradparker; 6 m mesh fence; 8 pcs mast lighting; 110 m 3 Vegetation layer; 29 pcs trees; 200 pcs shrubs; 880 pcs perennials; 2 a care.

Construction work for buildings relating to education and research

Stesad GmbH | Published February 1, 2017  -  Deadline March 6, 2017
cpvs
45214000, 45214220, 45212225, 45212220, 45233123

School location Tolkewitz, FL 071 - Facilities classrooms science schools (TO 1A, 1B).

Carpentry work on the finished reinforced concrete shell and partly. Finished drywall 2 school buildings (gymnasium 5-quickly and high school 4-liberally)

TO A - High School, 4 storeys + connector 1 storeys

12 460 m 2 BGF to 4060 m 2 Area,

- Cover-run media system including cabinets, tables, desks, chairs, partly experimental flushing, mobile deductions and interactive panels, other specialized facilities in 6 classrooms (physics, biology, chemistry).

- Cabinets, tables, desks, chairs, partly experimental rinsing, and interactive panels, other specialized facilities in 4 classrooms (physics, biology) with floor-run media,

- Cabinets, tables chairs, experimentation Sinks, Other sector institutions and partly chemical storage cabinets in 6 class rooms (physics, biology, chemistry),

TO B - high school, 4 storeys

8330 m 2 BGF to 2 290 m 2 footprint

- Cover-run media system including cabinets, tables, desks, chairs, partly experimental flushing, mobile deductions and interactive panels, other specialized facilities in 2 classrooms (physics, chemistry).

- Cabinets, tables, desks, chairs, partly experimental rinsing, and interactive panels, other specialized facilities in 2 classrooms (physics, biology) with floor-run media,

- Cabinets, tables chairs, experimentation Sinks, Other sector institutions and partly chemical storage cabinets in 3 preparation rooms (physics, biology, chemistry),

Submission of original calculation on separate request.