Call +44 800 9755 164

Public tenders for construction in Dresden Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Renewal light dome - metal construction work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published April 25, 2017  -  Deadline May 18, 2017
cpvs

Renewal light dome - metal construction work

Construction work for buildings relating to health

Universitätsklinikum Carl Gustav Carus Dresden an der Technischen Universität Dresden | Published April 8, 2017  -  Deadline April 28, 2017
cpvs
45215100

Construction of a new 6-storey surgical emergency room and surgical center:

- BGF approximately 21,050 m 2 ;

- BRI approximately 88 500 meters 3 ;

- Construction: reinforced concrete.

Installation of fire protection of plastic plates,

- H of 60 to 300 cm;

- about 4 550 m;

- Level: UG - 5th floor.

Construction work for buildings relating to health

Universitätsklinikum Carl Gustav Carus Dresden an der Technischen Universität Dresden | Published April 25, 2017  -  Deadline May 11, 2017
cpvs
45215100

New construction of a 6-storey surgical emergency room and operating center,

- BGF approx. 21 050 m 2 ;

- BRI about 88 500 m 3 ;

- Construction: reinforced concrete.

Installation of surgical wall cladding upholstery made of HPL and wooden handrail with stainless steel brackets,

Level: UG - 5th floor,

- surgical wall cladding HPL: approx. 2 180 m²;

- Wooden handrail with stainless steel consoles: approx. 428 m.

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published April 20, 2017  -  Deadline May 22, 2017
cpvs
45214210

Clear 24: Flooring work.

Approx. 2 400 m 2 Linoleum flooring including flooring; Approx. 200 m 2 Rubber flooring including flooring; Approx. 1 810 m wooden socking

Interim periods:

The service is spread out over several phases, sometimes overlapping stages (construction phases) with work interruptions. The services are to be completed on a chronological basis according to construction progress, in connection with the work of further trades. Due to these dependencies, it is not possible to ensure continuous performance.

Position 6/7-BO1 Stock building A:

- Building of existing buildings A: Compensation and substructures 7.8.17 - 6.10.17,

- existing building A: flooring including balancing and flooring 9.10.17- 10.11.17,

- Building of existing building A: Floor sealing 15.1.18 - 26.1.18.

Stage 6/7-BO2 Flooring New buildings:

- Annex House A: Flooring including balancing and baseboardists 2.11.17 - 16.2.18,

- new building N: flooring including balancing and sockellists 1.12.17 - 16.3.18,

- Sports hall: flooring including balancing and sockellists 15.1.18 - 9.2.18.

Position 7-BO3 Floor sealing New buildings, finishing work:

- Cultivation house A: Floor sealing 24.1.18 - 23.3.18,

- sports hall: floor sealing 26.2.18 - 9.3.18,

- new building N: floor sealing 5.3.18 - 27.4.18,

- All subobjects: Rework: until 25.5.18.

Engineering design services for the construction of civil engineering works

Landeshauptstadt Dresden, Geschäftsbereich Umwelt und Kommunalwirtschaft, Umweltamt | Published April 15, 2017  -  Deadline May 22, 2017
cpvs
71322000, 71327000, 71222000

In the district of Dresden-Coschütz the Collmberg stockpile whose composition consists of tailings, Außerbilanzerz, Armerz, ore, municipal waste from GDR households, construction waste and lignite ash is. The mining residues resulting from the uranium mining SAG / Wismut at the location of the stockpile (pit box Heidenschanze) from the period 1948 to 1955. In particular, from the legacy of uranium mining results in disadvantageous effects on the protection soil, water and air, which in accordance with current water -, ground and eliminate radiation protection requirements by taking appropriate measures or minimize.

Basic services engineering structures, line phases 3-7 according to § 43 HOAI 2013 plus special benefits for hours proof chargeable construction costs net 5400 000.00 EUR with basic services Structural engineering, phases 1-6 according to § 51 HOAI 2013 for retaining structures for securing terrain jumps, compensable construction costs net 349 500.00 EUR and basic services free equipment, work phases 3 - 6 in accordance with § 39 HOAI 2013, for off-road designs and plantations, construction costs net 730 000,00 EUR. Size of the stockpile area: 17 ha.

Bridge construction work

Landesamt für Straßenbau und Verkehr | Published April 8, 2017  -  Deadline May 16, 2017
cpvs
45221110

S 177 New Radeberg - BAB A4, construction of the bridge BW 17Ü1a: superstructure of steel girders, foundation piles; Individual spans: 43.3 to 45.2 m; Producing traffic routing; Producing during construction and site access widening in the area of ​​BAB A4.

4,954 m 3 topsoil removal;

2 730 m 3 Frost protection material;

1 341 m 2 Asphalt base;

1 341 m 2 Asphalt concrete surface layer;

187 m 3 Banquet;

460 m Teilsickerleitung DN 600;

51 m drainage channel DN 400;

28 m drainage line DN 200;

370 m 3 Basement excavation;

704 m 3 Soil improvement;

11,679 m 3 Backfilling / dam;

51 m 2 Trench line trench;

85 m drainage piping, GRP, DN 150/200;

7 St. bridge operations;

88 m Ortbetonbohrpfähle, DU 120 cm;

658 m 3 Reinforced concrete substructures;

330 m 3 Reinforced concrete, superstructure;

104 m 3 Reinforced concrete, caps;

159 t reinforcing steel;

592 t of steel girders with Betonobergurt;

95 m 2 producing natural stone facing;

1 St. spherical bearings;

4 St. elastomeric bearings;

24 m roadway transition structure;

214 m steel handrail;

72 m line and hangers;

1034 m 2 Superstructure sealing;

719 m 2 GA-protective layer;

674 m 2 mastic;

214 m FRS steel superstructure;

97 m from FRS BSWF, center strip.

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Zentrales Vergabebüro | Published April 8, 2017  -  Deadline May 15, 2017
cpvs
45214210, 45420000

Fl. 22 - Sports ground impact wall, sporting goods.

Abzurechen to existing building / extension / sports hall

Baffle: Metallwinkelaufständerung: 207 m 2 ; Space frame made of wood: 207 m 2 ; Baffle KA> 70% of plywood panels: 207m 2 ; Balla Broll board: 88 m

Internals windows, hangar doors, hall doors

Sport hall outer door 170/240 cm, 1-flg: 1 St .; Gerätraumtor 251/226 cm: 1 St .; Gym access door, 1 leaf, 151/226 cm: 2 St .; Control room window 251/126 cm: 1 St .; Whiteboard: 1 St .;

Sports floor: primer, bottom seal made of polymer bitumen 1LG, compensate for unevenness, thermal insulation, EPS, 80 mm, cover, PE-film, 0.2 mm, sports floor construction surface elastic, linoleum flooring 3.2 mm: 426 m 2 ; Linoleum flooring 3.2 mm, equipment room on floor: 69 m 2 ;

Pitch mark: 640 m 2

Sports equipment: Sprossenwand- double complex, around 200/260 cm: 3 St .; Impact protection / Turnmatte 1 820/950/80 mm: 6 St .; Climbing poles, 4-poles: 1 St .; The ball net electrically liftable: 172 m 2 ; Volleyball game pair of columns: 2 St .; Volleyball Training Network: 2 St .; Indoor handball goal, goal depth 100 cm: 1 St .;

Basketball hoop with safety net attachment: 7 St.

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published April 8, 2017  -  Deadline May 5, 2017
cpvs
45214210

Fachlos 20: Sports floor / baffle / installation exercise equipment.

475.00 m²: area elastic sports floor according to DIN 18032, with linoleum flooring and insulation of mineral wool

65.00 m²: sports floor as rigid construction in the equipment room

1.00 psch pitch mark

220.00 m²: baffle according to DIN 18032, with wood cladding, birch plywood, birch-veneered surface, clear coated, micro-perforation, incl Geräteraumtor and flaps..

1.00 St .: sports hall access door 2flgl WxH 2,80x2,40m, T30-RS, Emergency exit closure according DIN179-A, full panic function, integrated in the baffle wall to 18032, with an integrated overhead door closers

1.00 St .: exterior door, 2flgl. WxH 3,17x2,52m, Emergency exit closure according DIN179-A, full panic function, integrated in the baffle wall to 18032, embodiments in accordance with RC2

1.00 St .: gymnasium window BxH 1,75x1,345m, F30, integrated into the baffle by 18032

107.00 m²: acoustic wall covering made of birch multiplex slats section 40/18, Ballproof

69,00 m²: Acoustic ceiling linings made of birch multiplex slats section 40/18, Ballproof

Various fitted sports equipment with accessories such as climbing pole, double field wall bars, Klettertauanlage, basketball equipment, for home field, and as an exercise equipment, plug-stretching system,

uneven Bars

Between times:

Completion underbody sports floor (title 1.2) to 09/11/2017

Completion baffle and acoustic clothing to 12/08/2017

Maintenance:

Orders are placed under the condition that the company remains bound to the offer price for the service until the completion of the maintenance contract.

In the bid evaluation the prices indicated in the maintenance services at a scheduled period of 4 years are taken into account without using a present value factor.

A non-emitted maintenance price will result in exclusion from the tender process.

Construction work

Dresdner Bäder GmbH | Published March 11, 2017  -  Deadline May 9, 2017
cpvs
45000000

Disassembly, recycling, re-installation of a monumental acoustic drop ceiling made of aluminum sheet metal panels with Dämmauflagen about 2 000m 2 ,

Catenary's construction works

Dresdner Verkehrsbetriebe AG | Published April 13, 2017  -  Deadline May 16, 2017
cpvs
45234160

Lot 2 - renewal of the catenary system.

. - 78 masts including establishment;

- 10 transverse structures (without directional rope);

- 13 transverse structures (1-3) indicative ropes;

- 8 sheets of photographic paper;

- 16 boom simple contact lines;

- 43 boom catenary;

- supply and install 2755 m trolley wire AC-100 Cu;

- 1 365 m Cu carrying cable 95 mm 2 deliver and assemble;

- regulate 1540 m simple contact lines;

- regulate 2 125 m catenary;

- provide five sectioning and assemble;

- provide 7 lightweight section insulators and assemble;

- 4 provide feed and assemble;

- Remove the 102 concrete masts including foundations;.

- Remove the five steel masts including foundations;.

Disassemble 35 transverse structures (without topping cable) -;

- Remove the 6 cross-structures (1-3 directional ropes);

- Remove the 26 sheets of photographic paper;

- Remove 2 530 m simple contact lines;

- Remove 850 m catenary;

- Remove 5 sectioning;

- Remove 5 feed.

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen, Personal und Recht, Zentrales Vergabebüro | Published April 12, 2017  -  Deadline May 8, 2017
cpvs
45214210, 45442100

Fl. 23 - repainting.

Abzurechen to existing building / extension / sports hall

preparatory work

Preparing the inner surfaces of walls and primed: Extension 1 982 m², sport hall 490 m², existing building 5645 m²; Preparing the ceiling and prime: Extension 1 195 m², 162 m² gym, existing buildings: 1,938 m²; full surface filling / grind walls: Extension 730 m, sports hall 368 m²; full area filling ceiling / grind: Extension: 20 m²; Sports hall 151 m²; Plaster filling / grind: existing building 3,490 square meters.

Wallpapering painters fleece

Spanning with reinforcement fabric walls: Extension 1570 m², sport hall 539 m², existing building 585 m²; Spanning with reinforcement fabric ceilings: Extension 513 m, sports hall 12 m², existing building 893 sqm.

Coating (various substrates)

Walls with silicate color: Extension 1982 m², sport hall 699 m², existing building 4996 m²; Walls / ceilings of exposed concrete glaze: 890 m² extension, sports hall 70 m;

Cover with silicate color: Extension 1310 m², existing building 1938 m²;

Coating wood components: sports hall 309 m; solidify brick / sandstone areas: existing building 649 sqm.

joint compound

Extension 2 540 m, 472 m sports hall, existing building 3073 m.

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published March 25, 2017  -  Deadline April 28, 2017
cpvs
45214210

Fachlos 18 cement screed.

Leveling compound / mortar in different thicknesses up to 30mm as required;

about 1 240m 2 Thermal insulation EPS to 150mm WLG 035; approx 505m 2 Sound insulation MW up to 20mm; about 1 240 m 2 PE film as a cover; about 1 240 m 2 Cement screed CT-C30-F5 about 65 to 90mm as agricultural or heated screed; about 1000 running meters wall insulation strip to 220mm; including joint formation, separation and final rails; 1 piece 2-piece manhole cover made of aluminum checker plate, walkable, with angular frame (frame).

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen, Personal und Recht, Zentrales Vergabebüro | Published March 25, 2017  -  Deadline May 18, 2017
cpvs
45214210, 45000000

Fl. 27 - free installations.

- Sports facilities with a small pitch 27x45 m, with 1 215 m 2 Plastic lining and 145 m Net Fence and sports equipment as well as a combined 75 m track with long jump (520 m 2 Plastic coating and long jump pit)

- Hard surfaces for playground and farmyard 2 600 m 2

- 170 lm retaining walls, 156 yds stairs, 100 yds seating steps, 250 lm drainage channels

- Equipment: 2 tool sheds 4x8 m, cycle shelter 66 m 2 , 1 large game machine, 160 yds fence

- Planting 50 tree plantings, 850 m 2 Bush plantations, 1 240 m 2 Lawns.

Primary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published April 15, 2017  -  Deadline May 15, 2017
cpvs
45214210

Fachlos 15: Facade TO2.

1 St. Engineering processing, structural engineering, shop drawings,

55 m² curtain wall made of colored aluminum fins on wood-UK with MW between insulation,

25 m² curtain wall made of fiber cement panels on metal-UK with MW insulation,

530 m² EIFS, diff. Insulation thicknesses (mineral wool with mineral finishing coat)

93 running meters Tropfkanten- and transition profile,

140 m² lime-cement interior plaster.

Between times:

Curtain walls 14.08.2017 to 03.11.2017,

Insulation work 18/09/2017 to 10/20/2017,

Fassadenputzarb. 23/10/2017 to 17/11/2017,

Innenputzarbeiten 23/10/2017 to 11/03/2017.

Secondary school construction work

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt f. Hochbau u. Immobilienverwaltung | Published April 15, 2017  -  Deadline May 16, 2017
cpvs
45214220

Fachlos 26: Sports floor / baffle / sports equipment / acoustics.

- Double sprung floor with linoleum floor covering and floor heating,

- Yard Line,

- baffle laminated timber elements approximately 312 m²,

- 2 pieces equipment room doors,

- 2 pieces gymnasium access door 2-flüglich with glass cutting and impact wall floor covering,

- 6 pieces of different sizes Wandeklappen for sports equipment in the baffle wall niches

- GKB-wall ball throw approximately 95 m²,

- Acoustic elements ceiling board Peer wood elements approximately 140 m²,

- GK ceiling suspended, ball throw about 290 m²,

- Sports equipment including:.. 3 Sprossenwand double-conditioning plant climbing pole, 6 pcs rigid, 1 piece

Stk. Div. Basketball baskets, 8 pcs. Spielfpfosten, 1 pc. Klettertauanlage, plug computing system.

Construction work for halls of residence

Studentenwerk Dresden, AöR | Published April 20, 2017
cpvs
45214700, 45000000, 45111000, 45262670, 45421131, 45430000, 45443000, 45331000, 45112700, 39200000

Restoration a student housing bricks, 17 floors - 63% works, 33% CONSULT TECHNICAL building equipment, 4% outdoor facilities - BGF 11,096 m 2 , BRI 32 422 m 3

Trades way assignment is defined - in due course.

See item II.1.4 -. Renovation of a residence hall. After completion of planning of the different lots, they will be published separately.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Dresdner Verkehrsbetriebe AG | Published April 14, 2017  -  Deadline May 18, 2017
cpvs
45230000, 45231000, 45234126, 45233140

Lot 1 track construction, earthworks / Civil Engineering and LBP measures.

- track construction

1 818.0 m EC

340.0 m EC

2 188.0 m EC

2 188.0 m EC

1 440.0 m EC

614.0 m EC

380.0 St

662.0 m

266.0 m

2054 m EC

- Haltestellenbau, road construction and earthworks

116.0 m²

294.0 m²

2 408.0 m²

80.0 m

1 784.0 m³

8 851.0 m³

1 217.0 m³

1 224.0 m

1 800.0 m³

785.0 m²

6 515.00 m²

3 818.0 m³

895.0 m²

1 057.0 m

891.0 m

805.0 m²

778.0 m²

414.0 m²

65.0 m²

283.0 m

2nd

- drainage

87.0 m

12.0 St

643.0 m

389.0 m

210.0 m

New control and drainage shafts 13.0 St

- Demolition construction equipment

Technikhaus Infineon 1 St

Endpoint building thief climbing 1 St

Civil engineering - media

5580 m

Cabinet dismantle 6 St

Manhole expand 16 St

600 m³

1450 m²

3740 m

600 m

8 St

Cable ducts ran. u Install 38 St

400 m

45 m

1 St

Foundations LSA masts 2 St

- Services Nature and wildlife conservation

1,000 m

1600 m

110 St

230 m

Felling trees and clearing 53 St

180 St

2200 m²

6000 m²

4200 m³

Tree plantings 8 St

460 St

Stone and dead wood pile 8 St

800 m

- Additional Services

400 m²

Temporaries for the site put option, foot

260 m³

Traffic safety services (marking,

Traffic signals) for

the traffic management during construction

Verkehrsfreigabe- and final labeling

produce

Making steady signs.

D - Dresden, shell construction work exhibition

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 1 | Published April 24, 2017
cpvs

Construction of traffic cameras on motorways of Saxony

Landesamt für Straßenbau und Verkehr / Zentrale | Published April 5, 2017  -  Deadline May 9, 2017
cpvs

Replacement construction of sewage and storm water channel

Stadtentwässerung Dresden GmbH | Published April 12, 2017  -  Deadline May 2, 2017
cpvs