Call +44 800 9755 164

Public tenders for construction in Dresden Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published November 8, 2016  -  Deadline December 12, 2016
Screed works in school buildings with about 1 600 meters  2  Cement screed construction of EPS insulation 20-60 mm and MW-impact sound insulation 12 - 30 mm, and about 600 m  2  Heated screed as cement screed with substructure made of EPS insulation 20-60 mm and MW-impact sound insulation 12 - 30 mm.

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published December 7, 2016  -  Deadline January 16, 2017

Fachlos 16: interior plaster.

Part Object 1 - House A - stock:

Cancel 200 m² plaster by hand, load, transport and dispose of;

close 20 m² cement plaster on masonry of solid bricks or rubble masonry in stock, various small and partial surfaces as plaster repair, wall voids;

20 m² Refurbishment basement wall in the portfolio;

50 m Corrosion protection / fire concealed steel girders cap ceiling to F90;

25 m² cement plaster on vaulted ceiling cap.

Subobject 2 - House A - growing school:

Gipskalkputz 990 m 2 on KS-masonry and concrete.

Subobject 2 - House N - school building new construction:

Gipskalkputz 1,470m 2 on KS-masonry and concrete.

Subobject 2 - House N - connector:

30 m² cement plaster on KS-masonry and concrete.

Subobject 3 - Gymnasium:

Gipskalkputz 170 m 2 on KS-masonry and concrete.

Single deadlines:

The performance distributed staggered on several, be partly overlapping construction stages (phases) with work interruptions.

The services of the contractor are in sections, to provide staggered progress of construction, in conjunction with the work of other trades.

Through these dependencies no continuous power processing must be guaranteed.

The implementation of the beginning of performance requirements of the client is within the limits listed below within 6 business days after receipt by the Contractor to ensure (also by mail or fax).

Stage 4-IP1 (11.5.17 - 28.7.17).

- Existing building, levels 0-3: Putz examination and, if necessary, cleaning partial demolition, proportionate replastering walls and ceilings as lime-cement plaster, fire protection upgrading work, Restoration.

Stage 5-IP2 (08/14/17 - 08/09/17).

- Gymnasium level -1 side wings: interior plaster walls, lime cement plaster and lime plaster.

Position 5/6 IP3 (08/07/17 - 06/10/17).

- New house N Level -1: interior plaster walls, lime-cement plaster;

- New house N Level 0-2: interior plaster walls, lime cement plaster and lime plaster.

Stage 6 IP4 (4.9.17 - 13:10:17).

- Cultivation house A levels 0-3: interior plaster walls, lime cement plaster and lime plaster;

- Existing building stairwell cultivation TH2: interior plaster walls, lime-cement plaster.

Stage 7-IP5 (3.1.18 - 12.1.18).

- New house N connector Level 1-2: interior plaster walls, lime-cement plaster.

Template original calculation on separate request.

Works for complete or part construction and civil engineering work

Landesamt für Straßenbau und Verkehr, Zentraler Servicebereich | Published November 24, 2016  -  Deadline December 1, 2016

Construction of bypass Hoyerswerda east of Hoyerswerda; about 5 km long building phase from the OL Maukendorf to S 108, and expansion of spatially separated from the path forged path; Part of this announcement is the Streckenbau including signage, released marker, landscape conservation measures and bridge construction BW 1 over the train track Horkau - Roßlau; The measure is not separated into lots.

Works for complete or part construction and civil engineering work

Landesamt für Straßenbau und Verkehr, Zentraler Servicebereich | Published December 3, 2016  -  Deadline December 6, 2016

Construction of bypass Hoyerswerda east of Hoyerswerda; about 5 km long building phase from the OL Maukendorf to S 108, and expansion of spatially separated from the path forged path; Part of this announcement is the Streckenbau including signage, released marker, landscape conservation measures and bridge construction BW 1 over the train track Horkau - Roßlau; The measure is not separated into lots.

Construction work for buildings relating to education and research

Stesad GmbH | Published December 6, 2016  -  Deadline January 16, 2017

FL 073 Gymnasium expansion I - baffle and grandstand facilities TO 2C, 2D.

Joinery baffle for 2 gymnasiums (4 Field & 2 Field Hall), each 1-storey + basement.

Both gyms TO C and D are classified as public places, it is classification of building-minimum specifications which the materials that are strictly adhered to:

- Wallcoverings are absolutely produce perpendicular and aligned.

- Overall height baffle: approx 3.52 m.

- Construction depth: about 120 or 150 mm (VK substructure to VK wallcovering).

- BS Req. to UK: non-combustible, building material class A1 according to DIN 4102nd

- BS Req. at WV: flame retardant, at least building material class B1 according to DIN 4102..

- Force reduction (KA)> 60% in combination with ball protection, impact resistance according to DIN 18032, part. 3

For the offered system test certificates must be settled;

The test certificates must meet the criteria described in the text output exception:

- Material of the advertised trim panels (with the advertised perforation);

- Fastening: invisible;

- Thickness of the cladding panels;

- Overall installation depth of site wall surface;

- Akustikperforation;

- Massivholzpaneel, spruce, at least flame retardant -. BKL B1 - approved, tested in combination, minimum density, 950kg / m 3 or equivalent.

For all requirements test reports must be submitted:

- Force reduction must be ensured during the entire baffle to 2 m over FB.

- Unrestricted flying balls.

Individual periods see tender documents, Annex to Form 214 page. 4

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Dresdner Verkehrsbetriebe AG | Published November 22, 2016  -  Deadline December 22, 2016

Lot 1 - track construction, road construction, civil engineering media.

930 m;

145 m;

expand facilities, eliminate 17 St .;

Annex A 5 produce 1 St .;

EW plant 94 producing 1 St .;

Construction of stops 2 St .;

Preparation Gleisbogen lubrication systems 3 St .;

6350 m 2 ;

2700 m 2 ;

At 1 900 meters;

1,150 m;

2000 m 2 ;

5000 m 3 ;

10 800 m 3 ;

3 150 m 3 ;

8 000 m 2 ;

20 250 m 2 ;

112 St .;

70 m;

610 m;

450;

570 m;

Dränageschacht DN 400 PE 20 St .;

4300 m 3 ;

1050 m;

7400 m 2 ;

3650 m 2 ;

3100 m 2 ;

1300 m 2 ;

3000 m;

3300 m;

65 St .;

700 m;

170 m;

270 m;

18 m;

50 m;

128 m;

11 St .;

Shaft concrete DN 1000 - DN 2000 8 St .;

9300 m 2 ;

700 m;

600 m;

130 m;

1 250 m;

410 m;

770 m;

New lighting pylons 17 St .;

850 m;

150 m;

1 350 m;

8100 m;

Cable vault of reinforced concrete 6 St .;

Cable vault of PE 24 St .;

Tree plantings 49 St.

Construction work for school buildings

Landeshauptstadt Dresden, GB Personal und Recht, Zentrales Vergabebüro | Published November 19, 2016  -  Deadline December 8, 2016

FL 09 natural and stone work.

Technical work: engineering.

Cleaning facade elements from sandstone in JOS-process, cornices and window framing: 853 m, base plates: 50 m 2 ;

Dismantle defects base plates, manufacture, install, Material: Posta Sandstone: 23 m;

Edit surfaces: base plates on teething: 45m 2 , Surfaces on grinding: 20 m 2 ;

Dismantle defective window framing, newly finished, installed KG, Material: Posta Sandstone: 14 m;

Broken window framing dismantle some, newly finished, install the EC DG, Material: Cotta sandstone: 55 m;

work out flaws in the stone, complete with stone restoration mortars, to 10 x 10 x 4 cm: 495 St .;

Imperfections with a natural stone-crossing prepare, supplement, 1000-6000 cm 2 : 135 St .;

Replace Traufgesimsecke, 100 x 80 x 45 cm: 1 St .;

Windowsill ablate, 30 mm: 55 m;

Joints reaming, dispel, new grout: 310 m;

Sandstone elements hydrophobilize: 500 m 2 ;

Sandblasting, block stairs granite, inside: 74 St., sandstone: 35 St., Granite platforms: 18 m 2 Sandstone: 10m 2 ;

Solid steps, granite, about falter inside: 20 m 2 ;

Natursteinvierung sandstone staircase inside: 9 St .;

Door frame, sandstone, door panels and -haspen dismantle, inside: 33 St .;

work out flaws in the stone, complete with stone restoration mortars, interior to 10 x 10 x 4 cm: 60 St .;

Template original calculation on separate request.

Laboratory building construction work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published November 22, 2016  -  Deadline January 10, 2017

Expansion chamber 8 against magnetic fields.

As part of the reconstruction / rehabilitation of research and teaching building at the Technical University Dres-den (TUD) special services for magnetic shielding with concrete, drywall and painters work required.

It is a laboratory of about 40 m 2 Area most demanding be completely removed, which is protected against low frequency magnetic fields, sound waves and ground vibrations.

Offered Services:

- 250 m 2 magnetic shielding of a room with metal plates high permeability;

- Magnetic shielding a double-leaf door;

- 250 m 2 Gypsum fiber boards as an underground shield;

- Approximately 160 m Al-hollow profiles as substructure for drywall and ceiling;

- Approximately 165 m 2 Furring as metal studs;

- 40 m 2 Metal ceiling grid with 12 built-in lights;

- Approximately 36 m 2 Cleanroom raised floor to dry screed;

- Approximately 128 m 2 Wall painting and about 4.5 m 2 EPOX floor coating;

- 2 glass fiber reinforced concrete foundations, prefabricated 100 x 100 x 50 and 200 x 160 x 50 (cm).

Construction work for school buildings

Landeshauptstadt Dresden, GB Personal und Recht, Zentrales Vergabebüro | Published November 30, 2016  -  Deadline January 10, 2017

40_Schulstandort Pieschen_VE 02_LOS 02 trenches.

Producing trenches without excavation: 1. pcs trench 325 m 3 ; 1 pcs trench 32 m 3 ; 1 pcs trench 11 m 3 ; 1 pcs trench 20 m 3 ; 1 pcs trench 320 m 3 ; 1 pcs trench 185 m 3 ,

Please note that from 26.12.2016 to 1.1.2017 a reply to bidder requests is limited.

Replacement construction Geriatrics - Exteriors

Krankenhaus St. Joseph-Stift Dresden GmbH | Published November 28, 2016  -  Deadline January 4, 2017

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published November 26, 2016  -  Deadline January 9, 2017

Fachlos 16: Fire doors.

7 steel inner facades / interior door elements as smoke protection elements, dimensions: width

2 to 3.8 m, height 3.2 m, with einflügliger RS-door and overhead door closer, or

Arrester

6 steel inner facades / interior door elements as fire and smoke protection elements,

Abmesssungen: width from 1.8 to 3.4 m, height 3.2 m, with einflügliger T30-RS-door and

Arrester, or free-swing door closers

1 steel inner façade as fire protection (F30) - element dimensions: width 3.6 m, height 2.8 m

Between dates:

Start threshold mounting Gymnasium from 04:04:17, beginning threshold Assembly School at 22:05:17.

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published October 29, 2016  -  Deadline December 1, 2016
Flat roof as a warm roof approximately 1,000 m  2  spec. from primer, vapor barrier, Grunddäm., Gefälledäm., Kontergefälledäm. EPS bituminous layer 2 layers, ballast gravel 16/32, Roof Edge Profile Aluminium approx 260m, 2 St. skylight as roof hatch with SHE function, approx. 60 m  2  modular skylight system m. Ventilation u. SHE function, 7 piece roof outlets, 7 pieces emergency drains, ca.16 St fall protection a. Single anchorage points, approx. 165 m fall protection a. Be driven over cable system

Construction work for school buildings

Landeshauptstadt Dresden, GB Personal und Recht, Zentrales Vergabebüro | Published November 12, 2016  -  Deadline December 13, 2016

Los N04 Dachabdichtungsarbeiten.

Roof insulation for flat roofs of the New School Dresden South West, Bernhardstraße 18 with the following partial services:

Vapor barrier, EPS insulation, plastic sealing sheet;

Skylights, as smoke control and smoke ventilation systems;

Roofs extensively;

Plumbing Gutters and flashings.

The work will be in time and space in staggered sections instead of 2 separate roofs.

2700 m² roof waterproofing and green roof;

230 m² skylights;

300 m flashings aluminum sheet;

200 m drainpipes;

Special requirements: execution BNB Compliant;

Template original calculation on separate request;

Between periods see tender documents.

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published November 9, 2016  -  Deadline December 5, 2016
Approximately 990 m  2  Facade scaffolding incl. 16 weeks suspensions

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published November 4, 2016  -  Deadline December 2, 2016
Complete demolition of a building Hort (4 500m  3  enclosed space) including manual Hazardous Substances dismantlement in the black area.:

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published December 3, 2016  -  Deadline January 9, 2017

Fachlos 12: roofing TO. 2

545 m 2 Polymer bitumen sheet as vapor barrier;

505 m 2 Insulation PS as base and slope insulation;

40 m 2 Thermal insulation mineral wool as basic and slope insulation;

545 m 2 Roof insulation 2 layers, polymer bitumen membrane, root resistant;

200 m 2 Roll gravel;

360 m 2 Green roof extensively;

135 m aluminum Attica including wooden planks-UK.

7 St. utility patent protected Stainless Steel Anchorage Point;

90 m lifeline system;

5 St. roof drain.

Single deadlines:

Delivery roof drains: 1 AT, 23.5.2017;

Roof sealing and insulation works roof covers over EC: 10 AT, 06/26/2017 - 07/07/2017;

Sheeting waterproofing roof ceiling above floor: 5 AT, 17/07/2017 - 21/07/2017;

Roof sealing and insulation work roof ceiling above floor: 20 AT, 08/07/2017 - 09/01/2017;

Green roof / Dachbekiesung: 9 AT, 10/02/2017 - 10/13/2017;

Attikaverblechung; 5 AT, 16/10/2017 - 10/20/2017;

The individual periods are agreed in isolation from the start and finish dates.

Template original calculation on separate request.

Primary school construction work

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published December 6, 2016  -  Deadline January 10, 2017

Fachlos 12: Innenputzarbeiten.

Approximately 3000 m 2 Interior plaster works bilayer, PII, 15 mm, felted on masonry and concrete walls, Q2 and approximately 430 m 2 Interior plaster in two layers on concrete floors flat, PII D 15 mm, felted, Q2.

Individual periods: Completion Gymnasium until 03/31/2017; Completion school until 05/12/2017.

Replacement construction Geriatrics - steel doors

Krankenhaus St. Joseph-Stift Dresden GmbH | Published November 2, 2016  -  Deadline December 2, 2016

DEFV1622 - qualification competition for the construction of a coil system

Helmholtz-Zentrum Dresden-Rossendorf e. V. | Published December 1, 2016  -  Deadline December 16, 2016
For an experiment in project DRESDYN the Helmholtz-Zentrum Dresden-Rossendorf e. V. (HZDR) is a coil system are designed so that = = 0.8 m prepared in a cylinder of ℎ 2 m and r a homogeneous magnetic field Bz = 150 mT.

Replacement construction Geriatrics - metal frame doors

Krankenhaus St. Joseph-Stift Dresden GmbH | Published November 2, 2016  -  Deadline December 2, 2016